HomeMy WebLinkAbout09040009-10 Glick Indoor Self Storage Large Plan Pg 5PIPE SIZE AVERAGE RIPRAP DIAMETER (D50) PRON WIDTH APRON LENGTH 8 1N. 3 1N. 2 TO 3 FEET 5 TO 7 FEET 12 IN. 5 IN. 3 TO 4 FEET 6 TO 12 FEET 18 IN. 8 IN. 4 TO 6 FEET 8 TO 18 FEET 24 IN. 10 IN. 6 TO 8 FEET 12 TO 22 FEET 30 I N. 12 IN. 8 TO 10 FEET 14 TO 28 FEET 36 IN. 14 IN. 10 TO 12 FEET 16 TO 32 FEET LOAD SLOPE MAX. DISTANCE ABOVE FENCE LESS THAN 2 TO 5% 5 TO 10% 10 TO 20% MORE THAN 2% 20% 100 75 50 25 15 FT. FT. FT FT. FT. B C r C C B A B B 0 Ui W 0 0 N 0 0 0 C 0 0 0) 0 0 0 4 N C /N N z o OF�w E �g o POST 2 "X2" WOOD OR 1.33 LBS /FOOT STEEL 6' MAX. SPACING FLOW UNDISTURBED GROUND OD N Z 2 "x2" OR 2 (4 WOOD FRAME DROP INLET WITH GRATE WOVEN FILTER FABRIC SILT FENCE MATERIAL COVER 8 "X4" TRENCH TO BE BACKFILLED AND COMPACTED FINISH GRADE SILT FENCE co IIIII -1 II C ATTACH THE WOVEN WIRE FENCE TO EACH POST WITH THREE WIRE TIES OR OTHER FASTENERS 36" MAX. (TYP.) \'��I ■ice_ I r .4 Riu -v--A EXTEND WIRE FENCE A MIN. OF 8" INTO GROUND POSTS: 2 X 4 WOODEN STAKE FENCE: WOVEN WIRE, 14 -1/2 GA., 6" MAX. MESH OPENING FABRIC: IN ACCORDANCE WITH ASTM D 6461 LATEST EDITION. INSTALLATION 1. DIG AN EIGHT -INCH DEEP, FOUR -INCH WIDE TRENCH AROUND THE PERIMETER OF THE INLET. 2. IF USING PRE ASSEMBLED GEOTEXTILE FABRIC AND POSTS, DRIVE THE POSTS INTO THE SOIL, TIGHTLY STRETCHING THE GEOTEXTILE FABRIC BETWEEN POSTS AS EACH IS DRIVEN. (POSTS MUST BE PLACED ON THE INLET SIDE OF THE ANCHOR TRENCH WITH THE GEOTEXTILE FABRIC ON THE SIDE OF THE TRENCH FARTHEST FROM THE INLET.) NOTE: IF ASSEMBLING THE GEOTEXTILE FABRIC AND POSTS ON -SITE, DRIVE THE POSTS INTO THE SOIL AND THEN SECURE THE GEOTEXTILE FABRIC TO THE POSTS BY PLACING A PIECE OF LATHE OVER THE FABRIC AND FASTENING IT TO THE POST (STRETCHING THE FABRIC BETWEEN POSTS AS IT IS FASTENED). 3. USE THE WRAP JOIN METHOD WHEN JOINING POSTS. 4. PLACE THE BOTTOM 12 INCHES OF GEOTEXTILE FABRIC INTO THE EIGHT -INCH DEEP TRENCH, LAYING THE REMAINING FOUR INCHES IN THE BOTTOM OF THE TRENCH AND EXTENDING AWAY FROM THE INLET. 5. BACKFILL THE TRENCH WITH SOIL MATERIAL AND COMPACT IT IN PLACE. 