HomeMy WebLinkAbout03090027 Development for Weston Park pg. K20 EUO —A
4) GIN —B
0
O
0
0
0
0
0
0
0
0
0
O
0
0
0
0
0
O
0
0
0
0
0
14 EUO —A
2) GIN -8
14 EUO —A
14 EUO —A
3) GIN —B
16 SPI —A
1) GLE —T
16 SPI —A
14 EUO —A
_)3 GIN —B
14 JUN —C
27 EUO —A
O
O
0
0
0
O
0
0
0
0
O
0 0
0
0
'r
4A
1/43:91/0 s s A1 ti
SEE
SOAPING
LANS
GIN —B
MAL —R
GLE —T
GLE —T
3 MAL —R
z
FINAL GRADE
DOUBLE STRAND 12 GA.
WIRE TWISHED IN RUBBER
HOSE 6" FROM TOP OF
STAKES 400 0114
SUITABLE CORD
BANDING
CREPE TREE BURLAP OR HEAVY �EE WRAP MATERIAL 1
PLACE SOIL BALL IS
SLIGHTLY HIGHER THAN I�
EXISTING GRADE, MOUND
SOIL OVER FLARE
i►
7 GLE —T
I GLE—T
IiHIIL =III
II HIIII III
Ii III =_I
I -1I1 ==111
SOIL BACKFILL TO BE 75%
TOPSOIL 25% PEAT
(TAMPED)
REMOVE BINDING
TREE PLANTING DETAIL
NTS
2 MAL —R
LEGEND:
i-
AU
(.1
C
D
LARGE DECIDUOUS TREE
ORNAMENTAL TREE
SHRUBS
EVERGREEN SHRUBS
SIGNS
3" LAYER OF SHEDDED
HARDWOOD MULCH
INSTALL FERTILIZER
TABLETS OR SPIKES
EARTH SAUCER
NOTE: STAKE GUY
1 TREES AS SHOWN IF
12" SITE CONDITIONS DICTATE
MAX.
EXISTING SUBSOIL OR
COMPACTED BACKFILL
WHEAT OR RYE
OATS
ANNUAL RYEGRASS
NON— IRRIGATED*
IRRIGATED
DORMAT SEEDING
NTS
ggi
TEMPORARY SEEDING DATES:
PERMANENT SEEDING DATES
►.•Di ❖VV
0• b0•�►4•004•4
JAN FEB MAR APR MAY JUN JUL
L
IRRIGATION NEEDED DURING THIS PERIOD. TO CONTROL
EROSION AT TIMES OTHER THAN IN THE SHADED AREAS,
USE MULCH.
LATE SUMMER SEEDING DATES MAY BE: EXTENDED 5 DAYS
IF MULCH IS APPLIED.
INCREASE SEEDING APPLICATION BY 50
FIGURE 5 -3
TEMPORARY SEEDING:
KIND OF SEED 1000 SQ.FT. ACRE REMARKS
WHEAT OR RYE 3.5 LBS. 2 BU. COVER SEED 1" TO 1 —1 /2" DEEP
SPRING OATS 2.3 LBS. 3 BU. COVER SEED TO 1 DEEP
ANNUAL RYEGRASS l LB. 40 LBS. COVER SEED TO 1/4" DEEP
NOT NECESSARY WHERE MULCH IS APPLIED.
SEEDING SCHEDULE
"DON'T
DIG
BLIND"
IN FEET
1 inch 60 ft.
SE OCT
_I
NOV DEC
"HOLEY MOLEY"
SEZ:
"IT'S THE
LAW"
INDIANA UNDERGROUND PROTECTION SERVICE INC.
CALL TWO WORKING DAYS BEFORE YOU DIG
1- 800 382 -5544
CALL TOLL FREE
1 -800- 428 -5200
FOR CALLS OUTSIDE OF INDIANA
N OTE:
Survey and boundary information provided
by AMERICAN CONSULTING, INC.. Survey
dated 11/15/02.
PLANTING NOTES:
1. IN CASE OF DISCREPANCIES BETWEEN THE PLAN AND THE 10. THE LANDSCAPE CONTRACTOR SHALL OBTAIN AND PAY FOR
PLANT LIST (IF SHOWN), THE PLAN SHALL DICTATE. ALL PERMITS AND FEES THAT MAY BE REQUIRED FOR HIS
PORTION OF WORK.
2. ALL SHRUB PLANTING AREAS TO BE COVERED W/ 3" LAYER
OF SHREDDED HARDWOOD BARK MULCH. ALL GROUND
COVER BEDS SHALL BE COVERED W/ 2" SHREDDED
HARDWOOD BARK MULCH. MULCH SHALL BE APPROVED BY
LANDSCAPE ARCHITECT AND SHALL BE UNIFORM IN TEXTURE
AND COLOR AND SHALL BE OBTAINED FROM SAWMILL OR
LUMBERING OPERATION. NO UTILITY MULCH OR PROCESSED
TREE TRIMMINGS WILL BE ALLOWED.
3. AN APPROVED PRE EMERGENT HERBICIDE SHALL BE
APPLIED IN ALL PLANTING BEDS AT A RATE SPECIFIED BY
MANUFACTURER FOR EACH PLANT VARIETY.
4. FINAL PLACEMENT OF PLANT MATERIALS, ETC. SHALL
BE APPROVED BY LANDSCAPE ARCHITECT BEFORE PLANTING
OPERATIONS ARE TO PROCEED. ALL TREE LOCATIONS
SHALL BE MARKED WITH A WOOD STAKE INDICATING VARIETY
AND SIZE OF TREE. ALL GROUND COVER AND PLANTING
BED LINES SHALL BE MARKED W/ HIGHLY VISIBLE PAINT
LINES W/ OCCASIONAL WOOD STAKES FOR REFERENCE. ALL
STAKES SHALL PE REMOVED FOLLOWING PLANTING
OPERATIONS. LANDSCAPE ARCHITECT RESERVES THE RIGHT
TO ADJUST PLANT LOCATIONS ON THE SITE.
5. NO SUBSTITUTIONS OF PLANT MATERIALS WILL BE ALLOWED.
IF PLANTS ARE NOT AVAILABLE, THE CONTRACTOR SHALL
NOTIFY LANDSCAPE ARCHITECT PRIOR TO BID IN WRITING. 15.
ALL PLANTS SHP_L RE INSPECTED AND TAGGED WITH
PROJECT I.D. AT NURSERY OR CONTRACTORS OPERATIONS
PRIOR TO tvi0ViNG TO JOB SITE. PLANTS MAY BE INSPECTED
AND APPROVED OR REJECTED ON THE JOB SITE BY
LANDSCAPE ARCHITECT.
