Loading...
HomeMy WebLinkAbout09040009-10 Glick Indoor Self Storage Large Plan Pg 20cn 0 w a I- F— z 0 a 0 i O 0 if) d Cr 0 rn 0 0 0) 0 0 nl 8) 0 N 0 N O c /0 0 CO L O E F- 1 QW n.i LPSS MAIN (HPDE DR -11) 4 a I II -III III -II CONCRETE THRUST BLOCKING CONCRETE TO BE POURED BETWEEN PIPE Sc FIRM FACE OF TRENCH AT ALL TEES BENDS PLUGS TYPICAL THRUST BLOCKING (NO SCALE) EXCAVATION REDUCER CLOCK VALVE PRESSURE GAUGE TYPICAL TESTING OF FORCEMAIN (NO SCALE) MINIMUM COVER FOR PIPE CROSSINGS WITHIN CITY RIGHT —OF —WAY For installation of Storm Mains, Water Mains, Sanitary Mains, Water Service Laterals, Sanitary Service Laterals under City streets, regardless of jurisdiction of the utility, the minimum cover from the top of the installed pavement to the top of the installed pipe shall be the pavement section thickness (all bituminous and aggregate material above the subgrade) plus 1 —0 but under no circumstances shall the cover along any part of the pipe from the final pavement elevation to the top of the pipe be less than 2.5 —feet. If the standard practice of the utility that has jurisdiction over the installation has a more stringent cover requirement, the more stringent requirement shall govern. Cover heights for reinforced concrete pipe storm sewer that are less than those required will be evaluated on a case by case condition and approved only with written permission by the city engineer. 17F 6” 2 —6" -0" 4" 8" 2'-6" 2' -1 4" 10" 2' -6" 2' -3" 4" 12" 2' -9" 2' -5" 4" 15" 3' -0" 2' -8" 5" 18" 3' -6" 3'—O" 5" 21" 3' -11" 3' -4" 6" 24" 4' -3" 3' -8" 6" 27" 5' -6" 3' -11" 6" 30" 5' -9" 4' -4" 6" 36" 6' -3" 5' -2" 6" 42" 6' —11 8" 48" 7' -4" 9" 54" 8'—O" 9" 60" 8' -6" 9" 66" 9' -1" 9" 72" 9' -8" 10" 78" 10' -3" 10" 2" DISCHARGE LINE TYPICAL OUTDOOR INSTALLATION a: environment MODEL 2.10 CORPORATION Q 0. CONTROL PANEL E -ONE SUPPLY CABLE -GRAVITY SERVICE LINE LM000112 REV. A WATER AND SEWER UNDER PAVEMENT, SIDEWALK, PAVED AREAS AND WITHIN RIGHT —OF —WAY BEDDING, HAUNCHING, INITIAL BACKFILL Bedding, Haunching and initial backfill requirements and compaction for water mains, water service laterals, sanitary mains and sanitary service laterals shall be in accordance with the standard practice of the utility that has jurisdiction over the installation. FINAL BACKFILL Final backfill for water mains, water service laterals, sanitary mains and sanitary service laterals under and within 5- -feet of pavement or sidewalk or other paved areas and for all installations within City right —of —way shall be B— Borrow for Structure Backfill meeting the material requirements of the INDOT. The material shall be approved by the City of Carmel Department of Engineering at time of installation. Final backfill shall be compacted in 6 —inch maximum lifts to not less than 95% Standard Proctor Density for the entire depth of the material placed. The backfill for the top 6— inches of the