6. BRACE THE POSTS BY NAILING BRACES INTO EACH CORNER POST OR UTILIZE RIGID PANELS TO SUPPORT FABRIC. NOTE: IN SITUATIONS WHERE STORM WATER MAY BYPASS THE STRUCTURE, EITHER: SET THE TOP OF THE GEOTEXTILE FABRIC FILTER AT LEAST SIX INCHES LOWER THAN THE GROUND ELEVATION ON THE DOWN -SLOPE SIDE OF THE STORM DRAIN INLET, BUILD A TEMPORARY DIKE, COMPACTED TO SIX INCHES HIGHER THAN THE FABRIC, ON THE DOWN -SLOPE SIDE OF THE STORM DRAIN INLET, AND /OR USE IN CONJUNCTION WITH EXCAVATED DROP INLET PROTECTION. MAINTENANCE. INSPECT DAILY. INSPECT GEOTEXTILE FABRIC AND MAKE NEEDED REPAIRS IMMEDIATELY. REMOVE SEDIMENT FROM POOL AREA TO PROVIDE STORAGE FOR THE NEXT STORM EVENT. AVOID DAMAGING OR UNDERCUTTING FABRIC DURING SEDIMENT REMOVAL. WHEN CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE SEDIMENT, PROPERLY DISPOSE OF ALL CONSTRUCTION MATERIAL, GRADE AREA TO THE ELEVATION OF THE STORM DRAIN INLET TOP, THEN STABILIZE IMMEDIATELY. REFERENCED IN CHAPTER 7 PAGE 153 -157 IN THE INDIANA STORM WATER QUALITY MANUAL. 2 -WOOD POST /STAKES WRAPPED WITH SILT FENCE AND ROTATED AT LEAST ONE FULL TURN TO SECURE SILT FENCE END IN PLACE LI FA SILT FENCE TO JOIN TO ENDS OF TWO FENCES. CROSS BRACE II I 1 "x2" or 1 "x3" A WOVEN WIRE FENCE WITH SILT FENCE MATERIAL COVER 4 "x8" TRENCH SILT FENCE INLET PROTECTION FOR NON PAVED AREAS POST GEOTEXTILE FABRIC LAID ON DOWN SLOPE SIDE AND BOTTOM OF TRENCH EMBEDDED SILT FENCE MATERIAL MIN. 8" INTO GROUND W/ 4" LAID ALONG BOTTOM OF TRENCH. SOIL SLICING IN ACCORDANCE WITH ASTM D 6462 8.2.2 IS ALSO ACCEPTABLE. REFERENCE IN CHAPTER 7 PAGES 215 -221 IN THE INDIANA STORM WATER QUALITY MANUAL 5' MIN. OVERLAP 2 "x2" or 2 "x4" STAKE GEOTEXTILE FABRIC LAID ON DOWN -SLOPE SIDE AND BOTTOM OF TRENCH (NO SCALE) MAXIMUM LOAD SLOPE AND DISTANCE FOR WHICH A SILT FENCE IS APPLICABLE POSTS: STEEL T OR U TYPE, OR 2 "X2" HARD WOOD POST FENCE: WOVEN WIRE, 14 -1/2 GA., 6" MAX. MESH OPENING FABRIC: IN ACCORDANCE WITH ASTM D 6461 LATEST EDITION. POST 2 "X2" WOOD OR 1.33 LBS /FOOT STEEL 8' MAX. SPACING WIRE FENCE 14 GAUGE (MIN) -6" MESH REQ'D. IN SWALES OR AR EA OF CONCENTRATED FLOW FLOW UNDISTURBED SEDIMENTATION /SILT FENCE (NO SCALE) SILT FENCE MATERIAL TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH THREE TIES SPACED AT 3" ON CENTER SECURELY FASTEN OVERLAPPING ENDS c SILT FENCE MATERIAL TO ADJACENT STAKES WITH THREE WIRE TIES OR OTHER FASTENERS NONWOVEN FILTER FABRIC SECURE TO POSTS WITH 2 LATH 8 "X4" TRENCH TO BE BACKFILLED AND COMPACTED FINISH GRADE TOO I 1 4• -I H II t r fI L fl WITHOUT WIRE SUPPORT WITH WIRE SUPPORT GEOTEXTILE FABRIC LAID ON DOWN SLOPE SIDE AND BOTTOM OF TRENCH EMBEDDED SILT FENCE MATERIAL MIN. 8" INTO GROUND W/ 4" LAID ALONG BOTTOM OF TRENCH. SOIL SLICING IN ACCORDANCE WITH ASTM D 6462 8.2.2 IS