November 18, 2004
.~
R~CENEI~ ~
Mr. Timothy R. Fleck
Woollen, Molzan & Partners, Inc.
Architecture
47 South Pennsylvania Street
Suite 1000
Indianapolis, IN 46204
RE: St. Christopher Episcopal Church Expansion, Phase 2 /Project Review # 4
Dear Mr. Fleck
~O~ ~ g 200
0~~~
The Department of Engineering has received the revised Phase 2 drawings dated November IQ 2004 and
revised Drainage Calculations dated November 1, 2004 based upon the Department's review of November
5, 2004. The comments from the November 5"' review and all previous Department of Engineering reviews
have been satisfactorily addressed.
When the items from the Department `s fax on October 28, 2004 have been addressed, the Department will
approve the drawings that have been submitted.
If you have questions, please contact me at 571-2441.
Gary R Du an Jt'>,p,F/
Assistant ity Engineer
Departm f of Engineering
Cc: File
Department Review
Jon Dobo`siewicz, DOCS~ f
~ ~__ --
John Duffy, Utilities
Greg Hoyes, HCSO
Greg Ilko, Crossroads -
\Wpps2\user data\eng\shared\DHill\PROIREV04\STCHRISTOPHEREPISCOPAL PHASE 2 -REV ]EW # 4.doc
DEPAaitw;~T or E~GN'e[t[unG
Om: Cwlc S~unxE, Cnhwsi., 1N 46032 Orrice 317571.2441 FAx 317571.2439
L:atw, engineering aci.carmel.in.us
JAMES BRAIVARD, MAYOR
C
November 5, 2004
Mr. Timothy R. Fleck
Woollen, Molzan & Partners, Inc.
Architecture
47 South Pennsylvania Street
Suite 1000
Indianapolis, IN 46204
RE: St. Christopher Episcopal Church Expansion, Phase 2 /Project Review # 3
Dear Mr. Fleck
~~,~
9 s',On
/jy, ~4
The City has received your letter and Phase 2 drawings dated October 29, 2004 based upon the
City review of October 26, 2004. The comments from the City review have been satisfactorily
addressed with the following exceptions:
1. The maximum design water surface elevation noted on Sheet 3.01 does not match the
Phase 2 elevation noted on Sheet C2.01. C2.01 states 100-YR = 870.2; C3.02 states
869.1.
2. There is an invert elevation and pipe slope discrepancy between the drainage calculations
and the plans for Pipe #12. Please verify the design diameter of this pipe and revise the
plans or drainage calculations as necessary.
3. The City would still expect to see additional spot shots on the grading plan that shows
additional spot spots, specifically for purposes of construction staking. Proper
implementation of the proposed drainage plan relies on accurate construction. Without
adequate information for the Contractor to use, the integrity of the design could be at risk.
If it is your opinion that the Contractor can construct the proposed improvements from
these plans, the City will be satisfied with the information provided as far as the approval
of the drawings. However, the City shall not be considered responsible for an improperly
constructed drainage system.
4. Thank you for adding the drive culvert and for relocating the pond outfal] pipe. The City
understands that in accommodating this request, the minimum pipe cover required for
pipes in the City right-of-way could not be satisfied without changing the pavement
section at this location. The proposed 6-foot wide reinforced concrete pavement section
over the piping does provide the minimum required cover, but results in the installation
of a strip of concrete. across the otherwise asphalt driveway. As this area is temporary
until Grand Boulevard is constmcted, the City is willing to waive the minimum cover
requirement. Please delete the proposed concrete strip and indicate the installation of the
right-of-way pavement section for the entire driveway
Provided that the above comments are addressed, the City does not anticipate any further
comments related to this project. Please provide our office with a follow up letter regarding this
review and how the comments were addressed.
Dri~earnu:~r or E~cim:eat~c
On'r Civic S~uni+~., C:~a~iri., IN 4603? Orrice' 317.571.24'~l F,ix 317571.2439
E~rw. engineerin~~~~ci.carmel.in.us
J:~~IES BRAINARD, MAYOR
4
Mr. Timothy Fleck
November 5, 2004
Page 2 of 2
When these revisions have been made and the items from the City's fax on October 28, 2004
have been addressed, please provide this office with a minimum of 4-sets of certified civil
construction drawings and a final drainage report for approval/signatures. The City Engineer and
the Director of Carmel Utilities will sign the sets. One set will be returned and it must be
maintained on the construction site at all times. If additional approved sets are desired, we will
approve an additional 2-sets, but they must be submitted with the required 4-sets.
If you have questions, please contact me at 571-2441.
Cc: File
Department Review
Jon Dobosiewicz, DOCS
John Duffy, Utilities
Greg Hoyes, HCSO
Greg Ilko, Crossroads
\\Apps2Wser data\eng\shared\DHiI1W R07REVOA\STCHRISTOPHEREPISCOPAL PHASE 2 -REVIEW # 3.doc
October 26, 2004
Mr. Timothy R. Fleck
Woollen, Molzan & Partners, Inc.
Architecture
47 South Pennsylvania Street
Suite 1000
Indianapolis, IN 46204
~ .
RECENED
OCI' 2 6 2004
DOGS
RE: SL Christopher Episcopal Church Expansion, Phase 2 /Project Review # 2
Dear Mr. Fleck
The City has received your letter and Phase 2 drawings dated September 29, 2004 based upon the City
review of August 25, 2004.
The comments from the City review have been satisfactorily addressed with the following exceptions:
Sheet C2.01 Master Site Plan
3. Comment on previous review: "Please label the multi-use path as an Asphalt Multi-Use path and
show the back edge of the path 1-foot inside die right-of-way line. Please change the hatching for
this path as it differs from what would be considered sidewalk." Please label as "Asphalt multi-
use path to be constructed as a part of Phase 3".
5. Comment on previous review: "What is the status of the right-of-way dedication? Was this
dedicated as a part of Phase 1? Dedication of this right-of--way will be a condition for obtaining a
building permit if it has not already been dedicated." Thank you. Please keep us posted on the
status. Right-of--way dedication requires Board of Public Works and Safety approval and a
building permit will not be issued until right-of--way is dedicated.
SheefC3.02 Phase 2 Grading Utility and Erosion Control Plan
13. Comment on previous review: "The maximum design water surface elevation noted on this sheet
does not match the Phase 2 elevation noted on Sheet C3.01." Still does no[ match. C3.01 states
100-YR = 870.2; C3.02 states 869.1.
15. Comment on previous review: "Please install the pond outlet pipe at [he location indicated on [he
Phase 3 drawing. This will require a culvert under the proposed driveway." The City requests
modification to the ditch to the point of discharge in the Phase 3 location and installation of the
outlet pipe in the Phase 3 location with a cuh~ert under the drive. Modify drive grading over the
culvert as necessary for cover.
Sheet C5.01 Site Details
20. Comment on previous review: "Please add aright-of--way pavement detail [hat requires the
following pavement section: 1.5" H.A.C. Surface #11 over 2" H.A.C. Binder #9, over 3" H.A.C.
Base #SD over 7" Compacted #J3 Stone over 4" Compacted #2 Stone." Please specify #SD base
instead of #5 base.
22. Comment on previous review: "Please add amulti-use path detail with the following pavement
section: 110#/Syd. H.A.C. Surface No. 1 I, LV over 220#/Syd. H.A.C. Binder A'o. 8 LV over 5"
compacted Aggregate Base, Type O, Size #J3." Please ensure the detail for Phase 3 conforms to
the pavement section outlined in our previous continent letter.
23. Detail 2 Typ. Pipe Bedding Detail
c. Continent on previous review: "Please label and show 4-6-inch minimum topsoil over
[he trench for non-pavement areas. Please show pavement over the trench (possibly in a
second detail) and add a note that [here shall be a minimum of 1-foot from the top oCthe
llrrnernus~ or linct~er;at:vc
Osr: Civic SQuaiut, C:~t:atet, IN 46032 Orncr 317571.2.941 FAx 317.571.2439
Eat:w. engineering a ci.cu'mel.in.us
JAMES BRAI~'ARD, MAY012
vlr. Timothy Fleck
October 26, 2004
Page 2 of 2
pipe to the bottom of the lowest pavement section for all pipes installed in City right-of-
way." Please add a note that there shall be a minimum of 1-foot from top of the pipe to
the bottom of the lowest pavement section for all pipes installed in City right-of--way.
Please find the attached comments from Crossroad Eneineer's second review. If you have any questions
concerning these comments, please contact Greg Ilko directly a[ (317) 780-1555.
The above comments are based on [he Engineering Department's second review. Please provide our office
with a follow up letter regarding this review and revised plans, indicating all revisions. If you have
questions, please contact me at 571-2441.
