HomeMy WebLinkAbout03070016 Village of West Clay Sections9006 - A&B Large Plan pg. SEROSIO\ CONTROL SCHEDULE
EROSION CONTROL MEASURE
MAINTENANCE
INSTALLATION SEQUENCE
TEMP. DIVERSION SWALE SILT TRAPS
AS NEEDED
PRIOR TO CLEARING AND GRADING
STONE ENTRANCE
AS NEEDED
PRIOR TO CLEARING AND GRADING
SILT FENCE
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
PRIOR TO CLEARING AND GRADING
EXISTING INLET PROTECTION
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
PRIOR TO CLEARING AND GRADING
TREE PROTECTION
WEEKLY, AF I ER STORM EVENTS AND AS NEEDED
PRIOR TO CLEARING AND GRADING
TEMPORARY DIVERSIONS
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
ALONG WITH ROUGH GRADING
TEMPORARY SEEDING
WATER AS NEEDED
AF ILR ROUGH GRADING
PERMANENT SEEDING
WATER AS NEEDED
AFTER FINISH GRADING
EROSION CONTROL MATTING
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
AFTER FINISH GRADING
STRAW BALES
WEEKLY, AF IER STORM EVENTS AND AS NEEDED
AFTER FINISH GRADING
INLET PROTECTION
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
AF IER EACH INLET IS PLACED
SEED, SOD LANDSCAPE AROUND
WATER AS NEEDED
AFTER FINISHED GRADING AROUND FINISHED UNITS
UNITS FINISHED
20 -25
12 -18
REMOVAL OF STRAW BALES
N/A
AF IER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF INLET PROTECTION
N/A
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF SILT FENCE
N A
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
i3..
SOIL
CONDITION
Village of WestClay
SECTIONS 9006 —A B
CARMEL, INDIANA
BRENWICK DEVELOPMENT CO.
CARMEL, INDIANA
i3..
SOIL
CONDITION
DRAWN BY:
CWD
CHECKED BY:
SHEET TITLE:
EROSION CONTROL
DETAILS
DRAWING FILES:
N:\1238\9006\DWGSV802.DING
SHEET NO.:
C802
A
Wet
Vorrr
Dry
DATE:
6/30/03
SOIL
CONDITION
DRAWN BY:
CWD
CHECKED BY:
SHEET TITLE:
EROSION CONTROL
DETAILS
DRAWING FILES:
N:\1238\9006\DWGSV802.DING
SHEET NO.:
C802
Salt
Tolerance
Wet
Vorrr
Dry
Gen.
Soil
Spray
Creeping Red Fescue
Festuca rubra
2
1
2
1
1
1
Med.
1
20 -25
12 -18
7 -21
S
Kentucky Bluegrass
Poa pratinsis
2
1
2
1
1
1
Med.
1
25 -35
12 -18
10 -20
MT
Tall Fescue
Festuca L arundinacea
2
1
1
1
1
1
Low
1
24 -35
24 -36
5 -14
T
Perennial ryegrass
Lolium perenne
2
1
2
1
2
Med-
High
2
15 -20
12 -18
5 -10
MT
Crownvetch
Coronilla varia
1
1
2
Low
1
5 -10
24
14 -21
T
Red Clover
Trifolium pratense
1
2
Med.
1
7 -10
18
5 -10
S
S
DATE:
6/30/03
PROJECT NO.:
1238.9006
DRAWN BY:
CWD
CHECKED BY:
SHEET TITLE:
EROSION CONTROL
DETAILS
DRAWING FILES:
N:\1238\9006\DWGSV802.DING
SHEET NO.:
C802
Feb Mar Apr I May Jun Jul
EROSION )L MEASURES MAINTENANCE RE.. UIREL1ENTS
STRAW BALE DAM ENANCE REQUIREMENTS
1. INSPECT STRAW LE DAMS AFTER EACH STORM EVENT AND PROMPTLY REMOVE ANY
SEDIMENT S TO ENSURE ADEQUATE STORAGE VOLUME FOP THE NEXT RAIN,
TAKING CARE NOT TO UNDERMINE THE ENTRENCHED BALES.
2. INSPECT ALLY FOR DETERIORATION OR DAMAGE FROM CONSTRUCTION
ACTIVITIES AND :PAIR IMMEDIATELY.
3. AF IER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL
STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE
MAINTENANCE SILT FENCE REQUIREMENTS
INSPECT THE SILT FENCE PERIODICALLY AND AF IER EACH STORM EVENT.
