Loading...
HomeMy WebLinkAbout09040009-10 Glick Indoor Self Storage Large Plan Pg 16OFFICE OF THE HAMILTON COUNTY SURVEYOR 7 F 0 r n f V E S R C 5 L A A E L N 1 5.0 ao zo to 0.0 EXISTING GRADE —4 III =y ‘5. `S :a HORIZONTAL g 3 (MIN.) ,tI I T 3 (MIN) I II !II II r IIf I III I El II '�r 11I I I I BY 0.2' URE SILTING 1 771 I 'r H POSED GRADE r I I I UNDE' WALE I TO ALLOW I I I I I I I I I I11 II 111 I 1 1 1 1 A.g I I1I 810 UI IDI;RDRAIII3 RL'QUIRLD It1 311 �1a tt t11 LGJJ i rii1V i,' L,U y EXISTING GRADE I I 1 _r` 3 (MIN.) r tl rr? I I 805 I I 3 (MIN.) I I a W1 S PROPOSED GRADE 800 I I 1=_ I I I I I I ,--(1,-111 I I I PROPOSED GRADE BY 0.2' SILTING I I UNDERCUT SWALE I TO ALLOW FOR FUTURE /2 nu' (N) I I �0DO 00 I I I I 11 1 I 1 1 C I e 1 1 111 1 I I -I 763 PERFORATED SUBSURFACE DRAIN WITH MINIMUM 0.5% GRADIENT. SEE DEVELOPMENT PLAN FOR (6" MINIMUM) AND INVERT ELEVATIONS. 1 (SSD) PIPE SIZES TO SCALE) 0,--) D �O 3 N TILE SHALL 11TH WALL PERFORA PI TYPICAL SWALE ALL SUBSURFACE DRAINS IL SHABE CONSTRUCTED WITH DOUBLE WALL HANCOR1 OR EQUIVALENT DETAIL (DRAWING NOT HAMILTON COUNTY SURVEYOR'S OFFICE 780 REVISED 16 AUG 2005 APPROVED C: v 811[,l DC-- STANDARD PLAN D-16 KENT C. WARD, H ILTON COUNTY SURVEYOR DATE to U DLL +V' a o I 0 as 0 0 rn 0 O cV o o N D N 0.) A Z Or �I 6 F- O o 1 10 9 9 8 I 7 8 7 6 6 5 5 FIGURE 501 -1 Bedding and Backfill Standards for Storm Sewers RCP TRENCH DETAIL FOR CITY STORM SEWERS NO SCALE s NOTES! FINAL BACKFILL HAUNCHINC /2) L PAVEMENT SECTION VARIES 4 Bc SPKINGi INI 6" MINIMUM CF TO'SOL CI OF CARMv'L L S 7ANDARD 5 MNIIMUI. COVER SHALL BE PER NOTE 3 MILL!' I uF I AIL I Oli CI I Y S I OkIM SLb�'t_I�S STORM SEWER PLAN AND PROFILE NOTES: SEE STRUCTUE DATA TABLE ON GRADING PLAN, SHEET C301, FOR STRUCTURE AND CASTING TYPES. LEGEND 8c OUTSIDE DIAMETER D INSIDE DIAMETER d DEPTH OF BEDDING MATERIAL BFI.OW PIPE DEPTH OF BEDDING MATERIAL BELOW PIPE I d d MIN 60" SMALLER 4" 66" LARGER 6" 1, BED!NG AND HAUNCHING FOR ALL RCP TNSTALL.ATIONS SHALE BE 18 STONE MEETING THE MATERIAL REQUIREMENTS OF THE INDOT. BEDDING SHAL.. BE PLACED IN THE TRENCH 8011011 SUCH THAT AFTER 1HF PIPE IS INS1AIIEC TO GRADE AND LINE. THERE REMAINS A 4' IA NATUM DEPTH OF MATERIAL BELOW THE PIPE BARREL AND A MINIMUM OF 3" BELOW THE BELL. FOR PIPE SIZES 66" AND LARGER, HIE MINIMUM DEPTH OF MATERIAL BELOW THE PIPE BARREL SHALL BL 6 BEDDING SHALL BE PLACED TO BE UNIFORM AS POSSIBLE, BUT SHAI1 BE LOOSELY PLACED UNCOMPACTEO MATERIA! UNDER THE JIUDLE THIRD OF THE PIPE PRIOR 10 PLACEUENT CF THE PPE. IF THE UNDERLYING SCILS OF THE TRENCH BOTTOM ARE SOT T OR YLILDING, 1HL SOIL SHALL L L UNDERCUT TO SUCH A DEPTH 'HAT WIEN REPAIRED YMTH 12 STONE 11 WILL PRODUCE A LJNIFORLI AND STABl E FOJN:DATTON ALONG