Ce: File
Department Review
(Jon Dobosiewicz, DOCS
John Duffy, Utilities
Greg Hoyes, HCSO
Greg Ilko, Crossroads
\Wpps2\user data\eng\shared\DHill\PROJREV04\STCHRISTOPHEREPISCOPAL PHASE 2 - REVIEW !i 2.doc
October 15, 2004
Mr. Dick Hill
City of Carmel
Engineering Department
One Civic Square
Carmel, IN 46032
RE St. Christopher Episcopal Church
Plan Date: revised 9/15/04
Carmel Stamped: 9/29/04
CRE Received: 10/6/04
Dzar Dick:
Our comments, based upon the information submitted in response by Insight Enginzering. Inc.,
dated September 21, 2004, are listed below.
^ Drainaa_e Calculations
The post developed eovtposite wren is 29,800 sft less t/inn the pre-developed cotnposite
area, mul no accom»tor/atiorrs for direct runoff con/d be /Dented P/ense reviely and
revise.
The proposed far east and far nest drives ore not included within the detained area.
T/te increase of runoff doe to these improvements should be subtracted from the
calettlrrted pre-deve/open Q within the detained area. T/eis will deterntitte the proper
al/ownble ott~owfrom the detention pond.
^ ~e Desi>?n - 10 yr flood
Rational method calculntiats hove been supplied.
^ lie Slopes /Velocities (2.5 fps min, 10 fps max)
Pipe slopes and velocities fall lvitltln the standards. Tl:e following discrepancies exist
betlveetr the plans and calctdations. Please review and revise accordingly:
Pipe #10: IS° diameter indicated in calcuiations, but only I2"diameter is
s/Town on the construction plans.
Pipe #11: The slope of the pipe baser! on invert elevations is slrolvn to be
1 % in the calculntions, btrt the invert elevations on the plans indicate a
slope of 0.5%
Pipe #12: T/re slope of the pipe based on invert elevations is drown to be
1.6% in the calculntions, but the invert elevations on the plans iudicnte a
slope of 0.5%. Also, the dinnreter of the pipe is not indicrrterl on the
consh•actiott plmu.
St. Christopher Episcopal Church
October 1 ~, 2004
Paee 1 of 2
3417 South Sherman Or, m Bee[h Grove. IN 46107 o Tel 317.7804555 D Fax 317.788.6525 ----"'--'
Pipe #14: The slope ojtlre pipe ir: the calculations is based orr dte rim
elevation of the up stream structure. Please indicate a proper upstream
invert, slope of pipe, nnrl calculate the correct diameter. This should be
caller! out on the constr[rctior: plans.
Pipe :rl>: 13" diameter inrlicnterl in calculations, but 21 "diameter is s/town
on the construction plmrs.
^ Adequate Lot Drainaee
Inadequate spot elevations appear on the carstruetion plans. Please provide grades to
wkicl: the cmtlractor Wray be able to corrstrucl tl[e project properly. These grades
should correspond with the contours skown.
^ Surface Drainaee Shown with Arrows
Surface flow patterns /rave been delineated with arrows.
o Stntctures Numbers /Corresponding to Previous Sections
Please !abet the structure numbers on flre coratructiort plmts as they correspond rvitl:
the structures within Nie drainage calculations.
^ lie Sizes
Discrepnr:cies in the pipe sizing calculations and plans need to be revised to verify that
adequate sizing leas been accomplished.
^ Overflow Location Shown
Arr emergency spi/Lvay has been added to the plans. T/re spillway elevation should be
set at the maximum water surface elevation oj869.10. Please indicate this on the
detail and revise the grading plan accordingly.
Please feel free to call me at 780-1555 ext. 12 if you should have any questions or need
additional infortnation on this project.
Sincerely,
Cross d Engineers, P.C.
GC O,
Project Manager
St. Christopher Episcopal Church
October 15, 2004
Pale 2 of 2
~'e"`
~~g
C
August 25, 2004
Mr. Timothy R. Fleck
Woollen, Molzan & Partners, Inc.
Architecture
47 South Pennsylvania Street
Suite 1000
Indianapolis, IlV 46204
RE: St. Christopher's Episcopal Church
Phase II Plan Review
Dear Mr. Fleck
n
Opp, `~ ~~~'
~y7-v ~ ,9nL S
The City of Carmel (City) has received your letter and Phase 2 drawings dated July 22, 2004. The
following comments are provided based on the City's first review of this Phase of the project.
Sheet C2.01 Master Site Plan
1. Please provide a plan that shows only the Phase II construction. The Master Site Plan provided is a
great reference and should be left in the set.
2. Please provide more dimensions of the parking lot to the plan. Specifically radii dimensions.
3. Please label the multi-use path as an Asphalt Multi-Use path and show the back edge of [he path
1-foot inside the right-of--way line. Please chance the hatching for this path as it differs from what
would be considered sidewalk.
4. Please delineate the limits of the right-of-way pavement section and City standard straight curbing
on the proposed entrance.
5. What is the status of the right-of--way dedication? Was this dedicated as a part of Phase I?
Dedication of this right-of--way will be a condition for obtaining a building permit if it has not
already been dedicated.
6. Aright-of--way permit and bonding is required for the proposed driveway construction. Please
contact the City's right-of-\r ay inspector to obtain the pemut and for information on posting the
required bond.
Sheet C3.01 Phase I Grading, Utility and Erosion Control Plan
7. As Phase 1 has already been approved and assumed to be under constmction, please remove this
sheet from the drawing set. Has anything been changed on this sheet from the previously approved
drawing set?
8. The proposed rip-rap stilling basin is not the detail that the City was expecting. If the stilling basin
has not been installed at this point, please install per the detail provided by the City at prior
meetings.
9. Have you obtained Board of Public Works and Safety approval for the proposed open pavement
cut for the Sanitary Sewer connection? This approval is required for the work shown.
Sheet C3.02 Phasc 2 Grading, Utility and Erosion Control Plan
10. This Department recommends the installation of cleanouts at each of the bends for the sanitary
sewer lateral that runs to the grease trap. Please check with the Utility Department to see if
installation of cleanouts at each bend is a requirement.
11. This Department is of the opinion that the contours will not be able to be constructed as they are
drawn. Were these contours utilized to determine the pond volume available for detention storage?
If so, it is likely that the ponds would not be constmcted with the same effective area between
each contour line, resulting in inadequately sized ponds in the As-Built condition. .
I~I~P.\RT>II?\"f OI' li\'GI\IiFltl\G
Qxr Cwic SnuAer, Caevei, iN 46032 OI~Ftce 317.571.2441 Fax 317j71.2439
Eyt~u. e~~gi~~eeriirg mci.carmel.in.us
JA~4F.S BRAINARD, MAYOR
Mr. Timothy Fleck
August 2S. 2004
Page 2 of 3
12. The proposed entrance roadway, areas to the east of the entrance roadway, and areas north and
west of the on-site development are being allowed to direct discharge without being detained.
These areas need to be excluded from your calculations of the allowable release rate in the existing
condition if they have not already been excluded.
13. The maximum design water surface elevation noted on this sheet does not match the Phase 2
elevation noted on Sheet C3.01.
14. Please provide more spot shots and flow arrows for the parking lot, walks and areas around the
buildings.
15. Please install the pond outlet pipe at the location indicated on the Phase 3 drawing. This will
require a culvert under the proposed driveway.
Sheet C3.03 Phase 3 Grading, Utility and Erosion Control Plan
16. The Ciry will not review and approve this sheet at this time. The plan is contingent on the
available of City storm sewer. Please remove this sheet from the set.
17. 1s the church pursuing a drainage outlet into the Collins Drain in the event that the City storm
sewer is not available when Phase 3 is constmcted? In [he event that the City storm sewer was not
consmtcted, the City was anticipating the construction of a detention pond as a part of the Phase 3
construction that would have an outfall to the Collins Drain and an equalization pipe between the
Phase 2 and Phase 3 detention ponds at an elevation that would allow stored run-off for all rain
events above the SO-year event to drain equally between the two ouifalls. Since the Phase 3
drawings show no development or pond in the Collins Drain watershed, the City would not expect
the constntction of a third detention pond. However, the City would still expect an equal discharge
between the rivo outfalls for al] rain events above the SO-year event if the City sewer was not
available.
Sheet C4.01 Erosion Control Plan
18. Please show only the erosion control features pertinent to Phase 2 construction.
19. Detail 1 was not the Detail that the City was anticipating. Please replace with the Detail provided
by the City at prior meetings.
Sheet C5.01 Site Details
20. Please add aright-of--way pavement detail that requires the following pavement section: 1.5"
H.A.C. Surface #11 over 2" H.A.C. Binder #9, over 3" H.A.C. Base #SD over 7" Compacted #S3
Stone over 4" Compacted #2 Stone.
21. Please add the City standard detail for straight curb for the curb to be installed in the right-of--way.
22. Please add amulti-use path detail with the following pavement section: I ]0#/Syd. H.A.C. Surface
No. 11, LV over 220#/Syd. H.A.C. Binder No. 8 LV over S" compacted Aggregate Base, Type O,
Size #S3.
23. Detail 2 Typ. Pipe Bedding Detail
a. Please indicate the limits of the bedding and initial backfill.
b. For piping installed in the right-of-way, the City standard is for the limit of the initial
backfill to be 6-inches above the pipe springline and for all bedding and initial backfill to
be placed in 6-inch balanced lifts.
c. Please label and show 4-6-inch minimum topsoil over the trench for non-pavement areas.
