Loading...
HomeMy WebLinkAboutApplicationDOCKET NO. SDR DATE RECEIVED:. (information above to be completed by Department of Community Services) ~ a i 1~='~''~\ ~~ ~.,~ ' ~/ O ~.~~, ~s ~~''~ ~,~°"~qwe ~~'~~~. CITY OF CARMEL AND CLAY TOWNSHIP' ~ ~~, ~'~~, ~ , ~ : ~ Department of Community Services ~ ~p `~ a F!~ i- e r <~~ ~ Division of Planning & Zoning ~~ C'J, `~'ra~ ;' \= . ~:, Applicant Name: _~ Applicant Address:__~ Applicant Phone [ Applicant Fax Number: _ Applicant- EmaiLAddTess: Property Owner Name: _ Property Owner Address: Property Owner Phon [ Signature of filer: SITE PLAN & DESIGN REVIEW APPLICATION & PROCEDURES ..................................................................................................................................................... PREPARATION AND APPROVAL PROCEDURE FOR THE CITY OF CARMEL & CLAY TOWNSHIP > H TON C UNTY, INDIANA ;= rr ~ ~ ~ ~ Gn9~ 3i'~ SCE ',~,-~ 5 `-f \ Evening: 31~ S~-~ ° c`~2S ~ c~C'105~ ~t ICY • C C5`r`r` S'~!- U nP S I ~tJ~C~ \ t, CNr~c~ l r'~Q t t (Printed THIS PROCESS MUST BE COMPLETE BEFORE AN IMPROVEMENT LOCATION PERMIT WILL BE ISSUED. This checklist is to be followed in filing a petition. The Department will review each item to ensure it is complete. The application will not be considered filed with the Department until all items are complete. Comoleted ves No Petitioners shall contact the Planning & Zoning Division of the Department of Community Services/(Planning Department) to schedule apre-application conference, during which the petitioners will be advised ofthe details ofthe review procedures. It shall be the responsibility of the petitioner to become familiar with the regulations, policies and procedures of the City. If desired, a copy of the CarmeUClay Zoning Ordinance (Ordinance) may be purchased from the Planning Department. Review the document carefully. At the pre-application conference, the petitioner shall designate one contact person to work with the Planning Department for the duration of the project. Contact: Department of Community Services City Hall, Third Floor One Civic Square Carmel, IN 46032 Telephone: 317/571-2417 1 of 3 ves No Basic Project Information.~~ /` Address of Property: U Tax ID Number: Current U Proposed Please check appropriate box: ^ jJew Construction r~ Re n ovati on/Ad d iti o n ~~ •`'°T /,.~ ves No Recorded deed or recorded land contract. Must be the most recent recorded deed. ~~ C~ ~~ ves No Letter of consent. If you are leasing, buying on contract, or petitioning for property that is not legally in your name, the owner of the property must sign a letter giving his or her consent for the petition. ves No Existing Features 8 Site Analysis Plan. Please provide us with: two (2) print copies of your property survey or site plan, accurately drawn to scale, and one legible reduction at either 8.5" x 11" or 11" x 17" suitable for photocopying. The site plan must illustrate: 1. The subject property; 2. The location of all existing and proposed buildings, structures and improvements to be made to the subject property, including drainage and erosion control facilities and features; 3. Accurate dimensions of the parcel, buildings, parking areas and ingress/egress driveways; 4. Location, owner of record, zoning and use of adjacent properties, including the location, size and use of all structures within fifty (50) feet of the subject property; 5. Location, right-of-way and pavement width of all streets adjacent to the subject property; and 6. Proposed connections to public utilities. 7. Location, size and type of all existing landscaping on the property. ves No Area Map. Please provide us with two (2) copies of an area or context map that shows the location of the subject property, the locations of public and utility facilities and the relationship of the subject property to the thoroughfare plans for the area. vas No Architectural Design, Landscaoina. Liahtina. and Signaae Information. For residential and commercial projects: 1. Two (2) copies of building elevations including dimensions, materials, colors and signage. 2. Two (2) copies of additional information as requested by the Department. Additional information required for commercial projects: 1. Two (2) copies of the lighting plan indicating location of existing and proposed lighting standards, the type and size of fixtures, and foot-candle limits. 