6. ALL PLANTS SHALL MEET OR EXCEED AMERICAN STANDARDS
FOR NURSERY STOCK, 1996 EDITION, AS SET FORTH BY
AMERICAN ASSOCIATION OF NURSERYMEN.
7. PLANTS AND ALL OTHER MATERIALS TO BE STORED ON SITE
WILL BE PLACED WHERE THEY WILL NOT CONFLICT W/
CONSTRUCTION OPERATIONS AND AS DIRECTED BY
LANDSCAPE ARC !IECT.
8. ALL LANDSCAPE ;T NOS SHALL BE GUARANTEED FOR A
PERIOD OF ONE YEAR FOLLOWING FINAL INSPECTION BY
LANDSCAPE ARCHITECT. AT THE END OF THIS PERIOD,
PLANT MATERIAL TER ,AED DEAD OR UNSATISFACTORY BY
LANDSCAPE ARCHITECT SHALL BE REPLACED AT NO
ADDITIONAL. CHARGE BY THE LANDSCAPE CONTRACTOR,
9. LAWNS SHALL BE SODDED FOLLOWING SCARIFYING, FINAL
GRADING, FERTILIZING, AND RAKING. LAWN SHALL BE
FERTILIZED W/ 12 -12 -12 ANALYSIS FERT. AT A RATE OF
10Ibs. /1000s.f. AND LIME APPLIED AS DICTATED BY SOILS
TEST PRIOR TO SODDING.
EARTH SAUCER
FIN. GRADE
3" LF. CR OF SHREDDED
HARDWOOD BARK MULCH
EX, SOIL OR
FED BAL,KFILL
U PLANTING DETAIL
11. PEATMOSS TO BE USED ON PROJECT SHALL BE DOMESTIC
OR IMPORTED MATERIAL, CHOCOLATE BROWN IN COLOR AND
COMPOSED OF PARTIALLY DECOMPOSED VEGETABLE
MATERIAL. PEAT MOSS TO BE MILDLY ACIDIC IN CHARACTER
AND SHALL BE APPROVED BY LANDSCAPE ARCHITECT.
12. LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE
ARCHITECT IN WRITING PRIOR TO BID DATE OF ANY PLANTS
HE /SHE FEELS MAY NOT SURVIVE IN LOCATIONS NOTED ON
PLANS.
13. ALL DISTURBED LAWN AREAS SHALL BE SEEDED OR SODDED
AS NOTED. PERMANENT SODDED LAWNS SHALL BE SEED
MIX AS APPROVED BY LANDSCAPE ARCHITECT. SEED MIX
SHALL BE AN APPROVED BLUEGRASS BLEND.
14. ALL LAWNS SHALL BE GUARANTEED TO HAVE A FULL
UNIFORM STAND OF ACCEPTABLE GRASS AT THE END OF
THE ONE YEAR GUARANTEE PERIOD WITH NO BARE SPOTS
COMPRISING MORE THAN 2 OF ANY LAWN AREA. ANY
AREA SO NOTED WILL BE SEEDED OR SODDED UNTIL AN
ACCEPTABLE STAND OF GRASS IS ESTABLISHED.
ALL LANDSCAPE PLANTINGS TO BE MAINTAINED BY
CONTRACTOR FOR 60 DAYS FOLLOWING FINAL INSPECTION
BY LANDSCAPE ARCHITECT. ALL SEEDED LAWNS SHALL BE
MAINTAINED FOR 60 DAYS AND SODDED LAWNS 30 DAYS
FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT
AFTER WRITTEN REQUEST FROM THE LANDSCAPE
CONTRACTOR. MAINTENANCE TO INCLUDE WATERING WEEDING,
CULTIVATING, MULCHING, MOWING, AND ALL OTHER
NECESSARY OPERATIONS REQUIRED FOR PROPER
ESTABLISHMENT OF LAWNS AND PLANTINGS.
16. CONTRACTOR TO SUBMIT UNIT PRICES ON EVERY TYPE OF
WORK AS REQUIRED BY LANDSCAPE ARCHITECT.
17. ALL LAWN AREAS WITHIN LAWN LIMIT LINES TO RECEIVE
4 -6" APPROVED TOPSOIL PRIOR TO SEEDING OR
SODDING OPERATIONS.
18. BACKFILL FOR TREE PLANTING SHALL BE 75% APPROVED
TOPSOIL AND 25% APPROVED PEAT MOSS. TOP LAYER OF
BACKFILL SHALL BE 100% EXISTING TOPSOIL. A 5 -10 -5
ANALYSIS SLOW RELEASE FERTILIZER SHALL BE
INCORPORATED INTO BACKFILL AT APPROVED RATES.
19. ANY STAKES AND GUY WIRES USED TO PLANT TREES MUST
BE REMOVED WITHIN ONE YEAR.
PLACE BALL SLIGHTLY
HIGHER THAN FIN. GRADE.
MOUND SOIL OVER FLARE
RHODODENDRONS OTHER
ERICACEOUS PLANTS, PLACE
AND MOUND PEATMOSS
OVER FLARE MULCH
HEAVILY,
INSTALL FERTILIZER TABLETS
OR SPIKES
SOIL BACKFILL TO BE 75%
TOPSOIL 25% PEATMOSS
TAMPED TO PREVENT
SETTLEMENT.
UTILITY STATEM ENT:
The underground utilities shown have been located from field survey
information and existing drawings. The surveyor makes no guarantees
that the underground utilities comprise all such utilities in the area,
either in— service or abandoned. The surveyor further does not
warrant that the underground utilities shown are in the exact location
indicated although the surveyor does certify that they are located as
accurately as possible from information available. The surveyor has
not physically located the underground utilities.
1
EXIS LNG LEGEND:
f
DESCRIPTION:
DESCRIPTION:
PLANTING
SCHHDULH
WATER VALVE
EXISTING BRICK
�i
QUANTITY
Z -"t
La
BOTANICAL NAME
COMMON NAME
SIGN
SIZE
TEMPORARY BENCH MARK
n
l ir
ill
IIC
4
0
Q
It
BEEHIVE INLET
MONUMENT
Pm
INLET
12
GLE —T
DATE:
SHADEMASTER HONEY LOCUST
2
1/2" CAL.
B
B,
POWER POLE
16
GIN —B
GINKGO BILOBA
GINKGO
2
1/2" CAL.
B
B,
OVERHEAD ELECTRIC LINE
07
MAL —R
DWN BY: KRc
RED JEWEL CRABAPPLE
CHKD. BY: RRH
1/2" CAL.
