HomeMy WebLinkAboutPg 2 G1.0 Site Layout & GradingEX. RIM
855.20
856.34
SLOPE PAVING FROM
BUILDING TO MEET
EXISTING PAVING FLUSH
SLOPE PAVING FROM
BUILDING TO MEET
DTS11NG PAVING FLUSH
PAVING FROM
TO MEET
VING FLUSH
Juuiuu:
NlIququu11iIJININNIr
#INNUNUINl,
i .1
Z
NOTES
SLOPE PAVING FROM
BUILDING TO MEET
EXISTING PAVING FLUSH
SAWCUT, REMOVE AND REPLACE EXISTING ASPHALT OR
CONCRETE AND DISPOSE OFFSITE, SEE SHADED AREA.
COORDINATE FOOTING WITH OTHER BUILDING TRADES AND
EXISTING SEWER LOCATIONS.
REMOVE EXISTING SANITARY STRUCTURE AND REPLACE WITH
CLEANOUT. SEE PLUMBING PLANS FOR CLEANOUT AND PIPING.
NEW CONCRETE STOOPS, SEE STRUCTURAL PLAN
NEW ASPHALT WEDGE AND LEVEL PAVING WITH MIWNG AS
NOTED. SEE DETAIL #2 G1.0
NEW ASPHALT PAVING SECTION, SEE DETAIL #1 G1.0
856
EX. FF
/856.88
L.
SITE LAYOUT GRADING
SCALE:1 10' -0'
UNE
•1111.11�IIII.IIIiINe1N�1111 MIN IMINIMI•III�III •1111 •1INMIII•11111 1111•1III�III1•11M10t•NI•NI1•NI�IIIt• III •1IN 11111 IAN11IN•NN01111•III�III1III�I
4
1
1
1
1 I
1 1
1
1
1
1
1 1
1
1
1
1
1
1
1
1
1 1
1 1
1
1
1
TACK COAT
PRIME COAT
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
EXISTING
PARKING
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1 1
SURFACE COURSE MIN. 1 1/2"
BINDER COURSE MIN. 2 1/2"
COMPACTED STONE BASE 8"
EXIST
SERV
III •1111 MIMIIININIMIN •1III•1III •111I11•IN 10III1111III VIII •1IN111AI1•NI1•WINIIIMIIIII MIIIIIIIII MNIE1IN •1NI11•III•111 IN •1111 =1110111 11
I i
1 I
1 1
1 1
1
1
All contractors but not limited to the excavating con—
tractor or contractors must take particular care when
excavating in and around existing utility lines and equip—
ment. Actual field locations of all the existing utilities
are the contractors responsibilty and must be located
either by the representive of the utility company or by a
private underground utility locating company prior to the
start of excavating. Verify minimum cover requirements
by the utility contractor or contractors or agencies
whomever utility companies or agencies whomever has
jurisdication so not to cause damage.
All construction methods and materials must conform to
current standards and specifications of the Federal, State,
County, City or Local requirements, whichever has juris—
diction.
Existing pavement, sidewalks curbs driveways, electrical
transformer, ditches, drainage pipes and structures,
fences, lawns, trees, bushes, mailboxes, signs, power
poles etc., to remain shall be protected from damage by
the contractor. Any damage during construction shall be
restored, reconstructed or replaced by the contractor
at his expense. All damages shall be restored or re—
placed to at least their original condition or as required
or dictated by Federal, State, County, City or Local
All areas where the existing pavement or pavements are
damaged during construction from heavy traffic or equip—
ment, fuel oil, oil, gasoline, etc., by the General Cont—
ractor, Subcontractor, or Suppliers, shall be reconstructed
to it's original condition or as required or dictated by
Federal, State, County, City or local agencies. This recon—
struction and repair shall take place at the end of the
project construction or during the scheduled grading and
paving of those areas.
LEXINGTON BLVD.
ASPHALT PAVING
�1L
2.087 8P. CLASSROOM
ADDMON
1
O 1
i
1
1
PROPEMY II• NI11IN•1III�111 .10I11III.111 •1III•II01N11Mli r1111•1IIIMIIIMIIIMII• INMIII01rIII01III•II•1NI• III111NIN 11111•111'111
1 1 1 1
NTS
GENERAL NOTES
It shall be the responsiblity of the contractor to bare
all expenses to remove, relocate and or modify all
utiliies, private, public, unless noted otherwise on plans.