T1-'E ENTIRE LENGTH OF THE PIPE. HAUNCHING AND INITIAL EIACKFILL SHALL BE COMPACTED IN E` MAXIMUM. LIFTS TO NOT LESS THAN 90% STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF THE MATERIAL PLACED. THE BACKFILI SHALL 3E BR3JC;HT UP EVENLY ON BOTH SID=S CF THE PIPE FOR THE FULL L-ENGIH OF HE PIPE. HA'JNCHHNG SHALL EXTEND 10 11IE SPRNG_HNE OF THE PIPE. MINIMUM 1RENC WIDTH SMALL Iii= THE O.1TSDE. DIAMETER OE THE PIPE PLUS T8 7. FINA?. BACKFILE FOR ALL RCP INSTALLATIONS WHERE "1" IS 5' OR LESS SHALL 9F R- RORRC'A' FOR STRUCTURE BACKFILI MEETING THE MATERIAL REOU)REMENTS OF THE INDOT AND SHALL BE COMPACTED IN 6' MAXIMUM LIFTS 0 NOT LESS THAN 95% STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF THE MATERIAL PLACED. THE BACKFILI FOR THE TOP 6" OF THE EXCAVATON BELOW THE START OF THE AGGREGATE SUBBASE OF THE PAVEMENT SHALL BE X153 STONE MEETING THE MATERIAL REOUIREMENTS OF THE 'MOOT AND SHALL RE COMPACTED TO NOT IFSS THAN 95% STANDARD PROCTOR DENSITY. FINAL BACKFILL TOR ALL RCS INSTALLATIONS NI1ERC "L" IS GREATER THAN 5' SHALL BE CLEAN FILL MATERIAL FREE. 0! ROCKS LARGER THAN 6" IN DIAMA1FR, FROZEN LUMPS OF SUIT., WOOD OR OTHER EXTRANEOUS MATERIAL, COMPACTED IN 12" MAXIMUM LIFTS TO NOT LESS THAN 90% STANDARD PROCTOR DENSITY FCR THE ENTIRE DEPTH OF THE EXCAVATION. THE FINAL 6 INCHES OF THE EXCAVATION SiiALL CONSIST Of TOPSO'L 3. 111E. MINIMLN. COVER TROM THL TOT'' Of TA INSTALLED PAVEMENT 10 HI 10P OF THE INSTALLED PIPE SHALL 13E "HE PAVEMENT SECTION THICKNESS (ALL BITUMINOUS AND AGGREGATE MATERIAL ABOVE 1Pk SUEGRADE) Fl US 1' -0 BL i UNDER NO CIRCUMSTA'YCYS STALL 1HC COVER ALONG ANY PART Or THE PIPE TROY THE FINAL PAVEMENT LLEVAIION TO THE TOT' OF THE PIPE BE LESS THAN 2.5 FEET. 4. tF EXISTING SUBGRADE HAS BEEN LIVE STAB,L)ZED, BACKFILL WTH B- BORROW UP 10 BOTTOM OF UNTREATED EXISTING SJBGRADE AND FILL TO TOP OF TREATED 9UOGRADL WITH LIME STASAL!LLD SOL 5. THESE STANDARDS SHALL APPLY FOR STORV SEWERS INSTALLED 54 'THIN CITY EXISTING AND PROPOSED R /1Y1 REGARDLESS bF JURISDICTION OVER STORM PRES. 6. ALL STORM PIPE WTHIN EXISTING OR PROPOSED CITY R /W' SHALL BE REINFORCED CONCRETE PPE REGARDLESS OF JURISDICTION OVER STORY PIPES. STANDARD DR NC 10 28 MINIMUM COVER FOR PIPE CROSSINGS WITHIN CITY RIGHT -OF -WAY FOR INSTALLATION OF STORM MAINS, WATER MAINS, SANITARY MAINS, WATER SERVICE LATERALS, SANITARY SERVICE LATERALS UNDER CITY STREETS, REGARDLESS OF JURISDICTION OF THE UTILITY, THE MINIMUM COVER FROM THE TOP OF THE INSTALLED PAVEMENT TO THE TOP OF THE INSTALLED PIPE SHALL BE THE PAVEMENT SECTION THICKNESS (ALL BITUMINOUS AND AGGREGATE MATERIAL ABOVE THE SUBGRADE) PLUS 1 -0 BUT UNDER NO CIRCUMSTANCES SHALL THE COVER ALONG ANY PART OF THE PIPE FROM THE FINAL PAVEMENT