SCALE: 1 3 0'
DATE: 1 1 /24/02
BORING
SHRUBS
WATER LINE
PROJECT NUMBER
03 -188
STAND PIPE
4
DESIGN PHASE
DEVELOPMENT
144
EUO —A
PLAN NUMBER
C8MO
SHEET OF
DWARF BURNING BUSH
20 EUO —A
4) GIN —B
0
O
0
0
0
0
0
0
0
0
0
O
0
0
0
0
0
O
0
0
0
0
0
14 EUO —A
2) GIN -8
14 EUO —A
14 EUO —A
3) GIN —B
16 SPI —A
1) GLE —T
16 SPI —A
14 EUO —A
_)3 GIN —B
14 JUN —C
27 EUO —A
O
O
0
0
0
O
0
0
0
0
O
0 0
0
0
'r
4A
1/43:91/0 s s A1 ti
SEE
SOAPING
LANS
GIN —B
MAL —R
GLE —T
GLE —T
3 MAL —R
z
FINAL GRADE
DOUBLE STRAND 12 GA.
WIRE TWISHED IN RUBBER
HOSE 6" FROM TOP OF
STAKES 400 0114
SUITABLE CORD
BANDING
CREPE TREE BURLAP OR HEAVY �EE WRAP MATERIAL 1
PLACE SOIL BALL IS
SLIGHTLY HIGHER THAN I�
EXISTING GRADE, MOUND
SOIL OVER FLARE
i►
7 GLE —T
I GLE—T
IiHIIL =III
II HIIII III
Ii III =_I
I -1I1 ==111
SOIL BACKFILL TO BE 75%
TOPSOIL 25% PEAT
(TAMPED)
REMOVE BINDING
TREE PLANTING DETAIL
NTS
2 MAL —R
LEGEND:
i-
AU
(.1
C
D
LARGE DECIDUOUS TREE
ORNAMENTAL TREE
SHRUBS
EVERGREEN SHRUBS
SIGNS
3" LAYER OF SHEDDED
HARDWOOD MULCH
INSTALL FERTILIZER
TABLETS OR SPIKES
EARTH SAUCER
NOTE: STAKE GUY
1 TREES AS SHOWN IF
12" SITE CONDITIONS DICTATE
MAX.
EXISTING SUBSOIL OR
COMPACTED BACKFILL
WHEAT OR RYE
OATS
ANNUAL RYEGRASS
NON— IRRIGATED*
IRRIGATED
DORMAT SEEDING
NTS
ggi
TEMPORARY SEEDING DATES:
PERMANENT SEEDING DATES
►.•Di ❖VV
0• b0•�►4•004•4
JAN FEB MAR APR MAY JUN JUL
L
IRRIGATION NEEDED DURING THIS PERIOD. TO CONTROL
EROSION AT TIMES OTHER THAN IN THE SHADED AREAS,
USE MULCH.
LATE SUMMER SEEDING DATES MAY BE: EXTENDED 5 DAYS
IF MULCH IS APPLIED.
INCREASE SEEDING APPLICATION BY 50
FIGURE 5 -3
TEMPORARY SEEDING:
KIND OF SEED 1000 SQ.FT. ACRE REMARKS
WHEAT OR RYE 3.5 LBS. 2 BU. COVER SEED 1" TO 1 —1 /2" DEEP
SPRING OATS 2.3 LBS. 3 BU. COVER SEED TO 1 DEEP
ANNUAL RYEGRASS l LB. 40 LBS. COVER SEED TO 1/4" DEEP
NOT NECESSARY WHERE MULCH IS APPLIED.
SEEDING SCHEDULE
"DON'T
DIG
BLIND"
IN FEET
1 inch 60 ft.
SE OCT
_I
NOV DEC
"HOLEY MOLEY"
SEZ:
"IT'S THE
LAW"
INDIANA UNDERGROUND PROTECTION SERVICE INC.
CALL TWO WORKING DAYS BEFORE YOU DIG
1- 800 382 -5544
CALL TOLL FREE
1 -800- 428 -5200
FOR CALLS OUTSIDE OF INDIANA
N OTE:
Survey and boundary information provided
by AMERICAN CONSULTING, INC.. Survey
dated 11/15/02.
PLANTING NOTES:
1. IN CASE OF DISCREPANCIES BETWEEN THE PLAN AND THE 10. THE LANDSCAPE CONTRACTOR SHALL OBTAIN AND PAY FOR
PLANT LIST (IF SHOWN), THE PLAN SHALL DICTATE. ALL PERMITS AND FEES THAT MAY BE REQUIRED FOR HIS
PORTION OF WORK.
2. ALL SHRUB PLANTING AREAS TO BE COVERED W/ 3" LAYER
OF SHREDDED HARDWOOD BARK MULCH. ALL GROUND
COVER BEDS SHALL BE COVERED W/ 2" SHREDDED
HARDWOOD BARK MULCH. MULCH SHALL BE APPROVED BY
LANDSCAPE ARCHITECT AND SHALL BE UNIFORM IN TEXTURE
AND COLOR AND SHALL BE OBTAINED FROM SAWMILL OR
LUMBERING OPERATION. NO UTILITY MULCH OR PROCESSED
TREE TRIMMINGS WILL BE ALLOWED.
3. AN APPROVED PRE EMERGENT HERBICIDE SHALL BE
APPLIED IN ALL PLANTING BEDS AT A RATE SPECIFIED BY
MANUFACTURER FOR EACH PLANT VARIETY.
4. FINAL PLACEMENT OF PLANT MATERIALS, ETC. SHALL
BE APPROVED BY LANDSCAPE ARCHITECT BEFORE PLANTING
OPERATIONS ARE TO PROCEED. ALL TREE LOCATIONS
SHALL BE MARKED WITH A WOOD STAKE INDICATING VARIETY
AND SIZE OF TREE. ALL GROUND COVER AND PLANTING
BED LINES SHALL BE MARKED W/ HIGHLY VISIBLE PAINT
LINES W/ OCCASIONAL WOOD STAKES FOR REFERENCE. ALL
STAKES SHALL PE REMOVED FOLLOWING PLANTING
OPERATIONS. LANDSCAPE ARCHITECT RESERVES THE RIGHT
TO ADJUST PLANT LOCATIONS ON THE SITE.
5. NO SUBSTITUTIONS OF PLANT MATERIALS WILL BE ALLOWED.
IF PLANTS ARE NOT AVAILABLE, THE CONTRACTOR SHALL
NOTIFY LANDSCAPE ARCHITECT PRIOR TO BID IN WRITING. 15.
