HomeMy WebLinkAbout03090013 Townhomes at Hunter's Creek Large Plan pg. FDATE:
8/29/03
PROJECT NO.:
4409.001
DRAWN BY:
DRP
CHECKED BY:
JCC
SHEET TITLE:
EROSION CONTROL DETAILS
DRAWING FILES:
R:\4K\4409\001\DWGS\C105
SHEET NO.:
C.......,05
Oct
REVISIONS:
1. PRC 01/16/04 ADDED SLOTTED RISER DETAIL 2ND SEDIMENT TRAP OUTLET DETAIL.
Feb
00 i I I 1 111 I I
R,1 C RO B'
��sTER S �y'%
No.
920350 -0
0 STATE OF 'VDtAN
O/ 'O NAL E
X1111111
i
DATE: 12.1 (c)c-f
THIS DRAWING AND THE IDEAS, DESIGNS AND
CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF THE SCHNEIDER
CORPORATION, AND ARE NOT TO BE USED OR
REPRODUCED, IN WHOLE OR IN PART, WITHOUT
THE WRIIIEN CONSENT OF THE SCHNEIDER
CORPORATION.
U COPYRIGHTED BY THE SCHNEIDER CORP. (2003)
Ma TJun
1
t 4174
S chneider
THE SCHNEIDER CORPORATION
Historic Fort Harrison
8901 Otis Avenue
Indianapolis, IN 46216 -1037
Telephone: 317.826.7100
Fax: 317.826.7200
www.schneidercorp.com
Architecture
Civil Engineering
Environmental Engineering
Geotechnical Services
GIS LIS
Home Builder Services
Interior Design
Land Surveying
Landscape Architecture
Transportation Engineering
Jar,
Feb
Mar
Apr
Ma TJun
Jul
Aug Sep
Oct
Nov
Dec
Tolerance
ten.
Sou
Spray
Wet
Nornl Dry
A A
:viii
••;.e
s1s• 3:
Creeping Red Fescue
Festuca rubra
N
t
1
2
Permanent
1
Seeding
Dates
20 25
12-18
6\l�i
Kentucky Bluegrass
Poe pratinsis
1
1
1
1
Med.
Low
1
1
L5 -35
12 -18
10-20
i MT
Tall Fescue
Festuca L arundinacea
2
1
1
/iii
i J
5
I
Perennial ryegrass
Lolium perenne
2
2
M eg
High
1 5 20
5 -10
112 -18
24
5-
MT
this per,od.
1
1
I N
Irrigation needed during
To c ontrol
14 -21
erosion at times other than the shaded areas,
use mulch.
Oats
Annual Ryegrass
Non Irrigated*
COMPACTED
SUB -GRADE
(TYP.
TOP OF BANK 841.5
COMPACTED 7
SUB -GRADE
(TYP
Temporary Seeding Dates
Late summer seeding dates may be extended 5 days
if mulch is applied.
increase seeding application by 50
FIGURE 5-3
Ranking:
1 Good
2 Medium
Not tolerant
J
5'
10'
POLYFELT 15650 OR
EQUAL UNDER STONE
10'
POLYFELT TS650 OR
EQUAL UNDER STONE
FIGURE 5 -4
2:1 SLOPE
6" HP -RAP WITH
No. 5 STONE FACE
TOP OF BANK 842.0
Tom_n orklr ELEVATION 841.0 re
11 =11 ku„ 41 4
t �r .4 tittle 4,
����i��i�ir 0
6" RIP-RAP
2ND
IP -RAP
2ND SEDIMENT TRAP OUTLET DETAIL
2:1 SLOPE
A
Salt Tolerance (to both soil salts spray):
T Tolerance
MT Medium Tolerance
5 Slight Tolerance
5
SECTION A-A
20'
SUB -GRADE ELEVATION 835.0
A
SECTION A-A
20'
ONE FOOT THICK STONE
FACE OF No 5 STONE
2:1 SLOPE
SUB -GRADE ELEVATION 835.0
ONE FOOT THICK STONE
FACE OF No 5 STONE
6" RIP -RAP WITH
No. 5 STONE FACE
-STONE ELEVATION 840.8
-1:1 SLOPE
SUB -GRADE ELEVATION 839.8
10'
10'
5'
-GRADE ELEVATION 839.8
J'
v= v= n =u =u =a o i ft :�.it r s e ire
1ST SEDIMENT TRAP OUTLET DETAIL
TOP OF BANK 842.0
3:1 SLOPES
(MAX.)