ELEVATION TO THE TOP OF THE PIPE BE LESS THAN 2.5 –FEET. IF THE STANDARD PRACTICE OF THE UTILITY THAT HAS JURISDICTION OVER THE INSTALLATION HAS A MORE STRINGENT COVER REQUIREMENT, THE MORE STRINGENT REQUIREMENT SHALL GOVERN. COVER HEIGHTS FOR REINFORCED CONCRETE PIPE STORM SEWER THAT ARE LESS THAN THOSE REQUIRED WILL BE EVALUATED ON A CASE BY CASE CONDITION AND APPROVED ONLY WITH WRITTEN PERMISSION BY THE CITY ENGINEER. THE STORM SEWER SYSTEM SHALL BE CONSTRUCTED PER DESIGN SPECIFIED AND AS APPROVED BY THE CITY OF CARMEL ON THE FINAL APPROVED CONSTRUCTION PLANS. EVIATIONS FROM THE APPROVED DESIGN SHALL ONLY BE PERMITTED DUE TO SPECIAL CIRCUMSTANCES OR DIFFICULTY DURING CONSTRUCTION AND WILL REQUIRE PRIOR FIELD APPROVAL FROM A DESIGNATED REPRESENTATIVE OF THE CITY OF CARMEL IN ADDITION TO SUPPLEMENTAL APPROVAL BY THE DESIGN ENGINEER. AN EXPLANATION OF ANY SUCH EVIATION SHALL BE INCLUDED AS A REQUIREMENT ON AS– BUILT /RECORD DRAWINGS SUBMITTED FOR RELEASE OF PERFORMANCE GUARANTEES. APPROVED DESIGN SLOPES IDENTIFIED AS GENERATING VELOCITIES OF 2.5 FPS OR LESS OR 10 FPS OR GREATER (AT FULL FLOW CAPACITY) SHALL REQUIRE AS –BUILT CERTIFICATION AT THE TIME OF CONSTRUCTION, PRIOR TO BACKFILLING THE PIPE. THE CONTRACTOR IS INSTRUCTED TO AS –BUILT EACH SECTION OF STORM PIPE AS IT IS BEING INSTALLED TO ENSURE COMPLIANCE WITH THE DESIGN PLANS AND AS APPROVED BY THE CITY OF CARMEL. FULL DEPTH GRANULAR BACKFILL SHALL BE PER DETAIL 10 -28 ON THIS SHEET. REFER TO DETAIL 10 -28, THIS SHEET, FOR TRENCHING, BACKFILL AND COVER REQUIREMENTS. PIPES LENGTHS ARE MEASURED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE AND DOES NOT INCLUDE END SECTIONS. THERE SHALL BE NO FRAMES, CASTINGS, OR VALVE BOX EXTENSIONS IN THE STREET PAVEMENT, CURBS, SIDEWALKS, OR ASPHALT PATH FOR ANY UTILITY INSTALLATIONS IN THE RIGHT –OF –WAY WITH THE EXCEPTION OF CURB INLET CASTINGS. 3 3:1 SLOPE 3:1 SLOPE 808.0 r -D� 3:1 SLOPE 808.70 2 15' -0" DRY DETENTION DETAIL CROSS SECTION (NO SCALE) FLOODWAY MITIGATION (NORTH) o SPILLWAY BED 807.66 I I I 1 I I I It' II I III I II III III III III I DRY DETENTION (SOUTH) EMERGENCY SPILLWAY CROSS SECTION (NO SCALE) 3:1 SLOPE COMPACTED SURFACE W/ EROSION CONROL BLANKET. 808.70 COMPACTED SURFACE W/ EROSION CONROL BLANKET. TAC S i4'J'E/D 6 4 2009 1 7 F 0 r n f V E S R C 5 L A A E L N 1 5.0 ao zo to 0.0 I 0 SCALE: 1"=50' A le 8 ‘5. `S :a HORIZONTAL g 820 820 815 9- h DWG NAME: C601 STM PNP.DWG 815 810 CHECKED BY: JES DATE: 4/7/2009 A.g EXISTING GRADE 'M. STR. #103 a 0 +90.13 807.66 IX STORM I N L: E SHEET C60 810 805 STR. 1102 W4 *WE1 it' 0, 'r. of*c s, 4 4 OF i 'O ANA ummittO -o (1) V v w F- cD (J) PREPARED FOR: RANGE LINE ROAD SELF STORA GE PROJECT CLICK SELF STORAGE, LLC. 