HomeMy WebLinkAbout03090027 Development for Weston Park pg. EEXISTING
1
LEGEND:
DETAIL /SH.
'.!.'C•
,d io r
PROPOSED GRAVEL CONST. ENTRANCE
DETAIL 01/C4.1
PROPOSED EROSION CONTROL MAT
DETAIL 02/C4.1
sC Y� ue
-F
?-'1
PROPOSED RIPRAP
DETAIL 03/C4.1
yx 7
PROPOSED TEMPORARY SEEDING
)10'
FIRE HYDRANT
PROPOSED STRAW BALE INLET PROTECTION
DETAIL 04/C4.1
DA
PROPOSED INSERT FOR INLET PROTECTION
DETAIL 05/C4.1
PROPOSED DITCH EROSION CONTROL
DETAIL 06/C4.1
o
SF
PROPOSED SILT FENCE
DETAIL 07/C4.1
SOIL BOUNDARY
BEEHIVE INLET
n.s
CROSBY SILT LOAM, 0 3% SLOPES
MONUMENT
11111 /4.
%se O R kid ,,i
`C_ O r
i r
t4 i NQ 'PS
PE880303
STATE OF
r� ix. '��jtcSS'ONALC� %%44 ,lI,Illlit�
1
DATE: 11/24/2003
L
REBAR FOUND /REBAR SET
III
DRAINAGE MANHOLE
0
PK NAIL FOUND
r_
CURB INLET
i
POWER POLE
a
DECIDUOUS TREE
h
GUY WIRE
CONIFEROUS TREE
TELEPHONE PEDESTAL
ones
OVERHEAD ELECTRIC LINE
4
TRAFFIC POLE
elegy
UNDERGROUND ELECTRIC
DWN BY: K R C
CHKD. BY: R R H
SCALE: 1 60'
DATE: 11/24/03 2
PROJECT NUMBER
03-188
WATER UNE
DESIGN PHASE
DEVELOPMENT
STAND PIPE
L
PLAN NUMBER
C4.0
SHEET OF
EXISTING
PROPOSED EROSION CONTROL LEGEND:
LEGEND:
I
DESCRIPTION:
DETAIL /SH.
'.!.'C•
,d io r
PROPOSED GRAVEL CONST. ENTRANCE
DETAIL 01/C4.1
PROPOSED EROSION CONTROL MAT
DETAIL 02/C4.1
sC Y� ue
-F
?-'1
PROPOSED RIPRAP
DETAIL 03/C4.1
yx 7
PROPOSED TEMPORARY SEEDING
)10'
FIRE HYDRANT
PROPOSED STRAW BALE INLET PROTECTION
DETAIL 04/C4.1
DA
PROPOSED INSERT FOR INLET PROTECTION
DETAIL 05/C4.1
PROPOSED DITCH EROSION CONTROL
DETAIL 06/C4.1
o
SF
PROPOSED SILT FENCE
DETAIL 07/C4.1
SOIL BOUNDARY
BEEHIVE INLET
CrA
CROSBY SILT LOAM, 0 3% SLOPES
MONUMENT
Br
BROOKSTON SILTY CLAY LOAM
L
EXISTING
LEGEND:
DESCRIPTION:
DESCRIPTION:
N`WV
EXISTING ASPHALT
>Q
WATER VALVE
yx 7
EXISTING BRICK
)10'
FIRE HYDRANT
1
EXISTING CONCRETE
SIGN
0-
TEMPORARY BENCH MARK
o
MAILBOX
A
SECTION CORNER
0
BEEHIVE INLET
o
MONUMENT
111111111
INLET
REBAR FOUND /REBAR SET
III
DRAINAGE MANHOLE
0
PK NAIL FOUND
r_
CURB INLET
i
POWER POLE
a
DECIDUOUS TREE
h
GUY WIRE
CONIFEROUS TREE
TELEPHONE PEDESTAL
ones
OVERHEAD ELECTRIC LINE
4
TRAFFIC POLE
elegy
UNDERGROUND ELECTRIC
SANITARY MANHOLE
teIe
UNDERGROUND TELEPHONE
BORING
WATER UNE
o
STAND PIPE
L
GAS LINE
ex. sanitary ,„h
tn. 891.59
inv. s. 883.09
in.v. w. 883.39
ph
88,-
x, sanatory mh
lc 885 -81
e.= 89.42
n.
