Loading...
HomeMy WebLinkAboutCorrespondenceJanuary 19, 2009 Mr.~Pau1 A. Miller JAM85 BItAt~'Attl), NL15'OR Fanning Howey 9025 North River Road, Suite-200 Indianapolis, Indiana 46240 RE: Carmel Elementary School Kindergarten Addition-Project Review #1 Dear Mr. Miller: The City has received your construction plans dated December 19, 2008. This prbject will be reviewed at the January 21, 2009 Technical Advisory Committee meeting. We offer the following comments: GENERAL INFORMATION 1. These comments'represent the Department of Engineering's first review of [he construction plans for this.p~oject. 2. We request that all responses to our comments be provided in writing and be accompanied by a drawing reFlecting the requested revisions. Failureto provide written responses may result in the delay of the review process. 3. It is critical that this office be made aware of all modifications made on the plans being re- submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please-provide revised plans including all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, BZA orothe~ committee meetings. 4. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations submitted to this office for review. If you have not already done so, please provide a set of drainage plans and calculations to their office for review. We will share Crossioad's comments ss they are received. 5. Final drawings will not be approved for construction until: a. All Engineering Department and Utility Department and Hamilton County Surveyor issues have been resolved. b. All bonds and performance guarantees are posted. c. All Board of Public Works and Safety approvals and any other governing agency approvals (if required) are obtained. d. All off-siteeasements necessary to install utilities to serve the development are secured. e. SWPP is approved. f All fees are paid. 6. The Department reserves the right to provide additional comments based upon subsequent reviews. 7. An approved Storm Water Management Permit is required prior to.commencing any earth disturbing activity. 8. An approved right-of--way permit is required prior to commencing any work in the public right-of--way. 9. If it will be necessary [o relocate existing utility poles, they must be relocated to within one foot of the proposed right-of--way. Costs for such relocations are Yo be borne by the developer. 10. Compliance with the Thoroughfare Plan includesconstructidn of the improvements prescribed by the Thoroughfare Plan across the frontage controlled by the development (including sections with no access). Typically, developers provide a commitment equal to I~HPART9ILST Or ESGISIihail\t: Oar. Cn~ic tipunut:, C.v¢.en:L, IN 40032 Orrua: 317j712441 P,v~ 317S71.Z439 E\I:\II. rnpinccring24i~npcLln.4uc Mr. Paul A. Miller January 19, 2009 RE: Cannel Elementary Kindergarten Addition-Project Review #I Page 2 of 4 the value to construct these improvnnents for deposit into the City's non-reverting thoroughfare fund. Q~edit is typically eiven towards this commitment for any widening, milling and resurfacing of the perimeter streets. I I . The Department requires that the construction drawings be developed in accordance with the City of Carmel digital submission standards and that all required submittals for primaryrplat, secondary plat, and construction drawings be made. The digital files must be submitted to the Department of Engineering prior to the approval of the constmction plans. Please contact the City GIS Department for the requirements. 12. Jurisdictions: a. The project site is located withincunent City of Carmel Corporate Limits. b. Streets and Righi of Way -City of Cannel (4"'Avenue SE) c. Water - City of Cannel Utilities d. Sanitary Sewers -City of Carmel Utilities e. Storm Sewers/Drainage -City of Cannel. f ~ Legal Dmins -Hamilton County Surveyor's Office. 13. Drawings submitted for approval: a. The design engineer must certify all drawings submitted for final approval. b. This office will require 9-sets of drawings for approval after all issues have been resolved. The drawings will be stamped as approved and signed by the City Engineer and by Cannel Utilities. The.Owner will receive 3-sets, one of which must be maintained on the construction site at.all times. Ifthis project is subject to review and approval by the Hamilton County Surveyor's Office, a total of 1 I-sets will be required for final approval. I4. Cannel Utilities will provide separate reviews of this protect for water and sanitary sewer issues. Please assure that copies of all drawings are sent to: Pau] Pace Paul Arnone Cannel Utilities Distribution Cannel Utilities Collection 3450 Wes[ li l~' Street 901 Norih Rangeline Road Westfield, IN 46074 Carmel, 1N 4603? I5. Carmel Utilities does subscribe to "Holey Moley" who should be contacted directly for all water main locations. 