IE FENCE FABRIC EARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES
ACE THE AFFECTED PORTION IMMEDIATELY.
3. PEMOVE 1 SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT
ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE.
TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
AF 1ER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE
AND SEDIMENT POSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
TEMPORARY SEDIMENT RAP MAINTENANCE REQUIREMENTS
1. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT AND IMMEDIATELY
REPAIR ANY ION AND PIPING HOLES.
2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF THE DESIGN DEPTH.
3. REPLACE SPILLWAY GRAVEL FACING IF CLOGGED.
4. INSPECT )N, AND RE -SEED IF NECESSARY.
5. CHECK THE !AY DEPTH PERIODICALLY TO ENSURE A MINIMUM OF 1.5 FT. DEPTH
FROM THE LOWES) POINT OF THE SETTLED EMBANKMENT TO HIGHEST POINT OF THE
SPILLWAY CREST, AND FILL ANY LOW AREAS TO MAINTAIN DESIGN ELEVATION.
6. PROMPTLY REPLACE ANY DISPLACED RIPRAP, BEING CAREFUL THAT NO STONES IN THE
SPILLWAY ARE ABOVE DESIGN GRADE.
7. AF IER ALL DISTURBED AREAS HAVE BEEN STABILIZED. REMOVE THE STRUCTURE AND
SEDIMENT, SMOOTH THE SITE TO BLEND WITH ADJOINING AREAS, AND STABILIZE.
SANDBAG CURB INLET SEDIMENT BARRIER MAINTENANCE REQUIREMENTS
1. INSPECT FREQUENTLY FOR DAMAGE BY VEHICULAR TRAFFIC, AND REPAIR IF
NECESSARY.
2. INSPECT AFTER EACH STORM EVENT.
3. REMOVE SEDIMENT, WITHOUT FLUSHING, WHEN IT REACHES HALF THE HEIGHT OF THE
BARRIER.
4. DEPOSIT REMOVED SEDIMENT WHERE IT WILL NOT ENTER STORM DRAINS.
BLOCK AND GRAVEL CURB INLET PROTECTION MAINTENANCE REQUIREMENTS
1. AFTER EACH STORM EVENT, REMOVE THE SEDIMENT AND REPLACE THE GRAVEL;
REPLACE THE GEOTEXTILE FABRIC, IF USED.
2. PERIODICALLY REMOVE SEDIMENT AND TRACKED -ON SOIL FROM THE STREET, WITHOUT
FLUSHING, TO REDUCE THE SEDIMENT LOAD ON THE CURB INLET PROTECTION.
3. INSPECT PERIODICALLY FOR DAMAGE AND REPAIR; KEEP GRATES FREE OF DEBRIS.
4. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE
GRAVEL, WIRE MESH, GEOTEXTILE FABRIC, AND ANY SEDIMENT, AND DISPOSE OF THEM
PROPERLY.
EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS
1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY
EROSION BELOW THE BLANKET.
2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING
IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET.
3. AF IER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS
1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM
EVENTS OR HEAVY USE.
2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
3. TOPDRESS WITH CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND DIMENT TRACKED OR WASHED ONTO PUBLIC ROADS
BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY DE USED IF THE WATER IS
CONVEYED INTO A SEDIMENT TRAP OR BASIN.
5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
EROSION SEDIMENT CONTROL INFORMATION
PROJECT INFORMATION:
1A Project Location Map: See Sheet C100 for the location map.
1B Narrative: This project consists of the construction of Village of WestClay Section 9006 of a residential
development containing 29 single family lots. Site construction is scheduled to begin in the Summer of 2001 and be
completed in the Spring of 2002.
1C Location of Planned and /or Existing Roads, Utilities, Structures, Highways, etc: See Sheets C101 cnd c102 for
proposed and existing improvements.
TOPOGRAPHIC, DRAINAGE AND GENERAL SITE FEATURES.
2A Existing Vegetation: The parcel of real estate to be developed has existing vegetation comprised of
tree /grass /weed mix.
2B Location and Name of All Wetlands, Lakes, and Water Courses On and Adjacent to the Site: Elliot Creek flows
through the Southern portion of the project.
2C 100 Year Floodplains, Floodway Fringes, and Floodways: None
2D Soils Information: See Sheet C100 for the Soils Map showing th? spits information.
2E Existing and Planned Contour Lines: See Sheets C101 and C102 for existing and proposed contour lines.
