Loading...
HomeMy WebLinkAbout09030013 Private Golf Course - Reed Property Pg 7STR# B La axis THICKNESS CIVIL SITE GROUP, LLC Aj 643 Massachusetts Avenue, Suite 200 Indianapolis, Indiana 46204 Ph: (317) 423 -3305 Fax: (317) 423 -3306 18" RCP 5' 30' R, SURVEY] ONNER STREE 12" 8" Skirt N 2 11 530 4 24 48i %%IIIIIiS,, P'GLE /SS �,i a 41 N o PE10403858 F. STATE OF 0. i :Ai 0 0 %P UTAN (47 `SSIONALe' i -IIIIIII� 6 a 0.4 DATE: 03/19/09 13 DWN BY: EAG CHKD. BY: EAG SCALE: 1" 60' DATE: 03/16/09 2 740 6 27 46 73 30 16 1 L] flY-PR] 12351 WE ONSVILLE 18 i 2 990 9 27 46 73 36 19 1 PROJECT NUMBER MSI.023 DRAWING NUMBER Cl ONO SHEET 7 OF 8 21 STR# B La W THICKNESS d 50 18" RCP 5' 30' 15' 12" 8" Skirt N 2 11 530 4 24 48i 72i 24 13 1 SIZE OF STONE X OF TOTAL WEIGHT LARGER THAN GIVEN SIZE 3K 0 2K 20 K 50 0.1K 90 ID d (MIN) 27" SMALLER 2 1/4" o ro 4 66" LARGER 30" E Dia. +1 R -1 R -2 Skirt N 2 11 ID d (MIN) 27" SMALLER 3" 30" TO 60" 4 66" LARGER 6" 12/22/2006 NOTES: RCP TRENCH DETAIL FOR rtrY STORM SEWERS S NO SCALE TCT Sit CAME FINAL BAIV <LL SECTION A -A FIGURE )1 -1 Bedding and Bad Backfill Standards for Storm Sewers RCP TRENCH G OR T (GROOVE OUTLET END) (TOUNGE -INLET END) PAVEMENT gC ION WIRES I' I BEDDING AND HAAUNCHmc r oR ALL RCP iNSTALLATONS S1 LL E #8 STONE MEETING HE MATERIAL REOLIIR.Et ENTS O 'ICE !ROOT OT -:f, c 'SI`:s6t..:. W. PI.� l =;1) TI T r+l l 00 TYUICH. "H# AFTER ME PPE.:. I 1�4$ C' T/44.1 CAME kir; I.J' E„ THERE R MAJNS A 4'V /ANNUM DEPTH Cf MATERIAL ELOW THE PPE DA R L OiD A. MINIMUM h F *r E.10 THE: BELL, FOR PiPE &LES 66 Aft] LAMER, `AE MINIMUM DEPTH I, AT :MAL BELOW THE PIPE BARREL SHAIw BE 6 'r EIED II E,'€ jt{�A{y1�.I.{ BE PLACED TO I UNIFORM AS POSSIIBT.E., �y €FTy?* l PIPE. 3>u: LOOa Y PLACED F., 2A 5 tTFDC MARL ��J BER THE N 'Y.IDnI T£ W) OF 7R PI PRF TO P ACI 1Tl` :NT 4y 1* f1 IF' [7 DE RL IN M OF 4 F2�£N H Ef�£f�''I1�{ ARE OFT aR yE LDN( TAE: STS: SHAli BE UNDERCUT TO SUCH A DEPTH THAT «HEN I :EPA RED TA iIL SINE IT 'sly.,! PRODUCE A UNIFORM AND STABLE FOOND.AT1.* PI ONG THE ENTIRE. 1E Nx 1`H '"ar "ME PIPE. fAUN, H1 O AND INITIAL SACKFUL, SHAHS D COMPACTED €'41 t MA.XIMUNI LFTS SO NOT LESS THAN 9O S,A IDA) PROCTIX DENSITY FM THE ENTIRE E D`s:PTI" OF THE. MATERIAL IAt, 11„ ACID '1I::. BA rX *,,..I. SHALL L .9E PP BOIfalsIT UP EVENLY ON BOTH Sl') VI- THE PIPE FOR THE: FULL EENC- (Yi THE: PI K. HALIN I.IIN HALL FIEND '1; THE. S Rt+l %F.IM i» p4 17 MINIMUM IMUM TE NC'H WIDTH S1AL BE T4L OUTSIDE DIAIMETER. OF THE PIPE PLUS 1?.'