Please show pavement over the trench (possibly in a second detail) and add a note that
there shall be a minimum of 1-foot from the top of the pipe to the bottom of the lowest
pavement section for al] pipes installed in City right-of--way.
Genera]
24. Please provide drawings on 24"x36" sheets. The City's flat files will not accommodate the sheet
size submitted.
25. Crossroads has produced their drainage review comments. These were submitted to your office
under separate letter on August 24, 2004. Please address the comments and respond to Crossroads.
We reserve the right to provide additional comments on fi~rther reviews. Please provide our office with a
follow up letter and revised plans indicating all revisions. Second and subsequent reviews will focus only
Mr. Timothy Fleck
August 25, 2004
Page 3 of 3
on revised items. It is critical that this office be made aware of all modifications made on the plans being
re-submitted, particularly if any such changes are considered "new" or fall outside of our initial review
If you have any questions, please feel free to call the City of Carmel Department of Engineering at 571-
2441.
Department Review
[Jon.Dobo~ siewicz,:DOCS
John Duffy, Utilities
Greg Hoyes, HCSO
Greg Ilko, Crossroads
\Wpps2\user data\eng\shared\gduncan\LTRTFIeck082504.doc
Cc: File
April 27, 2004
Mr. Tim Fleck
Woollen, Molzan and Partners, Inc.
47 South Pennsylvania Sheet, Suite 1000
Indianapolis, I1V 46204
RE: SL Christopher's Episcopal Church Phase lExpansion-Project Review #1
Dear Mr. Fleck.
RECEIVED
APR ?_7 £~0,
ROCS
The City Engineer has reviewed the Phase I constmction plans (revision date of 3/29/04). We offer the
following comments:
Sheet C3.01-Phase I Grading, Utility, and Erosion Control Plan
Provide riprap-stilling basin in place of shave bales at the discharge point of the 12-inch pipe from the
parking area. This basin is to remain in place until the detention basin is installed.
General
Add, "Phase I Construction Only" to the Civil Cover Sheet, C0.01.
When these revisions have been made, provide this office with a minimum of 4-sets of certified civil
constmction drawings for approvaUsignatures. The City Engineer and the Director of Carmel Utilities will
sign the sets. One set will be returned and it must be maintained on the construction site at all times. If
additional approved sets are desired, we will approve an additional 2-sets, but they must be submitted with
the required 4-sets.
Si~el/
Dick Hill, Assistant Director
Department of Engineering
ec: Mike McBride, City Engineer
Jon Dobosiewicz, Department of Community Services
John Duffy, Director of Carmel Utilities
Jim Haag, Wastewater Utility
Greg Hoyes, Hamilton County Surveyor's Office
John South, Hamilton County Soi] and Water
S:V'ROJREV 04\STCHRISTOPHEREPISCOPA LPHI
DI:Pnrz~c>ir:~T or E~cln~eerun~c
Oar Cron SQueae, Cvi~~el,'IV' 46032 Orria: 317.571.244] FAQ 3775"71.2/39
EV~,A~~. kweeseOO Ci.cinneLin.us
J tilES BRAIyARD, MAYOR
^^^
WOOLLEN, MOLZAN
AND PARTNERS,INC.
ARCHITECTURE
TRANSMITAL
To:
Carmel Dept. of Community Services
One Civic Square
Carmel, IN 46032
Attention:
Angelina Butler
Date:
3/31/04
Re:
St. Christopher's Episcopal Church
~'~
Q,~ `L
~` ~~S ~~~
0"
f ,: ,
We are sendin ou herewith:
Copies Description
1 Response and drawings to review comments for preparation fo Presubmittal
Conference
By: Copies:
Tim Fleck TAC Members
47 Soufh Pennsylvania Sireef, Sui}e 1000 Indianapolis, Indiana 46204
317.632.7484 317.687.2064 (fax)
www.woollen molza n.com
^^^
WOOLLEN, MOLZAN
AND PARTNERS,INC.
ARCHITECTURE
March 30, 2004
Angelina Butler
Planning Administrator
City of Carmel
1 Civic Square
Carmel, Indiana 46032
RE: Plans for St. Christopher's Episcopal Church
Dear Ms Butler:
This letter is in response to your letter of October 8, 2003. (Copy Attached)
~~: ,
~~~~
R~-~~~~~~~~
Ae~o
Item 1-There will be no sign for Phase 1 building. Sign is dimensioned on drawing C2.01 for
Phase 2
Items 2 & 3- See drawing C0.01
Items 4 8.5-See dravving C2.01
Item 6- We have provided 24 parking spaces - 1 for the four employees and 2 for each of the
10 Classrooms.
Items 7, 8 &9- See drawing C2.01
Items 10, 1 1, 12 & 13 -Street lights will be provided in a later phase. No work is being done
along 131st street in Phase 1.
Items 14&15- See drawing C2.01
Item 16- Design has been approved by Special Studies Committee.
Items 17 - See drav~ing C2.01
Item 18- Mr. John Packer of St. Christopher's Church has met with Mr. Brewer who has given a
verbal approval.
Sinc ely,
Im R. A eck
Vice President
tfleck@ WoollenMolzan.com
Enclosure:
47 South Pennsylvania Sfreef, Suiie 1000 Indianapolis, Indiana 46204
317.632.7484 317.687.2064 (faxl
www.wool lenmolza n.co m
QCT 0 9 3003
City of Carmel
VIA FAX: 687-2064
~-Original by mail
October 8, 2003 ~y
Wvy
Timothy Fleck ('~,~IFD
Woollen, Molzan, and Partners, Inc. ,y Q ~ ~ ~ %~JA
47 S Pennsylvania St, 10th Floor r"
Indianapolis, IN 46204 ~ ~ \ ~ws
c'aa>
ItE: St. Christopher's Episcopal Church, ADLS Application ~r , -
\;
t.
Dear Mr. Fleck:
This letter is in response to yow ADLS Application for SL Christopher's Episcopal Church. This is a preliminary letter to
let you begin on revisions. Please complete the following items after you have received additional comments made by
members at the TAC Meeting on October 15.
Site Plan•
1. Please label sign(s) distance from road R/W.
2. Please place adjacent land uses and zoning on zoning map.
3. Please add the boundary of the 600-ft US 31 Overlay as the S-2/Old Meridian Line.
4. Please place dimensions on buildings
5. A cwbed parking lot is required; curbing does not need to exist where futwe parking lot expansion will take
place. Please label "curbed asphalt parking" on site plan.
6. Please give a parking breakdown for classroom, fellowship, and worship buildings: school = 1 per employee
and 2 per classroom (elementary or 10/classroom (secondary), meeting hall= 1/200 square feet, and worship =
'b seats in main assembly.
7. Please label easements.
8. Please label buffer yards (See Sec 26.4).
9. Please show the location of mechanical equipment and trash receptacle with proper screening.
10. Per [he ATP, a 10-ft separated parallel multi-use path is required along 131't Street; walkways are only 8-ft.
11. Streetlights must be spaced no les than 100 fee[ apart. Please show along 131't St.
12. What is the height of the light lamp? Must be less than 25 feet.
13. Fool-candles must be no greater than .5 a[ the property line. Also show distribution south to 131 St.
14. Show parking spaces as being 9' x 20' or 10' x 18'.
15. Bicycle parking shall be provided at 1 space per 100 feet of building frontage (20G.04.05-G).
16. Buildings must be faced in brick or stone with trim in other materials (20G.05.06-D.(2)).
17. Please show a 6-ft landscape strip around parking that is adjacent to the street.
18. Please forward a copy of the approval letter from Scott Brewer, Urban Forester.
19. Feel free to bring material and color samples to the meetings.
If you have any questions or if I may be of assistance, please feel free to call.
Sincerely„ ~ ~~
Angelina Butler
Planning Administrator
S[ChristophersChurch-ADLS
Page 1
ONE CIVIC SQUARE. CARMEL, INDIANA 46032 317/571-2417
^~^
WOOLLEN, MOLZAN
AND PARTNERS, INC.
ARCHITECTURE
March 30, 2004
Mr. Dick Hill
Assistant Director
Department of Engineering
City of Carmel
1 Civic Square
Carmel, Indiana 46032
RE: Plans for St. Christopher's Episcopal Church
Dear Mr. Hill:
RF_CFA'~E.Dry,;
A?;t ~ r,r., ,
oacs
~• P;
~< ~: ;.
In the interest of consolidating the review process and expediting St. Christopher's
application for a building permit, we have enclosed our responses to review comments
from your department, as well as from TAC members and the Department of Community
Services. We have also enclosed revised site drawings addressing these comments.
To the best of our knowledge, these responses resolve all outstanding issues with the City
of Carmel and other authorities having jurisdiction over this project.
Please let us know as soon as possible if this is satisfactory, and when we might expect a
pre-submittal conference. The church would like to be able to begin construction as
soon as possible.
