HomeMy WebLinkAbout08120009 REMCO Addition Large Plan Pg. GI
1. Is the site information posted at the entrance?
23. Is a designated equipment washout area astablished, Hearty marked and
being utihizod?
Are all necessary permits attained and Specie provisions being
implemented?
i
24. is solid waste property contained a stable access provided to the
Storage Pickup area?
3 is a construction entrance insulted and functioning properly?
i
4 Are construction staging parking areas restricted to areas designated on
tho plans?
5. Are public and private streets clean of sediment, debris and mud?
26. Is spill response equp
ent on -site and easily acces'Ws?
6. Are appropriate practicea instated where etormwater Leaves the site?
27. Are temporary soil stockpiles in approved areas properly protected?
T. Are all dischargepoints (oUtfals) free of erosion or sediment tran2port?
8. Has an silt fence been Installed property and being maintained?
(entrenched upright fabric not tom terminated to tithergrorrnd Pvrrvtiy
Armed et ond#
I
9 Are sediment basins traps installed according to plan pipe or rock
spillways functionail?
10 Are other sediment control barriers in place and functioning properly?
11. la the earthwork for erosion control practices properly graded, seeded
andlor mulched?
12. Are diversion swift r?crfrt rherrs installed to plan protected?
13 Do perimeter practices have adequate capacity do they need to be
doelned out'7
1 4 Is inlet protection installed properly on ell functioning Inlets being
maintained?
15 Is catch basin insert protection installed where required being
maintained?
is. Have mates and ditches been stabilized or protected?
j
17. Are stomrwater outlets adequately stabilized?
18 Hay temporary stabilization of disturbed ground been addressed?
(dormant for 15 days
19 is permanent stabiiitatbn of disturbed ground progressing on all
Completed areas?
20. Has herd or soft armoring been installed where natural vegetation will
erode?
21 Do water pumping operations have a protected outlet and disci clear
water?
22 Are all dewetedng structures functioning proper?
CrA
HOLEY MOLEY SAYS
"DON'T
DIG
BLIND'
BIT'S THE LAW'
CALL 2 WCAKING DAYS BEFORE YOU DiG
1 -800- 382 -5544
CALL TOiL FREE
PER INDIANA STATE LAW IS -69 -1991.
IT iS AGAINST TIC LAW TO EXCAVATE
WITHOUT NOTIFYING THE UNDERGROUND
LOCATION SERVICE TWO (2) WORKING
DAYS BEFORE COMMENCING WORK.
M B
SOILS MAP
SCALE: 1' 200'
11_waso :1111.
CONSTRUCTION 't
STAGING AREA
Br
n (7,1
1111.-•- r`y 1111
4
:4 4• 4
t 4 4
4 4 4. 4 •4 .4 •I. 4. 4.i 4. 4 4
4 444
4• 4-
.4.4.4 4 44:4.
4. 4.. 4 4 f t• 4 4
4 4 4.
•.W 4. T ��4 r.• i
6_0 4.
4
4.
4 4 4 4 4
4
4 •f 4 4 4 4
4 •44'•'44•'4'•'4'•'•44'4 4 4 4
••4. /•4••••••••
4
4
4•
.4 4 4 4
4 4
••4
4. ••t
.t•4•
•••0
4 4•; 4• 4,4 4-,4 4 4.
4 4.4 4 4 4 4 4 4 4 4 4 4
11.11••• t•- ♦t r N+
+ls 4 +4 +4
M•
J4 4 4
4
4 4 4 4 4 4 4 4 4
4
4 4. 4 4 4
0. 4 4 4 4 4
1 444 4 4 4 4 4.4 4.
4 4 44 4. 4.