-PLACE OUTLET STONE IN SEMI
CIRCLE AROUND EXISTING
STORM SEWER OUTLET
TOP OF BANK 841.5
i
3:1 SLOPES
(MAX.)
PLACE OUTLET STONE IN SEMI
CIRCLE AROUND EXISTING
STORM SEWER OUTLET
Kind of Seed 1000 Sq. Ft. Acre Remarks
Wheat or Rye 3.5 lbs. 2 Liu. Cover seed 1" to
1 1/2" deep
Spr Oats
Anriucll ryegress 1 lb.
4 Not necessary where mulch .s applied.
SEEDBED PREPARATION REQUIREMENTS
Seedbed Preparation
In e to raise the pH to the 'r del needed for species being
eeded. Apply 2 pounds 0 f 12-12 -12 analysis fertilizer (or equivalent) per
)00 sq. t' i,apprc >:irnately 1 000 pounds per acre) or fertilize according to
te.;t Application of 150 ibs of ammonium nitrate on areas low in organic
matter and fertility will greatly enhance vegetative growth.
t and lime into the soil to a depth of 2 -3 inches
with a harrow, disk or rake operated across t he slope as much as possible.
Seed
Select r sped mixture based on projected use of the area (Figure 5 -2),
while >nsiderina best Peeaing dotes. See Figure 5 -3 this sheet. If toler-
ances are problem, such as salt tolerance of seedings adjacent to streets
and highways, see Figure 5 -4 this sheet before final selection.
Level and Sloping, open ,Areas
Tall Fescue
F es ur
Red Clover
Kentuck Bluegrass 15 .4
Creeping Red Fescue 15 .4
Steep Banks and Cuts
T Fescue
Kentucky Bluegrass
Tall Fescue .35
Errerald Crowr:vetch 10
20'
20'
Temporary Seedings
Figure 5 -2 Permanent Seed Mixtures
Lawns and High Maintenance Areas
8. Tall Fescue 170 4.0
6. Kentucky Bluegrass 40 .9
Creeping Red Fescue 40 .9
7 Perennial Ryegrass 170 4.0
(Turf Type)
20 WIDE SPILLWAY
ELEVATION 840.5
SEE PLAN
20' 'WIDE SPILLWAY
t4 ELEVATION 841.0
SEE PLAN
2 z, lbs. 3 bu_ Cover seed 1" deep
Seeding Rate Suitable pH Site Suitability*
Ibsjacre lbs/1000 well
sq. ft-. Droughty Drained Wet
15 .4 5.8 -7.5 2 1
25 .6
8
25
3:1 SLOPES
(T'
3:1 SLOPES
rYF
40 lbs. Cover seed 1 "deep*
O 5.5 -8.3
.12
5.5 -8 -3 2
5.5 -7.5 2 1
5.5 -8.3 2 1
5.8 -7.5
5.0 -7.5
5.5 -8.3
2 1
2 1 2
1 Preferred 2 Will Tolerate Inoculate with specific Inoculant.
2
2
SILT FENCE
Silt Fence shall be a machine produced, non -woven geotextile of 100%
polypropylene meeting the physical properties below.
All stakes shall be 2" X 2" hardwood 36" tall with 24" tall lath stapled
to stakes over fabric as reinforcement.
All silt fence shall be prefabricated by the supplier. No field assembly
will be accepted.
Fabric Weight 4 oz /syd
Grab Strength Warp 125 lbs.
Elongation Warp 50
Trapezoidal Tear Strength 50 lbs.
Burst Strength 200 psi
UV Resistance 70
A.O.S 50 -80
Slurry Flow Rate 225 gpm /sq. ft
Sediment Retention 75
Silt Fence Material
Fence Post
N
Fence Post Should --Silt Fence Material Should
be Buried 1' Below be Buried 6" Below Ground
Ground Surface Surface.
SILT FENCE DETAIL
N TS
PUBLIC ROAD
Stakes 5' 0.C.