Sincer y,
T' o . PI k
ice President
tfleck@WoollenMolzan.com
Enclosure:
CC: TAC Members
47 South Pennsylvania Sfreef, Suite 1000 Indianapolis, Indiana 46204
317.632.7484 317.687.2064 (fax)
www.woollenmolza n.com
^~^
WOOLLEN MOLZAN
AND PARTNERS, INC.
ARCHITECTURE
March 30, 2004
Mr. Dick Hill
Assistant Director
Department of Engineering
City of Carmel
1 Civic Square
Carmel, Indiana 46032
RE: Plans for St. Christopher's Episcopal Church
Dear Mr. Hill:
This letter is in response to your letter of March 10, 2004 (Copy Attached)
Item 3:
a) Sewer availability has been indicated to be May 2004. Phase 1 will not be
occupied until sewer installation is complete.
b) There are no curb cuts required for Phase 1
c) We will utilize the existing drive
d& e) not applicable for Phase 1
f) See attached copy from ADLS. This is the correct legal description which is
being filed with Hamilton County.
g) Phase 1 gross square footage is 15,150 Sq. Pt., Office areas is 2,183 sq. ft. Total
number of fixtures including drinking fountains are 23
Item 4 We will forward 6 sets
Item 5 This is not applicable to our project.
Item 6, 7 & 8 No comment
Item 9 Brandt Construction, Inc. is the General Contractor and is responsible for bonding.
Item 10 Phase 1 Immediately, Phase 2 upon availability of storm sewers & Phase 3 to be
determined - at least three years.
Item 1 1 Existing church will be demolished after completion of Phase 2 or sale of the
property, whichever is later.
Item 12 We have shown entrances off of 131 ~f street in the attached revised drawings.
47 South Pennsylvania Street, Suite 1000 Indianapolis, Indiana 46204
317,632.7484 317.687.2064 (fax)
www.woollenmolza n.com
^~^
Item 13 This has been done
Item 14 See drawings C2.01 & C3.01
Item 1 S Existing R/W is 16.5'. Property R/W allowance is 60'
Item 16 Added to drawing C3.01
Item 17 There are no sidewalks in the R/W in Phasel
Item 18 No
Item 19 8, 20 We have shown as hatched on Drawings
Item 21 No additional pipes, Only what is currently shown on the plans.
Item 22 FL equals Flow Line.
Item 23 Phase 1 to the existing ditch north of 131 s1 street. Detention basin installed in
Phase 2 would drain into new storm sewer if and when installed. Phase 2 & 3 require
storm sewer prior to construction
Item 24 Pipes are survey markers only.
Item 25 & 26 - We cannot occupy phase 1 until sanitary sewer is installed. Water line
currently exists. It is owned and operated by Indianapolis Water Co.
Sincer ly,
~m .Fleck
Vice President
tfleckQW oollenMolzan.com
Enclosure:
47 South Pennsylvania Street, Suite 1000 Indianapolis, Indiana 46204
317.632.7484 317.687.20641fax)
www.woollen molza n.com
03/30/2004 TUE 13:25 FA% 3175949590 iRC3200
C
JAMES BRAIIIARD, MAYOR
March 10, 2004
~ ooz/o2z
~:~~` ~~`s~~X~,~ :: ~~R ~ ~ zaa~
I EL
Mr. Tim Fleck
Woollen, Molzan and Partners, luc.
47 South Petmsylvania Street, Suite 1060
Indianapolis, IN 46204
RE: St Christopher's Ep}scopal Church Expansion-Project Review #1
Dear Mr. Fleck:
These comments aze based upon the drawings received on September 19, 2003. We wilt provide comments
for the drawings received on February 10, 2004 as soon as possible.
GENERAL INFORMATION
1. The proj act site is currently located within current City of Carmel Corporate Limits. The following
jurisdictions will apply.
2. Jurisdictions:
• Sheet and Right of Way- City of Carmel (13l" Sheet).
• Water -Indianapolis Water Company service area.
• Sanitazy Sewers -City of Carmel
• Storm Sewer -City of Carmel
• I.R. Collins Legal Drain -Hamilton County Surveyor
3. Board of Public Works and Safety Approval Requirements:
0. • Sanitary Sewec Availability
b Commercial Curb Cut for new and/or tnodified 131" Street Entrances. We wilt require an 8 '/x x
i l drawing of each entrancelcurb cut to be used as exhibits for your DPW requesk These
drawings should include all pertinent dimensions including acceVdecel lanes, drive lane and
median widths, opposing curb cuts, radii, etc.
~ Temporary Construction Entrance (if located at a site other than the existing or proposed curb
cuts). Same requirements as for the Commercial Curb G1rt.
• Consent to Encroach Agreements for any permanent improvement to be installed wiWin dedicated
easements and/or dedicated right of way.
P • Right of Way dedication (if applicable).
I am enclosing a schedule fox Board of Public Works and Safety meetirtg dates and agenda deadlines
for your use. Please use the Engineering Department deadlines for submissions to the Board.
Any submission to the Board requiresprior final approval by the Ca+•nrel Clay Plan Camnaissiora
anrUor die Board of ZoiaingAppeals and completion of review by the Technical Advisory
Commiaee. Al! written requests to be place on tl+e Board's agenda must include the ttpproprtate
Docket Nrembers and the date (or dates) of approval by the Plan Commission and/or BZA.
Sanitary Sewer Availability (acreage) and Comiecdon Fees:
• Availability (acreage) Fees are based on the legal description of the ptoporty. Please provide this
office with a legal description that lists the total acreage and an exhibit of the legal description
DRPARTtrfEN'C OP EN6IIYEERINCr
ONU CMC SQUARE, CAxMEi, 1N 46032 OPP[cE 317.571,2441 Fnx 317.571.2439
_ EMAU. kweese®ci.carme6in.us
09/30/2004 TUH 13:20 FA% 3175949590 iRC3200
Mr. Tim Fleck
March 10, 2004
Page 2
The Sanitary Sewer Avai[ability Fee is $1,365.00 per acre. The church orlgirtally paid (on Tune
20, 1994) Availability Fees on 9.25 acres. However, this was later adjusted to 6.6 acres due to the
fact that the church sold 2.6 acres to the State of Indiana for completion of the U.S. 3 ! project ST-
F-222 (9). The church was reimbursed for the value of the difference of 2.6 acres. Availability
Fees will be due on the difference between the origina16.6 acres and the total acreage of the
church expansion. W e note the legal description on the Cover Sheet of the drawings submitted
indicate a total of 10.144 acres more or less. irappears that this acreage is for the expanded site.
We also note there is a legal description For Tract "A" in the ADLS submission that indicates
9.553 acres. What is the difference?
G • Connection Fees are based upon the average user factor tables from Section 9-200 (sanitary) of
J our Utility Ordinance. The Connection Feos are $795.OD per EDU for sanitary sewers. Again, the
-church originally paid {on June 20, 1994) Connection Fees based upon a sealing capacity of 325
and 2.6 fiDU's. However, this was later adjusted to a capacity of 180 and 1.4 EDU's. The church
was reimbursed for the value of the difference of 1.2 EDU's. We will need usage information for
the expanded site in order to calculate sanitary sewer connection fees. I am enclosing copies of
our Average User Factors for Sanitary Sewers and our aerrent fee schedule. [have also
highlighted the Average User Factors that might apply to this development.
Note: Any deviation from the Connection Fe¢ calculations listed in our Ordirzauce wiU require
Carmel UtUities med Board of Publk Works and Safety approvals.
4. TAC Review/Drawings submitted for approval:
We request that all comments and corntnent letters generated by this office be answered in writing and
be accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for
construction until all issues have been resolved. All Carmel Ufitity issues must also re resolved. The
design engineer must certify all drawings submitted for frnal approval. This office will require a
minimum of four-sets (maximum o fsix-sets) of approved drawings after all issues have been resolved,
The drawings will be stamped approved and signed by both the City Engineer and Director Carmel
Utilities. The Developer/Owner will receive one-set wlmich is to be maintained on the construction site
at all times. Carmel Utilities will receive one-set. Our Public Works inspector will receive one-set
and ono-set will be maintained in the Department of Bngineeriug. If more titan the minimum of four-
sets is requested to be approved, the additional sets (maximum total of two additional) must be
submitted with the four required sets.
5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated
easements andlor right of way will require a Consent to Encroach Agreement between the
' Owner/Developez and the City of Carmel. This Agreement requires Board of Public Works and Safety
approval
6. Carmel Utilities does not subscribe to "Holey Moley" and should be contacted duectly for all sanitary
sewer main Locations:
7. Carmel Utilities will provide a separate review of this project for sanitary sewer issues.
8. i am including copies of the following with this correspondence:
• Commercial Project Approval Procedures,
• Performance Release Procedure.
• Permit Data, Contacts, eta
• Cornntercial Permitting Procedrtres.
• Dedication of Right of Way documents.
