HomeMy WebLinkAbout09030013 Private Golf Course - Reed Property Pg 51
MAINTENANCE
INSTALLATION SEQUENCE
CIVIL SITE GROUP, LLC AjiiiI
643 Massachusetts Avenue, Suite 200
Indianapolis, Indiana 46204
Ph: (317) 423 -3305 Fax: (317) 423 -3306
AS NEEDED
PRIOR TO CLEARING AND GRADING
SILT FENCE
ONNEI
SVILLE
PRIOR TO CLEARING AND GRADING
EXISTING INLET PROTECTION
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
PRIOR TO CLEARING AND GRADING
.E PROTECTION
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
PRIOR TO CLEARING AND GRADING
%I IIIII/ 14
i>, 459.4;4!•./1/0S G L E/
a
N
PE10403858
STATE OF r
-P 0,,...4 11 0 IPA",
#,,,j, ,0%
"t 1 I fl"
6 N w a 0,6
DATE: 03/19/09
ALONG WITH ROUGH GRADING
DWN BY: EAG
CHKD. BY: EAG
SCALE: 1" 60'
DATE: 03/16/09
WATER AS NEEDED
AFTER FINISH GRADING AS SOON AS PRACTICAL UPON COMPLETION
EROSION CONTROL MATTING
II STORMWATER POLLUTION PREVENTION DETAILS II
AFTER FINISH GRADING AS SOON AS PRACTICAL UPON COMPLETION
STRAW BALES
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
AFTER FINISH GRADING AS SOON AS PRACTICAL UPON COMPLETION
rY Px�
12351 WE
ONSVILLE
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
AFTER EACH INLET IS PLACED
.4
5.8 -7.5
2
(OVAL OF TREE PROTECTION
N/A
AFTER PERMANENT SEEDING
(OVAL OF STRAW BALES
PROJECT NUMBER
MSI.023
DRAWING NUMBER
C3.1
SHEET 5 OF 8
(OVAL OF INLET PROTECTION
EROSION CONTROL SCHEDULE
EROSION CONTROL MEASURE
MAINTENANCE
INSTALLATION SEQUENCE
STONE ENTRANCE
AS NEEDED
PRIOR TO CLEARING AND GRADING
SILT FENCE
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
PRIOR TO CLEARING AND GRADING
EXISTING INLET PROTECTION
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
PRIOR TO CLEARING AND GRADING
.E PROTECTION
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
PRIOR TO CLEARING AND GRADING
'TEMPORARY DIVERSIONS
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
ALONG WITH ROUGH GRADING
IPORARY SEEDING
WATER AS NEEDED
AFTER ROUGH GRADING
PERMANENT SEEDING
WATER AS NEEDED
AFTER FINISH GRADING AS SOON AS PRACTICAL UPON COMPLETION
EROSION CONTROL MATTING
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
AFTER FINISH GRADING AS SOON AS PRACTICAL UPON COMPLETION
STRAW BALES
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
AFTER FINISH GRADING AS SOON AS PRACTICAL UPON COMPLETION
INLET PROTECTION
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
AFTER EACH INLET IS PLACED
.4
5.8 -7.5
2
(OVAL OF TREE PROTECTION
N/A
AFTER PERMANENT SEEDING
(OVAL OF STRAW BALES
N/A
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
(OVAL OF INLET PROTECTION
N/A
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
(OVAL OF SILT FENCE
N/A
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
SPECIES
SEEDING RATE
SUITABLE pH
SITE SUITABILITY
S75
LBS /ACRE
LBS /1000
SQ. FT.
DROUGHTY
WELL
DRAINED
WET
LEVEL AND SLOPING, OPEN AREAS
1. TALL FESCUE
35
.8
5.5 -8.3
2
1
2
2. TALL FESCUE
25
.6
5.5 -8.3
SPRING OATS
1
3 BU.
RED CLOVER
5
.12
7 -21
ANNUAL RYEGRASS
1 LB.
3. KENTUCKY BLUEGRASS
15
.4
5.8 -7.5
2
1
1
CREEPING RED FESCUE
15
.4
12 -18
10 -20
STEEP BANKS AND CUTS
4. TALL FESCUE
15
.4
5.8 -7.5
2
1
2
KENTUCKY BLUEGRASS
25
.6
24 -36
5 -14
T
5. TALL FESCUE
35
.8
5.5 -8.3
2
1
1
EMERALD CROWNVETCH
10
.25
15 -20
12 -18
5 -10
LAWNS AND HIGH MAINTENANCE AREAS
6. KENTUCKY BLUEGRASS
40
.9
5.8 -7.5
2
1
CREEPING RED FESCUE
40
.9
5 -10
24
14 -21
T
7. PERENNIAL RYEGRASS
170
4.0
5.0 -7.5
1
1
2
(TURF TYPE)
MED.
