HomeMy WebLinkAbout03100005 Construction Plans for National Bank of Indianapolis pg. 7SPECIES
EROSION CONTROL MEASURE
SITE SUITABILITY
MAINTENANCE
LBS /ACRE
INSTALLATION SEQUENCE
STONE ENTRANCE
AS NEEDED
[GNS,
LEVEL AND SLOPING, OPEN AREAS
1. TALL FESCUE
T STE
IS, IN
SILT FENCE
WEEKLY, AFTER
STORM
EVENTS AND AS
NEEDED
PRIOR TO CLEARING AND GRADING
EXISTING INLET PROTECTION
WEEKLY, AFTER
STORM
EVENTS AND AS
NEEDED
PRIOR TO CLEARING AND GRADING
TREE PROTECTION
WEEKLY, AFTER
STORM
EVENTS AND AS
NEEDED
PRIOR TO CLEARING AND GRADING
I
WEEKLY, AFTER
STORM
EVENTS AND AS
NEEDED
ALONG WITH ROUGH GRADING
TEMPORARY SEEDING
x ,01 i 111/11
ms s 9 o R. iio
:::1 N9 .33 PE880303
imi STATE OF
-PO VDI ANP.
,9 /ONAL ,s
c- R- 1 1 4,_
DATE: 10/02/2003
15
AFTER ROUGH GRADING
PERMANENT SEEDING
106th STREET& MICHIGAN ROAD
20 -35
12 -18
AFTER FINISH GRADING
EROSION CONTROL MATTING
WEEKLY, AFTER
STORM
EVENTS AND AS
NEEDED
AFTER FINISH GRADING
STRAW BALES
WEEKLY, AFTER
STORM
EVENTS AND AS
NEEDED
CON1
INLET PROTECTION
WEEKLY, AFTER
STORM
EVENTS AND AS
NEEDED
AFTER EACH INLET IS PLACED
DWN BY: KR C
CHKD. BY: R R H
SCALE: AS NOTED
DATE: 1 0/02/03 J
PROJECT NUMBER
03202
DESIGN PHASE
DEVELOPMENT
r PLAN NUMBER
C4A
SHEET OF
N/A
SPECIES
EROSION CONTROL SCHEDULE
EROSION CONTROL MEASURE
SITE SUITABILITY
MAINTENANCE
LBS /ACRE
INSTALLATION SEQUENCE
STONE ENTRANCE
AS NEEDED
WET
LEVEL AND SLOPING, OPEN AREAS
1. TALL FESCUE
PRIOR TO CLEARING AND GRADING
SILT FENCE
WEEKLY, AFTER
STORM
EVENTS AND AS
NEEDED
PRIOR TO CLEARING AND GRADING
EXISTING INLET PROTECTION
WEEKLY, AFTER
STORM
EVENTS AND AS
NEEDED
PRIOR TO CLEARING AND GRADING
TREE PROTECTION
WEEKLY, AFTER
STORM
EVENTS AND AS
NEEDED
PRIOR TO CLEARING AND GRADING
TEMPORARY DIVERSIONS
WEEKLY, AFTER
STORM
EVENTS AND AS
NEEDED
ALONG WITH ROUGH GRADING
TEMPORARY SEEDING
WATER AS NEEDED
CREEPING RED FESCUE
15
AFTER ROUGH GRADING
PERMANENT SEEDING
WATER AS NEEDED
20 -35
12 -18
AFTER FINISH GRADING
EROSION CONTROL MATTING
WEEKLY, AFTER
STORM
EVENTS AND AS
NEEDED
AFTER FINISH GRADING
STRAW BALES
WEEKLY, AFTER
STORM
EVENTS AND AS
NEEDED
AFTER FINISH GRADING
INLET PROTECTION
WEEKLY, AFTER
STORM
EVENTS AND AS
NEEDED
AFTER EACH INLET IS PLACED
2
1
1
EMERALD CROWNVETCH
10
.25
REMOVAL OF TREE PROTECTION
N/A
2
15 -20
LAWNS AND HIGH MAINTENANCE AREAS
AFTER PERMANENT SEEDING
REMOVAL OF STRAW BALES
N/A
5.8 -7.5
2
1
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF INLET PROTECTION
N/A
.9
LOW
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF SILT FENCE
N/A
170
4.0
5.0 -7.5
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
SPECIES
SEEDING RATE
SUITABLE pH
SITE SUITABILITY
MAY
LBS /ACRE
LBS /1000
SQ. FT.
DROUGHTY
WELL
DRAINED
WET
LEVEL AND SLOPING, OPEN AREAS
1. TALL FESCUE
35
.8
5.5 -8.3
2
1
2
2. TALL FESCUE
25
.6
5.5 -8.3
SPRING OATS
1
3 BU.
RED CLOVER
5
.12
1
20 -25
ANNUAL RYEGRASS
1 LB.
3. KENTUCKY BLUEGRASS
15
.4
5.8 -7.5
2
1
2
CREEPING RED FESCUE
15
.4
20 -35
12 -18
STEEP BANKS AND CUTS
4. TALL FESCUE
15
.4
5.8 -7.5
2
1
2
KENTUCKY BLUEGRASS
25
.6
LOW
1
24 -35
24 -36
5. TALL FESCUE
35
.8
5.5 -8.3
2
1
1
EMERALD CROWNVETCH
10
.25
2
H
HIGH
2
15 -20
LAWNS AND HIGH MAINTENANCE AREAS
6. KENTUCKY BLUEGRASS
40
.9
5.8 -7.5
2
1
1
CREEPING RED FESCUE
40
.9
LOW
1
5 -10
7. PERENNIAL RYEGRASS
170
4.0
5.0 -7.5
1
(TURF TYPE)
2
MED.
1
8. TALL FESCUE
170
4.0
5.5 -8.3
2
1
2
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV DEC
DEC
x
4
DRY
WHEAT OR RYE
3.5 LBS.
2 8U.
COVER SEED 1" TO 1 1/2" DEEP
r
CREEPING RED FESCUE
FESTUCA 3RA
L
SPRING OATS
2.3 LBS.
3 BU.
COVER SEED 1" DEEP
kN
1
20 -25
ANNUAL RYEGRASS
1 LB.
40 LB.
COVER SEED 1 /4" DEEP
l
;N
i
1
2
Vi i!!/
/�1�
1
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
x
4
DRY
WHEAT OR RYE
3.5 LBS.
2 8U.