4 4 4 4. 4
4.4 4 44'
4 4 4 4 4 4 4
4
4 4 4e►
4 4 x4
4
•4 4 4 4
••4
4. 4
4 4 i 4 4
4 4
tu t`
t i
4 4 *4
4 4 4 4 4
4
PS
Is
EROSION CONTROL NOTE
EROSION CONTROL NOTE
THERE SHALL BE NO DiRT, DEBRIS, OR STORAGE OF
MATERIALS IN THE STREET.
i
ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED
IN THE FIELD BY THE INSPECTOR.
r
I
GENERAL NOTES
12. ADDITIONAL EROSION CONTROL MEASURES MAY BE
REQUIRED IN THE FIELD BY THE INSPECTOR.
MINIM
SAN
CL
CD
CD
v_I cD
a
ar
C)
z
ei
L LJ
1. CONTRACTOR SHALL SCHEDULE A PRECON MEETING WITH HCSO
PRIOR TO ANY DEMOUTION/EARTH DISTURBING ACTIVITY.
CONTRACTOR SHALL INSTALL ALL REQUIRED SILT FENCES,
SILT TRAPS, TREE PROTECTION AND INLET PROTECTION FOR
EXISTING INLETS PRIOR TO THE START OF ANY EARTH MOVING
OR STRIPPING.
2. CONTRACTOR SHALL INSTALL A STONE CONSTRUCTION
ENTRANCE OR SOME OTHER DEVISE PRIOR TO THE START OF
EARTHWORK AS NECESSARY TO PREVENT SOIL FROM BEING
TRACKED OR WASHED INTO EXISTING ROADWAYS.
3. LAND ALTERATIONS WHICH STRIP THE LAND OF VEGETATION,
INCLUDING REGRADING, SHALL BE DONE IN A WAY THAT WILL
MINIMIZE EROSION. WHENEVER FEASIBLE, NATURAL
VEGETATION SHALL BE RETAINED AND PROTECTED. AS
GRADING IS DONE, INSTALL SILT TRAPS, SILT FENCES, SLOPE
DRAINS, TEMPORARY DIVERSIONS AND OTHER RUNOFF
CONTROL MEASURES AT APPROPRIATE LOCATIONS TO KEEP
SEDIMENT CONTAINED ON SITE.
4. ALL DISTURBED AREAS SHALL BE SEEDED AND STRAW
MULCHED AS SHOWN ON THE PLANS IMMEDIATELY AFTER
COMPLETION OF GROUND ACTIVITY. FOR LARGE PROJECTS,
THIS SEEDING SHOULD BE COMPLETED iN PHASES AS THE
DIFFERENT AREAS OF The SITE ARE COMPLETED.
5. PERMANENT AND FINAL VEGETATION OR STRUCTURAL
EROSION CONTROL DEVICES SHALL BE INSTALLED AS SOON AS
PRACTICAL UNDER THE CIRCUMSTANCES.
6. THE DURATION OF TiME WHICH AN AREA REMAINS EXPOSED
SHALL BE KEPT TO A PRACTICAL MINIMUM DEPENDING UPON
THE WEATHER. IF CONSTRUCTION ACTIVITY iS TO CEASE FOR
MORE THAN TWO WEEKS, THE DISTURBED AREAS SHALL BE
TEMPORARILY SEEDED.
7. ALL STORM SEWER INLET PROTECTION DEVICES SHALL BE PUT
IN PLACE AT THE TIME EACH INLET IS CONSTRUCTED.
8. THE CONTRACTOR SHALL MAINTAIN EROSION CONTROL
MEASURES AND DEVICES DURING CONSTRUCTION AND UNTIL
SILTATION OF THE STREETS AND STORM SEWERS WILL NO
LONGER OCCUR.
9. ONCE ONSITE EROSION AND SILTATION OF THE STREETS AND
STORM SEWERS WILL NO LONGER OCCUR, THE CONTRACTOR
SHALL REMOVE AND DISPOSE OF THE TEMPORARY EROSION
CONTROL DEVICES.