1
7 -10
18
5 -10
8. TALL FESCUE
170
4.0
5.5 -8.3
2
1
2
TYPE
TEMPORARY SEEDINGS
MAX. SLOPE
APPUCA11ON
S75
10 MONTHS
TYPE OF SEED
1000 SQ. FT.
ACRE
REMARKS
3: 1
LOW FLOW SWALES
S150
10 MONTHS
WHEAT OR RYE
3.5 LBS.
2 BU.
COVER SEED 1" TO 1 1/2" DEEP
2: 1
MODERATE DISCHARGE SWALES
SC150
2 YEARS
SPRING OATS
2.3 LBS.
3 BU.
COVER SEED 1" DEEP
>1:1
HIGH DISCHARGE SWALES
7 -21
ANNUAL RYEGRASS
1 LB.
40 LB.
COVER SEED 1 /e DEEP
TYPE
LONGEVITY
MAX. SLOPE
APPUCA11ON
S75
10 MONTHS
3:1
LOW FLOW SWALES
DS75
60 DAYS
3: 1
LOW FLOW SWALES
S150
10 MONTHS
2: 1
MODERATE DISCHARGE SWALES
DS150
60 DAYS
2: 1
MODERATE DISCHARGE SWALES
SC150
2 YEARS
1:1
MEDIUM DISCHARGE SWALES
C125
3 YEARS
>1:1
HIGH DISCHARGE SWALES
STR#
B
La
W
THICKNESS
d 50
18" RCP
5'
30'
15'
12"
8"
NORM
DRY
GEN.
SOIL
SPRAY
CREEPING RED
FESTUCA RU RA FESCUE
2
1
2
1
1
1
SIZE OF
STONE
OF TOTAL WEIGHT
LARGER THAN GIVEN SIZE
3K
0
2K
20
K
50
0.1K
90
RANKING:
1 GOOD
2 MEDIUM
NOT TOLERANT
SEEDBED PREPARATION
APPLY UME TO RAISE THE H TO THE LEVEL NEEDED FOR SPECIES BEING
SEEDED. APPLY 23 POUNDS OF 12 -12 -12 ANALYSIS FERTILIZER (OR EQUIVALENT) PER
1000 SQ. FT. (APPROXIMATELY 1000 POUNDS PER ACRE) OR FERTIUZE ACCORDING TO
TEST. APPUCATION OF 150 LBS. OF AMMONIUM NITRATE ON AREAS LOW IN ORGANIC
MATTER AND FERT1UTY WILL GREATLY ENHANCE VEGETATIVE GROWTH.
WORK THE FER11UZER AND LIME INTO THE SOIL TO A DEPTH OF 2 -3 INCHES
WITH A HARROW, DISK OR RAKE OPERATED ACROSS THE SLOPE AS MUCH AS POSSIBLE.
SEEDING
SELECT A SEED MIXTURE BASED ON PROJECTED USE OF THE AREA (SEE
PERMANENT SEED MIXTURE CHART). WHILE CONSIDERING BEST SEEDING DATES.
IF PERMANENT SEEDING IS NOT PERMITTED USE TEMPORARY SEEDING
UNTIL PERMANENT SEEDING CAN BE APPLIED. IF TOLERANCES ARE A PROBLEM, SUCH AS
SALT TOLERANCE OF SEEDINGS ADJACENT TO STREETS AND HIGHWAYS, SEE
SEED TOLERANCE CHART.
SALT TOLERANCE (TO BOTH SOIL SALTS SPRAY)
T TOLERANCE
MT MEDIUM TOLERANCE
S SUGHT TOLERANCE
SEED TOLERANCE
1 PREFERRED 2 WILL TOLERATE INOCULATE WITH SPECIFIC INOCULANT.
SEED TOLERANCE CHART
EROSION CONTROL MEASURES MAINTENANCE REQUIREMENTS
STRAW BALE AM MAINTENANCE REQUIREMENTS:
1. INSPECT STRAW BALE DAMS AFTER EACH STORM EVENT AND PROMPTLY REMOVE ANY
SEDIMENT DEPOSITS TO ENSURE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN,
TAKING ARE NOT TO UNDERMINE THE ENTRENCHED BALES.