ALSO ACCEPTABLE. INSTALLATION PREFABRICATED SILT FENCE 1. LAY OUT THE LOCATION OF THE FENCE SO THAT IT IS PARALLEL TO THE CONTOUR OF THE SLOPE AND AT LEAST 10 FEET BEYOND THE TOE OF THE SLOPE TO PROVIDE A SEDIMENT STORAGE AREA. TURN THE ENDS OF THE FENCE UP SLOPE SUCH THAT THE POINT OF CONTACT BETWEEN THE GROUND AND THE BOTTOM OF THE FENCE END TERMINATES AT A HIGHER ELEVATION THAN THE TOP OF THE FENCE AT ITS LOWEST POINT. 2. EXCAVATE AN EIGHT -INCH DEEP BY FOUR -INCH WIDE TRENCH ALONG THE ENTIRE LENGTH OF THE FENCE LINE. INSTALLATION BY PLOWING IS ALSO ACCEPTABLE. 3. INSTALL THE SILT FENCE WITH THE FILTER FABRIC LOCATED ON THE UP -SLOPE SIDE OF THE EXCAVATED TRENCH AND THE SUPPORT POSTS ON THE DOWN -SLOPE SIDE OF THE TRENCH. 4. DRIVE THE SUPPORT POSTS AT LEAST 18 INCHES INTO THE GROUND, TIGHTLY STRETCHING THE FABRIC BETWEEN THE POSTS AS EACH IS DRIVEN INTO THE SOIL. MINIMUM OF 12 INCHES OF THE FILTER FABRIC SHOULD EXTEND INTO THE TRENCH. 5. LAY THE LOWER FOUR INCHES OF FILTER FABRIC ON THE BOTTOM OF THE TRENCH AND EXTEND IT TOWARD THE UP -SLOPE SIDE OF THE TRENCH. 6. BACKFILL THE TRENCH WITH SOIL MATERIAL AND COMPACT IT IN PLACE. NOTE: IF THE SILT FENCE IS BEING CONSTRUCTED ON -SITE, ATTACH THE FILTER FABRIC TO THE SUPPORT POSTS AND ATTACH WOODEN LATHE TO SECURE THE FABRIC TO THE POSTS. ALLOW FOR AT LEAST 12 INCHES OF FABRIC BELOW GROUND LEVEL. COMPLETE THE SILT FENCE INSTALLATION, FOLLOWINGS STEPS 1 THROUGH 6 ABOVE. MAINTENANCE INSPECT WITHIN 24 HOURS OF A RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. NOTE: ALL REPAIRS SHOULD MEET SPECIFICATIONS AS OUTLINED WITHIN THIS MEASURE. REMOVE DEPOSITED SEDIMENT WHEN IT IS CAUSING THE FILTER FABRIC TO BULGE OR WHEN IT REACHES ONE -HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT. WHEN CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, GRADE THE SITE TO BLEND WITH THE SURROUNDING AREA, AND STABILIZE. GEOTEXTILE FILTER FABRIC INDOT #5 AGGREGATE (UPSTREAM FACE) GENERAL RULE FOR SPACING: THE ELEVATION OF THE BOTTOM OF THE UPSTREAM BERM SHOULD BE EQUAL TO THE ELEVATION OF THE TOP OF THE SUCCEEDING DOWNSTREAM BERM. UPSTREAM VIEW INDOT #5 AGGREGATE 12" LAYER (UPSTREAM FACE) %4 CLEAN STONE {R MAX. 2:1 MAX. f;44104 y' FLOVy 4 A► L_ tt A IL1_ /\i GEOTEXTILE FILTER FABRIC ELEVATION A D CHECK DAMS IN SWALE 2 ACRES OR LESS OF DRAINAGE AREA G EOTEXTI LE FILTER FABRIC NOTE: 1. REFERENCED IN CHAPTER 7 PAGE 97 IN THE INDIANA STORM WATER QUALITY