Loading...
HomeMy WebLinkAbout03100003 Hazel Dell Corner, Lot 4 Phase II Construction Plans Pg. E������'�C� G®��l de �►��4K ∎II�!i� .:7400 4 i����i� j ®I I® UN I I I® "ill III IN Iii ®I II PROPOSED II ��f II II 11®I II 11111 ii n 1 1 EP II i 1 a0on• mom •Emma ,i Einiummummmeminge e PROPOSED BUILDING INSTALL TEMPORARY STONE PATH SEE DETAIL ON SHEET C101 SITE SPECIFIC CONSTRUCTION SEQUENCING FOR EROSION CONTROL The purpose of staging construction during the earthwork phase of the project is to limit the amount of ground disturbed at any given time and to control silt from the areas that are disturbed to prevent silt from leaving the site. For the following sequencing should be followed as much as possible. 1. Before Construction, mark and protect trees and associated root zones to be preserved, and vegetation suitable for filter strips. 2. Install construction entrance /storage construction area. 3. Install perimeter BMP's. Provide earthmoving instructions that compliment erosion and sediment control plan. 4. Mass earthwork including movement of existing soil stockpile. 5. Start building construction. 6. Finish grade and seed the perimeter of the site and the new swale into the pond. Repair any damage to the pond banks. 7. Install storm and sanitary sewer and utilities. 8. Install inlet protection as storm inlets are functional. 9. Complete parking lots, roadways and curbs. 10. Temporary seed all disturbed areas. 11. Complete building. 12. Final grade and landscaping. 13. Complete final seeding and install erosion control blanket. 14. Maintain all erosion and sediment control practices until all disturbed areas are permenently stabilized. POST CONSTRUCTION ACTIVITIES 1. Inspect and maintain all erosion control measures as detailed in the erosion control measures and maintenance requirements beginning immediately after installation. 2. Remove silt fencing, individual inlet protection and straw bale dams only after seeding is established in each basin to the point where silt will not enter the ponds or storm sewer system. A CO 1- (.r) CC) w CD W 0 ANY INFORMATION DEPICTED HEREIN SHALL BE SUPERSEDED BY THE LANDSCAPE PLAN. INSTALL TEMPORARY STONE PATH SEE DETAIL ON SHEET C101, EXTEND EXISTING PATH ON 131st ST. HOLEY MOLEY SAYS DON'T DIG BLIND" 'IT'S THE LAW" CALL 2 WORKING DAYS BEFORE YOU DIG 1 -800- 382 -5544 CALL TOLL FREE PER INDIANA STATE LAW IS -69 -1991. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. W 4 AI "NKC:TrIES PERMANENT SEEDING SEE SHEET C801 FOR ALL ASSUMED NORTH SCALE: 1 =30' 11_,EC5r SOD OR EROSION CONTROL BLANKET WITH PERMANENT SEEDING TEMPORARY CONSTRUCTION ENTRANCE O INLET PROTECTION SEE SHEET C801 FOR DETAILS -0 SILT FENCE SEE SHEET C801 FOR DETAILS STRAW BAILS SEE SHEET C801 FOR DETAILS WARNING- THIS SHEET TO BE USED FOR EROSION CONTROL PURPOSES ONLY. FOR ANY OTHER INFORMATION SEE SHEET C101, C102 C104 EROSION CONTROL DETAILS NOTES JOH No.10100357 0 STATE OF 4 2 NDI A s /0 NAk- r ,1, )A 110/03/03 THIS DRAWIN AND THE IDEAS, DESIGNS AND CONCEPTS CON INED HEREIN ARE THE EXCLUSIVE INTELLECTUA PROPERTY OF THE SCHNEIDER CORPORATIOt. AND ARE NOT TO BE USED OR REPRODUCED, N WHOLE OR IN PART, WITHOUT THE WRITTE CONSENT OF THE SCHNEIDER CORPORATION. COPYRIGH _D BY THE SCHNEIDER CORP. (2003) ‘b, Schneider THE SCHNEIDER CORPORATION Historic ort Harrison 8901 Ot 3 Avenue Indianap lis, IN 46216 -1037 Telephor 317.826.7100 Fax: 31- .826.7200 www.sch eidercorp.com Architecture Civil Eno neering Environrr ental Engineering Geotechr ical Services GIS Home Builder Services Interior Design Land Surveying Landscar e Architecture Transpor ration Engineering DATE: 10/03P3 PROJECT NO.: 904.007 DRAWN BY: CWD CHECKED BY: JES SHEET TITLE: EROSI )N CONTROL PLAN DRAWING