2. INSPECT PERIODICALLY FOR DETERIORATION OR DAMAGE FROM CONSTRUCTION
ACTIVITIES AND REPAIR IMMEDIATELY.
3. AFTER 'THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABIUZED, REMOVE ALL
STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABIUZE IT.
SILT FENCE MAINTENANCE REQUIREMENTS:
1. INSPECT HE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES
INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY.
3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT
ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE.
4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE
AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS:
1. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT IMMEDIATELY
REPAIR ANY EROSION AND PIPING HOLES.
2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF THE DESIGN DEPTH.
3. REPLACE SPILLWAY GRAVEL FACING IF CLOGGED.
4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY.
5. CHECK THE SPILLWAY DEPTH PERIODICALLY TO ENSURE A MINIMUM OF 1.5 FT. DEPTH
FROM THE LOWEST POINT OF THE SETTLED EMBANKMENT TO HIGHEST POINT OF THE
SPILLWAY CREST, AND FILL ANY LOW AREAS TO MAINTAIN DESIGN ELEVATION.
6. PROMPTLY REPLACE ANY DISPLACED RIP RAP, BEING CAREFUL THAT NO STONES IN THE
SPILLWAY ARE ABOVE DESIGN GRADE.
7. AFTER ALL DISTURBED AREAS HAVE BEEN STABIUZED, REMOVE THE STRUCTURE AND
SEDIMENT, SMOOTH THE DISTURBED AREA TO BLEND WITH ADJOINING AREAS, AND STABIUZE.
SEEDING DETAIL
REVISION RECORD
REV
WHEAT OR RYE
OATS
ANNUAL RYEGRASS
NON- IRRIGATED*
IRRIGATED
DORMANT
SEEDING
DATE
DESCRIPTION
JAN
FEB
MAR APR MAY
JUN
JUL
AUG
SEP OCT
A
NOV
DEC
JAN
FEB
MAR APR MAY JUN JUL
AUG
SEP
r/A/
OCT
NOV
DEC
TEMPORARY SEEDING DATES
PERMANENT SEEDING DATES
INCREASE SEEDING APPUCATION BY 50%.
NOT NECESSARY WHERE MULCH IS APPLIED.
EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS:
1. DURING VEGETATIVE ESTABUSHMENT, INSPECT AFTER STORM EVENTS FOR ANY
EROSION BELOW THE BLANKET.
2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET
COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET.
3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS:
1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM
EVENTS OR HEAVY USE.
2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
3. TOP DRESS WITH CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS
BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS
CONVEYED INTO A SEDIMENT TRAP OR BASIN.
5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
IRRIGATION NEEDED DURING THIS PERIOD. TO CONTROL
EROSION AT TIMES OTHER THAN IN THE SHADED AREAS.
USE MULCH.
LATE SUMMER SEEDING DATES MAY BE EXTENDED 5 DAYS
IF MULCH IS APPLIED.
PIPE
CULVERT o
NOTES:
PIPE
CULVERT o
SLOPE
C ARIES
i
RIPRAP GEOTEXT1LE
UNDER END SECTION
DES BY
1. GEOTEXTILE UNDERLAYMENT TO BE
POLYFELT TS700 OR APPROVED EQUAL
APP BY
PLAN VIEW
CROSS SECTION
WHERE K d 50
NOTE:
DEPTH OF RIP RAP SHALL NOT
BE LESS THAN 3 x d 50
NOT TO SCALE
I I
RIPRAP DETAIL END SECTION
IPRA
(SEE
U)
w
END
SECTION
(SEE STR. ABOVE)
XISIING GRADE
EROSION CONTROL BLANKET
(NORTH AMERICAN GREEN
OR EQUAL)
NORTH AMERICAN GREEN
EROSION CONTROL MATTING DETAIL
6 e•a
s '.,:•LiBUC ROAD 0.*efia01.4
.44.0 4•Aka les„,.,44V.,,,,..
