HomeMy WebLinkAboutPg 5 Exterior ElevationsREMOVE EXISTING
COPING FASCIA, REFER
TO DETAIL SECTIONS
4" EXPANSION
JOINT
EXISTING COPING AND
FASCIA TO REMAIN
5
O
OFD
2"
O
RD
ALUMINUM COPING TO
MATCH EXISTING PROFILE
AND COLOR
3
REMOVE EXISTING
COPING FASCIA, REFER
TO DETAIL SECTIONS
6.5"
0
39 -0"
EXISTING COPING AND
FASCIA TO REMAIN
14' -0"
MOR
ALUMINUM STOREFRONT
TO MATCH EXISTING
ROOF PLAN
ALUMINUM FASCIA
TO MATCH EXISTING
PROFILE AND COLOR
O
RD
—ALUMINUM WINDOW
ALUMINUM COPING TO
MATCH EXISTING PROFILE
AND COLOR
BRICK TO MATCH
EXISTING
WEST ELEVATION
EXISTING BRICK
TO REMAIN
EXISTING DOOR
TO REMAIN
A1.5
4
ALUMINUM COPING
TO MATCH EXISTING
PROFILE AND COLOR
ALUMINUM FASCIA
TO MATCH EXISTING
PROFILE AND COLOR
ALUM. WINDOWS
BRICK TO MATCH
EXISTING
ALUMINUM STOR
ALUMINUM STOREFRONT
TO MATCH EXISTING
TO MATCH EXISTING
ALUMINUM COPING
TO MATCH EXISTING
PROFILE AND COLOR
EXISTING BRICK
TO REMAIN
1
TO MATCH EXISTING
PROFILE AND COLOR
EFRONT
CI
ALUMINUM WINDOWS
TO MATCH EXISTING
PROFILE AND COLOR
1)
4.
BRICK TO MATCH EXISTING B
J
ALUMINUM COPING
2
3
ALUMINUM WINDOW
ALUMINUM FASCIA
ALUMINUM FASCIA
TO MATCH EXISTING
PROFILE AND COLOR
ALUMINUM STOREFRONT
TO MATCH EXISTING
ALUMINUM FASCIA
TO MATCH EXISTING
PROFILE AND COLOR
BRICK TO MATCH
EXISTING
EXISTING
A1.5
PLASTER
ALUMINUM SILL
NORTH ELEVATION
EAST ELEVATION
A1.5
ALUM. WINOWS
SOUTH ELEVATION
RICK
TO REMAIN
BRICK TO MATCH
EXISTING
EAST ELEVATION
ALUMINUM COPING
TO MATCH EXISTING
PROFILE AND COLOR
ALUMINUM WINDOW
ROOF PLAN GENERAL NOTES
A. ALL DETAILS SHOWN ARE FOR GENERAL
INFORMATION. ALL FINAL FLASHING CONDMONS
SHALL BE THE RESPONSIBILITY OF THE ROOF
INSTALLER, AND SHALL MEET APPROVAL OF ROOF
MANUFACTURER.
B ALL DETAIL MODIFICATIONS MUST HAVE SHOP
DRAWINGS APPROVAL CONTRACTOR SHALL
INSPECT AND VERIFY ALL EXISTING FIELD
CONDITIONS, CLEARANCES, AND DIMENSIONS
BEFORE STARTING CONSTRUCTION.
COMMENCEMENT OF WORK CONSTITUTES
ACCEPTANCE OF EXISTING CONDITIONS. SHOULD
DIFFERENT CONDITIONS BE ENCOUNTERED,
CONTACT ARCHITECT BEFORE PROCEEDING WITH
ANY FURTHER WORK.
C OPENINGS IN ROOF WILL BE CUT BY ROOF
CONTRACTOR. MECHANICAL CONTRACTOR TO
COORDINATE LOCATION OF OPENING IN ROOF
WITH ROOF CONTRACTOR. CURB TO BE PROVIDED
BY MECHANICAL CONTRACTOR AND INSTALLED BY
ROOF CONTRACTOR.
D PROVIDE FLASHING AND SADDLES FOR ALL
EQUIPMENT PROVIDED UNDER MECHANICAL
E SADDLES AND TAPERED INSULATION SYMBOLS
INDICATE DESIGN INTENT TO SLOPE TO DRAIN.
CONTRACTOR SHALL PROVIDE SUBMITTAL
DRAWIINGS FOR TAPERED INSULATION AND
SADDLES TO INSURE POSITIVE SLOPE.
F THE ROOF CONTRACTOR SHALL PROTECT ALL
ROOF DRAINS, SCUPPERS, AND DOWNSPOUTS
FROM DEBRIS CREATED DURING DEMOLITION AND
CONSTRUCTION. THE ROOF CONTRACTOR SHALL
INSPECT AND CLEAR ALL DRAINS, SCUPPERS,
AND DOWNSPOUTS PRIOR TO COMPLETION OF
WORK AND TO ENSURE THAT THEY ARE FREE OF
DEBRIS AND ARE FUNCTIONING PROPERLY.
ROOF PLAN SYMBOL LEGEND
O
RD
INDICATES ROOF DRAIN SUMP PAN.
(FLASH IN ACCORDANCE WITH ROOF
MEMBRANE MANUFACTURER'S
RECOMMENDATION.) REFER TO
DETAILS X —AX.X.
INDICATES ROOF OVERFLOW DRAIN.
(FLASH IN ACCORDANCE WITH ROOF
MEMBRANE MANUFACTURER'S
RECOMMENDATION.) REFER TO
DETAILS X —AX.X.
INDICATES VENT STACK REFER
TO DETAILS X —AX.X.
INDICATES EXHAUST FAN REFER
TO DETAILS X —AX.X.
SLOPE 1/12p INDICATES ROOF SLOPE
INDICATES ROOF SADDLE REFER
TO PROJECT MANUAL
INDICATES WALL UNE BELOW REFER TO
ARCHITECTURAL FLOOR PLANS.
VERIFICATION NOTE
CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND
CLEARANCES AND ALL EXISTING FIELD CONDITIONS
BEFORE STARTING CONSTRUCTION. COMMENCEMENT
OF WORK CONSTITUTES ACCEPTANCE OF CONDITIONS.
SHOULD DIFFERENT CONDITIONS BE ENCOUNTERED,
CONTACT THE ARCHITECT BEFORE PROCEEDING WITH
WORK.
o
a
co
s
W
0
z
I
m
0
0
1—
a
0
0
1—
W
J
w
CC
CC
w
1—
w
w cc
U
x
z
8
0
0
0 0 co
N
rn
N
o y
z
W
0<
a in
(1)
0
3
O
V
0
s
0
03
00
M
W
1-
0
M
T
CARMEL ELEMENTARY SCHOOL
208100.00