HomeMy WebLinkAbout03090025 St. Christopher Episcopal Church Exapnsion pg. DEXISTING
CHURCH
TEMPORARY DRIVE
20' SB
1
60' 1/2 RAW
ler
24 SPACES
i
1 .11111111111111111 ININIIIII
1_ .1111... 1
au.ss ur sam
PHASE 1 i
(CLASSROOM)
BUILDING
0
0
20' SB
I,
uI I-
i imi
L6
ii
ill
.1 IVV
A
ii Iii
il :I
ratrararrarturairsionrarsionescoinie
.a,
PHASE 1 SIT
C1.01 1" 30'
PLAN
90' RAW
Architects
WOOLLEN, MOLZAN
AND PARTNERS, INC
ARCHITECTURE
47 South Pennsylvania Street Suite 1000 Indianapolis, IN 4620A
317.632.7484. 317.687.2064 (fax) www.woollenmolzan.corr
Civil Structural Engineers
ARSEE ENGINEERS, INC.
14500 EAST 136TH STREET
NOBLESVILLE, INDIANA 46060 -9480
Telephone: (317) 485 -5152
Fax: (317) 485 -5616
E -mail: Imodlin @arsee- engineers.com
Mechanical Electrical Plumbing Engineers
R.E. Dimond
and Associates, Inc.
Consulting Engineers
732 North Capitol Avenue
Indianapolis, Indiana 46204
Telephone: (317)634 -4672
Fax: (317)638 -8725
E -mail:
tion siC
LEN L.,
CL)
s
U
+114
(13
wow 0
o Lim
Q.
INC 0 c
7 U
(13
maw ft
CC
Z E
ton LLIII
DEVELOPMENT PLAN REVIEW
Certified by
Date
Drawn
xxx
Drawing Name
Sheet No.
July 10, 2003
PHASE 1
SITE PLAN
Checked
YYY
C2.02