MANUAL. MAINTENANCE INSPECT WITHIN 24 HOURS OF EACH RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, INSTALL AN EROSION- RESISTANT LINER IN THAT PORTION OF THE CHANNEL. REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES ONE -HALF THE HEIGHT OF THE DAM TO MAINTAIN CHANNEL CAPACITY, ALLOW DRAINAGE THROUGH THE DAM, AND PREVENT LARGE FLOW FROM DISPLACING SEDIMENT. ADD RIPRAP AND AGGREGATE AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION OF THE DAMS. WHEN DAMS ARE NO LONGER NEEDED, REMOVE THE RIPRAP AND AGGREGATE AND STABILIZE THE CHANNEL, USING AN EROSION- RESISTANT LINING IF NECESSARY. (RIPRAP AND AGGREGATE FROM THE DAM MAY BE REMOVED OR UTILIZED TO STABILIZE THE CHANNEL.) ROCK CHECK DAM FOR SWALES AND DITCHES (NO SCALE) r4 4 4 *a /4. li 1 "X1 "X24" HARDWOOD STAKES KOIR WATTLE INLET PROTECTION 9 "vele" DOWNSTREAM VIEW INDOT #5 AGGREGATE 12" LAYER (UPSTREAM FACE) FLOW I CLEAN STONE MAX 2 1�- <<�`���7�► NOT TO SCALE KOIR WATTLE GEOTEXTILE FILTER FABRIC INSTALLATION 1. LAY OUT THE LOCATION OF THE CHECK DAM. 2. EXCAVATE A CUTOFF TRENCH INTO THE CHANNEL BOTTOM AND DITCH BANKS, EXTENDING IT A MINIMUM OF 18 INCHES BEYOND THE TOP OF THE DITCH BANK. 3. INSTALL AND ANCHOR FILTER FABRIC IN THE CHANNEL AND CUTOFF TRENCH. 4. PLACE RIPRAP IN THE CUTOFF TRENCH AND CHANNEL TO THE LINES AND DIMENSIONS SHOWN IN THE CONSTRUCTION PLANS. THE CENTER OF EACH DAM MUST BE AT LEAST NINE INCHES LOWER THAN THE UPPERMOST POINTS OF CONTACT BETWEEN THE RIPRAP DAM AND CHANNEL BANKS (SEE ROCK CHECK DAM WORKSHEET ON PAGE 101). 5. EXTEND THE RIPRAP AT LEAST 18 INCHES BEYOND THE TOP OF THE CHANNEL BANKS TO KEEP OVERFLOW WATER FROM ERODING AREAS ADJACENT TO THE CHANNEL BANKS BEFORE IT RE- ENTERS THE CHANNEL. 6. PLACE FILTER MEDIUM (INDOT CA NO. 5 AGGREGATE) ON THE UP -SLOPE SIDE OF THE DAM. PLACE FILTER MEDIUM OVER THE ENTIRE FACE OF THE DAM UP TO THE BASE OF THE OVERFLOW WEIR NOTCH. 7. STABILIZE THE CHANNEL ABOVE THE UPPERMOST DAM. 8. INSTALL AN EROSION- RESISTANT LINING IN THE CHANNEL BELOW THE LOWERMOST DAM. THE LINING SHOULD EXTEND A MINIMUM DISTANCE OF SIX FEET BELOW THE DAM. 9. ADDITIONAL SEDIMENT STORAGE CAN BE PROVIDED BY EXCAVATING A SMALL SEDIMENT TRAP ON THE UPSTREAM SIDE OF THE CHECK DAM. ELEVATION B KOIR WATTLE 1 "X1 "X24" HARDWOOD STAKES TOP OF BANK RIPRAP Place Koir Wattle around drop inlet and curb inlet in such a way that there is no space between the ends of the Koir Wattle. (See Fig 3 and Fig 4 respectively.) Koir