2. Two (2) copies of the landscaping plan indicating the location of plantings, types and sizes of plantings, planting details, and mounding locations and details. 3. Two (2) copies of the signage plan indicating the location, size, materials and colors of any proposed signs. ~~~ `~clt,~v~-Q - t1"IS~IL ~C,~~~'`p ~~r~ta q' 2 of 3 EVALUATING YOUR PETITION ....................................................................................................................................................................... Section 23D.4 (B-C) of the Carmel/Clay Zoning Ordinance states: Review. Review of the Application and Supporting Documents and Materials by the Director; Following the receipt of the written application and required supporting information by the Director, the Director shall review the materials for the sole purpose of determining whether the application is complete and in technical compliance with all applicable ordinances, laws and regulations. If the materials submitted by the applicant are not complete or do not comply with the necessary legal requirements, the Director shall inform the applicant of the deficiencies in said materials. 1. Unless and until the Director formally accepts the application as complete and in legal compliance, it shall not be considered as formally filed forthe purpose of proceeding to succeeding steps toward approval as hereinafter set forth. 2. Within ten (10) days of the formal acceptance of the application by the Director, he shall formally approve, deny, or request additional information about the petition. Approval or Denial of the Application by the Commission. 1. An approved Site Plan 8 Design Review petition shall be valid for two (2) years from the date of approval. If construction of the building(s) has (have) not started at the end of the two (2) year period, the Site Plan & Design Review request must be re-submitted to the Director. 2. If an approved Site Plan & Design Review petition is (are) substantially altered, re-submittal to the Director for approval is required. 3. If the petition is denied by the Director, the Director shall provide the applicant with a copy of said reasons, if requested. 4, The applicant may appeal the decision of the Director, as specified in Chapter 30. ~~L~ ~ ~~ w-~:-P ti~ --~ - ~~~ ~~ . ~ ~ o.~. 3 of 3 ~r ~~ Y ~\ /~ n ~ October 2, 2003 ~`/ -'i /'" ~',,~ Jon C. Dobosiewiez -Planning Administrator ~ ~ ~ ~~ ~ ~~ City of Carmel ~„ Department of Community Services ~ One Civic Square ~' ' :%y' Carmel, IN 46032 ~~ - - - '~ Deaz Jon, The purpose of this letter and forthcoming meeting on Friday, October 3`d is to discuss the ADLS procedures and compliance. As we have discussed on the phone, my wife's business at 230 North Rangeline Road would like to build a small storage shed. This shed is a necessary requirement for standard property management tools like lawn mowers, wheel barrels, etc... However, and more importantly, the additional storage is needed for store inventory coming in daily that deliverymen can expediently place in a protected environment. Jon, we have been recently approved by the City of Carmel in 2003and gone through the ADLS requirements. We have followed all procedures and policies set forth by the city of Carmel I like to think that our store and property actually sets some standards of ideal old town new development. I have reviewed the preliminary design of the requested 12' x 12' storage facility with the Building Inspectors. While ultimate approval rest with your department, they have agreed that it doesn't need a building permit. The earlier review of the Water and drainage off of the pazking lot should not present a problem. 99% of the water off of the pazking lot flows either to the West side (back of lot) or to the alley. The placement of the storage shed on the North side of the lot on the identified Plot Plan (see attached) is not in the water run-off area. I will also have the storage unit placed +5 feet from my northern neighbors yard (property owner Eric Snedeker is also aware of my desire for the shed and has no issue with it). Jon, I am asking that the City of Carmel allow me to build the Shed per the attached plan and plot on my lot at 230 North Rangeline Road and waive the ADLS requirement. I am available for further discussions and appreciate your thorough review and consideration of this request. Sincerely ~KeithlG. Szarono S~~ ~2ea ar- ~,~~