•"", 2. FINAL: BACKFILL. FOR All RC INSTALLATIONS WH F 1> 1 5` OP ..E. SHPT.;. H BORROW MS STRUCTURE CKF I,I.: T�1 ;S� N i r. r» D OW F I r ET1? G THE MATED /AL REOVRE MEI TS OF THE IN DOT AND SHAL€. N. CIJAPACTED111 6' MAXIMUM LIFTS TO NOT LESS ThAN 95% STANDARD PROCTOR DENSITY FOP THE ENTIRE DEPTH OF T f MATERIAL I AC D THE BACKEIE FOR TWF TOP I;" -Ci THE EXCAVAION BELOW THE START a THE 4400 ''I1 AK 1E PAVEMENT #IML BE STONE P FETNC THE MATERIAL REQUIREMENTS OF THE MOOT T AND SHA.IA. BE COMPACTO TO NOT 'S THAN 95, STANDARD PROCTOR ICT DENSITY, Mk. SACKFUL POI AEI.. RCP I STALA7 NS ERE r4a scS GREKER THAN r5 t1ALl. BE ClEAIsi MATERIAL RIA FREE C ROCKS LARGER THAN 6 IN DAM .ATER, FROZEN LrLMN SOIL, W000 SIR OT KR Ia fFANEO MATERIAL. COMPACTED IN 12' MAXIMUM. LIFTS TO MT LESS THAN STANDARD PROCTOR VASTY FOR THE. ENT`R% DEPT 1 THE E*CA'MTIO, THE ANAL 6 INCHES Of 1 EXCAVATION STALL COW ST T "SOPS L. 1HL IA'41IM M COVER ERN THI TOP O rtiE: INSTAU INSTALLED PA' NEN 1£O Is't TOE IHiL INSTALLU) P P SAL UL THL PA .MEN T :C T d. TWCKNESS. (A1:. kT IMNOU A 1) A I• :M;"OE MA E£ A ABOVE f BGKA PLUS ileari Ni) sf CUUMS `+IIrEs SAL I:4In ti( ALO i ANY PART OF ME PIPE ROM 1s'IL ANAL PAVEMENT JL.ExArV TO NE 1CP OE THE PIK GE.: LESS THAN 2.5 MET. 4. F EASING SU60ADE HAS 8E0 LIME IMAilE aitUfti, 'MTH D4#tow t P TO BOTTOM OF UNTREATED L :ii.511''ru 51if2IADE M:T nu_ T1: %`t TREATED EK ALE. 'M1IIr1 UNIE:. AB L M SOIL 5 THESE STANDARDS SHALL AP Y FOR STORM FE CRS kS INSTALL WITHIN CITY 5P C AND PROPOSED Ft* REGARDLESS OF /WI:SD:CAA Crk..H STORM r IKE 6. Ali. T' d PIPE wrHiiN r.451 SiC PROPMET cry y t -IAu F 'IZENF+ s C'')N ;R5I P: F%F.` RE«:'>}kFttI, ='S JLRSDICTIO OVER SIOHM MKS, L A L. FOR C i .,1, Y STORM SEWERS 500 -7 NOT TO SCALE TO BE USED FOR REPLACEMENT OF EXISTING CULVERT BENEATH 116th STREET. CLUVERT PIPE TO BE BACKFILLED WITH FLOWABLE FILL AT THE REQUEST OF THE CITY OF CARMEL ENGINEERING DEPARTMENT. k 'MIt1IMUM OF TOPSOIL. MIN11U COW:R SHALL El PER NOTE 3 1 PRECAST CONCRETE FLARED END SECTION y R,�:. UTSI DMA TIT DEPTH c v 3%r cm c 'MT AI:: 9ELOW PIPE DEPTH CE BEDDING: G MA €1w IAL. SEW* PF"E. I3 d MIN 6 SMALLER 4` 66" As I.ARCER VERTICAL FLARE SECTION B -B NOTE: MANUFACTURE OF END SECTION IS IN ACCORDANCE WITH APPLICABLE PORTIONS OF A.S.T.M. SPECIFICATION C76. STANDARD ')RW f( I;..,. 