IQ 003/022
BONDING REOUIREMEIYTS
9. Upon initial review, it appears the following bonding requirements may apply to this project:
03/30/2004 TUE 13:27 FA% 3175949590 1RC3200
Mx. Tim Fleck
March 10, 2004
Page 3
Performance Guarantees
Thaxe do not appear to be anyPerfortnance Guarantee requirements for this expansion.
Street Cut/Right of Way Permit and Bonding Requirements
There appear to be at least three instances of work in the right of way of 131" Sheet associated with
demolition activities (Sheet C 1.01):
I) Remove existing pavement and/or walk
3) Saw cut/remove pavement
5) Remove power poles/guide wires (may or may not be right of way issues).
AIso, new and/or modified t 31" Strcet entrances will be included in the Right of Way Permit
requirements as will the closure(eliminaUon of eny existing residential curb cuts. Details regazding the
Right of Way Permit and associated Right of Way bonding requirements should be directed to Fred
Glaser, Department of Engineering Right of Way Inspector/Manager.
Please note That env oxen aavement cuts in dedicated streets require annroval by onr Board of
Public Works snd Safety.
PROJECT COMMENTS
l0. Please provide an estimated constrrction schedule for the three phases.
1 1. Will the existing church building remain after the completion of the expansion? If so, in what
capacit}?
12. There is a proposed development on the south side of 13 t" called Alexandria of Carmel. Please
indicate on your site plans the proposed location of their curb cut. The plans for this development have
been prepazed by Paul I Cripe Engineers. The wntact at Cripe is Paul Donica.
Sheet C1.01 Demolition Plan
13. Demolitionpemdts will be required through our Building and Code Enforcement Department. If Utere
are any wells to be abandoned or rernovcd, contact Morris IIensley of Cnxmel Utilities.
14. Please dimension the apparent north right of way line of 131" Street.
Sheet C2.OlSite Plan
15. Is the 60-foot half right of way indicated on this sheet, right of way to be dedicated to tfie City of
Carmel? We assume that this is not existing right of way. If it is not, please indicate, identify and
dimension Ute existing right of way line.
16. Are the patterned aeeas intended to indicate sidewalks? This pattern should be shown and identified as
a Legend on the sheet.
17. If these are sidewalks, what are yov planning in the xlght of way? Is this stamped and colozed
concreteT
18. Are there additional existing/planned easements other than the 5' Utility Strip? ~o
Sheet C2.03 Phase 2 Site Plan
19. Please distinguish Phase 2 from Phase 1 by cross-hatching or shading Phase 1 construction.
Sheet C2.04 Yhase 3 Site Plan
20. Please distinguish Phase 3 from Phase I and 2 by cross-Hatching or shading Phase 1 and 2
construction.
Sheet C3.O1Grading and Utility Plan
2l. Thet:e are no underground storm pipes planned for the parking lots or other areas other than those
indicatedT
22. Are the initials FL fntended to designate flow lines or "invert elevations"?
23. It appears that the outlet for the dry detention pond discharges into the right of way of 131" Streek
This is not an acceptable outlet location. No stomt sewer conveyance system exists along 131" Street
at this time that can accommodate the storm drainage from this site. Please modify plans to identify an
acceptable outlet and allow detention basins to discharge to that location
~J004/022
09/30/2004 TUR 13:28 FA% 3175949590 1RC3200
Mr. Tim Fleck
March 10, 2004
Page 4
24. Is the''/s' and'/1'pipes found on the west boundary and on the right of way line associated with the
legal drain? What is the pipe material?
25. How do you plan to serve the expansion area with water and sanitary sewer if this expansion happens
prior to Carmel Utilities extension of utilities?
26. The water service is indicated to be "existing Carmel water main extension". Don't think that is the
case.
The above continents are based upon the Engineering Department's initial review. Please pzovide our
office with a follow up letter regarding this review and revised plans, indicating all revisions. A second
review will focus only on detailed construction plans. It is critical that our office ba made ewaze of ell
modifications made on the plan:. being xe-submitted, particulazly if any such changes are considered "new"
or fall outside of our initial review. This pro}ect will not be released for construction until all Engineering
Department and other local agency issues have been addressed. Specifically, al( issues outlined by the
Hamt7ton County Surveyor's Office and rho Hamilton County Soil and W ater Conservation District must
be addressed. If you have questions, please contact Mike McBride or me at 571-2441.
/LY tyi
Dick Hill, Assistant Director
Department of Engineering
Hnelosures
cc: Mike McBridc, City Engirteer (w.o. enclJ
Jon Dobosiewicz, Department of Comtttunity Services (w.o. encl.)
John Duffy, Director of Cancel Utilities (w.o. encl.)
Jim Haag, Wastewater Utility (w.o. encl.)
Greg Hoyes, Hamilton County Surveyor's Office (w/o encl.)
John South, Hamilton County Soil and Water (w!o encl.)
IQ 005/022
3:1PRb7ttEV03~STCARISI'OPHBILBPLSCOPAL
..-.
LAND DESCRIPTION
' TRACT 'A"
Part of the Northeast Quarter of Section 26, Township 18 North Range 3 East, Hamilton County ,
Indiana and part of the real estate described in Instruments Numbered 2000-57571 and 2000-6246 in the
Office of the Recorder of Hamilton County, more particularly described as follows:
Commencing of the southwest corner of said Northeast Quarter, thence along the south line thereof
North 90 degrees 00 minutes 00 seconds East (bearings based on above referenced deeds) 372.82 feet to
' the Point of Beginning; thence North 00 degrees 00 minutes 00 seconds East 471.00 feet; thence North
45 degrees 24 minutes 39 seconds East 240.12 feet; thence South 88 degrees 55 minutes 00 seconds
East 512.00 feel to the east line of the real estate described as Parcel 4, Instrument Number 2000-57571
in said recorder's office; thence along said east line South 01 degrees 05 minutes 00 seconds West
' 630.00 feet io the south line of said quarter section; thence along said south line North 90 degrees 00
minutes 00 seconds West 671.00 feet to the Point of Beginning, containing 9.553 acres, more or less.
1
1
-----Original
Sent: Monday, March 15, 2004 4:26 PM
To: 'Jason Madden'; 'John South (E-mail)'; Hill, Dick B; Greg Hoyes (E-
mail)
Cc: Tim Fleck; Joe Schmitt Stahl, Gayle H; McBride, Mike T
Subject: RE: St. Christopher's Episcopal Church Project
We still have not received any kind of plan from the Church about how this
construction is going to proceed.
Is only Phase I goino to be constructed now?
ONLY PHASE 1 WILL BE CONSTRUCTED AT THIS TIME. WE WILL SEEK
SEPARATE APPROVAL FOR PHASES 2 & 3
If so, we need this phasing to be addressed in the plans. If so, we
still need a plan that indicates where the site's acceptable storm drainage
outlet is going to be.
PHASE 1 -EXISTING DITCH NORTH ALONG 131St
Phase 2 & 3 detention basins to discharge to new storm sewer.
Phase 2 & 3 are on hold until storm sewer is installed.
It is also not clear where the sanitary sewer
connection will be.
Phase 1 Drawing C3.01 shows sanitary sewer being connected to Carmel
sanitary sewer slated to be instailedrn May 2004. Occupancy of Phase 1
building may not take place until the sanitary sewer is installed and building is
hooked up. Final hook-up location is to be determined once Carmel Line
installed.
There is also a Board of Works Sanitary Sewer
Availability approval required. The most current set of plans we have were
received on February 10th. This set consisted of a total of 9-pages.
-----Original Message-----
From: Jason Madden [mailto:jasonm@brandtconstruction.com]
Sent: Friday, March 12, 2004 1:25 PM
To: 'John South (E-mail)'; Dick Hill (E-mail); Greg Hoyes (E-mail)
Cc: Tim Fleck (E-mail); Joe Schmit (E-mail); Gayle Stahl (E-mail)
Subject: St. Christopher's Episcopal Church Project
Gentleman,
I spoke with Gayle Stahl again today about establishing aPre-submittal
meeting for obtaining our building permit.
I informed her that Joe Schmit of Woollan Molzan is sending John South the
corrected erosion drawings that he requested, and it was our belief that all
concerns had been addressed. Gayle informed me that she needs an email from
each of you stating that your requirements have been met and she may begin
the permitting process, i.e. pre-submittal meeting.
Please contact me directly with any problems and questions you may have.
Jason Madden
Project Manager
Brandt Construction, Inc.
Office : (317) 638-3300
Fax:(317)633-6671
^~^
WOOLLEN MOLZAN
AND PARTNERS, INC.
ARCHITECTURE
March 30, 2004
Mr. Greg Hoyes
Plan Reviewer
Hamilton Co. Surveyor's Office
Suite 1188
One Hamilton Square
Noblesville, Indiana 46060
RE: Plans for St. Christopher's Episcopal Church
Dear Mr. Hoyes:
This letter is in response to your letter of October 17, 2003 Copy Attached)
Item 1-Phase 1 discharges to ditch on 131~~ street. Phase 2 8. 3 will discharge to new
storm sewer. Phase 2 8, 3 will not be built until storm sewer is available.