805 o 800 a W1 S PROPOSED GRADE 800 87' of 12" RCP N. 795 /2 nu' (N) 795 790 790 785 785 780 780 775 775 —0+50 0 +00 0 +50 1 +00 to U DLL +V' a o I 0 as 0 0 rn 0 O cV o o N D N 0.) A Z Or �I 6 F- O o 1 10 9 9 8 I 7 8 7 6 6 5 5 FIGURE 501 -1 Bedding and Backfill Standards for Storm Sewers RCP TRENCH DETAIL FOR CITY STORM SEWERS NO SCALE s NOTES! FINAL BACKFILL HAUNCHINC /2) L PAVEMENT SECTION VARIES 4 Bc SPKINGi INI 6" MINIMUM CF TO'SOL CI OF CARMv'L L S 7ANDARD 5 MNIIMUI. COVER SHALL BE PER NOTE 3 MILL!' I uF I AIL I Oli CI I Y S I OkIM SLb�'t_I�S STORM SEWER PLAN AND PROFILE NOTES: SEE STRUCTUE DATA TABLE ON GRADING PLAN, SHEET C301, FOR STRUCTURE AND CASTING TYPES. LEGEND 8c OUTSIDE DIAMETER D INSIDE DIAMETER d DEPTH OF BEDDING MATERIAL BFI.OW PIPE DEPTH OF BEDDING MATERIAL BELOW PIPE I d d MIN 60" SMALLER 4" 66" LARGER 6" 1, BED!NG AND HAUNCHING FOR ALL RCP TNSTALL.ATIONS SHALE BE 18 STONE MEETING THE MATERIAL REQUIREMENTS OF THE INDOT. BEDDING SHAL.. BE PLACED IN THE TRENCH 8011011 SUCH THAT AFTER 1HF PIPE IS INS1AIIEC TO GRADE AND LINE. THERE REMAINS A 4' IA NATUM DEPTH OF MATERIAL BELOW THE PIPE BARREL AND A MINIMUM OF 3" BELOW THE BELL. FOR PIPE SIZES 66" AND LARGER, HIE MINIMUM DEPTH OF MATERIAL BELOW THE PIPE BARREL SHALL BL 6 BEDDING SHALL BE PLACED TO BE UNIFORM AS POSSIBLE, BUT SHAI1 BE LOOSELY PLACED UNCOMPACTEO MATERIA! UNDER THE JIUDLE THIRD OF THE PIPE PRIOR 10 PLACEUENT CF THE PPE. IF THE UNDERLYING SCILS OF THE TRENCH BOTTOM ARE SOT T OR YLILDING, 1HL SOIL SHALL L L UNDERCUT TO SUCH A DEPTH 'HAT WIEN REPAIRED YMTH 12 STONE 11 WILL PRODUCE A LJNIFORLI AND STABl E FOJN:DATTON ALONG T1-'E ENTIRE LENGTH OF THE PIPE. HAUNCHING AND INITIAL EIACKFILL SHALL BE COMPACTED IN E` MAXIMUM. LIFTS TO NOT LESS THAN 90% STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF THE MATERIAL PLACED. THE BACKFILI SHALL 3E BR3JC;HT UP EVENLY ON BOTH SID=S CF THE PIPE FOR THE FULL L-ENGIH OF HE PIPE. HA'JNCHHNG SHALL EXTEND 10 11IE SPRNG_HNE OF THE PIPE. MINIMUM 1RENC WIDTH SMALL Iii= THE O.1TSDE. DIAMETER OE THE PIPE PLUS T8 7. FINA?. BACKFILE FOR ALL RCP INSTALLATIONS WHERE "1" IS 5' OR LESS SHALL 9F R- RORRC'A' FOR STRUCTURE BACKFILI MEETING THE MATERIAL REOU)REMENTS OF THE INDOT AND SHALL BE COMPACTED IN 6' MAXIMUM LIFTS 0 NOT LESS THAN 95% STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF THE MATERIAL PLACED. THE BACKFILI FOR THE TOP 6" OF THE EXCAVATON BELOW THE START OF THE AGGREGATE SUBBASE OF THE PAVEMENT SHALL BE X153 STONE MEETING THE MATERIAL REOUIREMENTS OF THE 'MOOT AND SHALL RE COMPACTED TO NOT IFSS THAN 95% STANDARD PROCTOR DENSITY. FINAL BACKFILL TOR ALL RCS INSTALLATIONS NI1ERC "L" IS GREATER THAN 5' SHALL BE CLEAN FILL MATERIAL FREE. 0! ROCKS LARGER THAN 6" IN DIAMA1FR, FROZEN LUMPS OF SUIT., WOOD OR OTHER EXTRANEOUS MATERIAL, COMPACTED IN 12" MAXIMUM LIFTS TO NOT LESS THAN 90% STANDARD PROCTOR DENSITY FCR THE ENTIRE DEPTH OF THE EXCAVATION. THE FINAL 6 INCHES OF THE EXCAVATION SiiALL CONSIST Of TOPSO'L 3. 