Loading...
HomeMy WebLinkAbout09060043 St. Vincent's Hybrid or No. 5 Renovation Large Plan Pg. QA\ ATTENTION! CEILING LIGHTING, HVAC DUCTS, SPRINKLERS, ETC. MUST NOT BE LOCATED WITHIN SIEMENS CEILING RAIL SYSTEMS AS INDICATED BY THE SHADED AREAS ON THIS PLAN. PLEASE COORDINATE THE PLACEMENT OF THESE ITEMS WITH THE SIEMENS PROJECT MANAGER. NOTE: FOR ALL WEIGHTS AND SIZES OF EQUIPMENT SHOWN ON THIS PLAN PLEASE REFER TO THE EQUIPMENT LEGEND ON SHEET A -101. FOR UNISTRUT PLACEMENT SEE SHEET S -102. REFLECTED CEILING PLAN NO CEILING COMPONENTS THAT ARE NOT PART OF THE SYSTEM MAY BE MOUNTED IN THIS AREA. NON- SYSTEM CEILING COMPONENTS THAT ARE MOUNTED IN THIS AREA MUST MEET THE FOLLOWING REQUIREMENTS: THE BOTTOM EDGE OF ANY FIXED COMPONENT MUST BE NO LESS THAN 9' -0 1" A.F.F ANY COMPONENT EXTENDING BELOW 9' -0 1" A.F.F MUST HAVE THE ABILITY TO MOVE OUTSIDE THE AREA SHOWN VIA ARTICULATION, TRACK MOUNTING, ETC. I r 1 1 I C FLOOR STAND OVERHEAD CARRIAGE RAILS 1 PROCEDURE ROOM 1 CONTROL ROOM LIGHTING GUIDELINES ROOM LIGHTING IS THE RESPONSIBILITY OF THE CUSTOMER. HOWEVER, SIEMENS OFFERS THE FOLLOWING RECOMMENDATIONS, AS A GENERAL GUIDE ONLY, WHEN PLANNING FOR LIGHTING. 1) OVERALL GENERAL ILLUMINATION IS NECESSARY FOR CLEAN UP AND MAINTENANCE OF EQUIPMENT. FLUORESCENT LIGHTING IS USUALLY PROVIDED FOR THIS PURPOSE AND SHOULD BE A MINIMUM LEVEL OF 50 FOOTCANDLES. TO MINIMIZE GLARE AND PROVIDE VISUAL COMFORT, AN INDIRECT LIGHTING SYSTEM SHOULD BE CONSIDERED TOGETHER WITH COLOR IMPROVED FLUORESCENT LAMPS. 2) THE GENERAL LIGHTING SHOULD HAVE A MULTI -LEVEL SWITCHING CAPABILITY TO ALLOW FLEXIBILITY OF AMBIENT LIGHTING LEVELS. 3) BECAUSE FLUOROSCOPY PROCEDURES ARE NOW PERFORMED WITH IMAGE INTENSIFICATION WITH VISUALIZATION ON A TELEVISION MONITOR, COMPLETE ROOM DARKNESS IS NO LONGER NECESSARY. HOWEVER, IN ORDER TO PERMIT PROPER READINGS OF THE MONITOR, THE ROOM LIGHTING INTENSITY MUST BE CAPABLE OF BEING LOWERED TO BETWEEN 2 TO 5 FOOTCANDLES. THIS CAN BE USUALLY ACCOMPLISHED BY MEANS OF A FOOT SWITCH. THE FOOT SWITCH CONTROL ARRANGEMENT IS SUCH THAT, WHEN OPERATED, A SEPARATE LIGHTING SYSTEM FOR FLUORSCOPY IS TURNED "ON" AND AT THE SAME TIME, THROUGH AN INTERLOCK, THE GENERAL LIGHTING SYSTEM IS TURNED "OFF IF A VARIABLE LOW LEVEL LIGHTING INTENSITY IS DESIRED BY THE CUSTOMER, THEN A DIMMER CONTROL CAN BE ADDED. IN THIS CASE, INCANDESCENT LIGHTING IS RECOMMENDED FOR THIS PURPOSE. FLUORESCENT DIMMING IS NOT RECOMMENDED. 6' -3" ISOCENTER OF FLOOR STAND SCALE: 1 /4" 1' CEILING NOTES 1) ALL CEILING MOUNTED LIGHT FIXTURES, MECHANICAL REGISTERS AND SPRINKLER HEADS SHALL BE FLUSH WITH FINISHED CEILING, SHALL BE OUTSIDE OF ALL HATCHED AREAS AND SHALL BE SPECIFIED BY THE ARCHITECT OF RECORD AND SUBSEQUENT CONSULTING ENGINEERS. 