10. THESE GENERAL PROCEDURES MAY NOT COVER ALL
SITUATIONS. REFER TO EROSION CONTROL PLANS FOR
SPECIFIC NOTES AND ADDITIONAL DETAILS
11. EROSION CONTROL TO COMPLY WITH INDIANA 327 IAC AND
RULE #5, AND INDIANA HANDBOOK FOR EROSION CONTROL IN
DEVELOPING AREAS
M.E.
Yoe No NM
EROSION CONTROL NOTE
THE USE OF TEMPORARY SILTATION TRAPS AND INLET
SEDIMENT BARRIERS WILL BE IMPLEMENTED. SEE
DETAILS ON SHEET C105.
'5 AN
Date
Inspected br
Type et inspection 17 Scheduled Weekly II Rain Event
UT)
Co
it
LU
Li
Is
rt'ttnl>rit fo -2: Casstrectbr Slte Inspection Arid Maraseiiace Lee (Peet I)
SA N
CONSTRUCTION SITE INSPECTION AND MAINTENANCE LOG
(To be Completed by Property Owner or Agent)
As stormwater pollution prevention et/Ps shall be Inspected and maintained as needed to ensure
continued performance of the Intended function during construction and shall oontirnie until the entire
site has been stabilized and a Notice of Termination has been issued An Inspection of the protect site
must be completed by the end of the next business day following each measurable stone event. if there
Ens no measurable afore events within a given week, the see should be monitored at least once in that
week. Maintenance and repair shall be conducted in accordance with the acne d site is. This tog
shat' be kept as a permanent record and must be made ava to i€01. ti 'tom in an
organized fashion, within forty -eight (48) hours upon request.
r.
CC)
W
r
N}
.10.. 1111115 ewers ..NW M NM= gala ..O. S.M., Mgf MM.
lliN; 1'� Arotid avticuxoeicidv
pr)
CD
91
Date
PrOtect
by
Type of Inspectkm. ..J Scheduled Wieldy J Rein PWem
0
3-
W
N.
LU
Cx
z
-891-
Sa 0
1111..
NOI POSTING,
CONCRETE WASHOUT
SOIL STOCKPILE AREA
•-.;3 11 11
894.6
1.IIIj11r
1r lli..�wl
BUG
G
894.70
894.13
893.41
891.90
89100
888.00
892.59
891.84
869,56
1••/ watr�re s
/CM, 1 840151111111=1,14110
892.20
887.48
41;14•110 mum. 4immo Vowirem
-•_1111.
If you enewered 'sr to m y of the above questions, des siho any corrective acke which must be taken to remedy the
problem and when the cartective whorls are to be Computed.
Lshiiblt 4a2-2: Construction Site Inspection And Sistriterrintert I.si (Pep 2)
0
ELI
I--
LU
z
C)
C.1
�c-
SF
rsa•.• eus.•f 1111..
10111110
I-
LU
0
z
EL1
z
0
I--
t,)
F-
C`J
CD
cn D
0
0
CT)
887
,9 01..Z
f
i
l
n 9) '00
SAN (5)
MAIO M.11111•
SF
/4//.re//a ,.e...... ..11..01.. 1111....
tp�
i
411.91.161
LEGEND
0
0
Ii
0 3
L
(N
0)
C.O. li
T.C. 891.50 Le.3
INV. 887.80u- I
SILT FENCE
S 4
sus 1111 r--
EXISTING CONTOUR LINE
PROPOSED CONTOUR LINE
EASEMENT BOUNDARY
EXISTING RIGHT-OF-WAY
PERMANENT SEEDING
EROSION CONTROL BLANKET
LIMITS OF CONSTRUCTION
SILT FENCE INLET PROTECTION
PAVED AREA INLET PROTECTION
EXISTING SANITARY SEWER MANHOLE
EXISTING STORM SEWER INLET MANHOLE
PROPOSED STORM SEWER, INLET, BEE HIVE INLET
END SECTION W/ RIP-RAP
L
30 0 30
10 1
Lit
1 CO
N.