SCALE: NONE
Ground Surface
PLAN VIEW
EROSION CONTROL MEASURES MAINTENANCE REQUIREMENTS
STRAW BALE DAM MAINTENANCE REQUIREMENTS
1. INSPECT STRAW BALE DAMS AFTER EACH STORM EVENT AND PROMPTLY REMOVE ANY
SEDIMENT DEPOSITS TO ENSURE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN,
TAKING CARE NOT TO UNDERMINE THE ENTRENCHED BALES.
2. INSPECT PERIODICALLY FOR DETERIORATION OR DAMAGE FROM CONSTRUCTION
ACTIVITIES AND REPAIR IMMEDIATELY.
3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL
STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE
IT.
SILT FENCE MAINTENANCE REQUIREMENTS
1. INSPECT THE SILT FENCE PERIODICALLY AND AF IER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES
INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY.
3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT
ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE.
4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AF ILR THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE
AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS
1. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT AND IMMEDIATELY
REPAIR ANY EROSION AND PIPING HOLES.
2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF THE DESIGN DEPTH.
3. REPLACE SPILLWAY GRAVEL FACING IF CLOGGED.
4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY.
5. CHECK THE SPILLWAY DEPTH PERIODICALLY TO ENSURE A MINIMUM OF 1.5 FT. DEPTH
FROM THE LOWEST POINT OF THE SETTLED EMBANKMENT TO HIGHEST POINT OF THE
SPILLWAY CREST, AND FILL ANY LOW AREAS TO MAINTAIN DESIGN ELEVATION.
6. PROMPTLY REPLACE ANY DISPLACED RIPRAP, BEING CAREFUL THAT NO STONES IN THE
SPILLWAY ARE ABOVE DESIGN GRADE.
7. AF IER ALL DISTURBED AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE AND
SEDIMENT, SMOOTH THE SITE TO BLEND MTH ADJOINING AREAS, AND STABILIZE.
SANDBAG CURB INLET SEDIMENT BARRIER MAINTENANCE REQUIREMENTS
1. INSPECT FREQUENTLY FOR DAMAGE BY VEHICULAR TRAFFIC, AND REPAIR IF
NECESSARY.
2. INSPECT AFTER EACH STORM EVENT.
3. REMOVE SEDIMENT, WITHOUT FLUSHING, WHEN IT REACHES HALF THE HEIGHT OF THE
BARRIER.
4. DEPOSIT REMOVED SEDIMENT WHERE IT WILL NOT ENTER STORM DRAINS.
BLOCK AND GRAVEL CURB INLET PROTECTION MAINTENANCE REQUIREMENTS
1. AFTER EACH STORM EVENT, REMOVE THE SEDIMENT AND REPLACE THE GRAVEL;
REPLACE THE GEOTEXTILE FABRIC, IF USED.
2. PERIODICALLY REMOVE SEDIMENT AND TRACKED -ON SOIL FROM THE STREET, WITHOUT
FLUSHING, TO REDUCE THE SEDIMENT LOAD ON THE CURB INLET PROTECTION.
3. INSPECT PERIODICALLY FOR DAMAGE AND REPAIR; KEEP GRATES FREE OF DEBRIS.
4, WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE
GRAVEL, WIRE MESH, GEOTEXTILE FABRIC, AND ANY SEDIMENT, AND DISPOSE OF THEM
PROPERLY.
EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS
1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY
EROSION BELOW THE BLANKET.
2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING
IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET.
3. AF ILR VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS
1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM
EVENTS OR HEAVY USE.
2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
3. TOPDRESS WITH CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS
BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS
CONVEYED INTO A SEDIMENT TRAP OR BASIN.
5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
LC
00
00
00
N
55 GALLON DRUM
20' (MIN.)
COMPACTED SUBGRADE
(ELEV. TO BE 13" MIN. BELOW FINISH GRADE)
PROFILE
(TO BE PLACED OVER ALL BEEHIVE
CASTINGS DURING CONSTRUCTION)
SLOTTED RISER
FOR SEDIMENT RETENTION
TEMPORARY CONSTRUCTION
ENTRANCE DETAIL
6-1"x SLOTS TO
BE EQUALLY SPACED.