16. The following items will be sent electronically upon request regarding this coiTespondence and project: a. Project Approval Checklist b. Performance/MaintenanceGuarantees c. Street Signage d. Utility Jurisdictions/Right of Way Permits e. Availability (acreage) Fees BOARD OF PUBLIC WORKS AND SAFETY 17. A schedule.forBoard of Public Worksand Safety meeting dates and agenda deadlines will be sent electronically for your use upon request. Please use the Engineering Department deadlines for submissions to the Board. 18. Any submission to the.Board requires prior approval by the Carmel Clay Plan Commission and/or [he Board of Zoning Appeals (if applicable) and completion of review by the'1'echnical Advisory Committee. All written requests to be placed on the Board's agenda must include the appropriate Docket Number and the date (or dates) of approval by the Plan Commission and/or the Board of Zoning Appeals (if applicable). 19. Water and Sewer Availability apptoyal from ttie Board is an EDIJ approval. Please contact Cannel Utilities to determine if additional Water and Sanitary Sewer EDUs will be assessed for this baildine addition. 20. Coinntercial Curb Cut Approval -This approval will not be applicable to this project. Mr: Paul A. Miller January 19, 2009 RE: Carmel Elementary Kindergarten Addition-Project Review #1 Page 3 of 4 21. Temporary Construction Entrance approval will be required to access the construction site via the existing private drive curb cut on 41h Avenue SE. 22. The installation of any permanent. privately owned and/ormaintained improvement (signs, decorative street signs, walls, streetlights, etc.) within dedicated right of way or dedicated easements requires the execution of a Consent to F,ncroach Agreement between the Owner and the City of Cannel. Such agreements are executed by the Board of Public Work and Safety. The City Engineer may approve irrigation system agreements. 23. SecondaryPlai approval if applicable. All performance guarantees must be pvsted prior [o submissionof secondary plats for Board of Public Works and Safety approval. 24. Dedication of Right of Way if not platted. 2i. Any open pavement cuts of existin_ 4'h Avenue SE will require Board approval. BONDING REQUIREMENTS 26. Upon initial review, it appears performance guarantees shall be provided for the following: a. Please contact Carmel Utilities to de[ertnine if a performance guarantee will be required for the Sanitary Sewer modifications. b. Erosion and Sediment Control and Stone Water Quality. Please contact Amanda Foley, Engineering Department S[onnwater Administrator, fordetails regarding engineer's estimates/performance guarantee requirements for these items. 27. The amountofthe Performance Guarantee is based upon a certified.Engineer's Estimate for 100% of the cost of labor and materials to construct the individual improvements, to be provided by the design engineer Pleaseprovide detailed Engineer's Estimates for each improvement including quantities, unit costs, pipe sizes and materials, etc. 28. Upon completion and release of individual Performance Guarat[ees, a three-year Maintenance Guarantee will be required (see Street Sign comments above). The Maintenance Guarantee amount is based upon 15% of the Performance amowtt for Streets and Curbs and 10"/0 of the Performance amount for all other improvements. 29. Performance Guarantees may be Performance or Subdivision Bonds or Irrevocable Letters of Credit. 30. Please reference the enclosures for more detailed explanation of our procedures. RIGHT OF WAY PERMIT AND BONDING 31. Any work in the dedicated right of way of 4'~' Avenue SE will require an approved Kight of Way Permit and a License & Permit Bond. !t does not appear that this will be a requirement for this project. 32. The bond amount is determined by our Right of Way Manager. However, if the work is included in the scope of work of a required and posted Performance Guarantee, the Performance Guarantee may be used [o satisfy the bond requirements of [he Right of R'ay Permit. 33. Please contact our Right of Way Manager, Fred Glaser, to arrange right of way permitting and bonding. AVAILABILITY AND CONNECTION FEES 34. Please contact CanneLUtilitiesrggarding the application of Water and Sanitary Sewer Connection Fees to this project. Water and Sanitary Sewer Availability (acreage) Fees will not be applicable. 