Item 2- The easement as recorded does not match the location of the drain as field
located by our survey. In either case, the location of the drain does not impact our
proposal.
Sincerely,
imo y R. Fleck
Vice President
tfleck@ WoollenMolzan.com
Enclosure:
47 South Pennsylvania Street, Suite 1000 Indianapolis, Indiana 46204
317.632.7484 317.687.2064 (fax)
www.woollen molza n.com
"~~ OCT 17 '03 10~SBRM
P. 2
:~~~-`~'
~~ _ .
October 17, 2003
.Keoion C. `lVarA, Surveyor
'i'(ronr (9 i71 77~-~4? s
'Fdr (3r77~7G-q63.
Woollen, Molzan and partners, lac,
Attn: Tim Fleck
47 South Pennsylvania Street, Suite 1000
Indianapolis, IN 46204
VIA FACSIMILE: 687-2064
Re: St. Christopher's Episcopal Church
Dear 1~'Ir, Fleck:
Suirc rstt
C1nr .Nrrndtrnrr C'nwtry Sgnnrt
;T`cGtrsville, lrrrlidnrt gtSo En-z~ju
I have reviewed the site pleas and ADLS for St. Christopher's Episcopal Ckturch, submitted.to
our office on September 19, 2003, and have the following comments:
1. The site fqr the proposed church falls within the City Limits o£ Carmel. It appears that a
portion of the site may fall within the J.R. Cgllias watershed. The proposal is to tako all on-
site and off-site water to the 131 °` Street road site ditch. Please coordinate tlxe proposed
drainage with the City of Carmel Engineering Department.
2. It appears there may be some discrepancy on the loeatian of the J.R. Collins regulated drain.
Please field locate the drain near the proposed development and egrrectly show the location,
including the easamenk on all site and utility plans.
3 • Please note that further comments may be necessary at a later date.
Should you have any questions, I caa be reached at 317-775-8495.
Sincerely,,(.}C
(iryeV g
Plan Reviewer
Cc: Jon I)tibosiewioz -Carmel DOCD
Dick Hill -.Carmel Engineering
Steve 13roetmann - HCHb
1
^ .1111'
AND PARTNERS INC
ARCHITECTURE
October 9, 2003
Fire Marshal Gary Hoyt
City of Carmel
Fire Department Headquarters
2 Civic Square
Carmel, Indiana 46032
RE: Proposed Plans for St. Christopher's Episcopal Church
Dear Mr. Hoyt:
Thank you for your review of the proposed plans for St. Christopher's Episcopal Church. Per
your request, I am responding in writing to the concerns you have expressed.
1. The building will be protected by an automatic sprinkler system. We will be happy
to schedule a meeting with you to discuss the location of the fire department
connection.
2. We will be happy to install a Knox box and Knox caps. We will coordinate
products and locations with you when we meet.
3. This will require some discussion. The project being proposed is planned to be built
in three phases, with the main worship space being the third phase.
Consequently, there will be several "main entrances", and the one that would be
most prominent will not be built until the third phase. We will be happy to locate
the enunciator panel(s) at your direction.
4. The building will not have a basement.
5. We will be happy to discuss the locations of fire hydrants when we meet.
Sincerely,
imothy R. Fleck
Vice President
tfleck@WoollenMolzan.com
c: John Haley, R.E. Dimond & Associates
Lee Modlin, Arsee Engineers
47 South Pennsylvania Street, Suite 1000 Indianapolis, Indiana 46204
317.632.7484 317.687.2064 (faxi
www.woollenmolzan.com
i
' Oct' 08 2003 3:14PM HP LRSERJET 3200
p.2
City of Carmel
Fire Department Headquarters
2 CIVIC SQUARE
CARMEL, INDIANA 46032
Voice (317) 571-2600 Fax (317) 571-2615
Fire Prevention Bureau
Tim Fleck
Woollen, Mohan and Partners, Inc.
47 South Pennsylvarila Street, Suke 1000
Indianapolis, IN 48204
RE: St. Christopher''s Episcopal Church
LETTER OF APPROVAL
The underalgned has reviewed the proposed plans for
St. Christopher's Episcopal Church
and has approved the plena subJect to the follawing;
1. Will this building be protected by an automatic fire suppression system? If so a meeting will
need to be scheduled to discuss the location of the rare department connection.
2. We are requestirig the installation of a Knox box for fire department access. If the building is
sprinklered, we will be requesting the Knox fire department connection cap(s). An application far
Knox products is!avallable through our office.
3. If the building is equipped with a fire alarm system, we are requesting that the enunciator panel
be located at themaln entrance.
4. Wlll this building have a basement? If so, what is the square footage of the basement?
5. We would Ilke to set up a meeting to discuss the addition of fre hydrant{s) for the entire project.
6.
Please respond to th+3 above noted condition(s) in writing and submit to our office prior to the
scheduled Technical Rdvisory Meeting for this project.
Date: October 8.2003 By: Gary Hoyt, Fire Marshal
Carmel Fire Department
. ERASION AND SEDIMENT CONTROL PLAN
TECHNICAL REVIEW AND COMMENT
Hamilton County Soil and Water Conservation District
1108 South 9th Street, Noblesville IN 46060
Ph- 317-773-1432 or Email at 'ohn-south iaswcd.or
PROJECT NAME: St Christopher's Episcopal Church Phase 1
SUBMITTED BY: St. Christopher's Episcopal Church Mr. Joseph Schmit
1440 West Main Street Woollen Molzan and Partners
Carmel, In 46032 47 S. Pennsylvania Street Suite 1000
Indianapolis, IN 46204
j schmit@woollenrnolzan. com
REVIEWED BY: John B. South P.E.
Certified Professional in Erosion and Sediment Control
PLAN REVIEW DATE: March Z5, 2004 Acreage: Part of a larger plan of development
LOCATION: North side of main Street'/< mile east of US 31
LEGAL DESCRIPTION: Sec. 26
TOWNSHIP: 18N RANGE: 3E CIVIL TOWNSHIP: Clay
SOIL SURVEY MAP SHEET: 50
The technical review and comments are intended to evaluate the completeness of the erosion and sediment control plan for tl~e
The erosion and sediment control plan submitted was not reviewed jor the adequacy of the engineering design. All
included in the plan, as well as those recommended in the comments should be evaluated as to their feasibility by a
qualified individual with structural practices designed by a qualifzed engineer. The plan has not been reviewed for local, state,
or federal permits that may be required to proceed with this project. Additional information, including design calculations may
be requested to further evaluate the erosion and sediment control plan.
The erosion and sediment control plan has been reviewed and it has been determined that the plan:
X Satisfies the minimum requirements and intent of 327IAC 15-5 (Rule 5). Notification will be forwarded to the
Indiana Department of Environmental Management.
Proper implementation ofthe erosion and sediment control plan and inspections of the construction site by the developer or a
representative are necessary to minimize off-site sedimentation. The developer should be aware that unforeseen construction
activities and weather conditions might affect the performance of a practice or the erosion and sediment control plan. The plan
must be a flexible document, with provisions to modify or substitute practices as necessary.
Revised 4 / 9
Cc: Carmel DOCS
Ha. Co. Surveyor
IDEM
File
~~ 7C°
September 25, 2003
is~S ~ 0 ~' e~'\
o~ ~k~~ ~
n ` d ¢ ~.{
nnn~ ~~3~n~~'~ ~m~~nn~~~
..r _{.
~r
~arme~,,~~YR~~Iia ~i, ~D®~~
`~... 3 H~D .. • 7
~0~
~6
SF-Q
Mr. Tim Fleck
Woollen, Molzan and Partners, INC.
47 S. Pennsylvania Street, Suite 1000
Indianapolis, IN 46204
RE: St. Christopher's Episcopal Church
Dear Mr. Fleck:
I have received and reviewed the information for the above-mentioned
project.
At the present time, I see nothing in the plans that would hamper law
enforcement efforts.
If we can be of any further assistance to you, please contact us.
Respectfully,
Michael D. Fogarty
Chief of Police
MDF:vb
cc: Dept. of Community Services
(317)57fl-2500
,: `: _=~,
°:.
A Nationally Accredit 1 ~, ~ ~~forcement Agency
t P
Fe:fb17)571-2512
~~` of `, h,~/~z HAMILTOI`I COuI`ITY
HIGHWA YDEPARTMEIYT
~9rF OF \NO\P27
September 22, 2003
Mr. Tim Fleck
Woollen, Molzan and Partners Inc.
47 South Pennsylvania Street, Suite 1000
Indianapolis, Indiana 46204
RE: St. Christopher's Episcopal Church
ADLS Submittal
N of 131 s` Street / E of US 31
Clay Township
Dear Mr. Fleck:
SEP 2 3 2D03
This letter serves to acknowledge receipt of a transmittal received 9/19/03 containing the
plans for the above-mentioned project. After reviewing the plans the Highway
Department has the following comments:
1. tt appears that this project lies entirely within the limits of the City of Carmel.
Therefore, all future comments should be directed toward the City. If you have any
information contrary to this statement, please contact me immediately.