It further shall be
the responsiblity of the contractor to verify with each
utility company and or agent to who is responsible to
remove, relocate and or modify such utilities existing or
proposed. It further shall be the responsibility of the
contractor to verify if any future utilities are planned and
how it may effect this project and its owner as to their
resonsibilities.
The contractor shall be responsibile to provide at Ms
expense all automobile and pedestrain traffic control
devices required by Federal, State, County, City or Local
agencies.
Removal of the existing improvements are as noted on
the plans. The materials removed from the site shall
be disposed of in a proper and legal manner per Federal,
State, County, City, and or Local laws and ordinance.
It is the responsibilty of the contractor or contractors to
obtain all Federal, State, County, City, and Local permits
for any and all work required unless otherwise noted.
This includes the submittal of soil erosion sediment
control plans as required for rule 5.
The contractor or contractors are responsible to pay for
all required permits by any or all agenies mentioned
above unless otherwise noted by the contract or specifi—
cations.
2:44
PARKING
206' -5'
L I I I
NEW PVMT. TO MEET
EXISTING PVMT. FLUSH
B
IIIII III III I
EXISTING
5
OVERALL LAYOUT PLAN
EXISTING PVMT
I
1
I I I I I I L II
I NMNNNNMIIMNIUNI MI• IIINNNNIMIIMIOSIIMIHNIINIM•11HM11•IN' IHN• IIIiINIIIIIMIMMIIIMII r•INNOVIIMNI•1411II•6111• III•
I4
o 1
1
1
1
i
IN AREAS WHERE NEW PAVEMENT ABUTTS
EXISTING PAVEMENT, MILL DOWN EXISTING
PAVEMENT 1X" DEEP AND CONTINUE
TOWARDS BUILDING UNTIL NEW PAVEMENT
SURFACE LAYER IS A CONSISTANT 1 X"
DEPTH. FROM THAT POINT ON NO MILLING
WILL BE REQUIRED BUT WEDGE AND LEVEL
AND MAINTAIN UNIFORM GRADES TOWARDS
BUILDING TO ELEVATIONS AS NOTED
SQ4J :1'= 100' -0"
i
S EDGE
2 NEW PVMT. C EXISTING PVMT.
It is the contractor's responsiblity to notify all the utilty
companies and departments 72 hours before construction
is to start to verify any utilities that may be present on
site. All verifications, locations, size and depths shall
be made by the appropriate utility companies or depart—
ments. men excavating around or over existing utilities,
the contractor must notify the utility company so a re—
presentive of the utility can be present during the
excavation to instruct and observe during the excavation.
It shall be the the responsibility of the contractor
to coordinate all proposed construction with adjacent
property owners and veriify that written permission
has been obtained to cross the neighboring properties to
access and complete proposed construction as shown.
It is the responsibility of the contractor to inspect each
day and remove all mud, dirt, gravel and loose materials
tracked, dumped, spilled or wind blown from this site
onto other sites, right of ways, public or private streets
or roads, driveways, yards or sidewalks. The contractor
must clean or pick up daily if necessary. The contractor
shall reduce the airborne dust during the entire con—
struction schedule. Water may be used as a reducer.
The utilities indicated on these plans
may not be a complete inventory of all the existing util—
ities present on and around this site. The locations and
size of these utilities are approximate. This information
was gathered or supplied from others and used by the
architect and or engineer and may not be actual. The
architect and or engineer may not be held liable for any
incorrect or misleading utility information indicated,
implied or not indicated on these plans.
4TH AVE.
3' -0
MI mNN■NI RomnioNImNmIIIomIIIiIImmosoIN mitill•NI1•IN1•NI .101•NIi1III •1NI1•1111MOMINMIMIN■
CARMEL LIBRARY
INSTALL ASPHALT BINDER COURSE
AND THEN PROTECTIVE MEMBRANE "PETROMAT"
SYSTEM PER MANUFACTURERS SPECS.
MANUFACTURED BY BP AMOCO FABRICS
AND FIBERS COMP.ACCROSS EXISTING
AND NEW PAVEMENT JUNCTION.