2 1-1" R A TAPER PER INCH PER SIDE HORIZONTAL FLARE EDGE OF PAVEMENT, CURB GUTTER OR SIMILAR STRUCTURE IN THE PUBLIC RIGHT OF WAY #8 STONE OR APPROVED EQUIVALENT. BEDDING MATERIAL HAND TAMPED OR WALKED INTO PLACE TO A MIN. OF 12" ABOVE TOP OF PIPE. LEGEND OD OUTSIDE DIAMETER OF PIPE ID INSIDE DIAMETER OF PIPE TOP OF BANK 835.5 NOT TO SCALE DISTANCE DEFINED BY D.O.T. REQUIREMENTS NOTES; 1. ALL INITIAL BACKFILL SHALL BE INSTALLED IN 6" TO 12" BALANCED LIFTS. 2. A MINIMUM 9" OF CLEARANCE SHALL BE PROVIDED ON EACH SIDE OF THE INSTALLED PIPE. PLASTIC PIPE (PVC HDPE) BEDDING /TRENCH DETAIL NOT TO SCALE 100 YR. FLOOD ELEVATION 833.52 TYPICAL EXISTING POND SECTION PIPE CULVERT o NOTES; PIPE g CULVERT c IN. 6 TOPSOIL TO ENSURE GRASS GROWTH IF NOT UNDER PAVEMENT SLOPE. i RIPRAP GEOTEXTILE UNDER END SECTION NOTE: MIN. OD NORMAL POOL ELEVATION 832.00 BOTTOM ELEVATION =824.0 "B" BORROW OR EQUIVALENT GRANULAR MATERIAL COMPACTED TO 95% STANDARD PROCTOR DENSITY TO TOP OF TRENCH IF LESS THAN OR WITHIN 5' OF EDGE OF PAVEMENT. IF GREATER THAN 5' FROM EDGE OF PAVEMENT, AREA TO BE BACKFILLED WITH CLEAN MATERIAL THAT SHALL CONTAIN NO MORE THAN 10" PASSING A No. 200 SEIVE. 1. GEOTEXTILE UNDERLAYMENT TO BE POLYFELT TS700 OR APPROVED EQUAL PLAN VIEW CROSS SECTION WHERE K d50 DEPTH OF RIP RAP SHALL NOT BE LESS THAN 3 x d 50 RIPRAP DETAIL END SECTION NOT TO SCALE La w E2 END SECTION (SEE STR. ABOVE) RIPRAP GEOTEXTILE (SEE NOTES) THICKNESS isPiwzommas 'War ///s EDGE OF PAVEMENT, CUR GUTTER OR SIMILAR STRUCTURE IN THE PUBLIC RIGHT -OF -WAY IF WITHIN 5' OF EDGE OF PAVEMENT, USE B BORROW OR EQUIV. GRANULAR MATERIAL COMPACTED TO 95% STANDARD PROCTOR DENSITY FOR ENTIRE TRENCH BACKFILL LEGEND OD OUTSIDE DIAMETER ID INSIDE DIAMETER d DEPTH OF BEDDING MATERIAL BELOW PIPE DISTANCE DEFINED BY D.O.T. REQUIREMENT MIN. 6" TOPSOIL TO ENSURE GRASS GROWTH IF NOT UNDER PAVEMENT MINIMUM WIDTH 1.25 OD 12 DEPTH OF BEDDING MATERIAL BELOW PIPE REINFORCED CONCRETE PIPE (RCP) BEDDING/TRENCH DETAIL NOT TO SCALE 6" SPAN x 4" RISE RECT. ORIFICE INV.