2F Location of Specific Points Where Stormwater Discharge WII Leave the Site: Stormwater is collected via an
on- site system of inlets, pipes and swoles and conveyed to the proposed retention pond. The storm water outfall
for this project is the Elliot Creek.
2G Identify All Receiving Waters: Receiving waters: Elliot Creek, White River
2H Potential Areas Where Stormwater May Enter Groundwater: None
21 Location of Stormwater System: See Sheets C101 and C102 for proposed stormwater system.
LAND DISTURBING ACTIVITIES:
3A Location and Approximate Dimensions of all Disturbed Areas: See Sheets C103 and C104 showing the limits of
construction.
3B Soil Stockpiles and /or Borrow Areas: Areas to be designated by the developer.
EROSION AND SEDIMENT CONTROL MEASURES:
4A Sequence of When Each Measure Will be Implemented: See Sheets 0103 and C104 for Erosion Control
Schedule showing installation sequence.
4B Monitoring and Maintenance Guidelines for Each Measure:
Schedule showing maintenance schedule.
4C Perimeter Sediment Contra; Measures: See Sheets C103 and C104 for location of perimeter control and Sheet
C804 for details and specifications.
4D Temporary Seeding: See Sheets 0103 and C104 for location of temporary seeding and Sheet C804 for details
and specifications.
4E Temporary Erosion and Sediment Control Measures: See Sheets C103 and C104 for location of temporary
erosion and sediment control measures and Sheet C804 for details and specifications.
4F Permanent Erosion and Sediment Control Measures: See Sheets C103 and C104 for location of permanent
erosion and sediment control measures and Sheet C804 for details and specifications.
4G Storm Drain Inlet Protection: See Sheets C103 and c104 for location of storm drain inlet protection and
Sheet C804 for details and specifications.
4H Stormwater Outlet Protection: See Sheets C103 and C104 for location of stormwater outlet protection and
Sheet C804 for details and specifications.
41 Stable Construction Entrance: See Sheets C103 and c104 for location of construction entrance and Sheet
C804 for details and specifications.
4J Erosion and Sediment Control on Individual Building Lots: See sheets C103 and C104 for additional
specifications for house builders.
4K Permonent Seeding: See Sheets C103 and C104 for location of permanent seeding and Sheet C804 for details
and specifications.
See Sheets C103 and C104 for Erosion Control
HOLEY HOLEY SAYS
"DON'T
DIG
BLIND
1- 800 -382 -5544
CALL TOLL FREE
1- 800 428 -5200
FOR CALLS OUTSIDE OF INDIANA
PER INDIANA STATE LAW IS-69--1991.
IT IS AGAINST THE LAW TO EXCAVATE
WITHOUT NOTIFYING THE UNDERGROUND
LOCATION SERVICE TWO (2) WORKING
DAYS BEFORE COMMENCING WORK.
2 -3" COARSE
AGGREGATE
GEOTEXTILE FABRIC TO STABILIZE
FOUNDATION (ESPECIALLY 'MPORTANT
WHERE WETNESS 15 ANTICIPATED)
24
EROSION CONTROL BY HOUSE BUILDERS
A. Temporary and permanent seeded areas established by the
developer will be maintained by the home builder and his sub-
contractors. Straw bale dams or silt fences previously installed
will be maintained.
B. A construction drive to the house -site from the street shall
be installed of Number 2 Stone, 6" thick and a minimum of 12'
wide. This shall be utilized for access to the house and any
mud or dirt tracked into the street shall be promptly removed
to a stable area (water shall not be used to flush silt or mud
to the storm sewer).
C. In a particularly persistent erosion condition, silt fencing or
other measures may be required by the developer
D. When time is appropriate, and as soon as possible, roof
down spout extenders of non perforated drain tile should be
extended to the street or other solid outlet
until o lawn is established.
TEMPORARY CONSTRUCTION
ENTRANCE DETAIL
LATHS
SILT FENCE MATERIAL SILT FENCE' EXTENDS
7 6" BELOW FINISHED GRADE
NOTE:
1. SEE SILT FENCE DETAIL
FOR MATERIAL SPECIFICATIONS.
2. SILT FENCE SHALL BE
PREASSEMBLED BY SUPPLIER.
INLET PROTECTION SILT FENCE
EROSION CONTROL SEQUENCING
CONTRACTOR SHALL INSTALL ALL REQUIRED SILT FENCES,
SILT TRAPS, DIVERSINO SWALES AND INLET PROTECTION FOR
EXISTING INLETS PRIOR TO THE START OF ANY EARTH MOVING
OR STRIPPING.