COVER SEED 1" TO 1 1/2" DEEP
r
CREEPING RED FESCUE
FESTUCA 3RA
L
SPRING OATS
2.3 LBS.
3 BU.
COVER SEED 1" DEEP
kN
1
20 -25
ANNUAL RYEGRASS
1 LB.
40 LB.
COVER SEED 1 /4" DEEP
S
;N
i
1
2
Vi i!!/
/�1�
1
1
20 -35
12 -18
10 -20
EROSION CONTROL
Al STRAW BALE MAINTENANCE REQUIREMENTS:
1. INSPECT ;TRA., BALE DAMS AFTER EACH STORM EVENT AND PROMPTLY E ANY
SEDIMENT DEPOSIT: TO ENSURE ADEQUATE STORAGE FOR OR 1f E NEXT RAIN,
TAKING CARE NOT TO UNDERMINE THE ENTRENCHED BALES.
2. INSPECT PERIODICALLY R DETERIORATION OR DAMAGE FROM CONSTRUCTION
ACTIVITIES AND REPAIR IMMEDIATELY.
3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL
STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE IT.
SILT FENCE INTENANCE REQUIREMENTS:
1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES
INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY.
3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT
ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE.
4. TAKE E TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE
AND RENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS:
1. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT IMMEDIATELY
REPAIR ANY EROSION AND PIPING HOLES.
2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF' THE DESIGN DEPTH.
3. REPLACE SPILLWAY GRAVEL FACING IF CLOGGED.
4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY.
5. CHECK THE SPILLWAY DEPTH PERIODICALLY TO ENSURE A MINIMUM OF 1.5 FT. DEPTH
FROM LOWEST POINT OF THE SETTLED EMBANKMENT TO HIGHEST POINT OF THE
SPILLWAY CREST, AND FILL ANY LOW AREAS TO MAINTAIN DESIGN ELEVATION.
6. PROMPTLY REPLACE ANY DISPLACED RIP RAP, BEING CAREFUL THAT NO STONES IN THE
SPILLWAY ARE ABOVE DESIGN GRADE.
7. AFTER ALL DISTURBED AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE AND
SMOOTH THE DISTURBED AREA TO BLEND WITH ADJOINING AREAS, AND STABILIZE.
EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS:,
1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY
EROSION BELOW THE BLANKET.
2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET
COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET.
3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS:
1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM
EVENTS OR HEAVY USE.
2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
3. TOP DRESS WITH CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS
BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS
CONVEYED INTO A SEDIMENT TRAP OR BASIN.
5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
1 GOOD
2 MEDIUM
IT
SEEDBED PREPARATION
SEED TOLERANCE
SALT TOLERANCE (TO BOTH SOIL SALTS SPRAY)
T TOLERANCE
MT MEDIUM TOLERANCE
S SLIGHT TOLERANCE
APPLY LIME 0 RAISE THE pH TO THE LEVEL NEEDED FOR SPECIES BEING
SEEDED. APPLY 3 POUNDS OF 12 -12 -12 ANALYSIS FERTILIZER (OR EQUIVALENT) PER
1000 SQ. FT. (APPROXIMATELY 1000 POUNDS PER ACRE) OR FERTILIZE ACCORDING TO
TEST. APPLICATION OF 150 LBS. OF AMMONIUM NITRATE ON AREAS LOW IN ORGANIC
MATTER AND FERTILITY WILL GREATLY ENHANCE VEGETATIVE GROWTH.
WORK THE FERTILIZER AND LIME INTO THE SOIL TO A DEPTH OF 2 -3 INCHES
WITH A HARROW, DISK OR RAKE OPERATED ACROSS THE SLOPE AS MUCH AS POSSIBLE.
SEEDING
SELECT A SEED MIXTURE BASED ON PROJECTED USE OF THE AREA (SEE
PERMANENT SEED MIXTURE CHART). WHILE CONSIDERING BEST SEEDING DATES.
IF PERMANENT SEEDING IS NOT PERMITTED USE TEMPORARY SEEDING
UNTIL PERMANENT SEEDING CAN BE APPLIED. IF TOLERANCES ARE A PROBLEM, SUCH AS
SALT TOLERANCE OF SEEDINGS ADJACENT TO STREETS AND HIGHWAYS, SEE
SEED TOLERANCE CHART.
EROSION AND SEDIMENT CONTROL
PLAN SUMMARY AND "RULE 5" DATA
PROJECT: THE NATIONAL BANK OF INDIANAPOLIS
NATURE AND PURPOSE: BANK
ESTIMATED START: OCTOBER 2003
ESTIMATED COMPLETION OF SITE DEVELOPMENT: JUNE 2004
FLOODPLAINS, FLOODWAY FRINGES, FLOODWAYS: N/A
STREAMS, CHANNELS, DITCHES, WETLANDS, ETC.: N/A
EXISTING SOIL TYPES DESCRIPTION
CROSBY SILT LOAM: DEEP, SOMEWHAT POORLY DRAINED SOIL
BROOKSTON SILT LOAM: DEEP, POORLY DRAINED SOIL
RECEIVING WATERS: CEMETERY CREEK
POTENTIAL AREAS WHERE STORMWATER MAY ENTER GROUNDWATER: NONE KNOWN
EXISTING VEGETATION:
THE SITE IS CURRENTLY COVERED WITH GRASS AND CULTIVATED FIELDS.
CONTACT PERSON:
UNKNOWN
ADJACENT LAND USE:
NORTH RESIDENTIAL AGRICULTURAL
SOUTH RESIDENTIAL AGRICULTURAL
EAST COMMERCIAL SR 421
WEST RESIDENTIAL
SITE SPECIFIC SEQUENCE AND ADDITIONAL NOTES:
THE PERIMETER SILT FENCES SHOULD BE CONSTRUCTED AND STABILIZED AS EARLY AS PRACTICAL TO PREVENT
RUN -OFF FROM LEAVING THE SITE OR CLEAN OFF -SITE WATER FROM WASHING THROUGH THE SITE. EROSION
CONTROL AND INLET PROTECTION SHALL BE INSTALLED IMMEDIATELY AFTER INSTALLATION OF STORM SEWERS.
SEED TOLERANCE CHART
1 PREFERRED 2 WILL TOLERATE INOCULATE WITH SPECIFIC INOCULANT.
SEEDING DETAIL
WHEAT OR RYE
OATS
ANNUAL RYEGRASS
NON -IRRIGATED*
IRRIGATED
DORMANT
SEEDING
TEMPORARY SEEDING DATES
PERMANENT SEEDING DATES
NOT NECESSARY WHERE MULCH IS APPLIED.