- 909.00 6" SPAN x 4" RISE RECT. ORIFICE INV.- 908.00 T.O.C. -910.0 d GRADE (NEW OR EXISTING) T.O.B. ELEV =911.0 BOT.- 905.75 IF NOT WITHIN 5' OF EDGE OF PAVEMENT: USE "B" BORROW COMPACTED TO 90% STANDARD PROCTOR DENSITY TO 1/6 OF PIPE DIAMETER AND REGULAR OD BACKFILL TO TOP OF TRENCH #8 STONE OR APPROVED EQUIVALENT EDDING MATERIAL HAND TAMPED OR WALKED INTO PLACE. 11 34 1/2" 30" NOTES; 1. ALL INITIAL BACKFILL SHALL BE INSTALLED IN 6" TO 12 BALANCED LIFTS. 2. A MINIMUM 9" OF CLEARANCE SHALL BE PROVIDED ON EACH SIDE OF THE INSTALLED PIPE. NEENAH CASTING R- 4215 -C If I REVISION RECORD REV 3(MIN.) 3 3/4" If DATE DESCRIPTION EXISTING GRADE BY 0.2' 11 UNDERCUT ALLOW FOR SWALE FUTURE SILTING TYPICAL SWALE DETAIL NOT TO SCALE 12 -6 I C -I I I BASE, ELEV =910.6 I 1._11= 1 11 III -III -I 1 I I I I 11 1; 1 111111 „I I 10 -0" EMERGENCY OVERFLOW WEIR NOT TO SCALE 2 #5 REINF. BARS 36" LONG STRUCTURE TO MEET ALL APPLICABLE ASTM STANDARDS 12" RCP OUTLET PIPE INV.- 906.17 TOP- 908.33 INV.- 908.00 NOT TO SCALE ft 3(MIN.) 'PROPOSED GRADE ORIFICE DETAILS TOP- 909.33 r d' I I INV.- 909.00 L -J I-�-I 6" OUTLET STRUCTURE (102) DES BY GRADE 1 OR EXISTING) T.O.B. ELEV 911.0 111 7:1117 11 III 11 I I I I 1 =1 11 =1 i 1- 42" APP BY (3 MINIMUM) II G or T Wt. Sec. A B C D E Dia. +1 R -1 R -2 Skirt 12 2 11 530 4 24 48i 72i 24 13 1 9 3� 2 740 6 27 46 73 30 16 1 11 3� 18 i 2 990 9 27 46 73 36 19 1 12 4 21 1280 9 35 38 73 42 22 1 13 4 24 3 2 1520 431 30 7 48 25 1 14 4 27 31 2 1930 101 48 2 7 54 28 1 14 4 30 3 2190 12 54 1 7 60 31 1 15 5 1 3150 131 581 3 9 66 34 2 171 36 4 4100 15 63 3 9 72 37 2 20 42 44 5380 21 63 35 98 78 43 27 22 48 5 6550 24 72 26 98 84 49 2 22 54 51 8040 27 65 35 100 90 55 3 24 60 6 5 8750 30 60 39 99 96 61 3 24 66 n �m 51 10630 24 78 21 99 102 67 M 24 7 72 78 6 12520 34 78 21 99 108 73 24 6I 14430 24 78 21 99 114 79 24 84 7 16350 24 78 21 99 120 85 24 9 12/22/2006 NOTES: RCP TRENCH DETAIL FOR rtrY STORM SEWERS S NO SCALE TCT Sit CAME FINAL BAIV <LL SECTION A -A FIGURE )1 -1 Bedding and Bad Backfill Standards for Storm Sewers RCP TRENCH G OR T (GROOVE OUTLET END) (TOUNGE -INLET END) PAVEMENT gC ION WIRES I' I BEDDING AND HAAUNCHmc r oR ALL RCP iNSTALLATONS S1 LL E #8 STONE MEETING HE MATERIAL REOLIIR.Et ENTS O 'ICE !ROOT OT -:f, c 'SI`:s6t..:. W. PI.