2. CONTRACTOR SHALL INSTALL A STONE CONSTRUCTION
ENTRANCE OR SOME OTHER DEVISE PRIOR TO THE START OF
EARTHWORK AS NECESSARY TO PREVENT SOIL FROM BEING
TRACKED OR WASHED INTO EXISTING ROADWAYS.
3. LAND ALTERATIONS WHICH STPIP THE LAND OF VEGETATION,
INCLUDING REGRADING, SHALL BE DONE IN A WAY THAT WILL
MINIMIZE EROSION. WHENEVER FEASIBLE, NATURAL
VEGETATION SHALL BE RETAINED AND PROTECTED. AS GRADING
IS DONE, INSTALL RUNOFF CONTROL MEASURES AT APPROPRIATE
LOCATIONS TO KEEP SEDIMENT CONTAINED ON SITE.
4. ALL DISTURBED AREAS SHALL BE SEEDED AND STRAW
MULCHED AS SHOWN ON THE PLANS IMMEDIATELY AFTER
COMPLETION OF GROUND ACTIVITY. THIS SEEDING SHOULD BE
COMPLETED IN PHASES AS THE DIFFERENT AREAS OF THE SITE
ARE COMPLETED.
5. PERMANENT AND FINAL VEGETATION OR STRUCTURAL
EROSION CONTROL DEVICES SHALL BE INSTALLED AS SOON AS
PRACTICAL UNDER THE CIRCUMSTANCES.
6. THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED
SHALL BE KEPT TO A PRACTICAL MINIMUM DEPENDING UPON
THE WEATHER. IF CONSTRUCTION ACTIVITY IS TO CEASE FOR
MORE THAN TWO WEEKS, THE DISTURBED AREAS SHALL BE
TEMPORARILY SEEDED.
7. ALL STORM SEWER INLET PROTECTION DEVICES SHALL BE PUT
IN PLACE AT THE TIME EACH INLET IS CONSTRUCTED.
8. THE CONTRACTOR SHALL MAINTAIN EROSION CONTROL
MEASURES AND DEVICES DURING CONSTRUCTION AND UNTIL
SILTATION OF THE STREETS AND STORM SEWERS WILL NO
LONGER OCCUR.
9. ONCE ONSITE EROSION AND SILTATION OF THE STREETS AND
STORM SEWERS WILL NO LONGER OCCUR, THE CONTRACTOR
SHALL REMOVE AND DISPOSE OF THE TEMPORARY EROSION
CONTROL DEVICES.
10. THESE GENERAL FROCEDURES MAY NOT COVER ALL
SITUATIONS. REFER TO EROSION CONTROL PLANS FOR
SPECIFIC NOTES AND ADDITIONAL DETAILS
11. EROSION CONTROL TO COMPLY WITH INDIANA 327 IAC AND
RULE #5, AND INDIANA HANDBOOK FOR EROSION CONTROL IN
DEVELOPING AREAS
12. THE INSPECTOR HAS THE AUTHORITY TO REQUEST
ADDITIONAL EROSION CONTROL MEASURES OR AMEND
EROSION CONTROL PLANS SUBJECT TO ACTUAL SITE
CONDITIONS.
BEEHIVE INLET OR
DRAINAGE COVER
2 stakes (typ)
per bale
FLOW
staked
straw bale
compacted soil
to prevent piping
Plan
(n.t.s.)
Profile
(n.t.s.)
BEEHIVE INLET STRAW
BALE PROTECTION
WEIR ELEV.
890.00
8' (MIN.)
bindings for straw bales
to be placed parallel
to ground
bindings to be
placed parallel
to ground
T.B. ELEV.
892.00
OVERFILL 6"
FOR SETTLEMENT
EARTH EMBANKMENT AND STONE OUTLET SECTION
STORAGE 80' x 100' x 3'
5' (MIN.) I
SET STAKE AT
CLEAN -OUT LEVEL
CROSS SECTIONAL VIEW OF THE STONE OUTLET SECTION
892.00
TEMPORARY SEDIMENT BASIIN
5'
FLOOD POOL
GRAVEL
FACE
890.00
12'
SECTION "A -A
NO SCALE
5'
FILTER FABRIC
RIP -RAP 6" IN DEPTH
892.00
:52 :52 :2412 :252412:2 :2:2:2;
SEDIMENT FILTER DETAIL
APRON
5' (MIN.)