111E. MINIMLN. COVER TROM THL TOT'' Of TA INSTALLED PAVEMENT 10 HI 10P OF THE INSTALLED PIPE SHALL 13E "HE PAVEMENT SECTION THICKNESS (ALL BITUMINOUS AND AGGREGATE MATERIAL ABOVE 1Pk SUEGRADE) Fl US 1' -0 BL i UNDER NO CIRCUMSTA'YCYS STALL 1HC COVER ALONG ANY PART Or THE PIPE TROY THE FINAL PAVEMENT LLEVAIION TO THE TOT' OF THE PIPE BE LESS THAN 2.5 FEET. 4. tF EXISTING SUBGRADE HAS BEEN LIVE STAB,L)ZED, BACKFILL WTH B- BORROW UP 10 BOTTOM OF UNTREATED EXISTING SJBGRADE AND FILL TO TOP OF TREATED 9UOGRADL WITH LIME STASAL!LLD SOL 5. THESE STANDARDS SHALL APPLY FOR STORV SEWERS INSTALLED 54 'THIN CITY EXISTING AND PROPOSED R /1Y1 REGARDLESS bF JURISDICTION OVER STORM PRES. 6. ALL STORM PIPE WTHIN EXISTING OR PROPOSED CITY R /W' SHALL BE REINFORCED CONCRETE PPE REGARDLESS OF JURISDICTION OVER STORY PIPES. STANDARD DR NC 10 28 MINIMUM COVER FOR PIPE CROSSINGS WITHIN CITY RIGHT -OF -WAY FOR INSTALLATION OF STORM MAINS, WATER MAINS, SANITARY MAINS, WATER SERVICE LATERALS, SANITARY SERVICE LATERALS UNDER CITY STREETS, REGARDLESS OF JURISDICTION OF THE UTILITY, THE MINIMUM COVER FROM THE TOP OF THE INSTALLED PAVEMENT TO THE TOP OF THE INSTALLED PIPE SHALL BE THE PAVEMENT SECTION THICKNESS (ALL BITUMINOUS AND AGGREGATE MATERIAL ABOVE THE SUBGRADE) PLUS 1 -0 BUT UNDER NO CIRCUMSTANCES SHALL THE COVER ALONG ANY PART OF THE PIPE FROM THE FINAL PAVEMENT ELEVATION TO THE TOP OF THE PIPE BE LESS THAN 2.5 –FEET. IF THE STANDARD PRACTICE OF THE UTILITY THAT HAS JURISDICTION OVER THE INSTALLATION HAS A MORE STRINGENT COVER REQUIREMENT, THE MORE STRINGENT REQUIREMENT SHALL GOVERN. COVER HEIGHTS FOR REINFORCED CONCRETE PIPE STORM SEWER THAT ARE LESS THAN THOSE REQUIRED WILL BE EVALUATED ON A CASE BY CASE CONDITION AND APPROVED ONLY WITH WRITTEN PERMISSION BY THE CITY ENGINEER. THE STORM SEWER SYSTEM SHALL BE CONSTRUCTED PER DESIGN SPECIFIED AND AS APPROVED BY THE CITY OF CARMEL ON THE FINAL APPROVED CONSTRUCTION PLANS. EVIATIONS FROM THE APPROVED DESIGN SHALL ONLY BE PERMITTED DUE TO SPECIAL CIRCUMSTANCES OR DIFFICULTY DURING CONSTRUCTION AND WILL REQUIRE PRIOR FIELD APPROVAL FROM A DESIGNATED REPRESENTATIVE OF THE CITY OF CARMEL IN ADDITION TO SUPPLEMENTAL APPROVAL BY THE DESIGN ENGINEER. AN EXPLANATION OF ANY SUCH EVIATION SHALL BE INCLUDED AS A REQUIREMENT ON AS– BUILT /RECORD DRAWINGS SUBMITTED FOR RELEASE OF PERFORMANCE GUARANTEES. APPROVED DESIGN SLOPES IDENTIFIED AS GENERATING VELOCITIES OF 2.5 FPS OR LESS OR 10 FPS OR