HomeMy WebLinkAbout09060043 St. Vincent's Hybrid or No. 5 Renovation Large Plan Pg. QA\
ATTENTION! CEILING LIGHTING,
HVAC DUCTS, SPRINKLERS, ETC.
MUST NOT BE LOCATED WITHIN
SIEMENS CEILING RAIL SYSTEMS
AS INDICATED BY THE SHADED
AREAS ON THIS PLAN. PLEASE
COORDINATE THE PLACEMENT OF
THESE ITEMS WITH THE SIEMENS
PROJECT MANAGER.
NOTE:
FOR ALL WEIGHTS AND SIZES OF EQUIPMENT
SHOWN ON THIS PLAN PLEASE REFER TO THE
EQUIPMENT LEGEND ON SHEET A -101.
FOR UNISTRUT PLACEMENT
SEE SHEET S -102.
REFLECTED CEILING PLAN
NO CEILING COMPONENTS
THAT ARE NOT PART OF THE
SYSTEM MAY BE MOUNTED IN
THIS AREA.
NON- SYSTEM CEILING COMPONENTS THAT
ARE MOUNTED IN THIS AREA MUST MEET
THE FOLLOWING REQUIREMENTS:
THE BOTTOM EDGE OF ANY FIXED COMPONENT
MUST BE NO LESS THAN 9' -0 1" A.F.F
ANY COMPONENT EXTENDING BELOW 9' -0 1" A.F.F
MUST HAVE THE ABILITY TO MOVE OUTSIDE THE
AREA SHOWN VIA ARTICULATION, TRACK MOUNTING, ETC.
I
r
1
1
I
C
FLOOR STAND
OVERHEAD
CARRIAGE RAILS
1
PROCEDURE
ROOM 1
CONTROL
ROOM
LIGHTING GUIDELINES
ROOM LIGHTING IS THE RESPONSIBILITY OF THE CUSTOMER.
HOWEVER, SIEMENS OFFERS THE FOLLOWING RECOMMENDATIONS, AS A
GENERAL GUIDE ONLY, WHEN PLANNING FOR LIGHTING.
1) OVERALL GENERAL ILLUMINATION IS NECESSARY FOR CLEAN UP
AND MAINTENANCE OF EQUIPMENT. FLUORESCENT LIGHTING IS
USUALLY PROVIDED FOR THIS PURPOSE AND SHOULD BE A MINIMUM
LEVEL OF 50 FOOTCANDLES. TO MINIMIZE GLARE AND PROVIDE
VISUAL COMFORT, AN INDIRECT LIGHTING SYSTEM SHOULD BE
CONSIDERED TOGETHER WITH COLOR IMPROVED FLUORESCENT LAMPS.
2) THE GENERAL LIGHTING SHOULD HAVE A MULTI -LEVEL
SWITCHING CAPABILITY TO ALLOW FLEXIBILITY OF AMBIENT
LIGHTING LEVELS.
3) BECAUSE FLUOROSCOPY PROCEDURES ARE NOW PERFORMED WITH
IMAGE INTENSIFICATION WITH VISUALIZATION ON A TELEVISION
MONITOR, COMPLETE ROOM DARKNESS IS NO LONGER NECESSARY.
HOWEVER, IN ORDER TO PERMIT PROPER READINGS OF THE
MONITOR, THE ROOM LIGHTING INTENSITY MUST BE CAPABLE OF
BEING LOWERED TO BETWEEN 2 TO 5 FOOTCANDLES. THIS CAN BE
USUALLY ACCOMPLISHED BY MEANS OF A FOOT SWITCH.
THE FOOT SWITCH CONTROL ARRANGEMENT IS SUCH THAT, WHEN
OPERATED, A SEPARATE LIGHTING SYSTEM FOR FLUORSCOPY IS
TURNED "ON" AND AT THE SAME TIME, THROUGH AN INTERLOCK, THE
GENERAL LIGHTING SYSTEM IS TURNED "OFF IF A VARIABLE LOW
LEVEL LIGHTING INTENSITY IS DESIRED BY THE CUSTOMER, THEN A
DIMMER CONTROL CAN BE ADDED. IN THIS CASE, INCANDESCENT
LIGHTING IS RECOMMENDED FOR THIS PURPOSE. FLUORESCENT
DIMMING IS NOT RECOMMENDED.
6' -3"
ISOCENTER OF
FLOOR STAND
SCALE: 1 /4" 1'
CEILING NOTES
1) ALL CEILING MOUNTED LIGHT FIXTURES, MECHANICAL REGISTERS
AND SPRINKLER HEADS SHALL BE FLUSH WITH FINISHED CEILING, SHALL
BE OUTSIDE OF ALL HATCHED AREAS AND SHALL BE SPECIFIED BY
THE ARCHITECT OF RECORD AND SUBSEQUENT CONSULTING ENGINEERS.