Wattle must be secured to the ground using 1" x 1" x 24" hardwood stakes at 2' on center. The top surface of the Koir Wattle must be located above the ponding height. Use multiple tiers if necessary. LOW LINE STONE PLACED AROUND END OF DRAIN PIPE TO PREVENT SLOPE EROSION AND UNDERCUTTING OF THE PIPE DRAIN PIPE WITH FLAIRED END SECTION AT =1.5' X D50 15" OR LESS, 1.2' X D50 15" OR LARGER STONE. I #2 STONE AGGREGATE AT BEET EROSION CONTROL SEEDING LIMITS VARIARI F VARIABLE I -7 I I II I di (OPTIONAL 2" #53 STONE AGGREGATr_ driS� Y• L �44'� j. -s! rte•- t ttik!" toli zIgrViAAMAIW ii...... VW GRADE A S SHOWN ON PLANS 1 3:1 SLOPE ppE =1 I :111 =1 11 111 -11 DRAINAGE E SECTION (NO SCALE) GEOTEXTILE FABRIC UNDERLI INSTALLATION: 1. REMOVE ALL VEGETATION AND OTHER OBJECTIONABLE MATERIAL FROM THE FOUNDATION AREA. 2. GRADE FOUNDATION AND CROWN FOR POSITIVE DRAINAGE. IF THE SLOPE OF THE CONSTRUCTION ENTRANCE IS TOWARD A PUBLIC ROAD AND EXCEEDS TWO PERCENT, CONSTRUCT AN EIGHT INCH HIGH DIVERSION RIDGE WITH A RATIO OF 3 -TO -1 SIDE SLOPES ACROSS THE FOUNDATION AREA ABOUT 15 FEET FROM THE ENTRANCE TO DIVERT RUNOFF AWAY FROM THE ROAD. 3. INSTALL A CULVERT PIPE UNDER THE PAD IF NEEDED TO MAINTAIN PROPER PUBLIC ROAD DRAINAGE. 4. IF WET CONDITIONS ARE ANTICIPATED, PLACE GEOTEXTILE FABRIC ON THE GRADED FOUNDATION TO IMPROVE STABILITY. 5. PLACE AGGREGATE (INDOT CA NO. 2) TO THE DIMENSIONS AND GRADE SHOWN IN THE CONSTRUCTION PLANS, LEAVING THE SURFACE SMOOTH AND SLOPED FOR DRAINAGE. 6. TOP -DRESS THE FIRST 50 FEET ADJACENT TO THE PUBLIC ROADWAY WITH TWO TO THREE INCHES OF WASHED AGGREGATE (INDOT CA NO. 53) [OPTIONAL, USED PRIMARILY WHERE THE PURPOSE OF THE PAD IS TO KEEP SOIL FROM ADHERING TO VEHICLE TIRES]. 7. WHERE POSSIBLE, DIVERT ALL STORM WATER RUNOFF AND DRAINAGE FROM THE INGRESS /EGRESS PAD TO A SEDIMENT TRAP OR BASIN. MAINTENANCE: INSPECT DAILY. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. TOP DRESS WITH CLEAN AGGREGATE AS NEEDED. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS. FLUSHING SHOULD ONLY BE USED IF THE WATER CAN BE CONVEYED INTO A SEDIMENT TRAP OR BASIN. REFRENCED IN CHAPTER 7 PAGE 17 -20 IN INIANA STORM WATER QUALITY MANUAL. TEMPORARY CONSTRUCTION INGRESS /EGRESS PAD LARGE SITES TWO ACRES OR LARGER t GEOTEXTILE FABRIC OR WELL GRADED AGGREGATE PLAN DITCH BED AL -BEET RIP -RAP SIDE AL= FEET AL= APRON LENGTH AT= APRON THICKNESS AW= APRON WIDTH 150 (WI N.) TABLE 1. SIZING FOR FLOW