FILES: R: \904 \007 \DW S \C103 XREF: R: \904 )7 \DWGS \007BS XREF: R: \904 )7 \DWGS \007EROS XREF: R: \904 )5 \DWGS \60BSOV XREF: R: \904\ )5 \DWGS \904005TP R: \904 \005 \DWG S \005BS SHEET NO.: C 03 ������'�C� G®��l de �►��4K ∎II�!i� .:7400 4 i����i� j ®I I® UN I I I® "ill III IN Iii ®I II PROPOSED II ��f II II 11®I II 11111 ii n 1 1 EP II i 1 a0on• mom •Emma ,i Einiummummmeminge e PROPOSED BUILDING INSTALL TEMPORARY STONE PATH SEE DETAIL ON SHEET C101 SITE SPECIFIC CONSTRUCTION SEQUENCING FOR EROSION CONTROL The purpose of staging construction during the earthwork phase of the project is to limit the amount of ground disturbed at any given time and to control silt from the areas that are disturbed to prevent silt from leaving the site. For the following sequencing should be followed as much as possible. 1. Before Construction, mark and protect trees and associated root zones to be preserved, and vegetation suitable for filter strips. 2. Install construction entrance /storage construction area. 3. Install perimeter BMP's. Provide earthmoving instructions that compliment erosion and sediment control plan. 4. Mass earthwork including movement of existing soil stockpile. 5. Start building construction. 6. Finish grade and seed the perimeter of the site and the new swale into the pond. Repair any damage to the pond banks. 7. Install storm and sanitary sewer and utilities. 8. Install inlet protection as storm inlets are functional. 9. Complete parking lots, roadways and curbs. 10. Temporary seed all disturbed areas. 11. Complete building. 12. Final grade and landscaping. 13. Complete final seeding and install erosion control blanket. 14. Maintain all erosion and sediment control practices until all disturbed areas are permenently stabilized. POST CONSTRUCTION ACTIVITIES 1. Inspect and maintain all erosion control measures as detailed in the erosion control measures and maintenance requirements beginning immediately after installation. 2. Remove silt fencing, individual inlet protection and straw bale dams only after seeding is established in each basin to the point where silt will not enter the ponds or storm sewer system. A CO 1- (.r) CC) w CD W 0 ANY INFORMATION DEPICTED HEREIN SHALL BE SUPERSEDED BY THE LANDSCAPE PLAN. INSTALL TEMPORARY STONE PATH SEE DETAIL ON SHEET C101, EXTEND EXISTING PATH ON 131st ST. HOLEY MOLEY SAYS DON'T DIG BLIND" 'IT'S THE LAW" CALL 2 WORKING DAYS BEFORE YOU DIG 1 -800- 382 -5544 CALL TOLL FREE PER INDIANA STATE LAW IS -69 -1991. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. W 4 AI "NKC:TrIES PERMANENT SEEDING SEE SHEET C801 FOR ALL ASSUMED NORTH SCALE: 1 =30' 11_,EC5r SOD OR EROSION CONTROL BLANKET WITH PERMANENT SEEDING TEMPORARY CONSTRUCTION ENTRANCE O INLET PROTECTION SEE SHEET C801 FOR DETAILS -0 SILT FENCE SEE SHEET C801 FOR DETAILS STRAW BAILS SEE SHEET C801 FOR DETAILS WARNING- THIS SHEET TO BE USED FOR EROSION CONTROL PURPOSES ONLY. FOR ANY OTHER INFORMATION SEE SHEET C101, C102 C104 EROSION CONTROL DETAILS NOTES JOH No.10100357 0 STATE OF 4 2 NDI A s /0 NAk- r ,1, )A 110/03/03 THIS DRAWIN AND THE IDEAS, DESIGNS AND CONCEPTS CON INED HEREIN ARE THE EXCLUSIVE INTELLECTUA PROPERTY OF THE SCHNEIDER CORPORATIOt. AND ARE NOT TO BE USED OR REPRODUCED, N WHOLE OR IN PART, WITHOUT THE WRITTE CONSENT OF THE SCHNEIDER CORPORATION. COPYRIGH _D BY THE SCHNEIDER CORP. (2003) ‘b, Schneider THE SCHNEIDER CORPORATION Historic ort Harrison 8901 Ot 3 Avenue Indianap lis, IN 46216 -1037 Telephor 317.826.7100 Fax: 31- .826.7200 www.sch eidercorp.com Architecture Civil Eno neering Environrr ental Engineering Geotechr ical Services GIS Home Builder Services Interior Design Land Surveying Landscar e Architecture Transpor ration Engineering