� l =;1) TI T r+l l 00 TYUICH. "H# AFTER ME PPE.:. I 1�4$ C' T/44.1 CAME kir; I.J' E„ THERE R MAJNS A 4'V /ANNUM DEPTH Cf MATERIAL ELOW THE PPE DA R L OiD A. MINIMUM h F *r E.10 THE: BELL, FOR PiPE &LES 66 Aft] LAMER, `AE MINIMUM DEPTH I, AT :MAL BELOW THE PIPE BARREL SHAIw BE 6 'r EIED II E,'€ jt{�A{y1�.I.{ BE PLACED TO I UNIFORM AS POSSIIBT.E., �y €FTy?* l PIPE. 3>u: LOOa Y PLACED F., 2A 5 tTFDC MARL ��J BER THE N 'Y.IDnI T£ W) OF 7R PI PRF TO P ACI 1Tl` :NT 4y 1* f1 IF' [7 DE RL IN M OF 4 F2�£N H Ef�£f�''I1�{ ARE OFT aR yE LDN( TAE: STS: SHAli BE UNDERCUT TO SUCH A DEPTH THAT «HEN I :EPA RED TA iIL SINE IT 'sly.,! PRODUCE A UNIFORM AND STABLE FOOND.AT1.* PI ONG THE ENTIRE. 1E Nx 1`H '"ar "ME PIPE. fAUN, H1 O AND INITIAL SACKFUL, SHAHS D COMPACTED €'41 t MA.XIMUNI LFTS SO NOT LESS THAN 9O S,A IDA) PROCTIX DENSITY FM THE ENTIRE E D`s:PTI" OF THE. MATERIAL IAt, 11„ ACID '1I::. BA rX *,,..I. SHALL L .9E PP BOIfalsIT UP EVENLY ON BOTH Sl') VI- THE PIPE FOR THE: FULL EENC- (Yi THE: PI K. HALIN I.IIN HALL FIEND '1; THE. S Rt+l %F.IM i» p4 17 MINIMUM IMUM TE NC'H WIDTH S1AL BE T4L OUTSIDE DIAIMETER. OF THE PIPE PLUS 1?.'•"", 2. FINAL: BACKFILL. FOR All RC INSTALLATIONS WH F 1> 1 5` OP ..E. SHPT.;. H BORROW MS STRUCTURE CKF I,I.: T�1 ;S� N i r. r» D OW F I r ET1? G THE MATED /AL REOVRE MEI TS OF THE IN DOT AND SHAL€. N. CIJAPACTED111 6' MAXIMUM LIFTS TO NOT LESS ThAN 95% STANDARD PROCTOR DENSITY FOP THE ENTIRE DEPTH OF T f MATERIAL I AC D THE BACKEIE FOR TWF TOP I;" -Ci THE EXCAVAION BELOW THE START a THE 4400 ''I1 AK 1E PAVEMENT #IML BE STONE P FETNC THE MATERIAL REQUIREMENTS OF THE MOOT T AND SHA.IA. BE COMPACTO TO NOT 'S THAN 95, STANDARD PROCTOR ICT DENSITY, Mk. SACKFUL POI AEI.. RCP I STALA7 NS ERE r4a scS GREKER THAN r5 t1ALl. BE ClEAIsi MATERIAL RIA FREE C ROCKS LARGER THAN 6 IN DAM .ATER, FROZEN LrLMN SOIL, W000 SIR OT KR Ia fFANEO MATERIAL. COMPACTED IN 12' MAXIMUM. LIFTS TO MT LESS THAN STANDARD PROCTOR VASTY FOR THE. ENT`R% DEPT 1 THE E*CA'MTIO, THE ANAL 6 INCHES Of 1 EXCAVATION STALL COW ST T "SOPS L. 1HL IA'41IM M COVER ERN THI TOP O rtiE: INSTAU INSTALLED PA' NEN 1£O Is't TOE IHiL INSTALLU) P P SAL UL THL PA .MEN T :C T d. TWCKNESS. (A1:. kT IMNOU A 1) A I• :M;"OE MA E£ A ABOVE f BGKA PLUS ileari Ni) sf CUUMS `+IIrEs SAL I:4In ti( ALO i ANY PART OF ME PIPE ROM 1s'IL ANAL PAVEMENT JL.ExArV TO NE 1CP OE THE PIK GE.: LESS THAN 2.5 MET. 4. F EASING SU60ADE HAS 8E0 LIME IMAilE aitUfti, 'MTH D4#tow t P TO BOTTOM OF UNTREATED L :ii.511''ru 51if2IADE M:T nu_ T1: %`t TREATED EK ALE. 