5' —O"
URF. COURSE
BINDER COURSE
COMP. AGGREGATE BASE
STABILIZED SUBGRADE
NEW PAVING
The contractor shall verify all dimensions and elevations
in the field before the start of construction. The con—
tractor shall be responsible for all field dimensions and
elevations during the entire construction schedule. If
any discrepancies are found on the engineering plans or
landscape plans from actual field conditions the con—
tractor shall contact the A/E immediately. If any dis—
crepancies are found on the survey plan or from actual
field conditions the contractor shall contact the A/E
immediately for instructions.
All dimensions are parallel and perpendicular to the base
lines, property lines and or building lines unless other—
wise noted.
All radii indicated shall be formed as circular arcs.
NTS
All dimensions of pavements are to edge of finish pavement
or face of curb unless otherwise noted.
All concrete curbs shall be tooled for control joints and
not to exceed 10' -0" maximum. Expansion joints shall
not exceed 30' -0" maximum. Control joints in curbs may be
saw cut within 24 hours after the curbs are poured.
All 4" concrete pavements or sidewalks are not to exceed
a maximum slope of 1' in 20'. Control joints shall not exceed
a maximum of 10' -0" o.c.. Expansion joints shall not exceed
40' -0" o.c. maximum unless otherwise noted or indicated on plans.
z
CC
CC Q
Lim -1
Z ZO
oWN
o Z
4C —II
J
W o
c)
cc _J
J
N
0
0 cc
0
z
0
Z
CC
0
od
I-
D
0
Q
—J
w
t!)
c) co
0
N I
rn
(Ni
0
2 la
0
O 0
m
w
m
m p
w
W
O 0
O
u
0
s
O
00
00
r
M
1—
0
0
C'3
CARMEL ELEMENTARY SCHOOL
208100.00
VICINITY MAP
STATE
Eve
MICHIGAN
OHIO
NORTH
SMOKEY ROW RD
z
a
ter
136TH STREET
Q
LOCATION
SITE
LO CATION
z
m
-1
z
ci
z
J r 'mum BEND
FORT
INDIANA
CARMEL
1NDMNAPOLIS
TERRE HAUTE
KENTUCKY
NAP
W MAIN STREET
1
131ST STREET
w
X
d
•TM
1
126TH
STREET (ApyR
z
7K
0 ,lam
o
,A
VIA P
VI
n my
CARMEL, INDIANA
EX. RIM
855.20
856.34
SLOPE PAVING FROM
BUILDING TO MEET
EXISTING PAVING FLUSH
SLOPE PAVING FROM
BUILDING TO MEET
DTS11NG PAVING FLUSH
PAVING FROM
TO MEET
VING FLUSH
Juuiuu:
NlIququu11iIJININNIr
#INNUNUINl,
i .1
Z
NOTES
SLOPE PAVING FROM
BUILDING TO MEET
EXISTING PAVING FLUSH
SAWCUT, REMOVE AND REPLACE EXISTING ASPHALT OR
CONCRETE AND DISPOSE OFFSITE, SEE SHADED AREA.
COORDINATE FOOTING WITH OTHER BUILDING TRADES AND
EXISTING SEWER LOCATIONS.
REMOVE EXISTING SANITARY STRUCTURE AND REPLACE WITH
CLEANOUT. SEE PLUMBING PLANS FOR CLEANOUT AND PIPING.
NEW CONCRETE STOOPS, SEE STRUCTURAL PLAN
NEW ASPHALT WEDGE AND LEVEL PAVING WITH MIWNG AS
NOTED. SEE DETAIL #2 G1.0
NEW ASPHALT PAVING SECTION, SEE DETAIL #1 G1.0
856
EX. FF
/856.88
L.