in *883.1F
r
inv 882.95
--I
O
ex. sanitary mh
894.49
v. S. 585.82
n.. w. 885.91
WAAA•
I
I
I ,II
I'
07
II
s�-
EMI
II
II
I
III r;
R
P I I
I
t �I
S
$V
1, 1 1
w$'I 1
t I
b� m
1
1;
1
I I
I Ib� l
LIMITS OF
CONSTRUCTION
I II
II;
I1
I 1
2 2
1
II
o l'��g9Y
0
EXISTING RAN
1
-66 5
l a-
I
_90
I
I A^
I
;11
I
a b
1
97
V
CP
ti
887-
vv
ex. sanatory mh
tc 890.63
n.w.= 877.89 1�
e. 877.78
a
892_88
Nor
aA t
0
S
•8
L
ac
ti
A
8
%""4
O
X 94
8
g
1
1
1
1
mit JINN
Boo OM
9s-
89 3.18 �rll
V
a�
1
I 1
•-r•.•
-H94
SEEDING AREA
Pi OPOSED R/W TO BE
DEDICATED IN THE FUTURE
PER THE REQUEST OF
HAMILTON COUNTY
a5 c
0
GRAVEL CONSTRUCTION
ENTRANCE='
k
1
9 J
a �b
LIMITS OF
CONSTRUCTION
9
1
1
1
1 a�o,5
I
1
z/
O
47,21......
y
EXISTING R/W
0
SEEDING AREA
I'
SEEDING AREA
g
a +a
1
1
6
/4 b�
ex. son ita ry mh
889.35
876.32
CONSTRUCTION ENTRANCE
(USE EXISTING ENTRANCE
ADD STONE TO REQ'D
ENGTH)
SEE DETAIL (SHEET C4.1)
rl�
8 a
+a
'i.
SEEDING AREA
EROSION CONTROL FABRIC
LIMITS OF
CONSTRUCTION
LIMITS OF
CONSTRUCTION
„o 96
e2 G ti c .889 '�+`eL.___- --e q0
aP, e -87-
7 q 2,, :1: 2 p ot; 9 i i 1 4
SEEDING AREA
PROPOSED RNV TO BE
DEDICATED IN THE FUTURE
PER THE REQUEST OF
HAMILTON COUNTY
ety
Yr7 -88`3,7y
Ns,
'1- 1 1 ,1 =.1 4, 7
IT' i I fi ;t6441441:' i i i "I': 1 "7 L-T 4 4 .111 0 ..-e -7. '1= -If f --,t.
.7.......: '.--7. --sss.-.'"\
CONSTRTION
4_ 4;Zif ikn r■ vv cor
S A „411
\46
giR BASIN
‘o,,
yr
4 A
LIMITS OF
CONSTRUCTION
IMITS OF
CONSTRUCTION
SEEDING AREA-
V.
ex. sanitary nTh
EROSION CONTROL NOTES
Survey and boundary information provided
by AMERICAN CONSULTING, INC.. Survey
dated 11/15/02.
1. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT
STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY OR
LOCAL REQUIREMENTS, WHICHEVER HAS JURISDICTION.
2. LAND ALTERATION WHICH STRIPS THE LAND OF VEGETATION, INCLUDING
REGRADING, SHALL BE DONE IN A WAY THAT WILL MINIMIZE EROSION.
3. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR
SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT
FROM LEAVING THE SITE. ADDITIONAL EROSION AND SEDIMENT CONTROL
MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ON-SITE INSPECTION.
4. SEDIMENT LADEN WATER SHALL BE DETAINED BY EROSION CONTROL
PRACTICES AS NEEDED TO MINIMIZE SEDIMENTATION IN THE RECEIVING
STREAM. NO STORM WATER SHALL BE DISCHARGED FROM THE SITE IN A
MANNER THAT CAUSES EROSION AT THE POINT OF DISCHARGE.