ALL PLANTS SHP_L RE INSPECTED AND TAGGED WITH
PROJECT I.D. AT NURSERY OR CONTRACTORS OPERATIONS
PRIOR TO tvi0ViNG TO JOB SITE. PLANTS MAY BE INSPECTED
AND APPROVED OR REJECTED ON THE JOB SITE BY
LANDSCAPE ARCHITECT.
6. ALL PLANTS SHALL MEET OR EXCEED AMERICAN STANDARDS
FOR NURSERY STOCK, 1996 EDITION, AS SET FORTH BY
AMERICAN ASSOCIATION OF NURSERYMEN.
7. PLANTS AND ALL OTHER MATERIALS TO BE STORED ON SITE
WILL BE PLACED WHERE THEY WILL NOT CONFLICT W/
CONSTRUCTION OPERATIONS AND AS DIRECTED BY
LANDSCAPE ARC !IECT.
8. ALL LANDSCAPE ;T NOS SHALL BE GUARANTEED FOR A
PERIOD OF ONE YEAR FOLLOWING FINAL INSPECTION BY
LANDSCAPE ARCHITECT. AT THE END OF THIS PERIOD,
PLANT MATERIAL TER ,AED DEAD OR UNSATISFACTORY BY
LANDSCAPE ARCHITECT SHALL BE REPLACED AT NO
ADDITIONAL. CHARGE BY THE LANDSCAPE CONTRACTOR,
9. LAWNS SHALL BE SODDED FOLLOWING SCARIFYING, FINAL
GRADING, FERTILIZING, AND RAKING. LAWN SHALL BE
FERTILIZED W/ 12 -12 -12 ANALYSIS FERT. AT A RATE OF
10Ibs. /1000s.f. AND LIME APPLIED AS DICTATED BY SOILS
TEST PRIOR TO SODDING.
EARTH SAUCER
FIN. GRADE
3" LF. CR OF SHREDDED
HARDWOOD BARK MULCH
EX, SOIL OR
FED BAL,KFILL
U PLANTING DETAIL
11. PEATMOSS TO BE USED ON PROJECT SHALL BE DOMESTIC
OR IMPORTED MATERIAL, CHOCOLATE BROWN IN COLOR AND
COMPOSED OF PARTIALLY DECOMPOSED VEGETABLE
MATERIAL. PEAT MOSS TO BE MILDLY ACIDIC IN CHARACTER
AND SHALL BE APPROVED BY LANDSCAPE ARCHITECT.
12. LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE
ARCHITECT IN WRITING PRIOR TO BID DATE OF ANY PLANTS
HE /SHE FEELS MAY NOT SURVIVE IN LOCATIONS NOTED ON
PLANS.
13. ALL DISTURBED LAWN AREAS SHALL BE SEEDED OR SODDED
AS NOTED. PERMANENT SODDED LAWNS SHALL BE SEED
MIX AS APPROVED BY LANDSCAPE ARCHITECT. SEED MIX
SHALL BE AN APPROVED BLUEGRASS BLEND.
14. ALL LAWNS SHALL BE GUARANTEED TO HAVE A FULL
UNIFORM STAND OF ACCEPTABLE GRASS AT THE END OF
THE ONE YEAR GUARANTEE PERIOD WITH NO BARE SPOTS
COMPRISING MORE THAN 2 OF ANY LAWN AREA. ANY
AREA SO NOTED WILL BE SEEDED OR SODDED UNTIL AN
ACCEPTABLE STAND OF GRASS IS ESTABLISHED.
ALL LANDSCAPE PLANTINGS TO BE MAINTAINED BY
CONTRACTOR FOR 60 DAYS FOLLOWING FINAL INSPECTION
BY LANDSCAPE ARCHITECT. ALL SEEDED LAWNS SHALL BE
MAINTAINED FOR 60 DAYS AND SODDED LAWNS 30 DAYS
FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT
AFTER WRITTEN REQUEST FROM THE LANDSCAPE
CONTRACTOR. MAINTENANCE TO INCLUDE WATERING WEEDING,
CULTIVATING, MULCHING, MOWING, AND ALL OTHER
NECESSARY OPERATIONS REQUIRED FOR PROPER
ESTABLISHMENT OF LAWNS AND PLANTINGS.
16. CONTRACTOR TO SUBMIT UNIT PRICES ON EVERY TYPE OF
WORK AS REQUIRED BY LANDSCAPE ARCHITECT.
17. ALL LAWN AREAS WITHIN LAWN LIMIT LINES TO RECEIVE
4 -6" APPROVED TOPSOIL PRIOR TO SEEDING OR
SODDING OPERATIONS.
18. BACKFILL FOR TREE PLANTING SHALL BE 75% APPROVED
TOPSOIL AND 25% APPROVED PEAT MOSS. TOP LAYER OF
BACKFILL SHALL BE 100% EXISTING TOPSOIL. A 5 -10 -5
ANALYSIS SLOW RELEASE FERTILIZER SHALL BE
INCORPORATED INTO BACKFILL AT APPROVED RATES.
19. ANY STAKES AND GUY WIRES USED TO PLANT TREES MUST
BE REMOVED WITHIN ONE YEAR.
PLACE BALL SLIGHTLY
HIGHER THAN FIN. GRADE.
MOUND SOIL OVER FLARE
RHODODENDRONS OTHER
ERICACEOUS PLANTS, PLACE
AND MOUND PEATMOSS
OVER FLARE MULCH
HEAVILY,
INSTALL FERTILIZER TABLETS
OR SPIKES
SOIL BACKFILL TO BE 75%
TOPSOIL 25% PEATMOSS
TAMPED TO PREVENT
SETTLEMENT.
UTILITY STATEM ENT:
The underground utilities shown have been located from field survey
information and existing drawings. The surveyor makes no guarantees
that the underground utilities comprise all such utilities in the area,
either in— service or abandoned. The surveyor further does not
warrant that the underground utilities shown are in the exact location
indicated although the surveyor does certify that they are located as
accurately as possible from information available. The surveyor has
not physically located the underground utilities.
1
EXIS LNG LEGEND:
f
DESCRIPTION:
DESCRIPTION:
PLANTING
SCHHDULH
WATER VALVE
EXISTING BRICK
�i
QUANTITY
KEY
BOTANICAL NAME
COMMON NAME
SIGN
SIZE
TEMPORARY BENCH MARK
n
MAILBOX
NOTES
TREES
BEEHIVE INLET
MONUMENT
Pm
INLET
12
GLE —T
GLEDITSIA TRIACANTHOS INERMIS SHADEMASTER
SHADEMASTER HONEY LOCUST
2
1/2" CAL.