EXTEND FABRIC
TO 4" BELOW
SURFACE
FILTER FABRIC
IRRIGATION NEEDED DURING THIS PERIOD. TO CONTROL
EROSION AT TIMES OTHER THAN IN THE SHADED AREAS,
USE MULCH.
LATE SUMMER SEEDING DATES MAY BE EXTENDED 5 DAYS
IF MULCH IS APPLIED.
INCREASE SEEDING APPLICATION BY 50
NON WOVEN
GEOTEXTILE
FABRIC
\\*\Ys
FLOW
J
N
12" MINIMUM
THICKNESS
#2 COARSE
AGGREGATE
SPACE POSTS PER
MANUFACTURER
RECOMMENDATIONS
POST
SILT FENCE CONSTRUCTION
NOT TO SCALE
GEOTEXTILE FABRIC TO STABILIZE
FOUNDATION (ESPECIALLY IMPORTANT
WHERE WETNESS IS ANTICIPATED)
TEMPORARY CONSTRUCTION ENTRANCE
NOT TO SCALE
SLOPE
LENGTH
FT.
300
275
250
225
200
175
150
125
100
75
50
25
NOTE:
POSTS SHALL HAVE A MINIMUM LENGTH OF
36 INCHES PLUS BURIAL DEPTH. POST MATERIAL
SHALL BE WOOD, STEEL, OR SYNTHETIC, AND SHALL
BE OF SUFFICIENT STRENGTH TO RESIST DAMAGE
DURING INSTALLATION AND TO SUPPORT APPLIED
LOADS.
FABRIC SHALL BE A WOVEN GEOTEXTILE FABRIC
CONSISTING OF STRONG, ROT RESISTANT,
MATERIALS RESISTANT TO DETERIORATION FROM
ULTRAVIOLET AND HEAT EXPOSURE.
SI
A
3'
1 STAPLE PER SQ. YD.
4:1
/N
3:1
x
x
x
io
1 1/2"
GENERAL STAPLE RECOMMENDATIONS
x
x
x
x
x
B
A
C
B
A
C
B
C
B
C
2:1
SLOPE GRADIENT
1:1
B
3' 1 1/2"
1
111 STAPLES PER SQ. YD.
CHANNEL
LINING
COMPACTED SOIL
TO PREVENT PIPING
j
STACKED
SAND BAGS
EROSION CONTROL MAT INSTALLATION GUIDE DETAIL
NOT TO SCALE
NOTES;
1. SANDBAGS TO CONSIST OF BURLAP OR WOVEN
GEOTEXTILE FABRIC, MUST BE FILLED WITH
GRAVEL, LAYERED AND PACKED TIGHTLY.
2. SANDBAGS TO BE STACKED TWO OR THREE HIGH.
3. ONE SANDBAG TO BE LEFT OUT OF TOP ROW TO
PROVIDE A SPILLWAY FOR OVERFLOW.
4. SANDBAGS TO BE USED AFTER PAVEMENT INSTALLATION.
PRIOR TO PAVEMENT INSTALLATION, STRAW BALE
PROTECTION IS TO BE USED.
5. SANDBAGS TO BE PLACED AROUND NEW DRAINAGE
STRUCTURES TO PREVENT SILT AND DEBRIS FROM
ENTERING DOWNSTREAM DRAINAGE FACILITIES.
SANDBAGS SHALL BE MAINTAINED UNTIL ALL SITE
WORK IS COMPLETE.
3'
x
SECTION
STORM INLET SAND
BAG PROTECTION
NOT TO SCALE
C
x
PLAN
2 STAPLES PER SQ. YD.
a
STORM INLET
STRUCTURE
SAND BAGS TO BE
PRESSED AGAINST STRUCTURE
AND GROUND TO CREATE
SUFFICIENT SEAL
ADDITIONAL STAPLES AS REQUIRED
DUE TO DEPTH OF FLOW
NOTES
CHANNEL LININGS UTILIZE STAPLE PATTERN "C"
WITH ADDITIONAL STAPLES ON SIDE SLOPES AT
PROJECTED WATER LINE.
STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN GREEN
EROSION CONTROL BLANKETS. STAPLE PATTERNS MAY VARY
DEPENDING UPON SOIL TYPE AND AVERAGE RAINFALL.
AT SLOPE LENGTHS GREATER THAN 300 FEET OR WHERE
DRAINAGE OVER LARGE AREAS IS DIRECTED ONTO THE BLANKETS,
STAPLE PATTERN "C" SHOULD BE UTILIZED.
1
TEMPORARY SEEDINGS
SHADE
TOLERANCE
CLOSE MOWING
TO 2 -3 1 /2 INCHES
TRAMPING
TOLERANCE
FERTILITY
NEEDS
TYPE OF SEED
1000 SQ. FT.
ACRE
REMARKS
SOIL
TOLERANCE
WET
x
4
DRY
WHEAT OR RYE
3.5 LBS.
2 8U.
COVER SEED 1" TO 1 1/2" DEEP
440.4
CREEPING RED FESCUE
FESTUCA 3RA
2
SPRING OATS
2.3 LBS.
3 BU.
COVER SEED 1" DEEP
/K
MED.
1
20 -25
ANNUAL RYEGRASS
1 LB.
40 LB.
COVER SEED 1 /4" DEEP
EROSION CONTROL
Al STRAW BALE MAINTENANCE REQUIREMENTS:
1. INSPECT ;TRA., BALE DAMS AFTER EACH STORM EVENT AND PROMPTLY E ANY
SEDIMENT DEPOSIT: TO ENSURE ADEQUATE STORAGE FOR OR 1f E NEXT RAIN,
TAKING CARE NOT TO UNDERMINE THE ENTRENCHED BALES.
2. INSPECT PERIODICALLY R DETERIORATION OR DAMAGE FROM CONSTRUCTION
ACTIVITIES AND REPAIR IMMEDIATELY.
3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL
STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE IT.
SILT FENCE INTENANCE REQUIREMENTS:
1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES
INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY.
3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT
ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE.
4. TAKE E TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE
AND RENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS:
1. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT IMMEDIATELY
REPAIR ANY EROSION AND PIPING HOLES.
2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF' THE DESIGN DEPTH.
3. REPLACE SPILLWAY GRAVEL FACING IF CLOGGED.
4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY.
5. CHECK THE SPILLWAY DEPTH PERIODICALLY TO ENSURE A MINIMUM OF 1.5 FT. DEPTH
FROM LOWEST POINT OF THE SETTLED EMBANKMENT TO HIGHEST POINT OF THE
SPILLWAY CREST, AND FILL ANY LOW AREAS TO MAINTAIN DESIGN ELEVATION.
