Loading...
HomeMy WebLinkAbout03100003 Hazel Dell Corner, Lot 4 Phase II Construction Plans Pg. GDATE: 10/03/)3 PROJECT NO.: 904.007 DRAWN BY: CWD CHECKED BY: SHEET TITLE: SITE LIGHTING PLAN DRAWING FILES. R: \904 \007 \DW S \C105 XREF: 007BS XREF: R: \904 \005 \DWGS \60BSOV XREF: R: \904 \005 \DWGS \904005TP XREF: R: \904 \005 \DWGS \005 -LITE XREF: R: \904 \005 \DWGS \005BS SHEET NO.: C....05 r DATE: 10/03/)3 PROJECT NO.: 904.007 DRAWN BY: CWD CHECKED BY: SHEET TITLE: SITE LIGHTING PLAN DRAWING FILES. R: \904 \007 \DW S \C105 XREF: 007BS XREF: R: \904 \005 \DWGS \60BSOV XREF: R: \904 \005 \DWGS \904005TP XREF: R: \904 \005 \DWGS \005 -LITE XREF: R: \904 \005 \DWGS \005BS SHEET NO.: C....05 0A 0.0 O.1 OA oA o0 0.0 OA 02 OA OA 0.1 0.3 21 12 1.9 0.8 12 OA O A 0.0 OA QA ao OA OA OA OA OA OA OA OA 0.0 0.1 Q1 0.1 OA OA 0.0 OA 0.0� -D OA Q1 to OA 00 .0 OA 0.0 0.0 0.0 1 02 PROPOSED BUILDING 5,100 S.F. FFE 772.50 LOT 4 PROPOSED BUILDING 12,950 S.F. 0.1 0.1 .1_OA�0.1 INSTALL TEMPORARY STONE PATH SEE DETAIL ON SHEET C101, EXTEND EXISTING PATH ON 131st ST. 0.1 OA OA OA OA OA 0 0.2 0.1 0.0 00 0.0 INSTALL T SEE DETAI Horiz e ril,`i 1 ��;125Pti M115OPS MI 17 5 P L rqp rypc g;''V:..; M175 O. 3j M1 75IMS X C; r =.1 Iyue U1 reflectors with tl, ;tu ver'ticJ! Iypt. VS reflector with r'oiku-vi. Te <S lire unique, fd.JEti° ,,et v c qre pending, patent G�; I inq i Nc 0 f3 0 Example �'e 1i t�rle PM MZOOPS N K 1 17 vs rl 1ti�r;`.�" t<'.' S t L 1 0v 't ll S l.�l. :.>rlly) fTfli NK („7,i13 r P r �_L s ,r' i1 .7 r+ li:1 M250 M400 M1151` M25u1` S i'',400M5 M175PS L i) MM4200P S t?• 250PS HIGH 4' S400 r). 0 Roficctar 11 4i v -t `,yE rti(:: Hi 1U vs Syr Voltage MI 347 480' 3 ?ti {1' i f =V, HALIDE M3 OPS M3'OPS -y8.) M400PS F O;:;iu• 1 Cr Color 087 1 scs SwT Pit.; ay P1,s I Q l 1i c ttC F SPAULDING NOTE: ALL FIXTURES SHALL HAVE SHERDS TO PREVENT LIGHT FROM EXTENDING BEYOND THE PARKING LOT. Luminaire Schedule Project: All Projects IV Spaulding Newark SINGLE SINGLE Description NK2- A- M40 -H4-- X-HS 400w MH Type 4 HSS 20' Pole Numeric Summary Project M Projects Label CalcType Units Avg Max Min AvglMin Max/Min Perimter Illuminance Fc 0.56 8.6 0.0 0.00 0.00 Parking Illuminance Fc 1.95 8.3 0.1 19.50 83.00 CALCULATIONS ARE MAINTAINED HORIZONTAL ILLUMINANCE FIGURES IN FOOT -CANDLES POINTS SHOWN ARE AT GRADE FIXTURES ARE MOUNTED ON 20' POLES 'PERIMETER' POINTS ARE IN BLUE OHivo <IIi/ i 4 F ��j No.10100357 r•- j STATE F �1 /1/ I ON A\. X THIS DRAWIN CONCEPTS CON I N TELLECTU CORPORATIOI REPRODUCED. THE WRITTE COPYRIGH )ATV 09/26/03 AND THE IDEAS, DESIGNS AND INED HEREIN ARE THE EXCLUSIVE PROPERTY OF THE SCHNEIDER AND ARE NOT TO BE USED OR N WHOLE OR IN PART, WITHOUT CONSENT OF THE SCHNEIDER CORPORATION. .D BY THE SCHNEIDER CORP. (2003) ‘b, Schneider THE SCHNEIDER CORPORATION Historic Tort Harrison 8901 Ot 3 Avenue Indianapi lis, IN 46216 -1037 Telephon 317.826.7100 Fax: 31- .826.7200 www.schrieidercorp.com Architecture Civil Engineering Environrr ental Engineering Geotechr ical Services GIS LI` Home B! ilder Services Interior resign Land Su' veying Landsca[ e Architecture Transpor-.ation Engineering