GREATER (AT FULL FLOW CAPACITY) SHALL REQUIRE AS –BUILT CERTIFICATION AT THE TIME OF CONSTRUCTION, PRIOR TO BACKFILLING THE PIPE. THE CONTRACTOR IS INSTRUCTED TO AS –BUILT EACH SECTION OF STORM PIPE AS IT IS BEING INSTALLED TO ENSURE COMPLIANCE WITH THE DESIGN PLANS AND AS APPROVED BY THE CITY OF CARMEL. FULL DEPTH GRANULAR BACKFILL SHALL BE PER DETAIL 10 -28 ON THIS SHEET. REFER TO DETAIL 10 -28, THIS SHEET, FOR TRENCHING, BACKFILL AND COVER REQUIREMENTS. PIPES LENGTHS ARE MEASURED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE AND DOES NOT INCLUDE END SECTIONS. THERE SHALL BE NO FRAMES, CASTINGS, OR VALVE BOX EXTENSIONS IN THE STREET PAVEMENT, CURBS, SIDEWALKS, OR ASPHALT PATH FOR ANY UTILITY INSTALLATIONS IN THE RIGHT –OF –WAY WITH THE EXCEPTION OF CURB INLET CASTINGS. 3 3:1 SLOPE 3:1 SLOPE 808.0 r -D� 3:1 SLOPE 808.70 2 15' -0" DRY DETENTION DETAIL CROSS SECTION (NO SCALE) FLOODWAY MITIGATION (NORTH) o SPILLWAY BED 807.66 I I I 1 I I I It' II I III I II III III III III I DRY DETENTION (SOUTH) EMERGENCY SPILLWAY CROSS SECTION (NO SCALE) 3:1 SLOPE COMPACTED SURFACE W/ EROSION CONROL BLANKET. 808.70 COMPACTED SURFACE W/ EROSION CONROL BLANKET. TAC S i4'J'E/D 6 4 2009 1 PEERS 9- PROJECT NO.: W09 -0041 DWG NAME: C601 STM PNP.DWG DESIGNED BY: EEF DRAWN BY: BMB /ATM CHECKED BY: JES DATE: 4/7/2009 A.g a) REVISIONS AND ISSUES W4 *WE1 it' 0, 'r. of*c s, 4 4 OF i 'O ANA ummittO -o JAMES E. SHIELDS JR. P.E. 10201333 PREPARED FOR: RANGE LINE ROAD SELF STORA GE PROJECT CLICK SELF STORAGE, LLC. STORM PLAN AND PROFILE /DETAIL SHEET Part of the SW /4 Sec. 19- T18N -R4E, Hamilton County, Indiana o a SHEET NO. C601 PROJECT NO. W09 -0041 to U DLL +V' a o I 0 as 0 0 rn 0 O cV o o N D N 0.) A Z Or �I 6 F- O o 1 10 9 9 8 I 7 8 7 6 6 5 5 FIGURE 501 -1 Bedding and Backfill Standards for Storm Sewers RCP TRENCH DETAIL FOR CITY STORM SEWERS NO SCALE s NOTES! FINAL BACKFILL HAUNCHINC /2) L PAVEMENT SECTION VARIES 4 Bc SPKINGi INI 6" MINIMUM CF TO'SOL CI OF CARMv'L L S 7ANDARD 5 MNIIMUI. COVER SHALL BE PER NOTE 3 MILL!' I uF I AIL I Oli CI I Y S I OkIM SLb�'t_I�S STORM SEWER PLAN AND PROFILE NOTES: SEE STRUCTUE DATA TABLE ON GRADING PLAN, SHEET C301, FOR STRUCTURE AND CASTING TYPES. LEGEND 8c OUTSIDE DIAMETER D INSIDE DIAMETER d DEPTH OF BEDDING MATERIAL BFI.OW PIPE DEPTH OF BEDDING MATERIAL BELOW PIPE I d d MIN 60" SMALLER 4" 66" LARGER 6" 1, BED!NG AND HAUNCHING FOR ALL RCP TNSTALL.ATIONS SHALE BE 18 STONE MEETING THE MATERIAL REQUIREMENTS OF THE INDOT. BEDDING SHAL.. BE PLACED IN THE TRENCH 8011011 SUCH THAT AFTER 1HF PIPE IS INS1AIIEC TO GRADE AND LINE. THERE REMAINS A 4' IA NATUM DEPTH OF MATERIAL BELOW THE PIPE BARREL AND A MINIMUM OF 3" BELOW THE BELL. FOR PIPE SIZES 66" AND LARGER, HIE