6. PROMPTLY REPLACE ANY DISPLACED RIP RAP, BEING CAREFUL THAT NO STONES IN THE
SPILLWAY ARE ABOVE DESIGN GRADE.
7. AFTER ALL DISTURBED AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE AND
SMOOTH THE DISTURBED AREA TO BLEND WITH ADJOINING AREAS, AND STABILIZE.
EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS:,
1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY
EROSION BELOW THE BLANKET.
2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET
COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET.
3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS:
1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM
EVENTS OR HEAVY USE.
2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
3. TOP DRESS WITH CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS
BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS
CONVEYED INTO A SEDIMENT TRAP OR BASIN.
5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
1 GOOD
2 MEDIUM
IT
SEEDBED PREPARATION
SEED TOLERANCE
SALT TOLERANCE (TO BOTH SOIL SALTS SPRAY)
T TOLERANCE
MT MEDIUM TOLERANCE
S SLIGHT TOLERANCE
APPLY LIME 0 RAISE THE pH TO THE LEVEL NEEDED FOR SPECIES BEING
SEEDED. APPLY 3 POUNDS OF 12 -12 -12 ANALYSIS FERTILIZER (OR EQUIVALENT) PER
1000 SQ. FT. (APPROXIMATELY 1000 POUNDS PER ACRE) OR FERTILIZE ACCORDING TO
TEST. APPLICATION OF 150 LBS. OF AMMONIUM NITRATE ON AREAS LOW IN ORGANIC
MATTER AND FERTILITY WILL GREATLY ENHANCE VEGETATIVE GROWTH.
WORK THE FERTILIZER AND LIME INTO THE SOIL TO A DEPTH OF 2 -3 INCHES
WITH A HARROW, DISK OR RAKE OPERATED ACROSS THE SLOPE AS MUCH AS POSSIBLE.
SEEDING
SELECT A SEED MIXTURE BASED ON PROJECTED USE OF THE AREA (SEE
PERMANENT SEED MIXTURE CHART). WHILE CONSIDERING BEST SEEDING DATES.
IF PERMANENT SEEDING IS NOT PERMITTED USE TEMPORARY SEEDING
UNTIL PERMANENT SEEDING CAN BE APPLIED. IF TOLERANCES ARE A PROBLEM, SUCH AS
SALT TOLERANCE OF SEEDINGS ADJACENT TO STREETS AND HIGHWAYS, SEE
SEED TOLERANCE CHART.
EROSION AND SEDIMENT CONTROL
PLAN SUMMARY AND "RULE 5" DATA
PROJECT: THE NATIONAL BANK OF INDIANAPOLIS
NATURE AND PURPOSE: BANK
ESTIMATED START: OCTOBER 2003
ESTIMATED COMPLETION OF SITE DEVELOPMENT: JUNE 2004
FLOODPLAINS, FLOODWAY FRINGES, FLOODWAYS: N/A
STREAMS, CHANNELS, DITCHES, WETLANDS, ETC.: N/A
EXISTING SOIL TYPES DESCRIPTION
CROSBY SILT LOAM: DEEP, SOMEWHAT POORLY DRAINED SOIL
BROOKSTON SILT LOAM: DEEP, POORLY DRAINED SOIL
RECEIVING WATERS: CEMETERY CREEK
POTENTIAL AREAS WHERE STORMWATER MAY ENTER GROUNDWATER: NONE KNOWN
EXISTING VEGETATION:
THE SITE IS CURRENTLY COVERED WITH GRASS AND CULTIVATED FIELDS.
CONTACT PERSON:
UNKNOWN
ADJACENT LAND USE:
NORTH RESIDENTIAL AGRICULTURAL
SOUTH RESIDENTIAL AGRICULTURAL
EAST COMMERCIAL SR 421
WEST RESIDENTIAL
SITE SPECIFIC SEQUENCE AND ADDITIONAL NOTES:
THE PERIMETER SILT FENCES SHOULD BE CONSTRUCTED AND STABILIZED AS EARLY AS PRACTICAL TO PREVENT
RUN -OFF FROM LEAVING THE SITE OR CLEAN OFF -SITE WATER FROM WASHING THROUGH THE SITE. EROSION
CONTROL AND INLET PROTECTION SHALL BE INSTALLED IMMEDIATELY AFTER INSTALLATION OF STORM SEWERS.
SEED TOLERANCE CHART
1 PREFERRED 2 WILL TOLERATE INOCULATE WITH SPECIFIC INOCULANT.
SEEDING DETAIL
WHEAT OR RYE
OATS
ANNUAL RYEGRASS
NON -IRRIGATED*
IRRIGATED
DORMANT
SEEDING
TEMPORARY SEEDING DATES
PERMANENT SEEDING DATES
NOT NECESSARY WHERE MULCH IS APPLIED.
EXTEND FABRIC
TO 4" BELOW
SURFACE
FILTER FABRIC
IRRIGATION NEEDED DURING THIS PERIOD. TO CONTROL
EROSION AT TIMES OTHER THAN IN THE SHADED AREAS,
USE MULCH.
LATE SUMMER SEEDING DATES MAY BE EXTENDED 5 DAYS
IF MULCH IS APPLIED.
INCREASE SEEDING APPLICATION BY 50
NON WOVEN
GEOTEXTILE
FABRIC
\\*\Ys
FLOW
J
N
12" MINIMUM
THICKNESS
#2 COARSE
AGGREGATE
SPACE POSTS PER
MANUFACTURER
RECOMMENDATIONS
POST
SILT FENCE CONSTRUCTION
NOT TO SCALE
GEOTEXTILE FABRIC TO STABILIZE
FOUNDATION (ESPECIALLY IMPORTANT
WHERE WETNESS IS ANTICIPATED)
TEMPORARY CONSTRUCTION ENTRANCE
NOT TO SCALE
SLOPE
LENGTH
FT.
300
275
250
225
200
175
150
125
100
75
50
25
NOTE:
POSTS SHALL HAVE A MINIMUM LENGTH OF
36 INCHES PLUS BURIAL DEPTH. POST MATERIAL
SHALL BE WOOD, STEEL, OR SYNTHETIC, AND SHALL
BE OF SUFFICIENT STRENGTH TO RESIST DAMAGE
DURING INSTALLATION AND TO SUPPORT APPLIED
LOADS.