B
B,
POWER POLE
16
GIN —B
GINKGO BILOBA
GINKGO
2
1/2" CAL.
B
B,
OVERHEAD ELECTRIC LINE
07
MAL —R
MALUS RED JEWEL
RED JEWEL CRABAPPLE
1
1/2" CAL.
B
B,
BORING
SHRUBS
WATER LINE
c
STAND PIPE
GAS LINE
144
EUO —A
EUONYMUS ALATA "COMPACTA"
DWARF BURNING BUSH
18"
B
B,
36" O.C.
45
JUN —C
JUNIPERUS CHINENSIS VAR. SARGENTII GLAUCA'
SARGENT JUNIPER
B
B,
48" O.C.
40
SPI —A
SPIREA X BUMALDA "ANTHONY WATERER"
ANTHONY WATERER SPIREA
18"
B
B,
24" O.C.
20 EUO —A
4) GIN —B
0
O
0
0
0
0
0
0
0
0
0
O
0
0
0
0
0
O
0
0
0
0
0
14 EUO —A
2) GIN -8
14 EUO —A
14 EUO —A
3) GIN —B
16 SPI —A
1) GLE —T
16 SPI —A
14 EUO —A
_)3 GIN —B
14 JUN —C
27 EUO —A
O
O
0
0
0
O
0
0
0
0
O
0 0
0
0
'r
4A
1/43:91/0 s s A1 ti
SEE
SOAPING
LANS
GIN —B
MAL —R
GLE —T
GLE —T
3 MAL —R
z
FINAL GRADE
DOUBLE STRAND 12 GA.
WIRE TWISHED IN RUBBER
HOSE 6" FROM TOP OF
STAKES 400 0114
SUITABLE CORD
BANDING
CREPE TREE BURLAP OR HEAVY �EE WRAP MATERIAL 1
PLACE SOIL BALL IS
SLIGHTLY HIGHER THAN I�
EXISTING GRADE, MOUND
SOIL OVER FLARE
i►
7 GLE —T
I GLE—T
IiHIIL =III
II HIIII III
Ii III =_I
I -1I1 ==111
SOIL BACKFILL TO BE 75%
TOPSOIL 25% PEAT
(TAMPED)
REMOVE BINDING
TREE PLANTING DETAIL
NTS
2 MAL —R
LEGEND:
i-
AU
(.1
C
D
LARGE DECIDUOUS TREE
ORNAMENTAL TREE
SHRUBS
EVERGREEN SHRUBS
SIGNS
3" LAYER OF SHEDDED
HARDWOOD MULCH
INSTALL FERTILIZER
TABLETS OR SPIKES
EARTH SAUCER
NOTE: STAKE GUY
1 TREES AS SHOWN IF
12" SITE CONDITIONS DICTATE
MAX.
EXISTING SUBSOIL OR
COMPACTED BACKFILL
WHEAT OR RYE
OATS
ANNUAL RYEGRASS
NON— IRRIGATED*
IRRIGATED
DORMAT SEEDING
NTS
ggi
TEMPORARY SEEDING DATES:
PERMANENT SEEDING DATES
►.•Di ❖VV
0• b0•�►4•004•4
JAN FEB MAR APR MAY JUN JUL
L
IRRIGATION NEEDED DURING THIS PERIOD. TO CONTROL
EROSION AT TIMES OTHER THAN IN THE SHADED AREAS,
USE MULCH.
LATE SUMMER SEEDING DATES MAY BE: EXTENDED 5 DAYS
IF MULCH IS APPLIED.
INCREASE SEEDING APPLICATION BY 50
FIGURE 5 -3
TEMPORARY SEEDING:
KIND OF SEED 1000 SQ.FT. ACRE REMARKS
WHEAT OR RYE 3.5 LBS. 2 BU. COVER SEED 1" TO 1 —1 /2" DEEP
SPRING OATS 2.3 LBS. 3 BU. COVER SEED TO 1 DEEP
ANNUAL RYEGRASS l LB. 40 LBS. COVER SEED TO 1/4" DEEP
NOT NECESSARY WHERE MULCH IS APPLIED.
SEEDING SCHEDULE
"DON'T
DIG
BLIND"
IN FEET
1 inch 60 ft.
SE OCT
_I
NOV DEC
"HOLEY MOLEY"
SEZ:
"IT'S THE
LAW"
INDIANA UNDERGROUND PROTECTION SERVICE INC.
CALL TWO WORKING DAYS BEFORE YOU DIG
1- 800 382 -5544
CALL TOLL FREE
1 -800- 428 -5200
FOR CALLS OUTSIDE OF INDIANA
N OTE:
Survey and boundary information provided
by AMERICAN CONSULTING, INC.. Survey
dated 11/15/02.
PLANTING NOTES:
1. IN CASE OF DISCREPANCIES BETWEEN THE PLAN AND THE 10. THE LANDSCAPE CONTRACTOR SHALL OBTAIN AND PAY FOR
PLANT LIST (IF SHOWN), THE PLAN SHALL DICTATE. ALL PERMITS AND FEES THAT MAY BE REQUIRED FOR HIS
PORTION OF WORK.
2. ALL SHRUB PLANTING AREAS TO BE COVERED W/ 3" LAYER
OF SHREDDED HARDWOOD BARK MULCH. ALL GROUND
COVER BEDS SHALL BE COVERED W/ 2" SHREDDED
HARDWOOD BARK MULCH. MULCH SHALL BE APPROVED BY
LANDSCAPE ARCHITECT AND SHALL BE UNIFORM IN TEXTURE
AND COLOR AND SHALL BE OBTAINED FROM SAWMILL OR
LUMBERING OPERATION. NO UTILITY MULCH OR PROCESSED
TREE TRIMMINGS WILL BE ALLOWED.
3. AN APPROVED PRE EMERGENT HERBICIDE SHALL BE
APPLIED IN ALL PLANTING BEDS AT A RATE SPECIFIED BY
MANUFACTURER FOR EACH PLANT VARIETY.
4. FINAL PLACEMENT OF PLANT MATERIALS, ETC. SHALL
BE APPROVED BY LANDSCAPE ARCHITECT BEFORE PLANTING
OPERATIONS ARE TO PROCEED. ALL TREE LOCATIONS
SHALL BE MARKED WITH A WOOD STAKE INDICATING VARIETY
AND SIZE OF TREE. ALL GROUND COVER AND PLANTING
BED LINES SHALL BE MARKED W/ HIGHLY VISIBLE PAINT
LINES W/ OCCASIONAL WOOD STAKES FOR REFERENCE. ALL
STAKES SHALL PE REMOVED FOLLOWING PLANTING
OPERATIONS. LANDSCAPE ARCHITECT RESERVES THE RIGHT
TO ADJUST PLANT LOCATIONS ON THE SITE.