2) THE ACTUAL CEILING DESIGN AND COORDINATION OF LIGHTING
AND MECHANICAL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE
ARCHITECT OF RECORD AND HIS SUBSEQUENT CONSULTING ENGINEERS.
3) THE CUSTOMER /CONTRACTOR SHALL BE RESPONSIBLE FOR
FABRICATING, SUPPLYING AND INSTALLING ALL LIGHT, MECHANICAL
AND STRUCTURAL SUPPORTING SYSTEMS. SIEMENS MEDICAL SYSTEMS,
INC. IS ONLY RESPONSIBLE FOR THE SUPPLYING, INSTALLING
AND CALIBRATION OF SMS EQUIPMENT AS SPECIFIED ON THE
EQUIPMENT SCHEDULE AS SHOWN ON SHEET A -101.
4) ALL ELECTRICAL AND STRUCTURAL SYSTEMS SHOWN ON THE
REFLECTED CEILING PLAN HAVE BEEN COORDINATED WITH THE
EQUIPMENT LOCATIONS AS SHOWN ON THE 1/4" SCALE
ARCHITECTURAL EQUIPMENT PLAN (SHEET A -101). ANY CHANGES TO
THE SMS EQUIPMENT CONFIGURATION AS SHOWN, DUE TO PLACEMENT
OF LIGHTING, STRUCTURAL, ELECTRICAL AND MECHANICAL SYSTEMS,
MUST BE APPROVED IN WRITING BY THE SMS PROJECT MANAGER
PRIOR TO THE COMPLETION OF CONSTRUCTION DOCUMENTS.
SAFETY /SERVICE
CLEARANCE
SAFETY /SERVICE CLEARANCE PLAN
CEILING
HEIGHT
RANGE
9' -4 1/4" 10' -2"
RECOMMENDED
CEILING
HEIGHT
9' -6 3/8"
ATTENTION:
-THIS DRAWING IS DESIGNED TO CONFORM TO FEATURES AND EQUIPMENT REQUIREMENTS PRESENTED
AT THE TIME OF THEIR PREPARATION. SINCE BOTH THESE FACTORS ARE SUBJECT TO DESIGN
MODIFICATION, THEY ARE NOT TO BE USED FOR CONSTRUCTION PURPOSES.
THIS SET OF PLANS REPRESENTS A COMPLETE SET OF DETAILS AND SHOULD NOT BE SEPARATED.
IT IS RECOMMENDED THAT THE SIEMENS DRAWINGS BE INCORPORATED WITH THE CONSTRUCTION
DOCUMENTS FOR REFERENCE.
-ALL DIMENSIONS SHOWN ON THIS DRAWING ARE FROM FINISHED SURFACES.
THIS DRAWING DOES NOT PROVIDE RADIATION SHIELDING REQUIREMENTS FOR X -RAY AND ASSOCIATED
EQUIPMENT. THE CUSTOMER IS RESPONSIBLE FOR CONSULTING WITH A REGISTERED RADIATION
PHYSICIST TO SPECIFY RADIATION PROTECTION.
SYM
ORIENTATION POINT
OF PATIENT TABLE
AT FLOOR PROCEDURE
ROOM 1
05/25/09
DATE
R -101RB VERSION DATED 05/20/09
APPROVED BY CUSTOMER FOR FINALS
DESCRIPTION
-ISSUE BLOCK-
SERVICE
CLEARANCE
CONTROL
ROOM
SCALE: NOTED
6' -3"
PROJECT MANAGER: STEVE DURAN
TEL: 269 429 -8403
VMAIL: 800 765 -1304 EXT: 3486
FAX: 509 479 -5929
EMAIL: TEV .DURANIPSIEMENS,COM
THE USE OR REPRODUCTION OF
THIS TITLE BLOCK WITHOUT
SIEMENS AUTHORIZATION WILL
RESULT IN PROSECUTION UNDER
FULL EXTENT OF THE LAW.
REF.
1 H2ZOR
IMAGER SERVICE NOTE:
UNDER NORMAL CIRCUMSTANCES, NO
LATERAL DISTANCE TO THE WALL OR
OTHER COMPONENTS IS REQUIRED. FOR
SERVICE, THE IMAGE SYSTEM MUST BE
MOVED VIA ROLLERS INTO A POSITION
WHERE IT CAN BE ACCESSED FROM ALL
SIDES (APPROX. 20" ON EACH SIDE).
ISOCENTER OF
FLOOR STAND
ST VINCENT HEART CENTER OF INDI
10580 NORTH MERIDIAN, INDIANAPOLIS, IN 46290
PROCEDURE ROOM 1 ARTIS ZEEGO
PROJECT
0901506
SHEET OF
2 8
DATE:
05/25/09
DRAWN BY:
H. NUTT
CH ECKED0 /25/09
SCALE: 1 /4"
SIEME
SHEET:
A -1
1 -0"
ARTIS Z
05/04
N!
NA
o