excavation below the start of the aggregate sub —base of the pavement shall be No. 53 Stone meeting the material requirement of the INDOT and shall be compacted to not less than 95% Standard Proctor Density. If the standard practice of the utility that has jurisdiction ove'^ the installation has a more stringent backfill requirement, the more stringent requirement shall govern. TRENCH SCHEDULE Table Is For ASTM D -3034, Wall Thickness Class SDR 35 For 6 -15" And ASTM F-679 Wall Thickness Class T -1 For 18 -36. For Other Flexible Pipes, Minimum Trench Width "U" Shall Meet Manufacturer's Requirements. 1' -0" Minimum Undisturbed Ground Existing Pavement Saw Cut Straight Edge Special Backfill Under Pavement, Drives, Walks Or Where Ordered Tamped In 6" Layers Special Backfill Shall Conform To INDOT 211.02b Undisturbed Earth "W" or "U" At Top Of Pipe Match Existing Pavement Material And Thickness TRENCH DETAIL FOR SEWER AND WATER MAINS NTS Date: March 2001 Approved Excavated Material In Unpaved Areas Unless Otherwise Directed Note: CITY OF CARMEL STANDARD DETAILS Under Existing Sewers, Water Lines, Gas Lines, Telephone Cable And Electrical Conduits, Backfill With Granular Bedding Material To The Centerline Of The Existing Utility Lines. For Flexible Pipe With Solid Or Profile Walls, Granular Bedding Material Shall Be Placed And Hand Tamped In 6" Layers To A Minimum Of 1' -0" Above Pipe. Bed Pipe In Specified Granular Bedding Material Hand Tamped In to 8 to 12 inches above pipe. Bedding Material Shall Conform To INDOT 903.02, Size No. 8 Note: "W" Is The Maximum Width For Rigid Pipes. "U" Is The Minimum Width For Flexible Pipes In Accordance With ASTM D -2321. Note: All Ductile Iron water mains shall be bedded in sand, from the bottom of the trench to 12" above the pipe. Blue Reflective Tape must be installed 18" above all water mains. Note: Scale: Not To Scale TITLE: TRENCH DETAIL TRENCH SCHEDULE Jones Henry Engineers, Inc. Drawing Name: WATER TIGHT LID, FRP FIELD JOINT, REQUIRED FOR MODELS TALLER THAN 2010 93 ELECTRICAL QUICK DISCONNECT (EQD) CORE CONTROL COMPARTMENT BREATHER SS CAST BALL VALVE DISCHARGE 1 -1/4" FNPT 1 -1/4" DISCHARGE LINE (304 S.S.) 040 mrn CHECK VALVE (GLASS FILLED TO DISCHARGE PVC) ANTI SIPHON VALVE 7 (GLASS FILLED PVC) SEMI POSITIVE DISPLACEMENT TYPE PUMP DIRECTLY DRIVEN BY A 1 HP MOTOR CAPABLE OF DELIVERING 9 gpm AT 138' T.D.H. (34 Ipm AT 42m T.D.H.) NOTE: A CONCRETE ANCHOR IS REQUIRED TO PREVENT TANK FROM FLOATING. SEE INSTALLATION INSTRUCTIONS OR SPECIFIC CUT SHEET FOR SIZE AND WEIGHT OF ANCHOR GRADE MUST SLOPE AWAY FROM STATION 46 COVER OVER DISCH 36.0 DISCHARGE: 1 -1/4 FEMALE PIPE THREAD 30 DIA in 749 mm *SEE INSTALLATION INSTRUCTIONS FOR FURTHER DETAILS NOTE: A CONCRETE ANCHOR OF 2600 Ibs (17.3 cu ft) IS REQUIRED ON ALL MODEL 2010 93" STATIONS. F,P FILL TO GRADE WITH CLEAN, COACTABLE BACKFILL, SUCH AS PEA GRAVEL OR CRUSHED STONE, 