5. NO SUBSTITUTIONS OF PLANT MATERIALS WILL BE ALLOWED.
IF PLANTS ARE NOT AVAILABLE, THE CONTRACTOR SHALL
NOTIFY LANDSCAPE ARCHITECT PRIOR TO BID IN WRITING. 15.
ALL PLANTS SHP_L RE INSPECTED AND TAGGED WITH
PROJECT I.D. AT NURSERY OR CONTRACTORS OPERATIONS
PRIOR TO tvi0ViNG TO JOB SITE. PLANTS MAY BE INSPECTED
AND APPROVED OR REJECTED ON THE JOB SITE BY
LANDSCAPE ARCHITECT.
6. ALL PLANTS SHALL MEET OR EXCEED AMERICAN STANDARDS
FOR NURSERY STOCK, 1996 EDITION, AS SET FORTH BY
AMERICAN ASSOCIATION OF NURSERYMEN.
7. PLANTS AND ALL OTHER MATERIALS TO BE STORED ON SITE
WILL BE PLACED WHERE THEY WILL NOT CONFLICT W/
CONSTRUCTION OPERATIONS AND AS DIRECTED BY
LANDSCAPE ARC !IECT.
8. ALL LANDSCAPE ;T NOS SHALL BE GUARANTEED FOR A
PERIOD OF ONE YEAR FOLLOWING FINAL INSPECTION BY
LANDSCAPE ARCHITECT. AT THE END OF THIS PERIOD,
PLANT MATERIAL TER ,AED DEAD OR UNSATISFACTORY BY
LANDSCAPE ARCHITECT SHALL BE REPLACED AT NO
ADDITIONAL. CHARGE BY THE LANDSCAPE CONTRACTOR,
9. LAWNS SHALL BE SODDED FOLLOWING SCARIFYING, FINAL
GRADING, FERTILIZING, AND RAKING. LAWN SHALL BE
FERTILIZED W/ 12 -12 -12 ANALYSIS FERT. AT A RATE OF
10Ibs. /1000s.f. AND LIME APPLIED AS DICTATED BY SOILS
TEST PRIOR TO SODDING.
EARTH SAUCER
FIN. GRADE
3" LF. CR OF SHREDDED
HARDWOOD BARK MULCH
EX, SOIL OR
FED BAL,KFILL
U PLANTING DETAIL
11. PEATMOSS TO BE USED ON PROJECT SHALL BE DOMESTIC
OR IMPORTED MATERIAL, CHOCOLATE BROWN IN COLOR AND
COMPOSED OF PARTIALLY DECOMPOSED VEGETABLE
MATERIAL. PEAT MOSS TO BE MILDLY ACIDIC IN CHARACTER
AND SHALL BE APPROVED BY LANDSCAPE ARCHITECT.
12. LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE
ARCHITECT IN WRITING PRIOR TO BID DATE OF ANY PLANTS
HE /SHE FEELS MAY NOT SURVIVE IN LOCATIONS NOTED ON
PLANS.
13. ALL DISTURBED LAWN AREAS SHALL BE SEEDED OR SODDED
AS NOTED. PERMANENT SODDED LAWNS SHALL BE SEED
MIX AS APPROVED BY LANDSCAPE ARCHITECT. SEED MIX
SHALL BE AN APPROVED BLUEGRASS BLEND.
14. ALL LAWNS SHALL BE GUARANTEED TO HAVE A FULL
UNIFORM STAND OF ACCEPTABLE GRASS AT THE END OF
THE ONE YEAR GUARANTEE PERIOD WITH NO BARE SPOTS
COMPRISING MORE THAN 2 OF ANY LAWN AREA. ANY
AREA SO NOTED WILL BE SEEDED OR SODDED UNTIL AN
ACCEPTABLE STAND OF GRASS IS ESTABLISHED.
ALL LANDSCAPE PLANTINGS TO BE MAINTAINED BY
CONTRACTOR FOR 60 DAYS FOLLOWING FINAL INSPECTION
BY LANDSCAPE ARCHITECT. ALL SEEDED LAWNS SHALL BE
MAINTAINED FOR 60 DAYS AND SODDED LAWNS 30 DAYS
FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT
AFTER WRITTEN REQUEST FROM THE LANDSCAPE
CONTRACTOR. MAINTENANCE TO INCLUDE WATERING WEEDING,
CULTIVATING, MULCHING, MOWING, AND ALL OTHER
NECESSARY OPERATIONS REQUIRED FOR PROPER
ESTABLISHMENT OF LAWNS AND PLANTINGS.
16. CONTRACTOR TO SUBMIT UNIT PRICES ON EVERY TYPE OF
WORK AS REQUIRED BY LANDSCAPE ARCHITECT.
17. ALL LAWN AREAS WITHIN LAWN LIMIT LINES TO RECEIVE
4 -6" APPROVED TOPSOIL PRIOR TO SEEDING OR
SODDING OPERATIONS.
18. BACKFILL FOR TREE PLANTING SHALL BE 75% APPROVED
TOPSOIL AND 25% APPROVED PEAT MOSS. TOP LAYER OF
BACKFILL SHALL BE 100% EXISTING TOPSOIL. A 5 -10 -5
ANALYSIS SLOW RELEASE FERTILIZER SHALL BE
INCORPORATED INTO BACKFILL AT APPROVED RATES.
19. ANY STAKES AND GUY WIRES USED TO PLANT TREES MUST
BE REMOVED WITHIN ONE YEAR.
PLACE BALL SLIGHTLY
HIGHER THAN FIN. GRADE.
MOUND SOIL OVER FLARE
RHODODENDRONS OTHER
ERICACEOUS PLANTS, PLACE
AND MOUND PEATMOSS
OVER FLARE MULCH
HEAVILY,
INSTALL FERTILIZER TABLETS
OR SPIKES
SOIL BACKFILL TO BE 75%
TOPSOIL 25% PEATMOSS
TAMPED TO PREVENT
SETTLEMENT.
UTILITY STATEM ENT:
The underground utilities shown have been located from field survey
information and existing drawings. The surveyor makes no guarantees
that the underground utilities comprise all such utilities in the area,
either in— service or abandoned. The surveyor further does not
warrant that the underground utilities shown are in the exact location
indicated although the surveyor does certify that they are located as
accurately as possible from information available. The surveyor has
not physically located the underground utilities.