FABRIC SHALL BE A WOVEN GEOTEXTILE FABRIC
CONSISTING OF STRONG, ROT RESISTANT,
MATERIALS RESISTANT TO DETERIORATION FROM
ULTRAVIOLET AND HEAT EXPOSURE.
SI
A
3'
1 STAPLE PER SQ. YD.
4:1
/N
3:1
x
x
x
io
1 1/2"
GENERAL STAPLE RECOMMENDATIONS
x
x
x
x
x
B
A
C
B
A
C
B
C
B
C
2:1
SLOPE GRADIENT
1:1
B
3' 1 1/2"
1
111 STAPLES PER SQ. YD.
CHANNEL
LINING
COMPACTED SOIL
TO PREVENT PIPING
j
STACKED
SAND BAGS
EROSION CONTROL MAT INSTALLATION GUIDE DETAIL
NOT TO SCALE
NOTES;
1. SANDBAGS TO CONSIST OF BURLAP OR WOVEN
GEOTEXTILE FABRIC, MUST BE FILLED WITH
GRAVEL, LAYERED AND PACKED TIGHTLY.
2. SANDBAGS TO BE STACKED TWO OR THREE HIGH.
3. ONE SANDBAG TO BE LEFT OUT OF TOP ROW TO
PROVIDE A SPILLWAY FOR OVERFLOW.
4. SANDBAGS TO BE USED AFTER PAVEMENT INSTALLATION.
PRIOR TO PAVEMENT INSTALLATION, STRAW BALE
PROTECTION IS TO BE USED.
5. SANDBAGS TO BE PLACED AROUND NEW DRAINAGE
STRUCTURES TO PREVENT SILT AND DEBRIS FROM
ENTERING DOWNSTREAM DRAINAGE FACILITIES.
SANDBAGS SHALL BE MAINTAINED UNTIL ALL SITE
WORK IS COMPLETE.
3'
x
SECTION
STORM INLET SAND
BAG PROTECTION
NOT TO SCALE
C
x
PLAN
2 STAPLES PER SQ. YD.
a
STORM INLET
STRUCTURE
SAND BAGS TO BE
PRESSED AGAINST STRUCTURE
AND GROUND TO CREATE
SUFFICIENT SEAL
ADDITIONAL STAPLES AS REQUIRED
DUE TO DEPTH OF FLOW
NOTES
CHANNEL LININGS UTILIZE STAPLE PATTERN "C"
WITH ADDITIONAL STAPLES ON SIDE SLOPES AT
PROJECTED WATER LINE.
STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN GREEN
EROSION CONTROL BLANKETS. STAPLE PATTERNS MAY VARY
DEPENDING UPON SOIL TYPE AND AVERAGE RAINFALL.
AT SLOPE LENGTHS GREATER THAN 300 FEET OR WHERE
DRAINAGE OVER LARGE AREAS IS DIRECTED ONTO THE BLANKETS,
STAPLE PATTERN "C" SHOULD BE UTILIZED.
1
SOIL
CONDITION
SHADE
TOLERANCE
CLOSE MOWING
TO 2 -3 1 /2 INCHES
TRAMPING
TOLERANCE
FERTILITY
NEEDS
WINTER
HARDINESS
FLOODING
TOLERANCE (DAYS)
a
EMERGENCE
TIME (DAYS)
SOIL
TOLERANCE
WET
x
4
DRY
L
x//
SOIL
440.4
CREEPING RED FESCUE
FESTUCA 3RA
2
:41
2
4907-.-
PA J*\
j•\
/K
MED.
1
20 -25
12 -18
\ma x: 414.
:::\;4.7
S
;N
i
1
2
1
x'' la
1
1
20 -35
12 -18
10 -20
EROSION CONTROL
Al STRAW BALE MAINTENANCE REQUIREMENTS:
1. INSPECT ;TRA., BALE DAMS AFTER EACH STORM EVENT AND PROMPTLY E ANY
SEDIMENT DEPOSIT: TO ENSURE ADEQUATE STORAGE FOR OR 1f E NEXT RAIN,
TAKING CARE NOT TO UNDERMINE THE ENTRENCHED BALES.
2. INSPECT PERIODICALLY R DETERIORATION OR DAMAGE FROM CONSTRUCTION
ACTIVITIES AND REPAIR IMMEDIATELY.
3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL
STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE IT.
SILT FENCE INTENANCE REQUIREMENTS:
1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES
INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY.
3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT
ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE.
4. TAKE E TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE
AND RENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS:
1. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT IMMEDIATELY
REPAIR ANY EROSION AND PIPING HOLES.
2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF' THE DESIGN DEPTH.
3. REPLACE SPILLWAY GRAVEL FACING IF CLOGGED.
4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY.
5. CHECK THE SPILLWAY DEPTH PERIODICALLY TO ENSURE A MINIMUM OF 1.5 FT. DEPTH
FROM LOWEST POINT OF THE SETTLED EMBANKMENT TO HIGHEST POINT OF THE
SPILLWAY CREST, AND FILL ANY LOW AREAS TO MAINTAIN DESIGN ELEVATION.
6. PROMPTLY REPLACE ANY DISPLACED RIP RAP, BEING CAREFUL THAT NO STONES IN THE
SPILLWAY ARE ABOVE DESIGN GRADE.
7. AFTER ALL DISTURBED AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE AND
SMOOTH THE DISTURBED AREA TO BLEND WITH ADJOINING AREAS, AND STABILIZE.
EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS:,
1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY
EROSION BELOW THE BLANKET.
2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET
COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET.
3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS:
1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM
EVENTS OR HEAVY USE.
2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
3. TOP DRESS WITH CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS
BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS
CONVEYED INTO A SEDIMENT TRAP OR BASIN.
5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
1 GOOD
2 MEDIUM
IT
SEEDBED PREPARATION
SEED TOLERANCE
SALT TOLERANCE (TO BOTH SOIL SALTS SPRAY)
T TOLERANCE
MT MEDIUM TOLERANCE
S SLIGHT TOLERANCE
APPLY LIME 0 RAISE THE pH TO THE LEVEL NEEDED FOR SPECIES BEING
SEEDED. APPLY 3 POUNDS OF 12 -12 -12 ANALYSIS FERTILIZER (OR EQUIVALENT) PER
1000 SQ. FT. (APPROXIMATELY 1000 POUNDS PER ACRE) OR FERTILIZE ACCORDING TO
TEST. APPLICATION OF 150 LBS. OF AMMONIUM NITRATE ON AREAS LOW IN ORGANIC
MATTER AND FERTILITY WILL GREATLY ENHANCE VEGETATIVE GROWTH.