ASSUMED NORTH
SCALE: 1"= 30
60
MIMIC
EROSION CONTROL
IMPLEMENTATION
MAINTENANCE CONTACT
T& W Corporation
3841 W. Morris Street
Indianapolis, IN 46241
(317) 244-7637
Fx: (317) 244-6348
Contact: Gary Dunbar
Co
It I
90
DOCKET NO. 08120009 TAO
co
0
F-
0
0
0
o
t.0 c Nit
o
f.st
IAJ Till
c.i pd
cc
(.5
F-
ChP% W CD
Ci)
ce Z
E2 Z
a. 0
mps
w ---(c)0
F-
ZOO'L
ujO
z 243/4 0 >0 1
0 w
(1) ce
PE10809477 E.-
STATE OF
/////0 /9/15%%"
BY:
DATE:
SHEET
C104
OF
12
23. Is a designated equipment washout area astablished, Hearty marked and
being utihizod?
24. is solid waste property contained a stable access provided to the
Storage Pickup area?
r 25. Are fuel tanks and v oter zatefexts tirraterlata sr>rFe,y Stilted a laded?
pro
26. Is spill response equp
ent on -site and easily acces'Ws?
27. Are temporary soil stockpiles in approved areas properly protected?
CrA
HOLEY MOLEY SAYS
"DON'T
DIG
BLIND'
BIT'S THE LAW'
CALL 2 WCAKING DAYS BEFORE YOU DiG
1 -800- 382 -5544
CALL TOiL FREE
PER INDIANA STATE LAW IS -69 -1991.
IT iS AGAINST TIC LAW TO EXCAVATE
WITHOUT NOTIFYING THE UNDERGROUND
LOCATION SERVICE TWO (2) WORKING
DAYS BEFORE COMMENCING WORK.
M B
SOILS MAP
SCALE: 1' 200'
11_waso :1111.
CONSTRUCTION 't
STAGING AREA
Br
n (7,1
1111.-•- r`y 1111
4
:4 4• 4
t 4 4
4 4 4. 4 •4 .4 •I. 4. 4.i 4. 4 4
4 444
4• 4-
.4.4.4 4 44:4.
4. 4.. 4 4 f t• 4 4
4 4 4.
•.W 4. T ��4 r.• i
6_0 4.
4
4.
4 4 4 4 4
4
4 •f 4 4 4 4
4 •44'•'44•'4'•'4'•'•44'4 4 4 4
••4. /•4••••••••
4
4
4•
.4 4 4 4
4 4
••4
4. ••t
.t•4•
•••0
4 4•; 4• 4,4 4-,4 4 4.
4 4.4 4 4 4 4 4 4 4 4 4 4
11.11••• t•- ♦t r N+
+ls 4 +4 +4
M•
J4 4 4
4
4 4 4 4 4 4 4 4 4
4
4 4. 4 4 4
0. 4 4 4 4 4
1 444 4 4 4 4 4.4 4.
4 4 44 4. 4.
4 4 4 4. 4
4.4 4 44'
4 4 4 4 4 4 4
4
4 4 4e►
4 4 x4
4
•4 4 4 4
••4
4. 4
4 4 i 4 4
4 4
tu t`
t i
4 4 *4
4 4 4 4 4
4
PS
Is
EROSION CONTROL NOTE
EROSION CONTROL NOTE
THERE SHALL BE NO DiRT, DEBRIS, OR STORAGE OF
MATERIALS IN THE STREET.
i
ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED
IN THE FIELD BY THE INSPECTOR.
r
I
GENERAL NOTES
12. ADDITIONAL EROSION CONTROL MEASURES MAY BE
REQUIRED IN THE FIELD BY THE INSPECTOR.
MINIM
SAN
CL
CD
CD
v_I cD
a
ar
C)
z
ei
L LJ
1. CONTRACTOR SHALL SCHEDULE A PRECON MEETING WITH HCSO
PRIOR TO ANY DEMOUTION/EARTH DISTURBING ACTIVITY.