PROTECTED
I I iI I I I 11 11 -11 I -Ill III T AREA
I1I 111 111 111 1 I 11 111! II =111';111111111111111 1111111111111 11 1 1 1 1 111 1 ��1 1 l ll l ul l l ti
CROSS SECTIONAL VIEW OF A TEMPORARY DIVERSION
TEMPORARY DIVERSION SWALE
DETENTION OUTFACE DETAIL
2 stakes (typ)
per bale
12" RCP W/ END SECTION
(10" OUTLET CONTROL)
Plan
(n.t.s.)
Profile
(n.t.s.)
flow
straw bale
stake (typ)
straw bale
3 6 "undertoe
NOTE:
GRADE
(NEw oR EXIS
SILT FENCE
Silt Fence shall be a machine produced, non woven geotextile of 100%
polypropylene meeting the physical properties below.
All stakes shall be 2" X 2" hardwood 36" tall with 24" tall lath stapled
to stakes over fabric as reinforcement.
All silt fence shall be prefabricated by the supplier. No field assembly
will be accepted.
Fabric Weight 4 oz /syd
Grab Strength Warp 125 lbs.
Elongation Warp 50
Trapezoidal Tear Strength 50 lbs.
Burst Strength 200 psi
UV Resistance
A.O.S
Slurry Flow Rote
Sediment Retention
Silt Fence Material
Fence Post
Fence Post Should
be Buried 1' Below
Ground Surface
SEEDED AND
STRAW MULCHED
SEEDING
300
275
250
225
200
SLOPE 175
LENGTH 150
(FT.) 125
100
75
50
25
0
3
THE BLANKET SHOULD NOT BE
STRETCHED BUT ALLOWED TO LAY
LOOSELY ON THE SOIL SURFACE TO
ACHIEVE MAXIMUM BLANKET TO SOIL
CONTACT.
5
IN HIGH VELOCITY CHANNEL APPLICATIONS,
CHECK SLOTS SHOULD BE ESTABLISHED
EVERY 35 40'. THE SLOTS SHOULD BE
6" WIDE BY 6" DEEP WITH THE BLANKET
STAPLED IN THE BOTTOM OF THE SLOT,
THEN BACKFILLED AND SEEDED.
EROSION CONTROL.
MATTING DETAIL
START BLANKET AT TOP OF THE SWALE
AND ROLL IN THE DIRECTION OF THE
WATER FLOW IN THE SWALE. REFER TO
MANUFACTURER'S RECOMMENDATIONS FOR
CHANNEL PLACEMENT AND STAPLE
PA TTERNS.
VARIES
FOR REAR YARD SWALE
SILT FENCE DETAIL
N TS
GENERAL STAPLE RECOMMENDATIONS
4:1 3:1 2:1
SLOPE GRADIENT
STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN
EROSION CONTROL BLANKETS. STAPLE PATTERNS MAY VARY
DEPENDING UPON SOIL TYPE AND AVERAGE ANNUAL RAINFALL
AT SLOPE LENGTHS GREATER THAN 300 FEET OR 'HERE
DR,INAGE OVER LARGE AREAS IS DIRECTED ONTO THE
BLANKETS, STAPLE PATTERN "C" SHOULD BE UTILIZED.
1
THE EDGES OF THE BLANKET SHOULD
BE BUTTED AGAINST EACH OTHER, THE
EDGES OF THE SCC225 SHOULD BE
OVEPLAPPED 2
EROSION CONTROL MATTING DETAIL
EROSION BLANKET INSTALLATION
N -6" MIN. TURN DOWN
EROSION CONTROL BLANKET
(NORTH AMERICAN GREEN
S -75 OR EQUAL)
EXISTING GRADE
S-75 EROSION CONTROL
E BY
NORTH AMERICAN GREEN
OR APPROVED EQUAL
SCALE: NONE
GRADE
OR EXISTING)
70
50-80
225 gpm /sq. ft
75
Stokes 0 5' 0.C.
Ground Surface
1:1
Silt Fence Material Should
be Buried 6" Below Ground
Surface.
CHANNEL
LINING
ADDITIONAL STAPLES AS
REQUIRED WE 10 DE"TH OF FLOW.
CHANNEL LIINNGS UTILIZE STAPLE PATTERN "C"
W 1H ADDITIONAL STAPLES ON SIDE SLOPES AT
PROJECTED WATER UNE.
4
ON LONG SLOPES, 11-€ ENDS OF THE
BLANKETS SHOULD BE OVERLAPPED
4 6" IN A "SHWGIE EFFECT'.