3 -1 "x6 SLOTS TO
BE EQUALLY SPACED.
2 -3" COARSE
AGGREGATE
1 1 I I I 1=111 I I #2 WASHED STONE
GEOTEXTILE FABRIC TO STABILIZE
FOUNDATION (ESPECIALLY IMPORTANT
WHERE WETNESS IS ANTICIPATED)
EROSION AND SEDIMENT CONTROL PLAN SUMMARY AND "RULE 5" DATA
5
Project: Townhomes Hunters Creek
Nature and Purpose: Townhomes
Estimated Start: October 15, 2003.
Estimated Completion of Site Development: December 31, 2003
Estimated Completion of Home Construction: December 31, 2004
Floodploins, Floodway Fringes, Floodways: None
Lakes, Streams, Channels, Ditches, Wetlands, etc.: None.
Existing Soil Types Description
Brookston Silty Clay Loom: Very poorly drained, moderately permeable.
Crosby Silt Loam: Deep, somewhat poorly drained, slowly permeable
Miami Silt Loam: Deep, well drained soil.
Receiving Waters: White River
Potential Areas Where Stormwater May Enter Groundwater: None known
Existing Vegetation: The site is a grass lawn with an asphalt parking lot
and a vacant building in the middle of the property. Ornamental trees
are located in parts of the site.
3
Contact Person:
Mork Webber
Estridge Development Company, Inc.
1041 West Main Street
Carmel, IN 46032
(317) 582 -2456
Adjacent Land Use:
North, West Residential
South Commerical
East Agricultural
Site Specific Sequence and Additional Notes:
See construction sequencing for erosion control notes.
2
CROSSBARS
LATHS
SILT FENCE MATERIAL ILT FENCE EXTENDS
N 7 S s BELOW FINISHED GRADE
NOTE: 40--
1. SEE SILT FENCE DETAIL
FOR MATERIAL SPECIFICATIONS.
2. SILT FENCE SHALL BE
PREASSEMBLED BY SUPPLIER.
INLET PROTECTION SILT FENCE
300
275
250
225
200
SLOPE 175
LENGTH 150
(FT.) 125-
100-
50
25
0
THE BLANKET SHOULD NOT BE
STRETCHED BUT ALLOWED TO LAY
LOOSELY ON THE SOIL SURFACE TO
ACHIEVE MAXIMUM BLANKET TO SOIL
CONTACT.
IN HIGH VELOCITY CHANNEL APPLICATIONS,
CHECK SLOTS SHOULD BE ESTABLISHED
EVERY 35 40'. THE SLOTS SHOULD BE
6' 'N1DE BY 6' DEEP WITH THE BLANKET
STAPLED IN THE BOTTOM OF THE SLOT,
THEN BACKRLLED AND SEEDED.
1 STAPLE PER SQ. YD.
75 A
A
4:1 3:1 2:1 1:1
GENERAL STAPLE RECOMMENDATIONS
SLOPE GRADIENT UNING
BEEHIVE INLET OR
DRAINAGE COVER
B
1-1/2 STAPLES PER SQ. YD.
CHANNEL
STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN
EROSION CONTROL BLANKETS. STAPLE PATTERNS MAY VARY
DEPENDING UPON SOIL TYPE AND AVERAGE ANNUAL RAINFALL
AT SLOPE LENGTHS GREATER THAN 300 FEET OR WHERE
DRAINAGE OVER LARGE AREAS IS DIRECTED ONTO THE
BLANKETS, STAPLE PA 1 ILRN "C" SHOULD BE UTILIZED.
1
THE EDGES OF THE BLANKET SHOULD
BE BUIILU AGAINST EACH OTHER, THE
EDGES OF THE SCO225 SHOULD BE
OVERLAPPED 2
2 STAPLES PER SQ. YD.
ADDITIONAL STAPLES AS
REQUIRED DUE TO DEPTH OF FLOW.
CHANNEL UNINGS UTILIZE STAPLE PAIIL2N "C"
WITH ADDITIONAL STAPLES ON SIDE SLOPES AT
PROJECTED WATER LINE.