35. Connection Fees, if applicable, will be tequired to be paid after all other Engineering Departmenfrequirements have been satisfied and prior to approval and start of construction activities. CONSTRUCTIONDRAVVINC REVIEW COMMENTS 36. General Comments Mr. Paul A. Miller January 19,2009 RE: Carmel Elementary Kindergarten Addition-Project Review #1 Page 4 of 4 a. This project is subject to._the City's Storm Water Manahgement and S[orm Water Quality Ordinances. b. Please contact AmandaFolev to review stone water quality/treatment requirements. c. Please add the following note to the drawings "IF IT WILL BE NECESSARY TO ' RELOCATE UTILITY POLES. THE EXPENSE OF SUCH RELOCATION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER:- ALLUTILITY POLES SHALL BE _ _ LOCATED WITHIN ONE-FOOT OF THE PROPSOED RIGHT-OF-WAY:' If you have questions, please contact: me at 571-2441. Sincerely. / ~ ~ , Nicholas J. Redden, P.E. Plan Review Coordinator Department of Engineering cc: Angelina Conn, Department of Community Services John Duffy, Cannel Utilities Paul Pace. Carmel Utilities Paul Arnone, Cannel Utilities Greg Hoyes, Hamilton County Surveyors Office Greg Ilko, Crossroad Engineers,PC Department Review/File Copy issvrappsluser data\zasharedlDHILL\YKOIKE V09\CARMELELEMENfARYKINDEROARTENADDITIONREVN 1 January 12, 2009 --~~.~ '~ C~ ~~~~ <<~ ~~i .,?~ Fanning-Howey Associates, Inc. ATTN: Paul Miller 9025 North River Road, Suite 200 Indianapolis, IN 46240 VIA E-MAIL: pmiller(c~fhai.com ~URV~ 'r~Fln r RE: Carmel Elementary School -Kindergarten Classroom Addition Dear Mr. Miller: We have reviewed the construction plans submitted to the Hamilton County Surveyor's Office on December 22, 2008, for this project and have the following comments: 1. The proposed project falls in the incorporated area and MS4 jurisdiction of the City of Carmel. 2. The proposed project DOES NOT fall in a Carmel Wellhead Protection Zone. 3. The proposed project does not fall in a Hamilton County Regulated Drain Watershed. 4. No permits will be needed from our office. 5. Please direct storm sewer and drainage questions to Carmel Engineering Department. Should you have any questions, I can be reached at 317-776-8495. ~~~~ Sincerely, Greg Hoyes, AC, CFM Plan Reviewer CC: Christine Barton-Holmes -Carmel DOCS John Thomas -Carmel Engineering Dick Hill -Carmel Engineering Greg Ilko -Crossroad Engineers /.. .7Centon C. `GP~nrd, Crf,1l su,rc ass silrVe}~Or Of .Hamilton County One .7fami(ron County Squure Q'6ane(3slt 976-6495 - .Tbblesvillr, LrJimm g6o6o-zz3o rFaz ljr7)77E-g6ad .G, ~h ~ rJaypri/s ~~~Tzy.j~ ~pp~~yyyyppgg~~gg 1=ANNING~HOWEY TRANSMITTAL To: Angie Conn Date: Department of Community Services (DOGS) One Civic Square, 3rd Floor Project: Carmel, IN 46032 From: Paul A. (Andy) Miller Project Coordinator/Associate No. of Conies Description of Items 5y~ ~~ c , ~: ;~ ~~e December 19, 2008 Carmel ES -Kindergarten Classroom Addition Carmel Clay Schools Carmel, IN Project No. 208100.00 1 Set of TAC Submittal Drawings 1 Check No. 226321, in the amount of $270.00 1 TAC Application 1 Legal Description Sent Via: I- Mail ~ UPS COMMENTS: pam/bc ~ Overnight !4 Hand Deliver f Pickup ~ Courier ~ Fax ~~ Fanning/Howey Associates, Inc. intends fo send thiz information lincluding ony akachmenis) only fo the designated individual or entity. If you received Ihis information in error, please notify the sender by replying to the elecvonic mail (if electronic) or by telephone of the number indimted on this document. Uze, discloswe, dissemination, distribution, or reproduction of this massoga by unintended recipients is not authorized and may be unlawFul. ARCHITECTURE I ENGINEERING 9025 North River Road ~ Suite 200 ~ Indianapolis, IN 46240 317.848.0966 ~ fox 317.848.0843 i www.fhai.com l'17) FANNING"HOWEY 'I EW o TRANSMITTA To Christine Barton Holmes Date: Dec 19 Department of Community Services (DOCS) One Civic Square, 3rd Floor Project: Carmel ES Kindergarten p Carmel, IN 46032 Classroom Addition Carmel Clay Schools From: Paul A. (Andy) Miller Carmel, IN Project Coordinator /Associate Project No. 208100.00 No. of Copies Description of Items 0 1 Set of TAC Submittal Drawings 1 TAC Application 1 Legal Description Sent Via: r Mail r UPS r Overnight r Hand Deliver r Pickup �i Courier r Fax COMMENTS: pam /bc Fanning /Howey Associates, Inc. intends to send this information (including any attachments) only to the designated individual or entity. If you received this information in error, please notify the sender by replying to the electronic mail (if electronic) or by telephone at the number indicated on this document. Use, disclosure, dissemination, distribution, or reproduction of this message by unintended recipients is not authorized and may be unlawful. ARCHITECTURE 1 ENGINEERING 9025 North River Road 'Suite 200 1 Indianapolis, IN 46240 317.848.0966 1 fax 317.848.0843 1 www.fhai.com