.0:04terkia"kee....e. 46.6
■�0 i_�.� d
i�,0ieri�di�•i
t r
�I %fir %0%0%0r�
0160 x,,•0 ,40 100.44
j� �4`,W, .p. .0 6
GEOTEXIILE FABRIC TO STABILIZE
FOUNDATION ESPECIALLY IMPORTANT
WHERE WETNESS IS ANTICIPATED)
03 TEMPORARY CONSTRUCTION ENTRANCE
NOT TO SCALE
THICKNESS
12" MINIMUM
THICKNESS
P GEOTEXIILE
OTES)
NOT TO SCALE
2 COARSE
AGGREGATE
EXTEND FABRIC
TO 4" BELOW
SURFACE
TYPICAL TOPSOIL STOCKPILE
FILTER FABRIC
FLOW
x
SILT FENCE
x
ON WOVEN
GEOTEXIILE
FABRIC
10'
TYPICAL
NOT TO SCALE
\ice \ice
3
THE BLANKET SHOULD NOT BE STRETCHED
BUT ALLOWED TO LAY LOOSELY ON THE
SOIL SURFACE TO ACHIEVE MAXIMUM
BLANKET TO SOIL CONTACT.
5
IN HIGH VELOCITY CHANNEL APPUCATIONS,
CHECK SLOTS SHOULD BE ESTABLISHED
EVERY 35 40'. THE SLOTS SHOULD BE
6" WIDE BY 6 DEEP WITH THE BLANKET
STAPLED IN THE BOTTOM OF THE SLOT,
THEN BACKFILLED AND SEEDED.
x
x
N
SPACE POSTS PER
MANUFACTURER
RECOMMENDATIONS
WOOD POST
N.O.I. POSTING
SIGN DETAIL
(OR EQUIVALENT)
SILT FENCE CONSTRUCTION
NOT TO SCALE
1
THE EDGES OF THE BLANKET SHOULD BE
BUTTED AGAINST EACH OTHER, THE EDGES OF
THE SCC225 SHOULD BE OVERLAPPED 2
EROSION BLANKET INSATLLATION
NOT TO SCALE
LYWOOD
24" X 24*
PAINTED WHITE
LACK LETTERS
6" HEIGHT
.5" LAG
SCREWS
WOOD POST
3 "X3 "X8'
05/,`
SANDBAG DITCH
EROSION CONTROL
NOT TO SCALE
24"
NOTE:
POSTS SHALL HAVE A MINIMUM LENGTH OF
36 INCHES PLUS BURIAL DEPTH. POST MATERIAL
SHALL BE WOOD, STEEL, OR SYNTHETIC, AND SHALL
BE OF SUFFICIENT STRENGTH TO RESIST DAMAGE
DURING INSTALLATION AND TO SUPPORT APPLIED
LOADS.
FABRIC SHALL BE A WOVEN GEOTEX1ILE FABRIC
CONSISTING OF STRONG, ROT RESISTANT,
MATERIALS RESISTANT TO DETERIORATION FROM
ULTRAVIOLET AND HEAT EXPOSURE.
7
ROLL BLANKETS
OUT IN DIRECTION
ky
OF WATER OW.
CROSSBARS
SILT FENCE MATERIA SILT FENCE EXTENDS
6" BELOW FINISHED GRADE
NOTE:
INLET PROTECTION SILT FENCE
//4
NOTE:
2
ON SLOPE APPUCA11ONS, THE TOP OF THE BLANKET
SHOULD BE "SLOTTED IN" ABOVE THE BREAK OF THE
SLOPE OR AT A MINIMUM, STAPLED IN PLACE WITH
STAPLES 6" APART ON THE END OF THE BLANKET.
1. SEE SILT FENCE DETAIL
FOR MATERIAL SPECIFICATIONS.
2. SILT FENCE SHALL BE
PREASSEMBLED BY SUPPLIER.
DRIVE 2 X 2 STAKES OR 4 REBAR THROUGH THE
SAND BAGS AND INTO THE GROUND 1 1/2 TO 2 FEET FOR
ANCHORAGE. INSPECT THE BAG CHECK DAM AND
PROVIDE NECESSARY MAINTENANCE FOLLOWING
EACH STORM PERIOD. REMOVE THE BAGS AND STAKES
ONCE PERMANENT DRAINAGE AND STABILIZATION IS RE-
ESTABLISHED AND ALL CONSTRUCTION IS COMPLETED
ON -SITE.
1 2"
4
ON LONG SLOPES, THE ENDS OF
THE BLANKETS SHOULD BE
OVERLAPPED 4 6" IN A
"SHINGLE EFFECT".