WORK THE FERTILIZER AND LIME INTO THE SOIL TO A DEPTH OF 2 -3 INCHES
WITH A HARROW, DISK OR RAKE OPERATED ACROSS THE SLOPE AS MUCH AS POSSIBLE.
SEEDING
SELECT A SEED MIXTURE BASED ON PROJECTED USE OF THE AREA (SEE
PERMANENT SEED MIXTURE CHART). WHILE CONSIDERING BEST SEEDING DATES.
IF PERMANENT SEEDING IS NOT PERMITTED USE TEMPORARY SEEDING
UNTIL PERMANENT SEEDING CAN BE APPLIED. IF TOLERANCES ARE A PROBLEM, SUCH AS
SALT TOLERANCE OF SEEDINGS ADJACENT TO STREETS AND HIGHWAYS, SEE
SEED TOLERANCE CHART.
EROSION AND SEDIMENT CONTROL
PLAN SUMMARY AND "RULE 5" DATA
PROJECT: THE NATIONAL BANK OF INDIANAPOLIS
NATURE AND PURPOSE: BANK
ESTIMATED START: OCTOBER 2003
ESTIMATED COMPLETION OF SITE DEVELOPMENT: JUNE 2004
FLOODPLAINS, FLOODWAY FRINGES, FLOODWAYS: N/A
STREAMS, CHANNELS, DITCHES, WETLANDS, ETC.: N/A
EXISTING SOIL TYPES DESCRIPTION
CROSBY SILT LOAM: DEEP, SOMEWHAT POORLY DRAINED SOIL
BROOKSTON SILT LOAM: DEEP, POORLY DRAINED SOIL
RECEIVING WATERS: CEMETERY CREEK
POTENTIAL AREAS WHERE STORMWATER MAY ENTER GROUNDWATER: NONE KNOWN
EXISTING VEGETATION:
THE SITE IS CURRENTLY COVERED WITH GRASS AND CULTIVATED FIELDS.
CONTACT PERSON:
UNKNOWN
ADJACENT LAND USE:
NORTH RESIDENTIAL AGRICULTURAL
SOUTH RESIDENTIAL AGRICULTURAL
EAST COMMERCIAL SR 421
WEST RESIDENTIAL
SITE SPECIFIC SEQUENCE AND ADDITIONAL NOTES:
THE PERIMETER SILT FENCES SHOULD BE CONSTRUCTED AND STABILIZED AS EARLY AS PRACTICAL TO PREVENT
RUN -OFF FROM LEAVING THE SITE OR CLEAN OFF -SITE WATER FROM WASHING THROUGH THE SITE. EROSION
CONTROL AND INLET PROTECTION SHALL BE INSTALLED IMMEDIATELY AFTER INSTALLATION OF STORM SEWERS.
SEED TOLERANCE CHART
1 PREFERRED 2 WILL TOLERATE INOCULATE WITH SPECIFIC INOCULANT.
SEEDING DETAIL
WHEAT OR RYE
OATS
ANNUAL RYEGRASS
NON -IRRIGATED*
IRRIGATED
DORMANT
SEEDING
TEMPORARY SEEDING DATES
PERMANENT SEEDING DATES
NOT NECESSARY WHERE MULCH IS APPLIED.
EXTEND FABRIC
TO 4" BELOW
SURFACE
FILTER FABRIC
IRRIGATION NEEDED DURING THIS PERIOD. TO CONTROL
EROSION AT TIMES OTHER THAN IN THE SHADED AREAS,
USE MULCH.
LATE SUMMER SEEDING DATES MAY BE EXTENDED 5 DAYS
IF MULCH IS APPLIED.
INCREASE SEEDING APPLICATION BY 50
NON WOVEN
GEOTEXTILE
FABRIC
\\*\Ys
FLOW
J
N
12" MINIMUM
THICKNESS
#2 COARSE
AGGREGATE
SPACE POSTS PER
MANUFACTURER
RECOMMENDATIONS
POST
SILT FENCE CONSTRUCTION
NOT TO SCALE
GEOTEXTILE FABRIC TO STABILIZE
FOUNDATION (ESPECIALLY IMPORTANT
WHERE WETNESS IS ANTICIPATED)
TEMPORARY CONSTRUCTION ENTRANCE
NOT TO SCALE
SLOPE
LENGTH
FT.
300
275
250
225
200
175
150
125
100
75
50
25
NOTE:
POSTS SHALL HAVE A MINIMUM LENGTH OF
36 INCHES PLUS BURIAL DEPTH. POST MATERIAL
SHALL BE WOOD, STEEL, OR SYNTHETIC, AND SHALL
BE OF SUFFICIENT STRENGTH TO RESIST DAMAGE
DURING INSTALLATION AND TO SUPPORT APPLIED
LOADS.
FABRIC SHALL BE A WOVEN GEOTEXTILE FABRIC
CONSISTING OF STRONG, ROT RESISTANT,
MATERIALS RESISTANT TO DETERIORATION FROM
ULTRAVIOLET AND HEAT EXPOSURE.
SI
A
3'
1 STAPLE PER SQ. YD.
4:1
/N
3:1
x
x
x
io
1 1/2"
GENERAL STAPLE RECOMMENDATIONS
x
x
x
x
x
B
A
C
B
A
C
B
C
B
C
2:1
SLOPE GRADIENT
1:1
B
3' 1 1/2"
1
111 STAPLES PER SQ. YD.
CHANNEL
LINING
COMPACTED SOIL
TO PREVENT PIPING
j
STACKED
SAND BAGS
EROSION CONTROL MAT INSTALLATION GUIDE DETAIL
NOT TO SCALE
NOTES;
1. SANDBAGS TO CONSIST OF BURLAP OR WOVEN
GEOTEXTILE FABRIC, MUST BE FILLED WITH
GRAVEL, LAYERED AND PACKED TIGHTLY.
2. SANDBAGS TO BE STACKED TWO OR THREE HIGH.
3. ONE SANDBAG TO BE LEFT OUT OF TOP ROW TO
PROVIDE A SPILLWAY FOR OVERFLOW.
4. SANDBAGS TO BE USED AFTER PAVEMENT INSTALLATION.
PRIOR TO PAVEMENT INSTALLATION, STRAW BALE
PROTECTION IS TO BE USED.
5. SANDBAGS TO BE PLACED AROUND NEW DRAINAGE
STRUCTURES TO PREVENT SILT AND DEBRIS FROM
ENTERING DOWNSTREAM DRAINAGE FACILITIES.
SANDBAGS SHALL BE MAINTAINED UNTIL ALL SITE
WORK IS COMPLETE.