1
EXIS LNG LEGEND:
f
DESCRIPTION:
DESCRIPTION:
EXISTING ASPHALT
W
VI
WATER VALVE
EXISTING BRICK
�i
FIRE HYDRANT
EXISTING CONCRETE
SIGN
TEMPORARY BENCH MARK
n
MAILBOX
SECTION CORNER
BEEHIVE INLET
MONUMENT
Pm
INLET
REBAR FOUND /REBAR SET
(019
DRAINAGE MANHOLE
PK NAIL FOUND
CURB INLET
a
POWER POLE
c
DECIDUOUS TREE
GUY WIRE
CONIFEROUS TREE
[fJ
TELEPHONE PEDESTAL
-o i e.
OVERHEAD ELECTRIC LINE
TRAFFIC POLE
ele
UNDERGROUND ELECTRIC
r=
SANITARY MANHOLE
-te
UNDERGROUND TELEPHONE
BORING
WATER LINE
c
STAND PIPE
GAS LINE
20 EUO —A
4) GIN —B
0
O
0
0
0
0
0
0
0
0
0
O
0
0
0
0
0
O
0
0
0
0
0
14 EUO —A
2) GIN -8
14 EUO —A
14 EUO —A
3) GIN —B
16 SPI —A
1) GLE —T
16 SPI —A
14 EUO —A
_)3 GIN —B
14 JUN —C
27 EUO —A
O
O
0
0
0
O
0
0
0
0
O
0 0
0
0
'r
4A
1/43:91/0 s s A1 ti
SEE
SOAPING
LANS
GIN —B
MAL —R
GLE —T
GLE —T
3 MAL —R
z
FINAL GRADE
DOUBLE STRAND 12 GA.
WIRE TWISHED IN RUBBER
HOSE 6" FROM TOP OF
STAKES 400 0114
SUITABLE CORD
BANDING
CREPE TREE BURLAP OR HEAVY �EE WRAP MATERIAL 1
PLACE SOIL BALL IS
SLIGHTLY HIGHER THAN I�
EXISTING GRADE, MOUND
SOIL OVER FLARE
i►
7 GLE —T
I GLE—T
IiHIIL =III
II HIIII III
Ii III =_I
I -1I1 ==111
SOIL BACKFILL TO BE 75%
TOPSOIL 25% PEAT
(TAMPED)
REMOVE BINDING
TREE PLANTING DETAIL
NTS
2 MAL —R
LEGEND:
i-
AU
(.1
C
D
LARGE DECIDUOUS TREE
ORNAMENTAL TREE
SHRUBS
EVERGREEN SHRUBS
SIGNS
3" LAYER OF SHEDDED
HARDWOOD MULCH
INSTALL FERTILIZER
TABLETS OR SPIKES
EARTH SAUCER
NOTE: STAKE GUY
1 TREES AS SHOWN IF
12" SITE CONDITIONS DICTATE
MAX.
EXISTING SUBSOIL OR
COMPACTED BACKFILL
WHEAT OR RYE
OATS
ANNUAL RYEGRASS
NON— IRRIGATED*
IRRIGATED
DORMAT SEEDING
NTS
ggi
TEMPORARY SEEDING DATES:
PERMANENT SEEDING DATES
►.•Di ❖VV
0• b0•�►4•004•4
JAN FEB MAR APR MAY JUN JUL
L
IRRIGATION NEEDED DURING THIS PERIOD. TO CONTROL
EROSION AT TIMES OTHER THAN IN THE SHADED AREAS,
USE MULCH.
LATE SUMMER SEEDING DATES MAY BE: EXTENDED 5 DAYS
IF MULCH IS APPLIED.
INCREASE SEEDING APPLICATION BY 50
FIGURE 5 -3
TEMPORARY SEEDING:
KIND OF SEED 1000 SQ.FT. ACRE REMARKS
WHEAT OR RYE 3.5 LBS. 2 BU. COVER SEED 1" TO 1 —1 /2" DEEP
SPRING OATS 2.3 LBS. 3 BU. COVER SEED TO 1 DEEP
ANNUAL RYEGRASS l LB. 40 LBS. COVER SEED TO 1/4" DEEP
NOT NECESSARY WHERE MULCH IS APPLIED.
SEEDING SCHEDULE
"DON'T
DIG
BLIND"
IN FEET
1 inch 60 ft.
SE OCT
_I
NOV DEC
"HOLEY MOLEY"
SEZ:
"IT'S THE
LAW"
INDIANA UNDERGROUND PROTECTION SERVICE INC.
CALL TWO WORKING DAYS BEFORE YOU DIG
1- 800 382 -5544
CALL TOLL FREE
1 -800- 428 -5200
FOR CALLS OUTSIDE OF INDIANA
N OTE:
Survey and boundary information provided
by AMERICAN CONSULTING, INC.. Survey
dated 11/15/02.
PLANTING NOTES:
1. IN CASE OF DISCREPANCIES BETWEEN THE PLAN AND THE 10. THE LANDSCAPE CONTRACTOR SHALL OBTAIN AND PAY FOR
PLANT LIST (IF SHOWN), THE PLAN SHALL DICTATE. ALL PERMITS AND FEES THAT MAY BE REQUIRED FOR HIS
PORTION OF WORK.
2. ALL SHRUB PLANTING AREAS TO BE COVERED W/ 3" LAYER
OF SHREDDED HARDWOOD BARK MULCH. ALL GROUND
COVER BEDS SHALL BE COVERED W/ 2" SHREDDED
HARDWOOD BARK MULCH. MULCH SHALL BE APPROVED BY
LANDSCAPE ARCHITECT AND SHALL BE UNIFORM IN TEXTURE
AND COLOR AND SHALL BE OBTAINED FROM SAWMILL OR
LUMBERING OPERATION. NO UTILITY MULCH OR PROCESSED
TREE TRIMMINGS WILL BE ALLOWED.
3. AN APPROVED PRE EMERGENT HERBICIDE SHALL BE
APPLIED IN ALL PLANTING BEDS AT A RATE SPECIFIED BY
MANUFACTURER FOR EACH PLANT VARIETY.
4. FINAL PLACEMENT OF PLANT MATERIALS, ETC. SHALL
BE APPROVED BY LANDSCAPE ARCHITECT BEFORE PLANTING
OPERATIONS ARE TO PROCEED. ALL TREE LOCATIONS
SHALL BE MARKED WITH A WOOD STAKE INDICATING VARIETY
AND SIZE OF TREE. ALL GROUND COVER AND PLANTING
BED LINES SHALL BE MARKED W/ HIGHLY VISIBLE PAINT
LINES W/ OCCASIONAL WOOD STAKES FOR REFERENCE. ALL
STAKES SHALL PE REMOVED FOLLOWING PLANTING
OPERATIONS. LANDSCAPE ARCHITECT RESERVES THE RIGHT
TO ADJUST PLANT LOCATIONS ON THE SITE.