MINIMUM DEPTH OF MATERIAL BELOW THE PIPE BARREL SHALL BL 6 BEDDING SHALL BE PLACED TO BE UNIFORM AS POSSIBLE, BUT SHAI1 BE LOOSELY PLACED UNCOMPACTEO MATERIA! UNDER THE JIUDLE THIRD OF THE PIPE PRIOR 10 PLACEUENT CF THE PPE. IF THE UNDERLYING SCILS OF THE TRENCH BOTTOM ARE SOT T OR YLILDING, 1HL SOIL SHALL L L UNDERCUT TO SUCH A DEPTH 'HAT WIEN REPAIRED YMTH 12 STONE 11 WILL PRODUCE A LJNIFORLI AND STABl E FOJN:DATTON ALONG T1-'E ENTIRE LENGTH OF THE PIPE. HAUNCHING AND INITIAL EIACKFILL SHALL BE COMPACTED IN E` MAXIMUM. LIFTS TO NOT LESS THAN 90% STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF THE MATERIAL PLACED. THE BACKFILI SHALL 3E BR3JC;HT UP EVENLY ON BOTH SID=S CF THE PIPE FOR THE FULL L-ENGIH OF HE PIPE. HA'JNCHHNG SHALL EXTEND 10 11IE SPRNG_HNE OF THE PIPE. MINIMUM 1RENC WIDTH SMALL Iii= THE O.1TSDE. DIAMETER OE THE PIPE PLUS T8 7. FINA?. BACKFILE FOR ALL RCP INSTALLATIONS WHERE "1" IS 5' OR LESS SHALL 9F R- RORRC'A' FOR STRUCTURE BACKFILI MEETING THE MATERIAL REOU)REMENTS OF THE INDOT AND SHALL BE COMPACTED IN 6' MAXIMUM LIFTS 0 NOT LESS THAN 95% STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF THE MATERIAL PLACED. THE BACKFILI FOR THE TOP 6" OF THE EXCAVATON BELOW THE START OF THE AGGREGATE SUBBASE OF THE PAVEMENT SHALL BE X153 STONE MEETING THE MATERIAL REOUIREMENTS OF THE 'MOOT AND SHALL RE COMPACTED TO NOT IFSS THAN 95% STANDARD PROCTOR DENSITY. FINAL BACKFILL TOR ALL RCS INSTALLATIONS NI1ERC "L" IS GREATER THAN 5' SHALL BE CLEAN FILL MATERIAL FREE. 0! ROCKS LARGER THAN 6" IN DIAMA1FR, FROZEN LUMPS OF SUIT., WOOD OR OTHER EXTRANEOUS MATERIAL, COMPACTED IN 12" MAXIMUM LIFTS TO NOT LESS THAN 90% STANDARD PROCTOR DENSITY FCR THE ENTIRE DEPTH OF THE EXCAVATION. THE FINAL 6 INCHES OF THE EXCAVATION SiiALL CONSIST Of TOPSO'L 3. 111E. MINIMLN. COVER TROM THL TOT'' Of TA INSTALLED PAVEMENT 10 HI 10P OF THE INSTALLED PIPE SHALL 13E "HE PAVEMENT SECTION THICKNESS (ALL BITUMINOUS AND AGGREGATE MATERIAL ABOVE 1Pk SUEGRADE) Fl US 1' -0 BL i UNDER NO CIRCUMSTA'YCYS STALL 1HC COVER ALONG ANY PART Or THE PIPE TROY THE FINAL PAVEMENT LLEVAIION TO THE TOT' OF THE PIPE BE LESS THAN 2.5 FEET. 4. tF EXISTING SUBGRADE HAS BEEN LIVE STAB,L)ZED, BACKFILL WTH B- BORROW UP 10 BOTTOM OF UNTREATED EXISTING SJBGRADE AND FILL TO TOP OF TREATED 9UOGRADL WITH LIME STASAL!LLD SOL 5. THESE STANDARDS SHALL APPLY FOR STORV SEWERS INSTALLED 54 'THIN CITY EXISTING AND PROPOSED R /1Y1 REGARDLESS bF JURISDICTION OVER STORM PRES. 6. ALL STORM PIPE WTHIN EXISTING OR PROPOSED CITY R /W' SHALL BE REINFORCED CONCRETE PPE REGARDLESS OF JURISDICTION OVER STORY PIPES. STANDARD DR NC 10 28 MINIMUM COVER FOR PIPE CROSSINGS WITHIN CITY RIGHT -OF -WAY FOR INSTALLATION OF STORM