2
EROSION BLANKET INSTALLATION
ON SLOPE APPUCAT1ONS, THE TOP OF
THE BLANKET SHOULD BE 'SLOIILU IN'
ABOVE THE BREAK OF THE SLOPE OR AT
A MINIMUM, STAPLED IN PLACE WITH
STAPLES 6" APART 014 THE END OF THE
BLANKET.
ROLL BLANKETS
OUT IN DIRECTION
OF WATER FLOW.
4
ON LONG SLOPES, THE ENDS OF THE
BLANKETS SHOULD BE OVERLAPPED
4 6" IN A "SHINGLE H-fECT°.
6
PREPARATION OF THE SEED BED,
INCLUDING APPUCATION OF UME,
FERT1UZER AND SEED SHOULD BE
CONDUCTED AS NORMAL PRIOR TO
INSTALLATION OF BLANKET.
-t
CONDITION
L
o
v
a ,ur,,;a1ol
buvdwo.)i
sPaaN
v,
a
C
-z
0
a>
o
O
E. G
N
a.,_
s
O N 7.
z
(s /:op) awil I
Tolerance
ten.
Sou
Spray
Wet
Nornl Dry
Creeping Red Fescue
Festuca rubra
N
t
1
2
1
1
Meg.
20 25
12-18
Kentucky Bluegrass
Poe pratinsis
C�J
1
1
1
1
Med.
Low
1
1
L5 -35
12 -18
10-20
i MT
Tall Fescue
Festuca L arundinacea
2
1
1
1
1
24 -35
24 -36
5
I
Perennial ryegrass
Lolium perenne
2
1
2
1
2
M eg
High
1 5 20
5 -10
112 -18
24
5-
MT
C rown'JetCh
Coronilla varia
1
1
I N
Loy,
14 -21
T
Red Clover
Trifolium pretense
1
2
Med.
1
7 -10
18
5 -10
S
S
Oats
Annual Ryegrass
Non Irrigated*
COMPACTED
SUB -GRADE
(TYP.
TOP OF BANK 841.5
COMPACTED 7
SUB -GRADE
(TYP
Temporary Seeding Dates
Late summer seeding dates may be extended 5 days
if mulch is applied.
increase seeding application by 50
FIGURE 5-3
Ranking:
1 Good
2 Medium
Not tolerant
J
5'
10'
POLYFELT 15650 OR
EQUAL UNDER STONE
10'
POLYFELT TS650 OR
EQUAL UNDER STONE
FIGURE 5 -4
2:1 SLOPE
6" HP -RAP WITH
No. 5 STONE FACE
TOP OF BANK 842.0
Tom_n orklr ELEVATION 841.0 re
11 =11 ku„ 41 4
t �r .4 tittle 4,
����i��i�ir 0
6" RIP-RAP
2ND
IP -RAP
2ND SEDIMENT TRAP OUTLET DETAIL
2:1 SLOPE
A
Salt Tolerance (to both soil salts spray):
T Tolerance
MT Medium Tolerance
5 Slight Tolerance
5
SECTION A-A
20'
SUB -GRADE ELEVATION 835.0
A
SECTION A-A
20'
ONE FOOT THICK STONE
FACE OF No 5 STONE
2:1 SLOPE
SUB -GRADE ELEVATION 835.0
ONE FOOT THICK STONE
FACE OF No 5 STONE
6" RIP -RAP WITH
No. 5 STONE FACE
-STONE ELEVATION 840.8
-1:1 SLOPE
SUB -GRADE ELEVATION 839.8
10'
10'
5'
-GRADE ELEVATION 839.8
J'
v= v= n =u =u =a o i ft :�.it r s e ire
1ST SEDIMENT TRAP OUTLET DETAIL
TOP OF BANK 842.0
3:1 SLOPES
(MAX.)
-PLACE OUTLET STONE IN SEMI
CIRCLE AROUND EXISTING
STORM SEWER OUTLET
TOP OF BANK 841.5
i
3:1 SLOPES
(MAX.)
PLACE OUTLET STONE IN SEMI
CIRCLE AROUND EXISTING
STORM SEWER OUTLET
Kind of Seed 1000 Sq. Ft. Acre Remarks
Wheat or Rye 3.5 lbs. 2 Liu. Cover seed 1" to
1 1/2" deep
Spr Oats
Anriucll ryegress 1 lb.