3'
x
SECTION
STORM INLET SAND
BAG PROTECTION
NOT TO SCALE
C
x
PLAN
2 STAPLES PER SQ. YD.
a
STORM INLET
STRUCTURE
SAND BAGS TO BE
PRESSED AGAINST STRUCTURE
AND GROUND TO CREATE
SUFFICIENT SEAL
ADDITIONAL STAPLES AS REQUIRED
DUE TO DEPTH OF FLOW
NOTES
CHANNEL LININGS UTILIZE STAPLE PATTERN "C"
WITH ADDITIONAL STAPLES ON SIDE SLOPES AT
PROJECTED WATER LINE.
STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN GREEN
EROSION CONTROL BLANKETS. STAPLE PATTERNS MAY VARY
DEPENDING UPON SOIL TYPE AND AVERAGE RAINFALL.
AT SLOPE LENGTHS GREATER THAN 300 FEET OR WHERE
DRAINAGE OVER LARGE AREAS IS DIRECTED ONTO THE BLANKETS,
STAPLE PATTERN "C" SHOULD BE UTILIZED.
1
SOIL
CONDITION
SHADE
TOLERANCE
CLOSE MOWING
TO 2 -3 1 /2 INCHES
TRAMPING
TOLERANCE
FERTILITY
NEEDS
WINTER
HARDINESS
FLOODING
TOLERANCE (DAYS)
MATURE
HEIGHT (INCHES)
EMERGENCE
TIME (DAYS)
SOIL
TOLERANCE
WET
NORM
DRY
GEN.
SOIL
SPRAY
CREEPING RED FESCUE
FESTUCA 3RA
2
1
2
1
1
1
MED.
1
20 -25
12 -18
7 -21
S
KENTUCKY :GRASS
POA SIS
2
1
2
1
1
1
MED.
1
20 -35
12 -18
10 -20
MT
TALL FESCUE
FESTUCA L. JDINACEA
2
1
1
1
1
1
LOW
1
24 -35
24 -36
5 -14
T
PERENNIAL ;BASS
LOLLUM VNE
2
1
2
1
2
H
HIGH
2
15 -20
12 -18
5 -10
MT
CROWNVETCH
CORONILLA RLA
1
1
2
LOW
1
5 -10
24
14 -21
T
RED CLOVER
TRIFOUUM TENSE
1
2
MED.
1
7 -10
18
5 -10
S
S
EROSION CONTROL
Al STRAW BALE MAINTENANCE REQUIREMENTS:
1. INSPECT ;TRA., BALE DAMS AFTER EACH STORM EVENT AND PROMPTLY E ANY
SEDIMENT DEPOSIT: TO ENSURE ADEQUATE STORAGE FOR OR 1f E NEXT RAIN,
TAKING CARE NOT TO UNDERMINE THE ENTRENCHED BALES.
2. INSPECT PERIODICALLY R DETERIORATION OR DAMAGE FROM CONSTRUCTION
ACTIVITIES AND REPAIR IMMEDIATELY.
3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL
STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE IT.
SILT FENCE INTENANCE REQUIREMENTS:
1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES
INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY.
3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT
ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE.
4. TAKE E TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE
AND RENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS:
1. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT IMMEDIATELY
REPAIR ANY EROSION AND PIPING HOLES.
2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF' THE DESIGN DEPTH.
3. REPLACE SPILLWAY GRAVEL FACING IF CLOGGED.
4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY.
5. CHECK THE SPILLWAY DEPTH PERIODICALLY TO ENSURE A MINIMUM OF 1.5 FT. DEPTH
FROM LOWEST POINT OF THE SETTLED EMBANKMENT TO HIGHEST POINT OF THE
SPILLWAY CREST, AND FILL ANY LOW AREAS TO MAINTAIN DESIGN ELEVATION.
6. PROMPTLY REPLACE ANY DISPLACED RIP RAP, BEING CAREFUL THAT NO STONES IN THE
SPILLWAY ARE ABOVE DESIGN GRADE.
7. AFTER ALL DISTURBED AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE AND
SMOOTH THE DISTURBED AREA TO BLEND WITH ADJOINING AREAS, AND STABILIZE.
EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS:,
1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY
EROSION BELOW THE BLANKET.
2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET
COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET.
3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS:
1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM
EVENTS OR HEAVY USE.
2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
3. TOP DRESS WITH CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS
BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS
CONVEYED INTO A SEDIMENT TRAP OR BASIN.
5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
1 GOOD
2 MEDIUM
IT
SEEDBED PREPARATION
SEED TOLERANCE
SALT TOLERANCE (TO BOTH SOIL SALTS SPRAY)
T TOLERANCE
MT MEDIUM TOLERANCE
S SLIGHT TOLERANCE
APPLY LIME 0 RAISE THE pH TO THE LEVEL NEEDED FOR SPECIES BEING
SEEDED. APPLY 3 POUNDS OF 12 -12 -12 ANALYSIS FERTILIZER (OR EQUIVALENT) PER
1000 SQ. FT. (APPROXIMATELY 1000 POUNDS PER ACRE) OR FERTILIZE ACCORDING TO
TEST. APPLICATION OF 150 LBS. OF AMMONIUM NITRATE ON AREAS LOW IN ORGANIC
MATTER AND FERTILITY WILL GREATLY ENHANCE VEGETATIVE GROWTH.
WORK THE FERTILIZER AND LIME INTO THE SOIL TO A DEPTH OF 2 -3 INCHES
WITH A HARROW, DISK OR RAKE OPERATED ACROSS THE SLOPE AS MUCH AS POSSIBLE.
SEEDING
SELECT A SEED MIXTURE BASED ON PROJECTED USE OF THE AREA (SEE
PERMANENT SEED MIXTURE CHART). WHILE CONSIDERING BEST SEEDING DATES.
IF PERMANENT SEEDING IS NOT PERMITTED USE TEMPORARY SEEDING
UNTIL PERMANENT SEEDING CAN BE APPLIED. IF TOLERANCES ARE A PROBLEM, SUCH AS
SALT TOLERANCE OF SEEDINGS ADJACENT TO STREETS AND HIGHWAYS, SEE
SEED TOLERANCE CHART.