SITE LAYOUT GRADING
SCALE:1 10' -0'
UNE
•1111.11�IIII.IIIiINe1N�1111 MIN IMINIMI•III�III •1111 •1INMIII•11111 1111•1III�III1•11M10t•NI•NI1•NI�IIIt• III •1IN 11111 IAN11IN•NN01111•III�III1III�I
4
1
1
1
1 I
1 1
1
1
1
1
1 1
1
1
1
1
1
1
1
1
1 1
1 1
1
1
1
TACK COAT
PRIME COAT
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
EXISTING
PARKING
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1 1
SURFACE COURSE MIN. 1 1/2"
BINDER COURSE MIN. 2 1/2"
COMPACTED STONE BASE 8"
EXIST
SERV
III •1111 MIMIIININIMIN •1III•1III •111I11•IN 10III1111III VIII •1IN111AI1•NI1•WINIIIMIIIII MIIIIIIIII MNIE1IN •1NI11•III•111 IN •1111 =1110111 11
I i
1 I
1 1
1 1
1
1
All contractors but not limited to the excavating con—
tractor or contractors must take particular care when
excavating in and around existing utility lines and equip—
ment. Actual field locations of all the existing utilities
are the contractors responsibilty and must be located
either by the representive of the utility company or by a
private underground utility locating company prior to the
start of excavating. Verify minimum cover requirements
by the utility contractor or contractors or agencies
whomever utility companies or agencies whomever has
jurisdication so not to cause damage.
All construction methods and materials must conform to
current standards and specifications of the Federal, State,
County, City or Local requirements, whichever has juris—
diction.
Existing pavement, sidewalks curbs driveways, electrical
transformer, ditches, drainage pipes and structures,
fences, lawns, trees, bushes, mailboxes, signs, power
poles etc., to remain shall be protected from damage by
the contractor. Any damage during construction shall be
restored, reconstructed or replaced by the contractor
at his expense. All damages shall be restored or re—
placed to at least their original condition or as required
or dictated by Federal, State, County, City or Local
All areas where the existing pavement or pavements are
damaged during construction from heavy traffic or equip—
ment, fuel oil, oil, gasoline, etc., by the General Cont—
ractor, Subcontractor, or Suppliers, shall be reconstructed
to it's original condition or as required or dictated by
Federal, State, County, City or local agencies. This recon—
struction and repair shall take place at the end of the
project construction or during the scheduled grading and
paving of those areas.
LEXINGTON BLVD.
ASPHALT PAVING
�1L
2.087 8P. CLASSROOM
ADDMON
1
O 1
i
1
1
PROPEMY II• NI11IN•1III�111 .10I11III.111 •1III•II01N11Mli r1111•1IIIMIIIMIIIMII• INMIII01rIII01III•II•1NI• III111NIN 11111•111'111
1 1 1 1
NTS
GENERAL NOTES
It shall be the responsiblity of the contractor to bare
all expenses to remove, relocate and or modify all
utiliies, private, public, unless noted otherwise on plans.
It further shall be
the responsiblity of the contractor to verify with each
utility company and or agent to who is responsible to
remove, relocate and or modify such utilities existing or
proposed. It further shall be the responsibility of the
contractor to verify if any future utilities are planned and
how it may effect this project and its owner as to their
resonsibilities.
The contractor shall be responsibile to provide at Ms
expense all automobile and pedestrain traffic control
devices required by Federal, State, County, City or Local
agencies.
Removal of the existing improvements are as noted on
the plans. The materials removed from the site shall
be disposed of in a proper and legal manner per Federal,
State, County, City, and or Local laws and ordinance.
It is the responsibilty of the contractor or contractors to
obtain all Federal, State, County, City, and Local permits
for any and all work required unless otherwise noted.
This includes the submittal of soil erosion sediment
control plans as required for rule 5.
The contractor or contractors are responsible to pay for
all required permits by any or all agenies mentioned
above unless otherwise noted by the contract or specifi—
cations.
2:44
PARKING
206' -5'
L I I I
NEW PVMT. TO MEET
EXISTING PVMT. FLUSH
B
IIIII III III I
EXISTING
5
OVERALL LAYOUT PLAN
EXISTING PVMT
I
1
I I I I I I L II
I NMNNNNMIIMNIUNI MI• IIINNNNIMIIMIOSIIMIHNIINIM•11HM11•IN' IHN• IIIiINIIIIIMIMMIIIMII r•INNOVIIMNI•1411II•6111• III•
I4
o 1
1
1
1
i
IN AREAS WHERE NEW PAVEMENT ABUTTS
EXISTING PAVEMENT, MILL DOWN EXISTING
PAVEMENT 1X" DEEP AND CONTINUE
TOWARDS BUILDING UNTIL NEW PAVEMENT
SURFACE LAYER IS A CONSISTANT 1 X"
DEPTH. FROM THAT POINT ON NO MILLING
WILL BE REQUIRED BUT WEDGE AND LEVEL
AND MAINTAIN UNIFORM GRADES TOWARDS
BUILDING TO ELEVATIONS AS NOTED
SQ4J :1'= 100' -0"