5. WASTES AND UNUSED BUILDING MATERIALS SHALL NOT BE ALLOWED TO BE
CARRIED FROM THE SITE BY STORMWATER RUNOFF. PROPER DISPOSAL OF
ALL WASTES AND UNUSED BUILDING MATERIALS IS REQUIRED.
6. SEDIMENT BEING TRACED ONTO PUBLIC OR PRIVATE ROADWAYS SHALL BE
MINIMIZED. CLEARING OF ACCUMULATED SEDIMENT SHALL NOT INCLUDE
FLUSHING WITH WATER. CLEARED SEDIMENT SHALL BE RETURNED TO THE
SITE FOR DISPOSAL.
7. SOIL WHICH HAS ACCUMULATED NEXT TO EROSION CONTROL DEVICES SHALL
BE COLLECTED AND REDISTRIBUTED ON SITE AFTER EACH RAINFALL EVENT,
AND AT LEAST ONCE A WEEK.
8. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY
WEATHER OR NIGHTFALL, THE PIPE ENDS SHALL BE COVERED WITH FILTER
FABRIC.
9. ALL EXISTING STRUCTURES, FENCING, TREES AND ETC., WITHIN CONSTRUCTION
AREA SHALL BE REMOVED AND DISPOSED OF OFF SITE. BURNING IS NOT
ALLOWED ON-SITE.
10. SCHEDULE OF EARTHWORK ACTIVITIES:
a) THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE
KEPT TO A PRACTICAL MINIMUM. THE AREA SHALL BE STABILIZED
SOON AS POSSIBLE. TEMPORARY VEGETATION OR MULCHING SHALL
BE USED TO PROTECT EXPOSED AREAS IF PERMANENT VEGETATION
CANNOT BE SEEDED WITHIN 14 DAYS OR ACTIVITY CEASES FOR MORE
THAN 21 DAYS OR AS DIRECTED BY THE ENGINEER.
b) TOPSOIL REPLACEMENT SHALL TAKE PLACE FROM MARCH 1 TO
OCTOBER 31. STOCKPILE TOPSOIL AT ALL OTHER TIME OF THE YEAR.
PERMANENT AND FINAL VEGETATION AND STRUCTURAL EROSION
CONTROL DEVICES SHALL BE INSTALLED WITHIN SEVEN (7) DAYS AFTER
FINAL GRADING OR AS SOON AS POSSIBLE.
"DON'T
DIG
BLIND"
"HOLEY MOLEY"
SEZ:
"IT'S THE
LAW"
INDIANA UNDERGROUND PROTECTION SERVICE INC.
CALL TWO WORKING DAYS BEFORE YOU DIG
CALL TOLL FREE
FOR CALLS OUTSIDE OF INDIANA
UTILITY STATEMENT:
The underground utilities shown have been located from field survey
information and existing drawings. The surveyor makes no guarantees
that the underground utilities comprise all such utilities in the area,
either in-service or abandoned. The surveyor further does not
warrant that the underground utilities shown are in the exact location
indicated although the surveyor does certify that they are located as
accurately as possible from information available. The surveyor has
not physically located the underground utilities.
PROJECT
LOCATION
emetory Creek
W 105th St
VICINITY MAP
NOT TO SCALE
60 0 30 60
r
1 inch 60 ft.
W 98th St
NORTH
rwInt
on
BENCHMARKS:
TBM #10
S.W. BOLT OF FIRE HYDRANT ON E. SIDE OF MICHIGAN ROAD, 15O'± S.
OF 106th STREET, WEST OF WALGREENS (MICHIGAN ROAD PROJECT)
ELEV 895.60
TBM #77
A CHISELED "X" ON TOP OF CURB ON
300'± W. OF MICHIGAN ROAD, N. SIDE
NORTHWEST PLAZA
S. SIDE NORTHWESTERN DR.,
CURB ISLAND ENTRANCE TO
ELEV 891.30
TBM #78
A CHISELED "X" ON S. SIDE CONC. LIGHT POLE BASE, S. SIDE
PEARSON FORD DEALERSHIP, N. SIDE OF 106th STREET, E. SIDE OF
ENTRANCE DRIVE, 40O'± W. OF MICHIGAN ROAD.