6
PREPARATION OF THE SEED BED, INCLUDING
APPUCATON OF LIME, FERTIUZER AND SEED
SHOULD BE CONDUCTED AS NORMAL PRIOR TO
INSTALLATION OF BLANKET.
W
3'
FILTER FABRIC UNDER STONE
OUTLET PIPE DIAMETER
OUTLET PIPE DIAMETER +2'
BEEHIVE INLET OR
DRAINAGE COVER
LATHS
6 FACE
OF #8 STONE
OVER RIP -RAP
STONE. x
Co
(3 MINIMUM)
SOIL
CONDITION
SHADE
TOLERANCE
CLOSE MOWING
TO 2 -3 1/2 INCHES
TRAMPING
TOLERANCE
FERTILITY
NEEDS
WINTER
HARDINESS
FLOODING
TOLERANCE (DAYS)
MATURE
HEIGHT (INCHES)
EMERGENCE
TIME (DAYS)
SOIL
TOLERANCE
WET
NORM
DRY
GEN.
SOIL
SPRAY
CREEPING RED
FESTUCA RU RA FESCUE
2
1
2
1
1
1
MED.
1
20 -25
12 -18
7 -21
S
KENTUCKY :GRASS SIS
POA
2
1
2
1
1
1
MED.
1
20 -35
12 -18
10 -20
MT
TALL FESCUE
FESTUCA L. IDINACEA
2
1
1
1
1
1
LOW
1
24-35
24 -36
5 -14
T
PERENNIAL RYEGRASS
LOLLUM PERENNE
2
1
2
1
2
MED.
HIGH
2
15 -20
12 -18
5 -10
MT
CROWNVETCH
CORONILLA VARLA
1
1
2
LOW
1
5 -10
24
14 -21
T
RED CLOVER
TRIFOLIUM PROTENSE
1
2
MED.
1
7 -10
18
5 -10
S
S
RANKING:
1 GOOD
2 MEDIUM
NOT TOLERANT
SEEDBED PREPARATION
APPLY UME TO RAISE THE H TO THE LEVEL NEEDED FOR SPECIES BEING
SEEDED. APPLY 23 POUNDS OF 12 -12 -12 ANALYSIS FERTILIZER (OR EQUIVALENT) PER
1000 SQ. FT. (APPROXIMATELY 1000 POUNDS PER ACRE) OR FERTIUZE ACCORDING TO
TEST. APPUCATION OF 150 LBS. OF AMMONIUM NITRATE ON AREAS LOW IN ORGANIC
MATTER AND FERT1UTY WILL GREATLY ENHANCE VEGETATIVE GROWTH.
WORK THE FER11UZER AND LIME INTO THE SOIL TO A DEPTH OF 2 -3 INCHES
WITH A HARROW, DISK OR RAKE OPERATED ACROSS THE SLOPE AS MUCH AS POSSIBLE.
SEEDING
SELECT A SEED MIXTURE BASED ON PROJECTED USE OF THE AREA (SEE
PERMANENT SEED MIXTURE CHART). WHILE CONSIDERING BEST SEEDING DATES.
IF PERMANENT SEEDING IS NOT PERMITTED USE TEMPORARY SEEDING
UNTIL PERMANENT SEEDING CAN BE APPLIED. IF TOLERANCES ARE A PROBLEM, SUCH AS
SALT TOLERANCE OF SEEDINGS ADJACENT TO STREETS AND HIGHWAYS, SEE
SEED TOLERANCE CHART.
SALT TOLERANCE (TO BOTH SOIL SALTS SPRAY)
T TOLERANCE
MT MEDIUM TOLERANCE
S SUGHT TOLERANCE
SEED TOLERANCE
1 PREFERRED 2 WILL TOLERATE INOCULATE WITH SPECIFIC INOCULANT.
SEED TOLERANCE CHART
EROSION CONTROL MEASURES MAINTENANCE REQUIREMENTS
STRAW BALE AM MAINTENANCE REQUIREMENTS:
1. INSPECT STRAW BALE DAMS AFTER EACH STORM EVENT AND PROMPTLY REMOVE ANY
SEDIMENT DEPOSITS TO ENSURE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN,
TAKING ARE NOT TO UNDERMINE THE ENTRENCHED BALES.
2. INSPECT PERIODICALLY FOR DETERIORATION OR DAMAGE FROM CONSTRUCTION
ACTIVITIES AND REPAIR IMMEDIATELY.
3. AFTER 'THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABIUZED, REMOVE ALL
STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABIUZE IT.