DISSIPATERS AT CULVERT PIPE OUTLETS EROSION CONTROL SEEDING LIMITS VARIABLE VARIABLE MAINTENANCE INSPECT WITHIN 24 HOURS OF A RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS. INSPECT FOR STONE DISPLACEMENT; REPLACE STONES ENSURING PLACEMENT AT FINISHED GRADE. CHECK FOR EROSION OR SCOURING AROUND SIDES OF THE APRON; REPAIR IMMEDIATELY. CHECK FOR PIPING OR UNDERCUTTING; REPAIR IMMEDIATELY. REFERENCE IN CHAPTER 7 PAGE 121 IN THE INDIANA STORM WATER QUALITY MANUAL OUTLET EROSION CONTROL PROTECTION (NO SCALE) TAC SUB (MIN.) WIDTH: (A) 20' MINIMUM OR FULL WIDTH OF ENTRANCE /EXIT DRIVE, WHICHEVER IS GREATER. (NO SCALE) DEPTH OF RIP -RAP AS INDICATED ON PLAN 12" MINIMUM ENERGY DISSIPATER (OUTLET PROTECTION) 1. DIVERT SURFACE WATER RUNOFF AROUND THE STRUCTURE DURING CONSTRUCTION SO THAT THE SITE CAN BE PROPERLY DEWATERED FOR FOUNDATION PREPARATION. 2. EXCAVATE FOUNDATION AND APRON AREA SUBGRADES BELOW DESIGN ELEVATION TO ALLOW FOR THICKNESS OF THE FILTER MEDIUM AND RIPRAP. 3. COMPACT ANY FILL USED IN SUBGRADE PREPARATION TO THE DENSITY OF SURROUNDING UNDISTURBED SOIL MATERIAL. 4. SMOOTH SUBGRADE ENOUGH TO PROTECT GEOTEXTILE FABRIC FROM TEARING. 5. PLACE GEOTEXTILE FABRIC OR AGGREGATE BEDDING MATERIAL (FOR STABILIZATION AND FILTRATION) ON THE COMPACTED AND SMOOTHED FOUNDATION. 6. INSTALL RIPRAP TO THE LINES AND ELEVATIONS SHOWN IN THE CONSTRUCTION PLANS. BLEND RIPRAP SMOOTi'.LY TO SURROUNDING GRADE. IF THE CHANNEL IS WELL DEFINED, EXTEND THE APRON ROSS THE CHANNEL BOTTOM AND UP THE CHANNEL BANKS TO AN ELEVATION OF SIX INCHES ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 7. IF GEOTEXTILE FABRIC TEARS WHEN PLACING RIPRAP, REPAIR IMMEDIATELY BY LAYING AND STAPLING A PIECE OF FABRIC OVER DAMAGED AREA, OVERLAPPING THE UNDAMAGED AREAS BY AT LEAST 12 INCHES. 8. CONSTRUCT A SMALL PLUNGE POOL WITHIN THE OUTLET APRON. (RIPRAP APRONS MUST BE LEVEL WITH OR SLIGHTLY LOWER THAN THE RECEIVING CHANNEL AND SHOULD NOT PRODUCE AN OVERFALL OR RESTRICT FLOW OF THE WATER CONVEYANCE STRUCTURE.) ITTAL EROSION CONTROL SEEDING LIMITS VARIABLE VARIABLE SLOPE FILTER FABRIC FLUSH WITH SIDES. NO AIR GAPS. 11 =111- 3' EROSION CONTROL SEEDING LIMITS VARIABLE VARIABLE GRADE AS SHOWN ON PLANS ripo �Y iY �Y .•�.•�.