INSTALL TEMPORARY STONE PATH
SEE DETAIL ON SHEET C101
SITE SPECIFIC CONSTRUCTION SEQUENCING FOR EROSION CONTROL
The purpose of staging construction during the earthwork phase of the project is to limit the amount of ground disturbed at
any given time and to control silt from the areas that are disturbed to prevent silt from leaving the site. For
the following sequencing should be followed as much as possible.
1. Before Construction, mark and protect trees and associated root zones to be preserved, and vegetation suitable for filter strips.
2. Install construction entrance /storage construction area.
3. Install perimeter BMP's. Provide earthmoving instructions that compliment erosion and sediment control plan.
4. Mass earthwork including movement of existing soil stockpile.
5. Start building construction.
6. Finish grade and seed the perimeter of the site and the new swale into the pond. Repair any damage to the pond banks.
7. Install storm and sanitary sewer and utilities.
8. Install inlet protection as storm inlets are functional.
9. Complete parking lots, roadways and curbs.
10. Temporary seed all disturbed areas.
11. Complete building.
12. Final grade and landscaping.
13. Complete final seeding and install erosion control blanket.
14. Maintain all erosion and sediment control practices until all disturbed areas are permenently stabilized.
POST CONSTRUCTION ACTIVITIES
1. Inspect and maintain all erosion control measures as detailed in the erosion control measures and maintenance requirements
beginning immediately after installation.
2. Remove silt fencing, individual inlet protection and straw bale dams only after seeding is established in each basin to the point where
silt will not enter the ponds or storm sewer system. A
CO
1-
(.r)
CC)
w
CD
W
0
ANY INFORMATION DEPICTED HEREIN SHALL
BE SUPERSEDED BY THE LANDSCAPE PLAN.
INSTALL TEMPORARY STONE PATH
SEE DETAIL ON SHEET C101, EXTEND
EXISTING PATH ON 131st ST.
HOLEY MOLEY SAYS
DON'T
DIG
BLIND"
'IT'S THE LAW"
CALL 2 WORKING DAYS BEFORE YOU DIG
1 -800- 382 -5544
CALL TOLL FREE
PER INDIANA STATE LAW IS -69 -1991.
IT IS AGAINST THE LAW TO EXCAVATE
WITHOUT NOTIFYING THE UNDERGROUND
LOCATION SERVICE TWO (2) WORKING
DAYS BEFORE COMMENCING WORK.
W 4
AI
"NKC:TrIES
PERMANENT SEEDING
SEE SHEET C801 FOR ALL
ASSUMED NORTH
SCALE: 1 =30'
11_,EC5r
SOD OR EROSION CONTROL BLANKET
WITH PERMANENT SEEDING
TEMPORARY CONSTRUCTION ENTRANCE
O INLET PROTECTION SEE SHEET
C801 FOR DETAILS
-0 SILT FENCE SEE SHEET
C801 FOR DETAILS
STRAW BAILS SEE SHEET
C801 FOR DETAILS
WARNING-
THIS SHEET TO BE USED FOR EROSION CONTROL
PURPOSES ONLY. FOR ANY OTHER INFORMATION SEE
SHEET C101, C102 C104
EROSION CONTROL DETAILS NOTES
JOH
No.10100357
0 STATE OF 4
2 NDI A
s /0 NAk-
r
,1,
)A 110/03/03
THIS DRAWIN AND THE IDEAS, DESIGNS AND
CONCEPTS CON INED HEREIN ARE THE EXCLUSIVE
INTELLECTUA PROPERTY OF THE SCHNEIDER
CORPORATIOt. AND ARE NOT TO BE USED OR
REPRODUCED, N WHOLE OR IN PART, WITHOUT
THE WRITTE CONSENT OF THE SCHNEIDER
CORPORATION.
COPYRIGH _D BY THE SCHNEIDER CORP. (2003)
‘b,
Schneider
THE SCHNEIDER CORPORATION
Historic ort Harrison
8901 Ot 3 Avenue
Indianap lis, IN 46216 -1037
Telephor 317.826.7100
Fax: 31- .826.7200
www.sch eidercorp.com
Architecture
Civil Eno neering
Environrr ental Engineering
Geotechr ical Services
GIS
Home Builder Services
Interior Design
Land Surveying
Landscar e Architecture
Transpor ration Engineering
DATE:
10/03P3
PROJECT NO.:
904.007
DRAWN BY:
CWD
CHECKED BY:
JES
SHEET TITLE:
EROSI )N CONTROL PLAN
DRAWING FILES:
R: \904 \007 \DW S \C103
XREF: R: \904 )7 \DWGS \007BS
XREF: R: \904 )7 \DWGS \007EROS
XREF: R: \904 )5 \DWGS \60BSOV
XREF: R: \904\ )5 \DWGS \904005TP
R: \904 \005 \DWG S \005BS
SHEET NO.:
C
03
������'�C� G®��l de �►��4K ∎II�!i� .:7400 4 i����i�
j ®I
I® UN
I I
I® "ill
III IN
Iii ®I
II PROPOSED II ��f
II
II 11®I
II 11111
ii n 1
1 EP
II i
1
a0on• mom •Emma ,i
Einiummummmeminge e
PROPOSED
BUILDING
INSTALL TEMPORARY STONE PATH
SEE DETAIL ON SHEET C101
SITE SPECIFIC CONSTRUCTION SEQUENCING FOR EROSION CONTROL
The purpose of staging construction during the earthwork phase of the project is to limit the amount of ground disturbed at
any given time and to control silt from the areas that are disturbed to prevent silt from leaving the site. For
the following sequencing should be followed as much as possible.