1/8' 3/4• IN SIZE. CLAY AND SILTS ARE NOT ACCEPTABLE BACKFILL POURED PRE -CAST IN -PLACE NNMant UNDISTURBED EARTH CONCRETE ANCHOR GRAVEL BEDDING 55 INVERT DEPTH 14 in 345 mm 24 gal. CHK'D CHK'D STRAIN RELIEF CORD CONNECTOR A. N. N. N. PROTECTIVE CABLE SHROUD (HOPE) POWER /ALARM CABLE 12 -6 W /GND. INTERNAL WELL VENT 2.0' DIA. INLET, GROMMET TO ACCEPT 4.50" 0.D. PVC PIPE (STANDARD). DUST COVER SUPPLIED FOR SHIPMENT (NOT SUITABLE FOR BURIAL) i 35 in 898 mm 18 in 447 mm 32 gal. 5/31/01 05/31/01 26 in 650 mm ISSUE SEWER SYSTEMS MODEL 2010, DETAIL SHEET PA 0908 P01 ISSUE SEWER SYSTEMS MODEL 2010 -93 PA 0856 PO4 TO INLET NOTE: A MINIMUM OF 36 INCHES OF UNDISTURBED COVER TO BE MAINTAINED ABOVE PIPELINES AT ALL TIMES SCALE SCALE VAVAVi..Vi i..... i....VII P AU...i...A.❖.........•........% 10' MULTI-USE ASPHALT PATH DETAIL (NO SCALE) 1.0" -HMA #11 SURFACE t. 2" -HMA #8 BINDER 5 #53 STONE 1 1 �I 1 -1 1-1 1 I-1 1 f-1 11-1 1 f•- -1 11-1 1 1—, I�II�II�II�II�II�II� COMPACTED GRANULAR SUBGRADE (UNDISTURBED SUBGRADE OVER PIPEUNES) *ALL PAVING IS TO BE COMPLETED IN ONE PAVING SEASON P:A'1,'EMEr"iT N,lIN. BOTH SIOES OF TRENCH! 1. l SLIFIFACt C5 TO BC SLOPED AT IRE aSAME W C A s 'r C COMM E S',�4 ?MICE, 2, EI tSTIUC Pf KT1MNT T. t `W.I�N' CUT ?0R A BREAK »o 17 t 13 1O 81W R Me FROM SfTt1 s. 1.5° RAC, 0 11 F 5, !,47UMtINaOUS TACK AnpUf.i AS PER 91' JIMA H1CIRWkAYS STANDARD SPECIF•FP MJ R 4rj, 4'!+ �Iha, $L Y PLAN r. Dro,7 rIr r._, 13 rt'S HF,s 1.5" S71.00 71 EX'STING F*AVElot Et lrt ,.-LA: i. DE STEEL PLATED I RNO .'.0141:PE 'ft: 1_ LI ".L rNit pa 11 I,''i 7L ,r c:P'r'LLL PLIk IS aF 1 t..., I...d L.: HA C, 'SURFACE 12 T1 AMOK. I COP f:R 'TE TO BE :FINISHED 1.5 BELCrIN THf� EXISTr C PAAS;Ek4 4T ,FL'OW:AB_E FILL TO BE PLACED Et'.IT1R'T: TRENCH 1`O BOTTOM CF CONCRETE f.L,EVATI�C'P Pre?, TTYPICAL .I.TYPICAL SIDEWALK "Ei lkO'N 5 a': r-n Trx,t'OrSE: Shc.I "I .i E1 rw 1.- f?';'' 7-met vii-, vii-, 5 th l� Caicrcic Ti o FAY IWAMOWFAMOVAYAWAY AYAMOW WAY AMR ....momMo...mowa. •y: THE '..RACE ".r HT rTHE _Iw T r+. ,i� E �n RS 'FILLED a�' I7l-'I s _�h:�F":I I T T r7 ,i'I'4,4u '�i� B�_ i THE i a1. rEC':.:jr,jl EL,L'v;*A.TI,Q.A 1:_ F r- ,TEJ I L.,A, r, t' S I O "'•,'K I E Icy IN DEP L I. SECTION I ,,r'' OF ,�,RI'41`iEf �—:1 ,A I`�1DA RD 5 �II�IIIIIIII�II�II�llllll� Of COMPACTED GRANULAR SUBGRADE (UNDISTURBED SUBGRADE OVER PIPELINES) LOCAL STREET PAVEMENT SECTION (NO SCALE) NOTE: A MINIMUM OF 36 INCHES OF UNDISTURBED COVER TO BE MAINTAINED ABOVE PIPELINES AT ALL TIMES *ALL PAVING IS TO BE COMPLETED IN ONE PAVING SEASON COMPACTED SUBGRADE 1.5" HMA #11 SURFACE 2" —HMA #8 BINDER 3" HMA #5D BASE 7 #53 STONE 8" CONCRETE 6 #53 STONE CONCRETE PAVING SECTION WITHIN INDOT R/W (NO SCALE) GENERAL NOTES Theta cute ai t are bta ai on a E. CryrF, heFx t naar? alma It, p+nptr51oraa,F'y aat;usE!ad ,711 cub Natela tar 1 .4h sR.aaam, +qtr #i wialr!h may Ibe eats at ta e rrat aurn a(11' Babe ate* 0,.rb ram ri'ana' be aM rihl 'nrt I i edge ad as barraxni mamma and 1; 'Tar Ifjere Lad 01'A 'W. art Rt.n bap TO cart mania acre Nw,e rn ape r,.f v'..: t Ian :reay 'Sr a':, 6r t rr, aalmlr P kre f bM ry MbeliAtell B I R'Aril ac a i,4 frr0 1 in mrra' rlfroltrA the a.k'4:1 porpip h3vARlre' sr, fi r? tx t gear sh,M n^1 aesC erv^I tJ 1. 