CONTRACTOR SHALL INSTALL ALL REQUIRED SILT FENCES,
SILT TRAPS, TREE PROTECTION AND INLET PROTECTION FOR
EXISTING INLETS PRIOR TO THE START OF ANY EARTH MOVING
OR STRIPPING.
2. CONTRACTOR SHALL INSTALL A STONE CONSTRUCTION
ENTRANCE OR SOME OTHER DEVISE PRIOR TO THE START OF
EARTHWORK AS NECESSARY TO PREVENT SOIL FROM BEING
TRACKED OR WASHED INTO EXISTING ROADWAYS.
3. LAND ALTERATIONS WHICH STRIP THE LAND OF VEGETATION,
INCLUDING REGRADING, SHALL BE DONE IN A WAY THAT WILL
MINIMIZE EROSION. WHENEVER FEASIBLE, NATURAL
VEGETATION SHALL BE RETAINED AND PROTECTED. AS
GRADING IS DONE, INSTALL SILT TRAPS, SILT FENCES, SLOPE
DRAINS, TEMPORARY DIVERSIONS AND OTHER RUNOFF
CONTROL MEASURES AT APPROPRIATE LOCATIONS TO KEEP
SEDIMENT CONTAINED ON SITE.
4. ALL DISTURBED AREAS SHALL BE SEEDED AND STRAW
MULCHED AS SHOWN ON THE PLANS IMMEDIATELY AFTER
COMPLETION OF GROUND ACTIVITY. FOR LARGE PROJECTS,
THIS SEEDING SHOULD BE COMPLETED iN PHASES AS THE
DIFFERENT AREAS OF The SITE ARE COMPLETED.
5. PERMANENT AND FINAL VEGETATION OR STRUCTURAL
EROSION CONTROL DEVICES SHALL BE INSTALLED AS SOON AS
PRACTICAL UNDER THE CIRCUMSTANCES.
6. THE DURATION OF TiME WHICH AN AREA REMAINS EXPOSED
SHALL BE KEPT TO A PRACTICAL MINIMUM DEPENDING UPON
THE WEATHER. IF CONSTRUCTION ACTIVITY iS TO CEASE FOR
MORE THAN TWO WEEKS, THE DISTURBED AREAS SHALL BE
TEMPORARILY SEEDED.
7. ALL STORM SEWER INLET PROTECTION DEVICES SHALL BE PUT
IN PLACE AT THE TIME EACH INLET IS CONSTRUCTED.
8. THE CONTRACTOR SHALL MAINTAIN EROSION CONTROL
MEASURES AND DEVICES DURING CONSTRUCTION AND UNTIL
SILTATION OF THE STREETS AND STORM SEWERS WILL NO
LONGER OCCUR.
9. ONCE ONSITE EROSION AND SILTATION OF THE STREETS AND
STORM SEWERS WILL NO LONGER OCCUR, THE CONTRACTOR
SHALL REMOVE AND DISPOSE OF THE TEMPORARY EROSION
CONTROL DEVICES.
10. THESE GENERAL PROCEDURES MAY NOT COVER ALL
SITUATIONS. REFER TO EROSION CONTROL PLANS FOR
SPECIFIC NOTES AND ADDITIONAL DETAILS
11. EROSION CONTROL TO COMPLY WITH INDIANA 327 IAC AND
RULE #5, AND INDIANA HANDBOOK FOR EROSION CONTROL IN
DEVELOPING AREAS
M.E.
Yoe No NM
EROSION CONTROL NOTE
THE USE OF TEMPORARY SILTATION TRAPS AND INLET
SEDIMENT BARRIERS WILL BE IMPLEMENTED. SEE
DETAILS ON SHEET C105.