1. Before Construction, mark and protect trees and associated root zones to be preserved, and vegetation suitable for filter strips.
2. Install construction entrance /storage construction area.
3. Install perimeter BMP's. Provide earthmoving instructions that compliment erosion and sediment control plan.
4. Mass earthwork including movement of existing soil stockpile.
5. Start building construction.
6. Finish grade and seed the perimeter of the site and the new swale into the pond. Repair any damage to the pond banks.
7. Install storm and sanitary sewer and utilities.
8. Install inlet protection as storm inlets are functional.
9. Complete parking lots, roadways and curbs.
10. Temporary seed all disturbed areas.
11. Complete building.
12. Final grade and landscaping.
13. Complete final seeding and install erosion control blanket.
14. Maintain all erosion and sediment control practices until all disturbed areas are permenently stabilized.
POST CONSTRUCTION ACTIVITIES
1. Inspect and maintain all erosion control measures as detailed in the erosion control measures and maintenance requirements
beginning immediately after installation.
2. Remove silt fencing, individual inlet protection and straw bale dams only after seeding is established in each basin to the point where
silt will not enter the ponds or storm sewer system. A
CO
1-
(.r)
CC)
w
CD
W
0
ANY INFORMATION DEPICTED HEREIN SHALL
BE SUPERSEDED BY THE LANDSCAPE PLAN.
INSTALL TEMPORARY STONE PATH
SEE DETAIL ON SHEET C101, EXTEND
EXISTING PATH ON 131st ST.
HOLEY MOLEY SAYS
DON'T
DIG
BLIND"
'IT'S THE LAW"
CALL 2 WORKING DAYS BEFORE YOU DIG
1 -800- 382 -5544
CALL TOLL FREE
PER INDIANA STATE LAW IS -69 -1991.
IT IS AGAINST THE LAW TO EXCAVATE
WITHOUT NOTIFYING THE UNDERGROUND
LOCATION SERVICE TWO (2) WORKING
DAYS BEFORE COMMENCING WORK.
W 4
AI
"NKC:TrIES
PERMANENT SEEDING
SEE SHEET C801 FOR ALL
ASSUMED NORTH
SCALE: 1 =30'
11_,EC5r
SOD OR EROSION CONTROL BLANKET
WITH PERMANENT SEEDING
TEMPORARY CONSTRUCTION ENTRANCE
O INLET PROTECTION SEE SHEET
C801 FOR DETAILS
-0 SILT FENCE SEE SHEET
C801 FOR DETAILS
STRAW BAILS SEE SHEET
C801 FOR DETAILS
WARNING-
THIS SHEET TO BE USED FOR EROSION CONTROL
PURPOSES ONLY. FOR ANY OTHER INFORMATION SEE
SHEET C101, C102 C104
EROSION CONTROL DETAILS NOTES
JOH
No.10100357
0 STATE OF 4
2 NDI A
s /0 NAk-
r
,1,
)A 110/03/03
THIS DRAWIN AND THE IDEAS, DESIGNS AND
CONCEPTS CON INED HEREIN ARE THE EXCLUSIVE
INTELLECTUA PROPERTY OF THE SCHNEIDER
CORPORATIOt. AND ARE NOT TO BE USED OR
REPRODUCED, N WHOLE OR IN PART, WITHOUT
THE WRITTE CONSENT OF THE SCHNEIDER
CORPORATION.
COPYRIGH _D BY THE SCHNEIDER CORP. (2003)
‘b,
Schneider
THE SCHNEIDER CORPORATION
Historic ort Harrison
8901 Ot 3 Avenue
Indianap lis, IN 46216 -1037
Telephor 317.826.7100
Fax: 31- .826.7200
www.sch eidercorp.com
Architecture
Civil Eno neering
Environrr ental Engineering
Geotechr ical Services
GIS
Home Builder Services
Interior Design
Land Surveying
Landscar e Architecture
Transpor ration Engineering