6
PREPARATION OF THE SEED BED,
INCLUDING APPLICATION OF UI E,
FERTILIZER ANDS D S•ICULD BE
CONDUCTED AS NORMAL PPIOR 11)
INSTALLATION OF BLANKET.
Wheat or Rye
Oats
Annual Ryegrass
Non Irrigated*
Irrigated
2
ON SLOPE APPLICATIONS, THE TOP OF
1HE BLANKET SAILED BE "SLOTTED IN"
ABOVE THE BREAK OF THE SLOPE OR AT
A MINIMUM, STAPLED IN PLACE WITH
STAPLES C APART ON THE END OF THE
BLANKET.
Dormant
Seeding
Species
Late summer seeding dates may be extended 5 days
if mulch is applied.
Increase seeding application by 50
Kind of Seed 1000 Sq. Ft. Acre Remarks
Wheat or Rye 3.5 lbs. 2 bu. Cover seed 1" to
1 1/2" deep
Spring Oats 2.3 lbs.
Annual ryegrass 1 Ib.
Not necessary where mulch is applied.
Seedbed Preparation
Apply lime to raise the pH to the level needed for species being
seeded. Apply 23 pounds of 12 -12 -12 analysis fertilizer (or equivalent) per
1000 sq. ft. (approximately 1000 pounds per acre) or fertilize according to
test. Application of 150 lbs. of ammonium nitrate on areas low in organic
matter and fertility will greatly enhance vegetctive growth.
Work the fertilizer and lime into the soil to a depth of 2 -3 inches
with a harrow, disk or rake operated across the slope as much as possible.
Seeding
Select a seed mixture based on projected use of the area (Figure 5 -2),
while considering best seeding dates. See Figure 5 -3 this sheet. If toler-
ances are a problem, such as salt tolerance of seedings adjacent to streets
and highways, see Figure 5 this sheet before final selection.
Level and Sloping, Open Areas
1. Tall Fescue
2. Tall Fescue
Red Clover
3. Kentucky Bluegrass
Creeping Red Fescue
Steep Banks and Cuts
4. Tall Fescue 15
Kentu Bluegrass 25
5. Tall Fescue 35
Emerald Crownvetch 10
Lawns and High Maintenance Areas
6. Kentucky Bluegrass
Creeping Red Fescue
7. Perennial Ryegrass
(Turf Type)
8. Tall Fescue
Ranking:
1 Good
2 Medium
Not tolerant
Temporary Seeding Dates
Irrigation needed during this period. To control
erosion at times other than in the shaded areas,
use mulch.
FIGURE 5-3
Temporary Seedings
3 bu. Cover seed 1" deep
40 lbs. Cover seed 1 /4 "deep*
Figure 5 -2: Permanent Seed Mixtures
Seeding Rate Suitable pH
lbs/acre Ibs /1000
sq. ft.
FIGURE 5 -4
35 .8 5.5 -8.3 2 1 2
25 .6 5.5 -8.3 1
5 .12
15 .4 5.5 -7.5 2
15 .4
40
40
170
170 4.0
SILT FENCE
X
x
.4 5.8 -7.5 2
.6
.8 5.5 -8.3 2
.25
.9
.9
4.0
10'
TYPICAL
5.8 -7.5 2
5.0 -7.5
5.5 -8.3
x
x
1 2
1 Preferred 2 Will Tolerate Inoculate with specific Inoculant.
TYPICAL TOPSOIL STOCKPILE
Dec
Site Suitability*
well
Droughty Drained Wet
2 1 2
Salt Tolerance (to both soil salts spray):
T Tolerance
MT Medium Tolerance
S Slight Tolerance
sE
G
No.
9500028
STATE OF
A\'. x P..
!yD I
,S "ONAL c
rinN1
DATE
THIS DRAWING AND THE IDEAS, DESIGNS AND
CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF THE SCHNEIDER
CORPORATION, AND ARE NOT TO BE USED OR
REPRODUCED, IN WHOLE OR IN PART, WITHOUT
THE WRITTEN CONSENT OF THE SCHNEIDER
CORPORATION.
COPYRIGHTED BY THE SCHNEIDER CORP. (2003)
‘Ib
Schneider
THE SCHNEIDER CORPORATION
12821 E. New Market Street
Suite 100
Carmel, IN 46032
Telephone: 317.569.8112
Fax: 317.826.6410
www.schneidercorp.com
Architecture
Civil Engineering
Environmental Engineering
Geotechnical Services
GIS *LIS
Home Builder Services
Interior Design
Land Surveying
Landscape Architecture
Transportation Engineering