4 Not necessary where mulch .s applied.
SEEDBED PREPARATION REQUIREMENTS
Seedbed Preparation
In e to raise the pH to the 'r del needed for species being
eeded. Apply 2 pounds 0 f 12-12 -12 analysis fertilizer (or equivalent) per
)00 sq. t' i,apprc >:irnately 1 000 pounds per acre) or fertilize according to
te.;t Application of 150 ibs of ammonium nitrate on areas low in organic
matter and fertility will greatly enhance vegetative growth.
t and lime into the soil to a depth of 2 -3 inches
with a harrow, disk or rake operated across t he slope as much as possible.
Seed
Select r sped mixture based on projected use of the area (Figure 5 -2),
while >nsiderina best Peeaing dotes. See Figure 5 -3 this sheet. If toler-
ances are problem, such as salt tolerance of seedings adjacent to streets
and highways, see Figure 5 -4 this sheet before final selection.
Level and Sloping, open ,Areas
Tall Fescue
F es ur
Red Clover
Kentuck Bluegrass 15 .4
Creeping Red Fescue 15 .4
Steep Banks and Cuts
T Fescue
Kentucky Bluegrass
Tall Fescue .35
Errerald Crowr:vetch 10
20'
20'
Temporary Seedings
Figure 5 -2 Permanent Seed Mixtures
Lawns and High Maintenance Areas
8. Tall Fescue 170 4.0
6. Kentucky Bluegrass 40 .9
Creeping Red Fescue 40 .9
7 Perennial Ryegrass 170 4.0
(Turf Type)
20 WIDE SPILLWAY
ELEVATION 840.5
SEE PLAN
20' 'WIDE SPILLWAY
t4 ELEVATION 841.0
SEE PLAN
2 z, lbs. 3 bu_ Cover seed 1" deep
Seeding Rate Suitable pH Site Suitability*
Ibsjacre lbs/1000 well
sq. ft-. Droughty Drained Wet
15 .4 5.8 -7.5 2 1
25 .6
8
25
3:1 SLOPES
(T'
3:1 SLOPES
rYF
40 lbs. Cover seed 1 "deep*
O 5.5 -8.3
.12
5.5 -8 -3 2
5.5 -7.5 2 1
5.5 -8.3 2 1
5.8 -7.5
5.0 -7.5
5.5 -8.3
2 1
2 1 2
1 Preferred 2 Will Tolerate Inoculate with specific Inoculant.
2
2
SILT FENCE
Silt Fence shall be a machine produced, non -woven geotextile of 100%
polypropylene meeting the physical properties below.
All stakes shall be 2" X 2" hardwood 36" tall with 24" tall lath stapled
to stakes over fabric as reinforcement.
All silt fence shall be prefabricated by the supplier. No field assembly
will be accepted.
Fabric Weight 4 oz /syd
Grab Strength Warp 125 lbs.
Elongation Warp 50
Trapezoidal Tear Strength 50 lbs.
Burst Strength 200 psi
UV Resistance 70
A.O.S 50 -80
Slurry Flow Rate 225 gpm /sq. ft
Sediment Retention 75
Silt Fence Material
Fence Post
N
Fence Post Should --Silt Fence Material Should
be Buried 1' Below be Buried 6" Below Ground
Ground Surface Surface.
SILT FENCE DETAIL
N TS
PUBLIC ROAD
Stakes 5' 0.C.
SCALE: NONE
Ground Surface
PLAN VIEW
EROSION CONTROL MEASURES MAINTENANCE REQUIREMENTS
STRAW BALE DAM MAINTENANCE REQUIREMENTS
1. INSPECT STRAW BALE DAMS AFTER EACH STORM EVENT AND PROMPTLY REMOVE ANY
SEDIMENT DEPOSITS TO ENSURE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN,
TAKING CARE NOT TO UNDERMINE THE ENTRENCHED BALES.
2. INSPECT PERIODICALLY FOR DETERIORATION OR DAMAGE FROM CONSTRUCTION
ACTIVITIES AND REPAIR IMMEDIATELY.
3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL
STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE
IT.