If you have any questions or comments concerning this letter, please feel free to contact
me at anytime.
Sincerely,
~~~~
Steven J. Broermann
Staff Engineer
cc: Jon Dobosiewicz
Greg Hoyes
G:\USERS\SB\03tac\0&22-03stchris.doc
1700 South 10'" Street Office (317) 773-7770
Noblesville, In. 46060 www.co.hamilton.in.us Fax (317) 776-9814
Babbitt, Pamela A
From: Stahl, Gayle H
Sent: Monday, January 26, 2004 2:44 PM
To: Duffy, John M; Hill, Dick B; McBride, Mike T; Adrienne Keeling; Babbitt, Pamela A; Butler,
Angelina V; Candy Feltner (E-mail); Dawn Pattyn; Greg Hoyes (E-mail); Hoyt, Gary A; Jeff
Kendall; Jim Blanchard; John South (E-mail); Jon Dobosiewicz; Pohlman, Jesse M; Ramona
Hancock; Sarah Lillard; Scott Brewer; Steve Broerman; William Akers
Cc: 'jstults@glavan.com'
Subject: Pre-Submittal Meeting: CHIPOTLE MEXICAN GRILL
The Dept. of Community Service, Building & Code Enforcement division, has
received a request to schedule apre-submittal meeting for the purpose of
obtaining a building permit.
r~
Project: Chipotle Mexican Grill @ 1422 Keystone Way
Meeting Date: Pending
Related Planning 8 Zoning docket numbers:C11.2 03 dDLS~TAC July 16, 2003
Representative: Jason Stults
If there are concerns that might affect the issuance of this permit, please REPLY
TO ALL on this a-mail.
t
City of Carmel
Department of Community Services
One Civic Square
Carmel, IN 46032
317-571-2417
Fax:317-571-2426
FACSIMILE TELECOPY COVER LETTER
DATE: October 31, 2003
TO: Tim Fleck
FAX: 687-2064
FROM: Connie
Attached hereto are 2 pages, including this cover letter, for facsimile transmission.
Should you experience any problem in the receipt of these pages, please call 317/571/2419
and ask for Connie.
NOTES:
Attached is the Department Report for:
140-03 A & 147-03 ADLS, St. Christopher's Episcopal Church
Please call if you have any questions.
CONFIDENTIALITY NOTICE: The materials enclosed with this facsimile transmission are prYvate and confidential
and are the property o(the sender. The information contained in the material is privileged and is intended only (or
the use of the individual(s) or entity(ies) named above. tl you are not the intended recipient, 6e advised that any
unauthorized disGosure, copying, disMbution or the taking of any action in reliance on thecontents o/this te/ecopied
information is stricdy prohibited. I(you have received this facsimile transmission in error, please immediatelynotity
us by telephone to arrange for refum of the forwarded documents to us.
City of Carmel
Department of Community Services
One Civic Square
Carmel, IN 46032
317-571-2417
Fax:317-571-2426
FACSIMILE TELECOPY COVER LETTER
DATE: October 24, 2003
TO: Tim Fleck
FAX: 687-2064
FROM: Pam
Attached hereto are 3 pages, including this cover letter, for facsimile
transmission. Should you experience any problem in the receipt of these pages,
please call 317/571/2417 and ask for Pam.
NOTES:
Please call if you have any questions.
CONFIDENTIALITY NOTICE: The materials enclosed with this (acsimile transmission are private
and confidential and are the property of the sender. The information contained in the material is
privileged and is intended only for the use of the individual(s) or entity(ies) named above. If you are
not the intended recipient, be advised that any unauthorized disclosure, copying, distribution or the
taking of any action in reliance on the contents of this to/ecopied information is strictly prohibited. If
you have received this (acsimile transmission in error, please immediately notify us by telephone to
arrange for return o(the (onvarded documents to us.
October 17, 2003
OCT 17 '03 10~20RM
Woollen, Molzan and Partners, Inc.
Amt: Tim Fleck
47 South Pennsylvania Street, Suite 1000
Indianapolis, IN 46204
VIA FACSIMILE: 687-2064
.~~4~E1R•~S OFF1.,.
Re: St: `Christopher's^Episcopel Church`
Dcar Mr. Fleck:
P.1/1
I have reviewed the site plans and ADLS for St. Christopher's Episcopal Church, submitted to
our office on September 19, 2003, and have the following comments:
1. The site for the proposed church falls within the City Limits of Carmel. It appears that a
portion of the site may fall within the J.R. Collins watershed. The proposal is to take all on-
site and off-site water to the 131" Street road site ditch. Please coordinate the proposed
drainage with the City of Carmel Engineering Department.
2. Tt appears there may be some discrepancy on the location of the J.R. Collins regulated drain.
Please field locate the drain near the proposed development and correctly show the location,
including the easement, on all site and utility plans,
3. Please note that fitrther comments may be necessary at a later date.
Should you have any questions, I can be reached at 317-776-8495,
Sincerely,
~ye~
Plan Reviewer
Cc: Jon Dobosiewicz -Carmel DOCD
Dick Hill -Carmel Engineering
Steve Broelmann - HCHD
:Kcufon C. `IVarA, Sun~eyor Suim rde
Bliortr (,;'7~ 776-dq ~ S Orte .Nnmilton Comity Square
'Fux (3t7J77v-gbz8 :Nbblesville,lvAimm gGnGo.aa,;o
City of Carmel
Department of Community Services
One Civic Square
Carmel, IN 46032
317-571-2417
Fax: 317-571-2426
FACSIMILE TELECOPY COVER LETTER
DATE: October 16, 2003
TO: Tim Fleck
FAX: 687-2064
FROM: Pam
Attached hereto are 4 pages, including this cover letter, for facsimile
transmission. Should you experience any problem in the receipt of these pages,
please call 317/571/2417 and ask for Pam.
NOTES: Plan Commission Agenda Dept. Reports were faxed
yesterday
Please call if you have any questions.
CONFIDENTIALITY NOTICE: The materials enclosed with this /acsimile transmission are private
and confidential and are the property o/ the sender. The information contained in the material is
privileged and is intended only for the use of the individual(s) or entity(iesJ named above. I/you are
not the intended recipient, be advised that any unauthorized disclosure, copying, distribution or the
taking of any action in reliance on the contents of this telecopied information is strictly prohibited. If
you have received this facsimile transmission in error, please immediately notify us by telephone to
arrange for return of the forwarded documents to us.
City of Carmel
Department of Community Services
One Civic Square
Carmel, IN 46032
317-571-2417
Fax:317-571-2426
FACSIMILE TELECOPY COVER LETTER
-ar1R^l TFlec-KCB lJao~~P~ r„olza n .c,~„~.
DATE: October 9, 2003
TO: Tim Fleck
FAX: 687-2064
FROM: Pam
Attached hereto are 5 pages, including this cover letter, for facsimile
transmission. Should you experience any problem in the receipt of these pages,
please call 317/571/2417 and ask for Pam.
NOTES: TAC AGENDA FOR OCTOBER 22, 2003, and LIST OF TAC
MEMBERS.
Please call if you have any questions.
CONFIDENTIALITY NOTICE: The materials enclosed with this facsimile transmission are private
and confidential and are the property of the sender. The in/ormation contained in the material is
privileged and is intended only /or fhe use of the individual(s) or entity(iesJ named above. 11 you are
not the intended recipient, be advised that any unauthorized disclosure, copying, distribution or the
taking of any action in reliance on the contents of this te/ecopied information is strictly prohibited. If
you have received this facsimile trensmission in error, please immediately notify us by telephone to
arrange /or return of the forwarded documents to us.
One Clvic Square
Cannel, IN 46032
(317) 571-2417
Fax (317) 571-2426
Fax
From: ~{~ 91~
~U~'l-2r~
Fax ~/ 8 ~ ~ (2 ~~~--~ Pages: Z
Phone: Date: ~ Q - U ~ ~~
Re: 5~. C 17v~~~apher 'S C h ~rc~ - cc:
-4~~~ S
^ Urgent ^ For Review ^ Please Comment ^ Please Reply ^ Please Recycle
c oP~/
°r eqH
`Si ~F
¢u9~=~~ C it o f C acme 1
<ro ullll~
~~ ?~ ~ y
VIA FAX: 687-2064
Original by mail
October 8, 2003
Timothy Fleck
Wot~en, Molzan, and PartneFFSS Inc
47 S Pennsylvania St ~ ~ 07tt F hll~
Indianapolis, IN 46201:
RE: St. Christopher's Episcopal Church, ADLS Application
Dear Mc Fleck:
This letter is in response to your ADLS Application for St. Christopher's Episcopal Church. This is a preliminary letter to
le[ you begin on revisions. Please complete the following items after you have received additional comments made by
members at the TAC Meeting on October 15.
Site Plan
1. Please label sign(s) distance from road R/W.
2. Please place adjacent land uses and zoning on zoning map.
3. Please add the boundary of the 600-ft US 31 Overlay as the S-2/Old Meridian Line.
4. Please place dimensions on buildings
5. A curbed parking lot is required; curbing does not need to exist where future parking lot expansion will take
place. Please label "curbed asphalt parking" on site plan.