5. NO SUBSTITUTIONS OF PLANT MATERIALS WILL BE ALLOWED.
IF PLANTS ARE NOT AVAILABLE, THE CONTRACTOR SHALL
NOTIFY LANDSCAPE ARCHITECT PRIOR TO BID IN WRITING. 15.
ALL PLANTS SHP_L RE INSPECTED AND TAGGED WITH
PROJECT I.D. AT NURSERY OR CONTRACTORS OPERATIONS
PRIOR TO tvi0ViNG TO JOB SITE. PLANTS MAY BE INSPECTED
AND APPROVED OR REJECTED ON THE JOB SITE BY
LANDSCAPE ARCHITECT.
6. ALL PLANTS SHALL MEET OR EXCEED AMERICAN STANDARDS
FOR NURSERY STOCK, 1996 EDITION, AS SET FORTH BY
AMERICAN ASSOCIATION OF NURSERYMEN.
7. PLANTS AND ALL OTHER MATERIALS TO BE STORED ON SITE
WILL BE PLACED WHERE THEY WILL NOT CONFLICT W/
CONSTRUCTION OPERATIONS AND AS DIRECTED BY
LANDSCAPE ARC !IECT.
8. ALL LANDSCAPE ;T NOS SHALL BE GUARANTEED FOR A
PERIOD OF ONE YEAR FOLLOWING FINAL INSPECTION BY
LANDSCAPE ARCHITECT. AT THE END OF THIS PERIOD,
PLANT MATERIAL TER ,AED DEAD OR UNSATISFACTORY BY
LANDSCAPE ARCHITECT SHALL BE REPLACED AT NO
ADDITIONAL. CHARGE BY THE LANDSCAPE CONTRACTOR,
9. LAWNS SHALL BE SODDED FOLLOWING SCARIFYING, FINAL
GRADING, FERTILIZING, AND RAKING. LAWN SHALL BE
FERTILIZED W/ 12 -12 -12 ANALYSIS FERT. AT A RATE OF
10Ibs. /1000s.f. AND LIME APPLIED AS DICTATED BY SOILS
TEST PRIOR TO SODDING.
EARTH SAUCER
FIN. GRADE
3" LF. CR OF SHREDDED
HARDWOOD BARK MULCH
EX, SOIL OR
FED BAL,KFILL
U PLANTING DETAIL
11. PEATMOSS TO BE USED ON PROJECT SHALL BE DOMESTIC
OR IMPORTED MATERIAL, CHOCOLATE BROWN IN COLOR AND
COMPOSED OF PARTIALLY DECOMPOSED VEGETABLE
MATERIAL. PEAT MOSS TO BE MILDLY ACIDIC IN CHARACTER
AND SHALL BE APPROVED BY LANDSCAPE ARCHITECT.
12. LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE
ARCHITECT IN WRITING PRIOR TO BID DATE OF ANY PLANTS
HE /SHE FEELS MAY NOT SURVIVE IN LOCATIONS NOTED ON
PLANS.
13. ALL DISTURBED LAWN AREAS SHALL BE SEEDED OR SODDED
AS NOTED. PERMANENT SODDED LAWNS SHALL BE SEED
MIX AS APPROVED BY LANDSCAPE ARCHITECT. SEED MIX
SHALL BE AN APPROVED BLUEGRASS BLEND.
14. ALL LAWNS SHALL BE GUARANTEED TO HAVE A FULL
UNIFORM STAND OF ACCEPTABLE GRASS AT THE END OF
THE ONE YEAR GUARANTEE PERIOD WITH NO BARE SPOTS
COMPRISING MORE THAN 2 OF ANY LAWN AREA. ANY
AREA SO NOTED WILL BE SEEDED OR SODDED UNTIL AN
ACCEPTABLE STAND OF GRASS IS ESTABLISHED.
ALL LANDSCAPE PLANTINGS TO BE MAINTAINED BY
CONTRACTOR FOR 60 DAYS FOLLOWING FINAL INSPECTION
BY LANDSCAPE ARCHITECT. ALL SEEDED LAWNS SHALL BE
MAINTAINED FOR 60 DAYS AND SODDED LAWNS 30 DAYS
FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT
AFTER WRITTEN REQUEST FROM THE LANDSCAPE
CONTRACTOR. MAINTENANCE TO INCLUDE WATERING WEEDING,
CULTIVATING, MULCHING, MOWING, AND ALL OTHER
NECESSARY OPERATIONS REQUIRED FOR PROPER
ESTABLISHMENT OF LAWNS AND PLANTINGS.
16. CONTRACTOR TO SUBMIT UNIT PRICES ON EVERY TYPE OF
WORK AS REQUIRED BY LANDSCAPE ARCHITECT.
17. ALL LAWN AREAS WITHIN LAWN LIMIT LINES TO RECEIVE
4 -6" APPROVED TOPSOIL PRIOR TO SEEDING OR
SODDING OPERATIONS.
18. BACKFILL FOR TREE PLANTING SHALL BE 75% APPROVED
TOPSOIL AND 25% APPROVED PEAT MOSS. TOP LAYER OF
BACKFILL SHALL BE 100% EXISTING TOPSOIL. A 5 -10 -5
ANALYSIS SLOW RELEASE FERTILIZER SHALL BE
INCORPORATED INTO BACKFILL AT APPROVED RATES.
19. ANY STAKES AND GUY WIRES USED TO PLANT TREES MUST
BE REMOVED WITHIN ONE YEAR.
PLACE BALL SLIGHTLY
HIGHER THAN FIN. GRADE.
MOUND SOIL OVER FLARE
RHODODENDRONS OTHER
ERICACEOUS PLANTS, PLACE
AND MOUND PEATMOSS
OVER FLARE MULCH
HEAVILY,
INSTALL FERTILIZER TABLETS
OR SPIKES
SOIL BACKFILL TO BE 75%
TOPSOIL 25% PEATMOSS
TAMPED TO PREVENT
SETTLEMENT.
UTILITY STATEM ENT:
The underground utilities shown have been located from field survey
information and existing drawings. The surveyor makes no guarantees
that the underground utilities comprise all such utilities in the area,
either in— service or abandoned. The surveyor further does not
warrant that the underground utilities shown are in the exact location
indicated although the surveyor does certify that they are located as
accurately as possible from information available. The surveyor has
not physically located the underground utilities.
1