SILT FENCE MAINTENANCE REQUIREMENTS
1. INSPECT THE SILT FENCE PERIODICALLY AND AF IER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES
INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY.
3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT
ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE.
4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AF ILR THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE
AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS
1. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT AND IMMEDIATELY
REPAIR ANY EROSION AND PIPING HOLES.
2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF THE DESIGN DEPTH.
3. REPLACE SPILLWAY GRAVEL FACING IF CLOGGED.
4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY.
5. CHECK THE SPILLWAY DEPTH PERIODICALLY TO ENSURE A MINIMUM OF 1.5 FT. DEPTH
FROM THE LOWEST POINT OF THE SETTLED EMBANKMENT TO HIGHEST POINT OF THE
SPILLWAY CREST, AND FILL ANY LOW AREAS TO MAINTAIN DESIGN ELEVATION.
6. PROMPTLY REPLACE ANY DISPLACED RIPRAP, BEING CAREFUL THAT NO STONES IN THE
SPILLWAY ARE ABOVE DESIGN GRADE.
7. AF IER ALL DISTURBED AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE AND
SEDIMENT, SMOOTH THE SITE TO BLEND MTH ADJOINING AREAS, AND STABILIZE.
SANDBAG CURB INLET SEDIMENT BARRIER MAINTENANCE REQUIREMENTS
1. INSPECT FREQUENTLY FOR DAMAGE BY VEHICULAR TRAFFIC, AND REPAIR IF
NECESSARY.
2. INSPECT AFTER EACH STORM EVENT.
3. REMOVE SEDIMENT, WITHOUT FLUSHING, WHEN IT REACHES HALF THE HEIGHT OF THE
BARRIER.
4. DEPOSIT REMOVED SEDIMENT WHERE IT WILL NOT ENTER STORM DRAINS.
BLOCK AND GRAVEL CURB INLET PROTECTION MAINTENANCE REQUIREMENTS
1. AFTER EACH STORM EVENT, REMOVE THE SEDIMENT AND REPLACE THE GRAVEL;
REPLACE THE GEOTEXTILE FABRIC, IF USED.
2. PERIODICALLY REMOVE SEDIMENT AND TRACKED -ON SOIL FROM THE STREET, WITHOUT
FLUSHING, TO REDUCE THE SEDIMENT LOAD ON THE CURB INLET PROTECTION.
3. INSPECT PERIODICALLY FOR DAMAGE AND REPAIR; KEEP GRATES FREE OF DEBRIS.
4, WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE
GRAVEL, WIRE MESH, GEOTEXTILE FABRIC, AND ANY SEDIMENT, AND DISPOSE OF THEM
PROPERLY.
EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS
1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY
EROSION BELOW THE BLANKET.
2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING
IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET.
3. AF ILR VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS
1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM
EVENTS OR HEAVY USE.
2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
3. TOPDRESS WITH CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS
BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS
CONVEYED INTO A SEDIMENT TRAP OR BASIN.
5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
LC
00
00
00
N
55 GALLON DRUM
20' (MIN.)
COMPACTED SUBGRADE
(ELEV. TO BE 13" MIN. BELOW FINISH GRADE)
PROFILE
(TO BE PLACED OVER ALL BEEHIVE
CASTINGS DURING CONSTRUCTION)
SLOTTED RISER
FOR SEDIMENT RETENTION
TEMPORARY CONSTRUCTION
ENTRANCE DETAIL
6-1"x SLOTS TO
BE EQUALLY SPACED.
3 -1 "x6 SLOTS TO
BE EQUALLY SPACED.
2 -3" COARSE
AGGREGATE
1 1 I I I 1=111 I I #2 WASHED STONE
GEOTEXTILE FABRIC TO STABILIZE
FOUNDATION (ESPECIALLY IMPORTANT
WHERE WETNESS IS ANTICIPATED)
EROSION AND SEDIMENT CONTROL PLAN SUMMARY AND "RULE 5" DATA
5
Project: Townhomes Hunters Creek
Nature and Purpose: Townhomes
Estimated Start: October 15, 2003.
Estimated Completion of Site Development: December 31, 2003
Estimated Completion of Home Construction: December 31, 2004
Floodploins, Floodway Fringes, Floodways: None
Lakes, Streams, Channels, Ditches, Wetlands, etc.: None.