6. Please give a parking breakdown for classroom, fellowship, and worship buildings: school = 1 per employee
and 2 per classroom (elementary or 10/classroom (secondary), meeting hall= 1/200 square feet, and worship =
'/. seats in main assembly.
7. Please label easements.
8. Please label buffer yards (See Sec 26.4).
9. Please show [he location of mechanical equipment and trash receptacle with proper screening.
10. Per the ATP, a 10-ft separated pazallel multi-use path is required along 131 s` Street; walkways are only 8-ft.
11. Streetlights must be spaced no les than 100 feet apart. Please show along 131" St.
12. What is the height of the light lamp? Must be less than 25 feet.
13. Foot-candles must be no greater than .5 at [he property line. Also show distribution south to 131 St.
14. Show parking spaces as being 9' x 20' or 10' x 18'.
15. Bicycle parking shall be provided at 1 space per 100 feet of building frontage (20G.04.05-G).
16. Buildings must be faced in brick or stone with trim in other materials (20G.05.06-D.(2)).
17. Please show a 6-ft landscape strip around parking [ha[ is adjacent to the street.
18. Please forward a copy of [he approval letter from Scott Brewer, Urban Forester.
19. Feel free to bring material and color samples to the meetings.
If you have any questions or if I may be of assistance, please feel free [o call.
Sincerely,
Angelina Butler
Planning Administrator
StChris[ophersChurch-ADLS Page 1
ONE CI~~IC SQUARE CAR~'t7EL, INDIANA 46032 317/571-2417
~~~~
~',
~ //i~
~ . O~c~ ?l~~'
.i
September 25, 2003
Mr. Tim Fleck
Woollen, Molzan and Partners, INC.
47 S. Pennsylvania Street, Suite 1000
Indianapolis, IN 46204
~U~
~n~Q~
1
RE: St. Christopher's Episcopal Church
Dear Mr. Fleck:
I have received and reviewed the information for the above-mentioned
project.
At the present time, I see nothing in the plans that would hamper law
enforcement efforts.
If we can be of any further assistance to you, please contact us.
Respectfully,
~~~~t '~tQ,GP ~. ~I~1~
Michael D. Fogarty
Chief of Police
MDF:vb
cc: Dept. of Community Services
13- 76 57-_25g1D
~r ~~,
~} `:e
i i'
A Nationally Accredited,l?Law`::Eriforcement Agency
91/4+~4~iu"~lY
Q~Il 7D ~7Il.2:efl~
SEP-22-2003 09:46 FROM:HRMILTON CO HWY DEP 3177769814 T0:317 571 2426 P.001~001
HA~~LTUI~ CO~InTY
HIGHWAYD,EPARTM~'1YT-
September 22, 2003
Mr. Tim Fleck
Woollen, Molzan and Partners Inc.
47 South Pennsylvania Street, Suite 1000
Indianapolis, Indiana 46204
`:~^ a~,•
RE , >.~aChristophe~s Episcopal ChGrch
ADLS~S~utimlttei
N of 13t"Street! E of US 31
Clay Township
Dear Mr. Fleck:
b~~ ~' Rc G~~~~ C,~.',
IG ~JF~ ~.1
\~~ ~- arcs
This letter serves to acknowledge receipt of a transmittal received 9/19103 containing the
plans for the above-mentioned project. After revfewing the plans the Highway
Department has the following comments:
1. It appears that this project lies entirely within the limits of fire Clty of Carmel.
Therefore, all future comments should be directed toward the City. If you have any
Information contrary to this statement, please contact me immediately.
If you have any questions or comments concerning this letter, please feel free to contact
me at anytime.
Sincerely,
Stoven J. Broonnonn
Staff Engineer
cc: Jon Dobosiewicz
Greg Hoyes
G: W SE R 9139~03fa A09-22-03aroh Ae.doc
1700 South 1 D'" Street CMCice (317) 773-7770
Noblesville, In. 4fi060 wow go~hamllSo,~inua Fax (317) 7769814
.~'
Dobosiewicz, Jon C
From: Tingley, Connie S
Sent: Friday, September 05, 2003 3:53 PM
To: Brewer, Scott I; Butler, Angie; Dobosiewicz, Jon C; Hollibaugh, Mike P; Lillig, Laurence M;
Pattyn, Dawn E
Subject: New Submittal
Recd this afternoon:
;St: Chnstopher's '`ADLS*` Woollen, Molzan & Partners, Inc
EpiscopaPChurch Timothy Fleck
632-7484
I have placed it on the PC shelf behind the reception area.
ct
b, ~'~,~ '"'~
WOOLLEN MOLZRN PRRTNRS Fax:3176872064
.:. ,.
---~_ -- -
~r
,,~ -~
~°~
?i/ ~~~~~rj}
r ~
t ,
4 t1 ~y1- _ ',
1i
~Q~~
~'r. .
i
i~-i.,..
Jun 5 '03 17:34 P. 01
~~,D 5
I -'
P~ ~ t ~ }h ( t F
~ i d
fle5ertt Jon C. Dotwsiev,4cz Planning Administrator
Carmel Deoartment of
Tim Reck
Marty liarpold
David Jahn
CC: Attendees
David Stewart
Russ Bachman
WOOYen, MOIZan ano rut a you, rv~.
St. Ctvistophar's Ep'scopa4 Church
St. Christopher's Episcopal Church
St. Christopher's Episcopal Church
51. Christopher's Episcopal Church
Dde: May 30, 2003,10:30 AM
location: Department of Community Services Coriference Room
i . Mr. Fleck presented changes made to the proposed site plan in response to Mr.
Dobosiewicz's comments in his Apn7 22 meeting with Mr. Fleck (Drawings dated May 30,
2003). Affer review of the proposed plans and reference to the Cannel/Clay Zoning
Ordinance and Old Meridian Sheet DisMct regulations, Mr. Dobosiewicz indicated overall
satisfaction with the changes and wflh the design.
1.1. Mr. Dobosiewicz said that he would support administrative approval for gravel
surfacing and the omission of curbs for the temporary drive between the current
parking lot and the phase 1 and 2 parking lot, so long as it was submitted with a
proposed time by which R would be improved to city standards or removed.
1.2. Mr. Dobosiewicz said that the parking ds~ drawn is within the requirements of the
ordinance, except for four to sa spaces wtych are south of the fronT line of the phase
two terrace. He said he would support allovdng those parking spaces by
administrative waiver, rather than requiring a variance.
1.3. Mr. Dobosiewicz said that the bcafions of the curb cuh onto Main Street are
acceptable as drawn, with the following cjuafifications:
1.3.1. When the west curb cut is developed, the church's existing curb cut would be
dosed. -
1.3.2. When Main Street is improved and center idonds developed, the west curb
cut maybe requced to be right-tumin~ right-ium-out only (no break in the center
island), especially'rf Pennsylvania Drive: is extended as on enhance into the
developed area north and west of the church site.
4760Uth P6rMIryIVWO3Ir8Bt,SW1e 1000 '~~ Indbnapolts, ln~ana 46204
317.6327484 317.687.2]61 (fmc)
www,vroolervno~an.com
:n.3 ::. ._ ., , ~~ .. ,.
:,,, ;, .r;. .... .. .. .,
WOOLLEN MOLZAN PARTNRS Fax~3176872064 Jun 5 '03 1734 P. 02
__ ~__-~------~-- ----------~-- T - ..._.-
r- --- -
2, Mr. Dobosiewicz suggested that the church fie ft
and S'rc,7nage) approval for the entire master plae
file for each phase.
2. L A proposed timeline for commencemerr
part of thk filing.
2.2. ADCs approval does not require public hi
- ~ - - Juy T for the Juy 16 TAC meeting: This wouP
Plan Commission meeting, referral to Septet
and potential approval at the September 1 i
ADLS (Architectural Design, Lighting
so that it would not be necessary to re-
completion of all phases would' be
aring, so the deadline for filing would be
aiow presentation at the August 19
bet 2 Special Use Committee hearing.
Plan Commisson Hearing.
3. Mr. Dobosiewicz suggested that Petition to Change the Zoning Map (to coordinate with
The church's new proposed property Gnej be filed at the same time.
3.1. He recommended against tiling to rezone the north and west parcel at this time.
Typicaly, the Hoard of Zoning Appeals B not ;enthusiastic about petitions to rezone
property without a proposed project.
3.2. At the time that a developer s ready io propose an acceptable project for the
north and west parcel, the City of Carmel wpuld support rezoning of this parcel to
B-5.
4. The meeting was adjourned at 11:30 AM. Mr. Flepk secured the necessary forms and-wit
prepare them for filing in advance of the relevant deadlines.
Respectfuly submitted,
Timdthy R. Fleck
vice-President
Woolen, Molzan and Parfiers, Architects
ff your recollection of any part of this meeting varies significantly from these notes,
please notify the senderimmedatey.
• Page 2 ,