i
S EDGE
2 NEW PVMT. C EXISTING PVMT.
It is the contractor's responsiblity to notify all the utilty
companies and departments 72 hours before construction
is to start to verify any utilities that may be present on
site. All verifications, locations, size and depths shall
be made by the appropriate utility companies or depart—
ments. men excavating around or over existing utilities,
the contractor must notify the utility company so a re—
presentive of the utility can be present during the
excavation to instruct and observe during the excavation.
It shall be the the responsibility of the contractor
to coordinate all proposed construction with adjacent
property owners and veriify that written permission
has been obtained to cross the neighboring properties to
access and complete proposed construction as shown.
It is the responsibility of the contractor to inspect each
day and remove all mud, dirt, gravel and loose materials
tracked, dumped, spilled or wind blown from this site
onto other sites, right of ways, public or private streets
or roads, driveways, yards or sidewalks. The contractor
must clean or pick up daily if necessary. The contractor
shall reduce the airborne dust during the entire con—
struction schedule. Water may be used as a reducer.
The utilities indicated on these plans
may not be a complete inventory of all the existing util—
ities present on and around this site. The locations and
size of these utilities are approximate. This information
was gathered or supplied from others and used by the
architect and or engineer and may not be actual. The
architect and or engineer may not be held liable for any
incorrect or misleading utility information indicated,
implied or not indicated on these plans.
4TH AVE.
3' -0
MI mNN■NI RomnioNImNmIIIomIIIiIImmosoIN mitill•NI1•IN1•NI .101•NIi1III •1NI1•1111MOMINMIMIN■
CARMEL LIBRARY
INSTALL ASPHALT BINDER COURSE
AND THEN PROTECTIVE MEMBRANE "PETROMAT"
SYSTEM PER MANUFACTURERS SPECS.
MANUFACTURED BY BP AMOCO FABRICS
AND FIBERS COMP.ACCROSS EXISTING
AND NEW PAVEMENT JUNCTION.
5' —O"
URF. COURSE
BINDER COURSE
COMP. AGGREGATE BASE
STABILIZED SUBGRADE
NEW PAVING
The contractor shall verify all dimensions and elevations
in the field before the start of construction. The con—
tractor shall be responsible for all field dimensions and
elevations during the entire construction schedule. If
any discrepancies are found on the engineering plans or
landscape plans from actual field conditions the con—
tractor shall contact the A/E immediately. If any dis—
crepancies are found on the survey plan or from actual
field conditions the contractor shall contact the A/E
immediately for instructions.
All dimensions are parallel and perpendicular to the base
lines, property lines and or building lines unless other—
wise noted.
All radii indicated shall be formed as circular arcs.
NTS
All dimensions of pavements are to edge of finish pavement
or face of curb unless otherwise noted.
All concrete curbs shall be tooled for control joints and
not to exceed 10' -0" maximum. Expansion joints shall
not exceed 30' -0" maximum. Control joints in curbs may be
saw cut within 24 hours after the curbs are poured.
All 4" concrete pavements or sidewalks are not to exceed
a maximum slope of 1' in 20'. Control joints shall not exceed
a maximum of 10' -0" o.c.. Expansion joints shall not exceed
40' -0" o.c. maximum unless otherwise noted or indicated on plans.
z
CC
CC Q
Lim -1
Z ZO
oWN
o Z
4C —II
J
W o
c)
cc _J
J
N
0
0 cc
0
z
0
Z
CC
0
od
I-
D
0
Q
—J
w
t!)
c) co
0
N I
rn
(Ni
0
2 la
0
O 0
m
w
m
m p
w
W
O 0
O
u
0
s
O
00
00
r
M
1—
0
0
C'3
CARMEL ELEMENTARY SCHOOL
208100.00