Existing Soil Types Description
Brookston Silty Clay Loom: Very poorly drained, moderately permeable.
Crosby Silt Loam: Deep, somewhat poorly drained, slowly permeable
Miami Silt Loam: Deep, well drained soil.
Receiving Waters: White River
Potential Areas Where Stormwater May Enter Groundwater: None known
Existing Vegetation: The site is a grass lawn with an asphalt parking lot
and a vacant building in the middle of the property. Ornamental trees
are located in parts of the site.
3
Contact Person:
Mork Webber
Estridge Development Company, Inc.
1041 West Main Street
Carmel, IN 46032
(317) 582 -2456
Adjacent Land Use:
North, West Residential
South Commerical
East Agricultural
Site Specific Sequence and Additional Notes:
See construction sequencing for erosion control notes.
2
CROSSBARS
LATHS
SILT FENCE MATERIAL ILT FENCE EXTENDS
N 7 S s BELOW FINISHED GRADE
NOTE: 40--
1. SEE SILT FENCE DETAIL
FOR MATERIAL SPECIFICATIONS.
2. SILT FENCE SHALL BE
PREASSEMBLED BY SUPPLIER.
INLET PROTECTION SILT FENCE
300
275
250
225
200
SLOPE 175
LENGTH 150
(FT.) 125-
100-
50
25
0
THE BLANKET SHOULD NOT BE
STRETCHED BUT ALLOWED TO LAY
LOOSELY ON THE SOIL SURFACE TO
ACHIEVE MAXIMUM BLANKET TO SOIL
CONTACT.
IN HIGH VELOCITY CHANNEL APPLICATIONS,
CHECK SLOTS SHOULD BE ESTABLISHED
EVERY 35 40'. THE SLOTS SHOULD BE
6' 'N1DE BY 6' DEEP WITH THE BLANKET
STAPLED IN THE BOTTOM OF THE SLOT,
THEN BACKRLLED AND SEEDED.
1 STAPLE PER SQ. YD.
75 A
A
4:1 3:1 2:1 1:1
GENERAL STAPLE RECOMMENDATIONS
SLOPE GRADIENT UNING
BEEHIVE INLET OR
DRAINAGE COVER
B
1-1/2 STAPLES PER SQ. YD.
CHANNEL
STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN
EROSION CONTROL BLANKETS. STAPLE PATTERNS MAY VARY
DEPENDING UPON SOIL TYPE AND AVERAGE ANNUAL RAINFALL
AT SLOPE LENGTHS GREATER THAN 300 FEET OR WHERE
DRAINAGE OVER LARGE AREAS IS DIRECTED ONTO THE
BLANKETS, STAPLE PA 1 ILRN "C" SHOULD BE UTILIZED.
1
THE EDGES OF THE BLANKET SHOULD
BE BUIILU AGAINST EACH OTHER, THE
EDGES OF THE SCO225 SHOULD BE
OVERLAPPED 2
2 STAPLES PER SQ. YD.
ADDITIONAL STAPLES AS
REQUIRED DUE TO DEPTH OF FLOW.
CHANNEL UNINGS UTILIZE STAPLE PAIIL2N "C"
WITH ADDITIONAL STAPLES ON SIDE SLOPES AT
PROJECTED WATER LINE.
2
EROSION BLANKET INSTALLATION
ON SLOPE APPUCAT1ONS, THE TOP OF
THE BLANKET SHOULD BE 'SLOIILU IN'
ABOVE THE BREAK OF THE SLOPE OR AT
A MINIMUM, STAPLED IN PLACE WITH
STAPLES 6" APART 014 THE END OF THE
BLANKET.
ROLL BLANKETS
OUT IN DIRECTION
OF WATER FLOW.
4
ON LONG SLOPES, THE ENDS OF THE
BLANKETS SHOULD BE OVERLAPPED
4 6" IN A "SHINGLE H-fECT°.
6
PREPARATION OF THE SEED BED,
INCLUDING APPUCATION OF UME,
FERT1UZER AND SEED SHOULD BE
CONDUCTED AS NORMAL PRIOR TO
INSTALLATION OF BLANKET.