SILT FENCE MAINTENANCE REQUIREMENTS:
1. INSPECT HE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES
INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY.
3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT
ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE.
4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE
AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS:
1. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT IMMEDIATELY
REPAIR ANY EROSION AND PIPING HOLES.
2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF THE DESIGN DEPTH.
3. REPLACE SPILLWAY GRAVEL FACING IF CLOGGED.
4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY.
5. CHECK THE SPILLWAY DEPTH PERIODICALLY TO ENSURE A MINIMUM OF 1.5 FT. DEPTH
FROM THE LOWEST POINT OF THE SETTLED EMBANKMENT TO HIGHEST POINT OF THE
SPILLWAY CREST, AND FILL ANY LOW AREAS TO MAINTAIN DESIGN ELEVATION.
6. PROMPTLY REPLACE ANY DISPLACED RIP RAP, BEING CAREFUL THAT NO STONES IN THE
SPILLWAY ARE ABOVE DESIGN GRADE.
7. AFTER ALL DISTURBED AREAS HAVE BEEN STABIUZED, REMOVE THE STRUCTURE AND
SEDIMENT, SMOOTH THE DISTURBED AREA TO BLEND WITH ADJOINING AREAS, AND STABIUZE.
SEEDING DETAIL
REVISION RECORD
REV
WHEAT OR RYE
OATS
ANNUAL RYEGRASS
NON- IRRIGATED*
IRRIGATED
DORMANT
SEEDING
DATE
DESCRIPTION
JAN
FEB
MAR APR MAY
JUN
JUL
AUG
SEP OCT
A
NOV
DEC
JAN
FEB
MAR APR MAY JUN JUL
AUG
SEP
r/A/
OCT
NOV
DEC
TEMPORARY SEEDING DATES
PERMANENT SEEDING DATES
INCREASE SEEDING APPUCATION BY 50%.
NOT NECESSARY WHERE MULCH IS APPLIED.
EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS:
1. DURING VEGETATIVE ESTABUSHMENT, INSPECT AFTER STORM EVENTS FOR ANY
EROSION BELOW THE BLANKET.
2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET
COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET.
3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS:
1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM
EVENTS OR HEAVY USE.
2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
3. TOP DRESS WITH CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS
BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS
CONVEYED INTO A SEDIMENT TRAP OR BASIN.
5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
IRRIGATION NEEDED DURING THIS PERIOD. TO CONTROL
EROSION AT TIMES OTHER THAN IN THE SHADED AREAS.
USE MULCH.
LATE SUMMER SEEDING DATES MAY BE EXTENDED 5 DAYS
IF MULCH IS APPLIED.
PIPE
CULVERT o
NOTES:
PIPE
CULVERT o
SLOPE
C ARIES
i
RIPRAP GEOTEXT1LE
UNDER END SECTION
DES BY
1. GEOTEXTILE UNDERLAYMENT TO BE
POLYFELT TS700 OR APPROVED EQUAL
APP BY
PLAN VIEW
CROSS SECTION
WHERE K d 50
NOTE:
DEPTH OF RIP RAP SHALL NOT
BE LESS THAN 3 x d 50
NOT TO SCALE
I I
RIPRAP DETAIL END SECTION
IPRA
(SEE
U)
w
END
SECTION
(SEE STR. ABOVE)
XISIING GRADE
EROSION CONTROL BLANKET
(NORTH AMERICAN GREEN
OR EQUAL)
NORTH AMERICAN GREEN
EROSION CONTROL MATTING DETAIL
6 e•a
s '.,:•LiBUC ROAD 0.*efia01.4
.44.0 4•Aka les„,.,44V.,,,,..
.0:04terkia"kee....e. 46.6
■�0 i_�.� d
i�,0ieri�di�•i
t r
�I %fir %0%0%0r�
0160 x,,•0 ,40 100.44
j� �4`,W, .p. .0 6
GEOTEXIILE FABRIC TO STABILIZE
FOUNDATION ESPECIALLY IMPORTANT
WHERE WETNESS IS ANTICIPATED)
03 TEMPORARY CONSTRUCTION ENTRANCE
NOT TO SCALE
THICKNESS
12" MINIMUM
THICKNESS
P GEOTEXIILE
OTES)
NOT TO SCALE
2 COARSE
AGGREGATE
EXTEND FABRIC
TO 4" BELOW
SURFACE
TYPICAL TOPSOIL STOCKPILE
FILTER FABRIC
FLOW
x
SILT FENCE
x
ON WOVEN
GEOTEXIILE
FABRIC
10'
TYPICAL
NOT TO SCALE
\ice \ice
3
THE BLANKET SHOULD NOT BE STRETCHED
BUT ALLOWED TO LAY LOOSELY ON THE
SOIL SURFACE TO ACHIEVE MAXIMUM
BLANKET TO SOIL CONTACT.