'5 AN
Date
Inspected br
Type et inspection 17 Scheduled Weekly II Rain Event
UT)
Co
it
LU
Li
Is
rt'ttnl>rit fo -2: Casstrectbr Slte Inspection Arid Maraseiiace Lee (Peet I)
SA N
CONSTRUCTION SITE INSPECTION AND MAINTENANCE LOG
(To be Completed by Property Owner or Agent)
As stormwater pollution prevention et/Ps shall be Inspected and maintained as needed to ensure
continued performance of the Intended function during construction and shall oontirnie until the entire
site has been stabilized and a Notice of Termination has been issued An Inspection of the protect site
must be completed by the end of the next business day following each measurable stone event. if there
Ens no measurable afore events within a given week, the see should be monitored at least once in that
week. Maintenance and repair shall be conducted in accordance with the acne d site is. This tog
shat' be kept as a permanent record and must be made ava to i€01. ti 'tom in an
organized fashion, within forty -eight (48) hours upon request.
r.
CC)
W
r
N}
.10.. 1111115 ewers ..NW M NM= gala ..O. S.M., Mgf MM.
lliN; 1'� Arotid avticuxoeicidv
pr)
CD
91
Date
PrOtect
by
Type of Inspectkm. ..J Scheduled Wieldy J Rein PWem
0
3-
W
N.
LU
Cx
z
-891-
Sa 0
1111..
NOI POSTING,
CONCRETE WASHOUT
SOIL STOCKPILE AREA
•-.;3 11 11
894.6
1.IIIj11r
1r lli..�wl
BUG
G
894.70
894.13
893.41
891.90
89100
888.00
892.59
891.84
869,56
1••/ watr�re s
/CM, 1 840151111111=1,14110
892.20
887.48
41;14•110 mum. 4immo Vowirem
-•_1111.
If you enewered 'sr to m y of the above questions, des siho any corrective acke which must be taken to remedy the
problem and when the cartective whorls are to be Computed.
Lshiiblt 4a2-2: Construction Site Inspection And Sistriterrintert I.si (Pep 2)
0
ELI
I--
LU
z
C)
C.1
�c-
SF
rsa•.• eus.•f 1111..
10111110
I-
LU
0
z
EL1
z
0
I--
t,)
F-
C`J
CD
cn D
0
0
CT)
887
,9 01..Z
f
i
l
n 9) '00
SAN (5)
MAIO M.11111•
SF
/4//.re//a ,.e...... ..11..01.. 1111....
tp�
i
411.91.161
LEGEND
0
0
Ii
0 3
L
(N
0)
C.O. li
T.C. 891.50 Le.3
INV. 887.80u- I
SILT FENCE
S 4
sus 1111 r--
EXISTING CONTOUR LINE
PROPOSED CONTOUR LINE
EASEMENT BOUNDARY
EXISTING RIGHT-OF-WAY
PERMANENT SEEDING
EROSION CONTROL BLANKET
LIMITS OF CONSTRUCTION
SILT FENCE INLET PROTECTION
PAVED AREA INLET PROTECTION
EXISTING SANITARY SEWER MANHOLE
EXISTING STORM SEWER INLET MANHOLE
PROPOSED STORM SEWER, INLET, BEE HIVE INLET
END SECTION W/ RIP-RAP
L
30 0 30
10 1
Lit
1 CO
N.
ASSUMED NORTH
SCALE: 1"= 30
60
MIMIC
EROSION CONTROL
IMPLEMENTATION
MAINTENANCE CONTACT
T& W Corporation
3841 W. Morris Street
Indianapolis, IN 46241
(317) 244-7637
Fx: (317) 244-6348
Contact: Gary Dunbar
Co
It I
90
DOCKET NO. 08120009 TAO
co
0
F-
0
0
0
o
t.0 c Nit
o
f.st
IAJ Till
c.i pd
cc
(.5
F-
ChP% W CD
Ci)
ce Z
E2 Z
a. 0
mps
w ---(c)0
F-
ZOO'L
ujO
z 243/4 0 >0 1
0 w
(1) ce
PE10809477 E.-
STATE OF
/////0 /9/15%%"
BY:
DATE:
SHEET
C104
OF
12