1110,,1 "0 fie i The Hilo^' thaw, the Eireara PrarttI may be rlra'- p @•.+�^I 3.a,ire.n'eaen Then ru'raf'rrrm; L'1 'i7B curb R rqarr Ova rr rn F ,.prn of i!n 1 1r^_a n'earerrn:aH 13 en a• l},ae'..n :'R°Rr5S1 ifhl.A M Lti r n -1.3* praverrl .1r rrl !'?e} r 8�e•a ;3's J tMpreaw3y E 004- WOCR-1;2 Per Rico a:* 11, rnlam tfd.3111141 ITTAI, 8 hk =ro Irtawar,to It alelate ra era, tsaia ed .oen bgrrP 41,1th. parr *wag be knead te. kat l +wa es 11 IB to P r cti w 2'�1" wkle e -I p r1N l be re, ry See deed skeet, M! n'mu- rr.r rnhBerraied math ,:11 n,iar", 44,1 0 T re- t1 ri.1 l F F' I," 4 C) I I I.,',: 1 �•-I W'- 1 1, r T r-11�_. I"1C3 Ll I'° TJ' 'C 7.:e I_ 'Fr:" �g•R ��y���, �.F'- r_ w• p.:- µ..r. Oki 'L I� v" (R Ll..• 1 `I r'rR/ L r. coN SECTION 8-0 SECTION AA 51 4V.1. 12 5 PrnnEure j rr 'u., L'artatateat aJ 1 taawalad fl0),, aervi .SECTION A-A 17o IQ' 1Pzier, e,;' r r. E. Leo. Pitorrwai 'Uhler vor PP aba 4915' PA.VLMFF•rr ALTERNATE CURS CONSTR,UCI )N 'iiaiatilr P6 'nd f+7rrrprlBa Sur* CE qotlsTRuc tICMN PET.ill ee Saralloll Llraa*wrrt E @W- ."*'i.'arr:F+! -t 2' Fcer darn. cartedriflaye er arnw B Sir 'Away Drawl r.� E allea'r'Bdta curb r°# s,rniin 10. Serr. garalard E e4)4,;,Y =4,11 F ct -1.1: bar l C,o,i Ir.r F elan tre :.snare] Ni, rf reetteritraa 11 Sara Standard Llrawee-4 E 04.44,Napr.a 432 acrta'P¢iv$! 10) ',x;# 'II 1'11 fly ;wl '41 LIB CURB RAMP €Y FE ft sarrOktet 1 :1 a MkL 1rw,Rrn S eta :r N.OTEB 54511 ST,51 l a d D l0 E. I? 64 Tcr grTxwe 0 l.arl9. 1- Stand DY3'd.40 E 8E41 dckaag at tNe werrnrry1 e13 Soo S•'Sr«4ard Dirmorig E 6041. S`r ";;H' 412 ftr' ItecrtEtW oat Ir1rinatructia,, Sa 51ar+de.f I D'ehroihlg F r0a 5'r"fcR•l'3 1 ^r typrAl nemp ex 04 tO. Sae S[sn#44n1 Drawing E 604- S1'"rk:F? -01 and %I rat' Lrx..Ert Raft srncC G tivrA1 Na_1t+es I IS a5aaty .5% 1:1,3 1t 11 Dr P,aF f NOTES S Sera afro Drarari nig E 0,14- ^VtE.Fb g lym3frr t CFHtea'ls. TAIL OF R't, 1WIP GR;Io i' r3.� L4'8q.,ev1„r x•m'•rA. ar�.pa dh'"baM4x W Irll e.laA rr.F e:l '.I i, I Vei::;l tttI AEA.L?I Cu'Ea.B't~i:AMPiR T 1 13 13S TEa,FaE1 tS !rraatnACnTaaa.aaa 14:) E 13gw- Efr'a'E Pm. eat NINA mr.' be *MIN CHANGE OF GRADE 4 -two* PAvorEsT 5iC 1AU(CtifCF5 GENERAL IN0 'PS 4 OFT}a LS SiEPTEI, F: :U :d �r adeettaT' Taaar at+l l■•? E Exu I� a5t4 ar t F Yrr' "1~' 'i. 1 0,1 Y''..) 1.4' I ,.1. R i. 'a<"1 ,t[ 1 f i, 'F; a 'r.` 4•1 ::e "C .a4.1; .P•1 f' li DATED 6/4/2009 10 10 9 9 8 8 7 7 6 6 5 5 4 4 3 3 2 2 SHEET NO. PROJECT NO. 00 M 00 00 O M 00 OF DiS N-- 49 c\a‘S iONALt /1 /1111111111 JAMES E. SHIELDS JR. P.E. 10201333 W09 -0041 a) 1 N 1 U cn 0 —J C800 0 0 c1 N W E-' 0 0 0 .0 0