2) THE ACTUAL CEILING DESIGN AND COORDINATION OF LIGHTING AND MECHANICAL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE ARCHITECT OF RECORD AND HIS SUBSEQUENT CONSULTING ENGINEERS. 3) THE CUSTOMER /CONTRACTOR SHALL BE RESPONSIBLE FOR FABRICATING, SUPPLYING AND INSTALLING ALL LIGHT, MECHANICAL AND STRUCTURAL SUPPORTING SYSTEMS. SIEMENS MEDICAL SYSTEMS, INC. IS ONLY RESPONSIBLE FOR THE SUPPLYING, INSTALLING AND CALIBRATION OF SMS EQUIPMENT AS SPECIFIED ON THE EQUIPMENT SCHEDULE AS SHOWN ON SHEET A -101. 4) ALL ELECTRICAL AND STRUCTURAL SYSTEMS SHOWN ON THE REFLECTED CEILING PLAN HAVE BEEN COORDINATED WITH THE EQUIPMENT LOCATIONS AS SHOWN ON THE 1/4" SCALE ARCHITECTURAL EQUIPMENT PLAN (SHEET A -101). ANY CHANGES TO THE SMS EQUIPMENT CONFIGURATION AS SHOWN, DUE TO PLACEMENT OF LIGHTING, STRUCTURAL, ELECTRICAL AND MECHANICAL SYSTEMS, MUST BE APPROVED IN WRITING BY THE SMS PROJECT MANAGER PRIOR TO THE COMPLETION OF CONSTRUCTION DOCUMENTS. SAFETY /SERVICE CLEARANCE SAFETY /SERVICE CLEARANCE PLAN CEILING HEIGHT RANGE 9' -4 1/4" 10' -2" RECOMMENDED CEILING HEIGHT 9' -6 3/8" ATTENTION: -THIS DRAWING IS DESIGNED TO CONFORM TO FEATURES AND EQUIPMENT REQUIREMENTS PRESENTED AT THE TIME OF THEIR PREPARATION. SINCE BOTH THESE FACTORS ARE SUBJECT TO DESIGN MODIFICATION, THEY ARE NOT TO BE USED FOR CONSTRUCTION PURPOSES. THIS SET OF PLANS REPRESENTS A COMPLETE SET OF DETAILS AND SHOULD NOT BE SEPARATED. IT IS RECOMMENDED THAT THE SIEMENS DRAWINGS BE INCORPORATED WITH THE CONSTRUCTION DOCUMENTS FOR REFERENCE. -ALL DIMENSIONS SHOWN ON THIS DRAWING ARE FROM FINISHED SURFACES. THIS DRAWING DOES NOT PROVIDE RADIATION SHIELDING REQUIREMENTS FOR X -RAY AND ASSOCIATED EQUIPMENT. THE CUSTOMER IS RESPONSIBLE FOR CONSULTING WITH A REGISTERED RADIATION PHYSICIST TO SPECIFY RADIATION PROTECTION. SYM ORIENTATION POINT OF PATIENT TABLE AT FLOOR PROCEDURE ROOM 1 05/25/09 DATE R -101RB VERSION DATED 05/20/09 APPROVED BY CUSTOMER FOR FINALS DESCRIPTION -ISSUE BLOCK- SERVICE CLEARANCE CONTROL ROOM SCALE: NOTED 6' -3" PROJECT MANAGER: STEVE DURAN TEL: 269 429 -8403 VMAIL: 800 765 -1304 EXT: 3486 FAX: 509 479 -5929 EMAIL: TEV .DURANIPSIEMENS,COM THE USE OR REPRODUCTION OF THIS TITLE BLOCK WITHOUT SIEMENS AUTHORIZATION WILL RESULT IN PROSECUTION UNDER FULL EXTENT OF THE LAW. REF. 1 H2ZOR IMAGER SERVICE NOTE: UNDER NORMAL CIRCUMSTANCES, NO LATERAL DISTANCE TO THE WALL OR OTHER COMPONENTS IS REQUIRED. FOR SERVICE, THE IMAGE SYSTEM MUST BE MOVED VIA ROLLERS INTO A POSITION WHERE IT CAN BE ACCESSED FROM ALL SIDES (APPROX. 20" ON EACH SIDE). ISOCENTER OF FLOOR STAND ST VINCENT HEART CENTER OF INDI 10580 NORTH MERIDIAN, INDIANAPOLIS, IN 46290 PROCEDURE ROOM 1 ARTIS ZEEGO PROJECT 0901506 SHEET OF 2 8 DATE: 05/25/09 DRAWN BY: H. NUTT CH ECKED0 /25/09 SCALE: 1 /4" SIEME SHEET: A -1 1 -0" ARTIS Z 05/04 N! NA o