Loading...
HomeMy WebLinkAbout03090013 Townhomes at Hunter's Creek Large Plan pg. EN t l CR 0 E J N0. 920350 C" 1 STATE OF 4v z-_- s �NDi AN?' ��k: E rriiittt A DATE: 8/29/03 PROJECT NO.: 4409.001 DRAWN BY: DRP CHECKED BY: JCC SHEET TITLE: EROSION CONTROL PLAN DRAWING FILES: R: \4K \4409 \001 \DWGS \C104 XREF: 001BS XREF: 001 ERO XREF: 001 -TOPO SHEET NO.: C de' 04 N t l CR 0 E J N0. 920350 C" 1 STATE OF 4v z-_- s �NDi AN?' ��k: E rriiittt A DATE: z4CL( THIS DRAWING AND THE IDE S, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTEI I FCTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. COPYRIGHTED BY THE SCHNEIDER CORP. (2003) 1 4 1 46 Schneider THE SCHNEIDER CORPORATION Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 -1037 Telephone: 317.826.7100 Fax: 317.826.7200 www.schneidercorp.com Architecture Civil Engineering Environmental Engineering Geotechnical Services GIS *LIS Home Builder Services Interior Design Land Surveying Landscape Architecture Transportation Engineering rum WARNING- SHEET TO BE USED FOR EROSION CONTROL PURPOSES ONLY. R ANY OTHER INFORMATION SEE DEVELOPMENT PLAN. 'SILT ._FENCE- =TO BE PACED ALONtG -CU D R[ B [NG- ARY ,CDNSTRUCT10N FOR1 C}1 .BU.ILDI'NO. CON CTION c .`4 1111111111 U 843.0 842.0 844.0 841.3 ONSTRUC ON�� CONSTRUCTION LIMITS Q CONSTRUCTION ACTIVITIES PART 1 7. Strip, excavate and fill rnass earthwork for streets and pads. 8. Fine grade and seed site perimeter areas outside streets and buildings. 9. Excavate new dry detention area and complete fills. NOTE: FOR ALL EROSION CONTROL DETAILS AND SEEDING TABLES SEE SHEET C105. NOTE: ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BY FIELD INSPECTOR. C SILT FENCE SITE SPECIFIC CONSTRUCTION I SEQUENCING FOR EROSION CONTROL The purpose of staging construction during the earthwork phase of the project is to limit the amount of ground disturbed at any given time and to control silt from the areas that are disturbed to prevent silt from leaving the site. For this reason, the following sequencing should be followed as much as possible. ['RECONSTRUCTION ACTIVITIES 1. Install temporary stone access drive for access from Marano Drive entry. 2. Install silt fence on south, and east property lines and at north east corner of site. ESTABLISH 1st. SILT BASIN 3. The existing dry detention area and storm outlet should be left in place, undisturbed, as a silt basin for as long as possible during mass earthwork. 4, Excavate as necessary and install stone silt basin outlet around storm sewer outlet for existing dry detention area. 5. Cut temporary diversion swale from silt basin outlet along southeast corner of the site using swale cut to build the small mound on the south side of the swale. 6. Seed disturbed areas around diversion swale and silt basin outlet. ESTABLISH 2nd. SILT BASIN 10. Excavate to depth of storm sewer invert and install 2nd. silt basin outlet across path of storm sewer outlet pipe. CONSTRUCTION ACTIVITIES PART 2 11 Install matting an detention areas. 12. Fine grade and seed detention areas. 13. Install storm sewer sanitary sewer and water. All beehive and curb inlet protection shall be installed as each storm sewer inlet is installed. 14. Fine grade and seed rear yards disturbed by storm sewer construction. 15. Install remaining utilities. 16. Fine grade and seed or sod front yards and install landscaping as each building is completed. 17. Remove 2nd silt basin outlet and complete storm sewer installation once all pads perimeter areas are seeded. POST CONSTRUCTION ACTIVITIES 18. Inspect and maintain all erosion control measures as detailed on Sheet C105 in the erosion control measures and maintenance requirements beginning immediately after installation. 19 Remove individual inlet protection and straw bale dams only after seeding is established in each basin to the point where silt will not enter the lakes or storm sewer system. BEEHIVE INLET PROTECTION EXISTING CRADE DIVERSION SWALE MOUND NOTE: N O S OIL STOCKPILES ARE PROPOSED FOR THIS SITE. SILT FENCE SECTION A-A DIVERSION SWALE WITH MOUND PROPERTY LINE NOTE: SHADED AREA DENOTES AREA TO BE SEEDED AND STRAW MULCHED. cam '�60 CONSTRUCTION LIMITS 7 UNDlSTURBED SOIL HATCH PA I l ERN DENOTES TEMPORARY SEEDING HATCH PA I 1 ERN DENOTES PERMANENT SEEDING HATCH DENOTES EROSION CONTROL BLANKET SILT FENCE TEMPORARY DIVERSION SWALE TO EXISTING DRY DETENSION AREA AND SILT BASIN. SEE SECTION A -A DETAIL 1 J D. SILT FENCE i tx- x 50 TBM1 RAILROAD SPIKE IN POWER POLE #838 -1812, 37 FEET EAST OF RHORER ROAD EAST OF THE NORTHEAST CORNER OF HUNTER'S CREEK SOUTH SECTION 1. ELEVATION 840.23 (NGVD 1929) TBM 2 NORTHWEST CORNER OF WALK AT THE STEPS FACING MARANA DRIVE ON LOT 1 HUNTER'S CREEK SOUTH, SECTION 1. ELEVATION 842.78 TBM 3 CUT "x" ON THE TOP OF THE NORTH SIDE OF THE AREA LIGHT BASE ON SITE. ELEVATION 847.85 TBM 4 CUT "x" AT THE TOP OF CURB ON THE CURB INLET ON THE SOUTH SIDE OF MARANA DRIVE AT THE NORTHWEST CORNER OF THE SUBJECT TRACT. ELEVATION 857.86 IBM 5 TOP OF THE CONCRETE MONUMENT AT THE SOUTHEAST CORNER OF LOT 39, HUNTER'S CREEK SOUTH, SECTION 1 ELEVATION 856.31 IEBIENTCIE-1 RD PNSILT FENCE L h 0 HOLEY MOLEY SAYS e DON'T DIG BLIND" "IT'S THE LAW" CALL 2 WORKING DAYS BEFORE YOU DIG 1- 800 382 -5544 CALL TOLL FREE PER INDIANA STATE LAW IS 69 1991. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. SILT BASIN OUTLET. SE MENT OF STORM SEWER TO BE LEFT OUT OF OUTLET PIP WITH SILT BASIN OUTLET INSTALLED UNTIL ALL PERIMETER 1AND PAD SEEDING IS COMPLETE. 1 T f SILT BASIN. OUT�ET AROUND EXISTING END S�CyTION SEE DETAIL ON C105. r CONSTRUCTION LIMITS SILT FENCE BED HIVE INLET QTEC11ON 0 /mo ASSUMED NORTH SCALE: 1 =30' IXISTING DRY DETENSION AREA TO BE USED AS SILT BASIN UNTIL NEW DETENSION AREA IS EXCAVATED. w w CC w w CD w z 0 irz.S ID