'M1IIr1 UNIE:. AB L M SOIL 5 THESE STANDARDS SHALL AP Y FOR STORM FE CRS kS INSTALL WITHIN CITY 5P C AND PROPOSED Ft* REGARDLESS OF /WI:SD:CAA Crk..H STORM r IKE 6. Ali. T' d PIPE wrHiiN r.451 SiC PROPMET cry y t -IAu F 'IZENF+ s C'')N ;R5I P: F%F.` RE«:'>}kFttI, ='S JLRSDICTIO OVER SIOHM MKS, L A L. FOR C i .,1, Y STORM SEWERS 500 -7 NOT TO SCALE TO BE USED FOR REPLACEMENT OF EXISTING CULVERT BENEATH 116th STREET. CLUVERT PIPE TO BE BACKFILLED WITH FLOWABLE FILL AT THE REQUEST OF THE CITY OF CARMEL ENGINEERING DEPARTMENT. k 'MIt1IMUM OF TOPSOIL. MIN11U COW:R SHALL El PER NOTE 3 1 PRECAST CONCRETE FLARED END SECTION y R,�:. UTSI DMA TIT DEPTH c v 3%r cm c 'MT AI:: 9ELOW PIPE DEPTH CE BEDDING: G MA €1w IAL. SEW* PF"E. I3 d MIN 6 SMALLER 4` 66" As I.ARCER VERTICAL FLARE SECTION B -B NOTE: MANUFACTURE OF END SECTION IS IN ACCORDANCE WITH APPLICABLE PORTIONS OF A.S.T.M. SPECIFICATION C76. STANDARD ')RW f( I;..,. 2 1-1" R A TAPER PER INCH PER SIDE HORIZONTAL FLARE EDGE OF PAVEMENT, CURB GUTTER OR SIMILAR STRUCTURE IN THE PUBLIC RIGHT OF WAY #8 STONE OR APPROVED EQUIVALENT. BEDDING MATERIAL HAND TAMPED OR WALKED INTO PLACE TO A MIN. OF 12" ABOVE TOP OF PIPE. LEGEND OD OUTSIDE DIAMETER OF PIPE ID INSIDE DIAMETER OF PIPE TOP OF BANK 835.5 NOT TO SCALE DISTANCE DEFINED BY D.O.T. REQUIREMENTS NOTES; 1. ALL INITIAL BACKFILL SHALL BE INSTALLED IN 6" TO 12" BALANCED LIFTS. 2. A MINIMUM 9" OF CLEARANCE SHALL BE PROVIDED ON EACH SIDE OF THE INSTALLED PIPE. PLASTIC PIPE (PVC HDPE) BEDDING /TRENCH DETAIL NOT TO SCALE 100 YR. FLOOD ELEVATION 833.52 TYPICAL EXISTING POND SECTION PIPE CULVERT o NOTES; PIPE g CULVERT c IN. 6 TOPSOIL TO ENSURE GRASS GROWTH IF NOT UNDER PAVEMENT SLOPE. i RIPRAP GEOTEXTILE UNDER END SECTION NOTE: MIN. OD NORMAL POOL ELEVATION 832.00 BOTTOM ELEVATION =824.0 "B" BORROW OR EQUIVALENT GRANULAR MATERIAL COMPACTED TO 95% STANDARD PROCTOR DENSITY TO TOP OF TRENCH IF LESS THAN OR WITHIN 5' OF EDGE OF PAVEMENT. IF GREATER THAN 5' FROM EDGE OF PAVEMENT, AREA TO BE BACKFILLED WITH CLEAN MATERIAL THAT SHALL CONTAIN NO MORE THAN 10" PASSING A No. 200 SEIVE. 