MAINS, WATER MAINS, SANITARY MAINS, WATER SERVICE LATERALS, SANITARY SERVICE LATERALS UNDER CITY STREETS, REGARDLESS OF JURISDICTION OF THE UTILITY, THE MINIMUM COVER FROM THE TOP OF THE INSTALLED PAVEMENT TO THE TOP OF THE INSTALLED PIPE SHALL BE THE PAVEMENT SECTION THICKNESS (ALL BITUMINOUS AND AGGREGATE MATERIAL ABOVE THE SUBGRADE) PLUS 1 -0 BUT UNDER NO CIRCUMSTANCES SHALL THE COVER ALONG ANY PART OF THE PIPE FROM THE FINAL PAVEMENT ELEVATION TO THE TOP OF THE PIPE BE LESS THAN 2.5 –FEET. IF THE STANDARD PRACTICE OF THE UTILITY THAT HAS JURISDICTION OVER THE INSTALLATION HAS A MORE STRINGENT COVER REQUIREMENT, THE MORE STRINGENT REQUIREMENT SHALL GOVERN. COVER HEIGHTS FOR REINFORCED CONCRETE PIPE STORM SEWER THAT ARE LESS THAN THOSE REQUIRED WILL BE EVALUATED ON A CASE BY CASE CONDITION AND APPROVED ONLY WITH WRITTEN PERMISSION BY THE CITY ENGINEER. THE STORM SEWER SYSTEM SHALL BE CONSTRUCTED PER DESIGN SPECIFIED AND AS APPROVED BY THE CITY OF CARMEL ON THE FINAL APPROVED CONSTRUCTION PLANS. EVIATIONS FROM THE APPROVED DESIGN SHALL ONLY BE PERMITTED DUE TO SPECIAL CIRCUMSTANCES OR DIFFICULTY DURING CONSTRUCTION AND WILL REQUIRE PRIOR FIELD APPROVAL FROM A DESIGNATED REPRESENTATIVE OF THE CITY OF CARMEL IN ADDITION TO SUPPLEMENTAL APPROVAL BY THE DESIGN ENGINEER. AN EXPLANATION OF ANY SUCH EVIATION SHALL BE INCLUDED AS A REQUIREMENT ON AS– BUILT /RECORD DRAWINGS SUBMITTED FOR RELEASE OF PERFORMANCE GUARANTEES. APPROVED DESIGN SLOPES IDENTIFIED AS GENERATING VELOCITIES OF 2.5 FPS OR LESS OR 10 FPS OR GREATER (AT FULL FLOW CAPACITY) SHALL REQUIRE AS –BUILT CERTIFICATION AT THE TIME OF CONSTRUCTION, PRIOR TO BACKFILLING THE PIPE. THE CONTRACTOR IS INSTRUCTED TO AS –BUILT EACH SECTION OF STORM PIPE AS IT IS BEING INSTALLED TO ENSURE COMPLIANCE WITH THE DESIGN PLANS AND AS APPROVED BY THE CITY OF CARMEL. FULL DEPTH GRANULAR BACKFILL SHALL BE PER DETAIL 10 -28 ON THIS SHEET. REFER TO DETAIL 10 -28, THIS SHEET, FOR TRENCHING, BACKFILL AND COVER REQUIREMENTS. PIPES LENGTHS ARE MEASURED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE AND DOES NOT INCLUDE END SECTIONS. THERE SHALL BE NO FRAMES, CASTINGS, OR VALVE BOX EXTENSIONS IN THE STREET PAVEMENT, CURBS, SIDEWALKS, OR ASPHALT PATH FOR ANY UTILITY INSTALLATIONS IN THE RIGHT –OF –WAY WITH THE EXCEPTION OF CURB INLET CASTINGS. 3 3:1 SLOPE 3:1 SLOPE 808.0 r -D� 3:1 SLOPE 808.70 2 15' -0" DRY DETENTION DETAIL CROSS SECTION (NO SCALE) FLOODWAY MITIGATION (NORTH) o SPILLWAY BED 807.66 I I I 1 I I I It' II I III I II III III III III I DRY DETENTION (SOUTH) EMERGENCY SPILLWAY CROSS SECTION (NO SCALE) 3:1 SLOPE COMPACTED SURFACE W/ EROSION CONROL BLANKET. 808.70 COMPACTED SURFACE W/ EROSION CONROL BLANKET. TAC S i4'J'E/D 6 4 2009 1