EROSION AND SEDIMENT CONTROL
PLAN SUMMARY AND "RULE 5" DATA
PROJECT: THE NATIONAL BANK OF INDIANAPOLIS
NATURE AND PURPOSE: BANK
ESTIMATED START: OCTOBER 2003
ESTIMATED COMPLETION OF SITE DEVELOPMENT: JUNE 2004
FLOODPLAINS, FLOODWAY FRINGES, FLOODWAYS: N/A
STREAMS, CHANNELS, DITCHES, WETLANDS, ETC.: N/A
EXISTING SOIL TYPES DESCRIPTION
CROSBY SILT LOAM: DEEP, SOMEWHAT POORLY DRAINED SOIL
BROOKSTON SILT LOAM: DEEP, POORLY DRAINED SOIL
RECEIVING WATERS: CEMETERY CREEK
POTENTIAL AREAS WHERE STORMWATER MAY ENTER GROUNDWATER: NONE KNOWN
EXISTING VEGETATION:
THE SITE IS CURRENTLY COVERED WITH GRASS AND CULTIVATED FIELDS.
CONTACT PERSON:
UNKNOWN
ADJACENT LAND USE:
NORTH RESIDENTIAL AGRICULTURAL
SOUTH RESIDENTIAL AGRICULTURAL
EAST COMMERCIAL SR 421
WEST RESIDENTIAL
SITE SPECIFIC SEQUENCE AND ADDITIONAL NOTES:
THE PERIMETER SILT FENCES SHOULD BE CONSTRUCTED AND STABILIZED AS EARLY AS PRACTICAL TO PREVENT
RUN -OFF FROM LEAVING THE SITE OR CLEAN OFF -SITE WATER FROM WASHING THROUGH THE SITE. EROSION
CONTROL AND INLET PROTECTION SHALL BE INSTALLED IMMEDIATELY AFTER INSTALLATION OF STORM SEWERS.
SEED TOLERANCE CHART
1 PREFERRED 2 WILL TOLERATE INOCULATE WITH SPECIFIC INOCULANT.
SEEDING DETAIL
WHEAT OR RYE
OATS
ANNUAL RYEGRASS
NON -IRRIGATED*
IRRIGATED
DORMANT
SEEDING
TEMPORARY SEEDING DATES
PERMANENT SEEDING DATES
NOT NECESSARY WHERE MULCH IS APPLIED.
EXTEND FABRIC
TO 4" BELOW
SURFACE
FILTER FABRIC
IRRIGATION NEEDED DURING THIS PERIOD. TO CONTROL
EROSION AT TIMES OTHER THAN IN THE SHADED AREAS,
USE MULCH.
LATE SUMMER SEEDING DATES MAY BE EXTENDED 5 DAYS
IF MULCH IS APPLIED.
INCREASE SEEDING APPLICATION BY 50
NON WOVEN
GEOTEXTILE
FABRIC
\\*\Ys
FLOW
J
N
12" MINIMUM
THICKNESS
#2 COARSE
AGGREGATE
SPACE POSTS PER
MANUFACTURER
RECOMMENDATIONS
POST
SILT FENCE CONSTRUCTION
NOT TO SCALE
GEOTEXTILE FABRIC TO STABILIZE
FOUNDATION (ESPECIALLY IMPORTANT
WHERE WETNESS IS ANTICIPATED)
TEMPORARY CONSTRUCTION ENTRANCE
NOT TO SCALE
SLOPE
LENGTH
FT.
300
275
250
225
200
175
150
125
100
75
50
25
NOTE:
POSTS SHALL HAVE A MINIMUM LENGTH OF
36 INCHES PLUS BURIAL DEPTH. POST MATERIAL
SHALL BE WOOD, STEEL, OR SYNTHETIC, AND SHALL
BE OF SUFFICIENT STRENGTH TO RESIST DAMAGE
DURING INSTALLATION AND TO SUPPORT APPLIED
LOADS.
FABRIC SHALL BE A WOVEN GEOTEXTILE FABRIC
CONSISTING OF STRONG, ROT RESISTANT,
MATERIALS RESISTANT TO DETERIORATION FROM
ULTRAVIOLET AND HEAT EXPOSURE.
SI
A
3'
1 STAPLE PER SQ. YD.
4:1
/N
3:1
x
x
x
io
1 1/2"
GENERAL STAPLE RECOMMENDATIONS
x
x
x
x
x
B
A
C
B
A
C
B
C
B
C
2:1
SLOPE GRADIENT
1:1
B
3' 1 1/2"
1
111 STAPLES PER SQ. YD.
CHANNEL
LINING
COMPACTED SOIL
TO PREVENT PIPING
j
STACKED
SAND BAGS
EROSION CONTROL MAT INSTALLATION GUIDE DETAIL
NOT TO SCALE
NOTES;
1. SANDBAGS TO CONSIST OF BURLAP OR WOVEN
GEOTEXTILE FABRIC, MUST BE FILLED WITH
GRAVEL, LAYERED AND PACKED TIGHTLY.
2. SANDBAGS TO BE STACKED TWO OR THREE HIGH.
3. ONE SANDBAG TO BE LEFT OUT OF TOP ROW TO
PROVIDE A SPILLWAY FOR OVERFLOW.
4. SANDBAGS TO BE USED AFTER PAVEMENT INSTALLATION.
PRIOR TO PAVEMENT INSTALLATION, STRAW BALE
PROTECTION IS TO BE USED.
5. SANDBAGS TO BE PLACED AROUND NEW DRAINAGE
STRUCTURES TO PREVENT SILT AND DEBRIS FROM
ENTERING DOWNSTREAM DRAINAGE FACILITIES.
SANDBAGS SHALL BE MAINTAINED UNTIL ALL SITE
WORK IS COMPLETE.
3'
x
SECTION
STORM INLET SAND
BAG PROTECTION
NOT TO SCALE
C
x
PLAN
2 STAPLES PER SQ. YD.
a
STORM INLET
STRUCTURE
SAND BAGS TO BE
PRESSED AGAINST STRUCTURE
AND GROUND TO CREATE
SUFFICIENT SEAL
ADDITIONAL STAPLES AS REQUIRED
DUE TO DEPTH OF FLOW
NOTES
CHANNEL LININGS UTILIZE STAPLE PATTERN "C"
WITH ADDITIONAL STAPLES ON SIDE SLOPES AT
PROJECTED WATER LINE.
STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN GREEN
EROSION CONTROL BLANKETS. STAPLE PATTERNS MAY VARY
DEPENDING UPON SOIL TYPE AND AVERAGE RAINFALL.
AT SLOPE LENGTHS GREATER THAN 300 FEET OR WHERE
DRAINAGE OVER LARGE AREAS IS DIRECTED ONTO THE BLANKETS,
STAPLE PATTERN "C" SHOULD BE UTILIZED.
1