1. GEOTEXTILE UNDERLAYMENT TO BE POLYFELT TS700 OR APPROVED EQUAL PLAN VIEW CROSS SECTION WHERE K d50 DEPTH OF RIP RAP SHALL NOT BE LESS THAN 3 x d 50 RIPRAP DETAIL END SECTION NOT TO SCALE La w E2 END SECTION (SEE STR. ABOVE) RIPRAP GEOTEXTILE (SEE NOTES) THICKNESS isPiwzommas 'War ///s EDGE OF PAVEMENT, CUR GUTTER OR SIMILAR STRUCTURE IN THE PUBLIC RIGHT -OF -WAY IF WITHIN 5' OF EDGE OF PAVEMENT, USE B BORROW OR EQUIV. GRANULAR MATERIAL COMPACTED TO 95% STANDARD PROCTOR DENSITY FOR ENTIRE TRENCH BACKFILL LEGEND OD OUTSIDE DIAMETER ID INSIDE DIAMETER d DEPTH OF BEDDING MATERIAL BELOW PIPE DISTANCE DEFINED BY D.O.T. REQUIREMENT MIN. 6" TOPSOIL TO ENSURE GRASS GROWTH IF NOT UNDER PAVEMENT MINIMUM WIDTH 1.25 OD 12 DEPTH OF BEDDING MATERIAL BELOW PIPE REINFORCED CONCRETE PIPE (RCP) BEDDING/TRENCH DETAIL NOT TO SCALE 6" SPAN x 4" RISE RECT. ORIFICE INV.- 909.00 6" SPAN x 4" RISE RECT. ORIFICE INV.- 908.00 T.O.C. -910.0 d GRADE (NEW OR EXISTING) T.O.B. ELEV =911.0 BOT.- 905.75 IF NOT WITHIN 5' OF EDGE OF PAVEMENT: USE "B" BORROW COMPACTED TO 90% STANDARD PROCTOR DENSITY TO 1/6 OF PIPE DIAMETER AND REGULAR OD BACKFILL TO TOP OF TRENCH #8 STONE OR APPROVED EQUIVALENT EDDING MATERIAL HAND TAMPED OR WALKED INTO PLACE. 11 34 1/2" 30" NOTES; 1. ALL INITIAL BACKFILL SHALL BE INSTALLED IN 6" TO 12 BALANCED LIFTS. 2. A MINIMUM 9" OF CLEARANCE SHALL BE PROVIDED ON EACH SIDE OF THE INSTALLED PIPE. NEENAH CASTING R- 4215 -C If I REVISION RECORD REV 3(MIN.) 3 3/4" If DATE DESCRIPTION EXISTING GRADE BY 0.2' 11 UNDERCUT ALLOW FOR SWALE FUTURE SILTING TYPICAL SWALE DETAIL NOT TO SCALE 12 -6 I C -I I I BASE, ELEV =910.6 I 1._11= 1 11 III -III -I 1 I I I I 11 1; 1 111111 „I I 10 -0" EMERGENCY OVERFLOW WEIR NOT TO SCALE 2 #5 REINF. BARS 36" LONG STRUCTURE TO MEET ALL APPLICABLE ASTM STANDARDS 12" RCP OUTLET PIPE INV.- 906.17 TOP- 908.33 INV.- 908.00 NOT TO SCALE ft 3(MIN.) 'PROPOSED GRADE ORIFICE DETAILS TOP- 909.33 r d' I I INV.- 909.00 L -J I-�-I 6" OUTLET STRUCTURE (102) DES BY GRADE 1 OR EXISTING) T.O.B. ELEV 911.0 111 7:1117 11 III 11 I I I I 1 =1 11 =1 i 1- 42" APP BY (3 MINIMUM)