5
IN HIGH VELOCITY CHANNEL APPUCATIONS,
CHECK SLOTS SHOULD BE ESTABLISHED
EVERY 35 40'. THE SLOTS SHOULD BE
6" WIDE BY 6 DEEP WITH THE BLANKET
STAPLED IN THE BOTTOM OF THE SLOT,
THEN BACKFILLED AND SEEDED.
x
x
N
SPACE POSTS PER
MANUFACTURER
RECOMMENDATIONS
WOOD POST
N.O.I. POSTING
SIGN DETAIL
(OR EQUIVALENT)
SILT FENCE CONSTRUCTION
NOT TO SCALE
1
THE EDGES OF THE BLANKET SHOULD BE
BUTTED AGAINST EACH OTHER, THE EDGES OF
THE SCC225 SHOULD BE OVERLAPPED 2
EROSION BLANKET INSATLLATION
NOT TO SCALE
LYWOOD
24" X 24*
PAINTED WHITE
LACK LETTERS
6" HEIGHT
.5" LAG
SCREWS
WOOD POST
3 "X3 "X8'
05/,`
SANDBAG DITCH
EROSION CONTROL
NOT TO SCALE
24"
NOTE:
POSTS SHALL HAVE A MINIMUM LENGTH OF
36 INCHES PLUS BURIAL DEPTH. POST MATERIAL
SHALL BE WOOD, STEEL, OR SYNTHETIC, AND SHALL
BE OF SUFFICIENT STRENGTH TO RESIST DAMAGE
DURING INSTALLATION AND TO SUPPORT APPLIED
LOADS.
FABRIC SHALL BE A WOVEN GEOTEX1ILE FABRIC
CONSISTING OF STRONG, ROT RESISTANT,
MATERIALS RESISTANT TO DETERIORATION FROM
ULTRAVIOLET AND HEAT EXPOSURE.
7
ROLL BLANKETS
OUT IN DIRECTION
ky
OF WATER OW.
CROSSBARS
SILT FENCE MATERIA SILT FENCE EXTENDS
6" BELOW FINISHED GRADE
NOTE:
INLET PROTECTION SILT FENCE
//4
NOTE:
2
ON SLOPE APPUCA11ONS, THE TOP OF THE BLANKET
SHOULD BE "SLOTTED IN" ABOVE THE BREAK OF THE
SLOPE OR AT A MINIMUM, STAPLED IN PLACE WITH
STAPLES 6" APART ON THE END OF THE BLANKET.
1. SEE SILT FENCE DETAIL
FOR MATERIAL SPECIFICATIONS.
2. SILT FENCE SHALL BE
PREASSEMBLED BY SUPPLIER.
DRIVE 2 X 2 STAKES OR 4 REBAR THROUGH THE
SAND BAGS AND INTO THE GROUND 1 1/2 TO 2 FEET FOR
ANCHORAGE. INSPECT THE BAG CHECK DAM AND
PROVIDE NECESSARY MAINTENANCE FOLLOWING
EACH STORM PERIOD. REMOVE THE BAGS AND STAKES
ONCE PERMANENT DRAINAGE AND STABILIZATION IS RE-
ESTABLISHED AND ALL CONSTRUCTION IS COMPLETED
ON -SITE.
1 2"
4
ON LONG SLOPES, THE ENDS OF
THE BLANKETS SHOULD BE
OVERLAPPED 4 6" IN A
"SHINGLE EFFECT".
6
PREPARATION OF THE SEED BED, INCLUDING
APPUCATON OF LIME, FERTIUZER AND SEED
SHOULD BE CONDUCTED AS NORMAL PRIOR TO
INSTALLATION OF BLANKET.
W
3'
FILTER FABRIC UNDER STONE
OUTLET PIPE DIAMETER
OUTLET PIPE DIAMETER +2'
BEEHIVE INLET OR
DRAINAGE COVER
LATHS
6 FACE
OF #8 STONE
OVER RIP -RAP
STONE. x
Co
(3 MINIMUM)