•j �4� •4 �Y -�Y 4 2' OVERLAP ON SEAM SA O INFILTRATION TRENCH CROSS- SECTION (NO SCALE) DESCRIPTION OF PROPOSED POST CONSTRUCTION STORMWATER QUALITY MEASURES INFILTRATION TRENCHES AN INFILTRATION TRENCH IS AN EXCAVATED TRENCH THAT HAS BEEN LINED WITH FILTER FABRIC AND BACKFILLED WITH A SAND FILTER OR COARSE STONE TO FORM AN UNDERGROUND BASIN. RUNOFF IS DIVERTED INTO THE TRENCH AND INFILTRATES INTO THE SOIL. INFILTRATION TRENCHES EFFECTIVELY REMOVE SOLUBLE AND PARTICULATE POLLUTANTS. THEY CAN PROVIDE GROUNDWATER RECHARGE BY DIVERTING 60 TO 9 PERCENT OF ANNUAL URBAN RUNOFF BACK INTO THE SOIL. GENERAL STAPLE RECOMMENDATIONS 300 275 250 225 200 175 150 125 100 75 50 25 4:1 3:1 2:1 1: 1 CHANNEL SLOPE GRADIENT LINING ADDITIONAL STAPLES AS REQUIRED CHANNEL LININGS UTILIZE STAPLE PATTERN "C" WITH ADDITIONAL STAPLES ON SIDE SLOPES. 6' 6' A 3' 1 STAPLE PER SQ. YD. 3' X x 1 5' 3' 1.5' B 4' 4' 1 1/2 STAPLE PER SQ. YD. NOTES: STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN GREEN EROSION CONTROL BLANKETS. STAPLE PATTERNS MAY VARY DEPENDING UPON SOIL TYPE AND AVERAGE ANNUAL RAINFALL. AT SLOPE LENGTHS GREATER THAN 300 FEET OR WHERE DRAINAGE OVER LARGE AREAS IS DIRECTED ONTO THE BLANKETS, STAPLE PATTERN "C" SHOULD BE UTILIZED. CHANNEL LININGS REQUIRED A 2.0' MINIMUM OVERLAP AT LONGITUDINAL JOINTS. SIDESLOPES SHALL REQUIRE A 6" MINIMUM OVERLAP. WHERE OVERLAPS OCCUR, THE UPSTREAM BLANKET SHALL OVERLAP THE DOWNSTREAM. IF OTHER THAN NORTH AMERICAN GREEN EROSION CONTROL BLANKETS ARE INSTALLED FOLLOW THE INSTALLATION DIRECTIONS RECOMMENDED BY THAT PRODUCTS COMPANY. EROSION CONTROL BLAN /<ET STAPLE PA I I ERN (NO SCALE) -I I I -1 I I -I 1' NON- COMPACTED TOPSOIL 2' D -50 WASHED STONE BETWEEN 1.5" AND 3" WARNING- THIS PLAN TO BE USED FOR EROSION CONTROL PURPOSES ONLY. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR. C x x x 2 STAPLE PER SQ. YD. Contact Person for Erosion Control Sediment Practices Glick Self Storage 8425 Woodfield Crossing BLVD Suite 300W Indianapolfr:s, IN 46240 TELEPHONE: 317 469- 5897 CONTACT PERSON: Bruce Sklare -NOTE THIS PLAN INDICATES EROSION CONTROL MEASURES REQUIRED AI- I ER SOIL STRIPPING AND PAD BUILDING HAS TAKEN PLACE. COORDINATE WITH DEVELOPER FOR MEASURES REQUIRED UNTIL PROPERTY TURNED OVER FOR DEVELOPMENT. COORDINATE WITH SOIL CONSERVATION DISTRICT REPRESENTATIVE FOR ANY OTHER MEASURES REQUIRED DUE TO SITE CONDITIONS. DATED 6 4 OO9 0 w rn E/2 0 z C/2 z 0 W Ix 0 0w z C, 0 N N U Z. c ..0 0 10 10 9 i 8 9 8 7 7 6 6 5 5 4 4 3 3 2 I 1 2 00 4) (V VrD O d- c td) O O -4-) 0 nti 3 F-•a Cl) PROJECT NO. N M O 00 OF IONAI.\ /VII /IIIIIIIIII11 JAMES E. SHIELDS JR. P.E. 10201333 N z W09 -0041 0 U) 202 4- a) U