Loading...
HomeMy WebLinkAbout04010002 C201 Site PlanLANDSCAPE BLOCK WALL SITE BENCHMARK #2 ELEV.= 836.83 0 ASPHALT GATE ASPHALT O' WIDE UTILITY EASEMENT D.B. 127, PAGE 38 0 w 0 LL-1 w c.� 10' R19.5' CARMEL DRIVE ASPHALT PAVEMENT 21.08' SELF •E" VE CARWASH F FFE= 843.50 150.8' 32.76' 0) 80' 10' TYP 49.13' AUTOMATED CARWASH FACILITY FFE 846.00 5' SIDEYARD SETBACK 11.67' CIL ASPHALT LLJ z 0 0 SPRINKLER HEAD 6' PRIVACY FENCE SHELL CAR WASH SEPTIC TANK UD CONC. WALL SPRINKLER HEAD LCD go' x ,--FENCE CONCRETE LANDSCAPE TIMBER WALL 5' SIDEYARD SETBACK LCD Lri E: x LID 1n r, r) CONC. PAD 26.17' x 5' SIDEYARD SETBACK 155.3' ASPHALT 26.17' F.F.E.= 844.97 CONCRETE BLOCK BUILDING SITE BENCHMARK ft 1 ELEV.= 848.90 w-A c., CONCRETE C) :z 1-5' RIGHT -O- -WAY LINE AS SHOWN ON THE WEIHE ENGINEERS, INC. SURVEY SITE WORK GENERAL NOTES AND SPECIFICATIONS NOTICES AND PERMITS 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, OR VERIFYING, THAT ALL PERMITS AND APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY, COUNTY AND STATE AGENCIES PRIOR TO STARTING CONSTRUCTION. 2. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES IN THE VICINITY OF THE CONSTRUCTION AREA PRIOR TO STARTING CONSTRUCTION. 3. IT SHALL BE THE CONTRACTORS RESPONSIBILITY FOR NOTIFICATION AND COORDINATION OF ALL CONSTRUCTION WITH RESPECTIVE UTILITY COMPANIES. 4. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER AND CONTRACTOR TO MAINTAIN QUALITY CONTROL THROUGHOUT THE PROJECT; FAILURE TO DO SO MAY RESULT IN REMOVAL AND REPLACEMENT OF THE DEFECTIVE WORK. IT IS RECOMMENDED THAT THE DEVELOPER HAVE A QUALIFIED INSPECTOR ON THE JOB SITE AT ALL TIMES DURING CONSTRUCTION. 5. IT IS ESSENTIAL THAT THE WORK TO BE DONE IN CONJUNCTION WITH THIS PROJECT SHALL BE INSTALLED ACCORDING TO THESE SPECIFICATIONS. THE ENGINEER WILL BE REQUIRED TO CERTIFY TO CERTAIN PORTIONS OF THIS PROJECT UPON COMPLETION. THEREFORE, IT IS NECESSARY TO OBTAIN APPROVAL AND ACCEPTANCE BY THE CITY THAT CONSTRUCTION WAS DONE IN COMPLIANCE WITH THESE PLANS AND SPECIFICATIONS. 6. ALL QUANTITIES GIVEN ON THE PRINTS, VERBALLY OR IN THE SCOPE OF WORK SECTION ARE ESTIMATES AND SHALL BE CONFIRMED BY THE BIDDING CONTRACTOR. 7. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS FOR EXCAVATIONS. FINAL RULE 29 CFR PART 1926, SUBPART "P" APPLIES TO ALL EXCAVATIONS EXCEEDING FIVE (5) FEET IN DEPTH. 8. EXCAVATIONS EXCEEDING TWENTY (20) FEET IN DEPTH REQUIRE THE DESIGN OF A TRENCH SAFETY SYSTEM BY A REGISTERED PROFESSIONAL ENGINEER. 9. LOCATIONS ELEVATIONS OF "FLOODWAY LIMITS" AND "100 YEAR FLOOD LIMITS" ARE SHOWN FOR REFERENCE ONLY. DEVELOPER /BUILDER /INDIVIDUAL LOT OWNER TO REFER TO NATIONAL FLOOD HAZARD INSURANCE MAP (F.E.MA) TO DETERMINE FLOOD HAZARD POTENTIAL PRIOR TO INDIVIDUAL LOT /PROJECT CONSTRUCTION. SITE PLAN NOTES' 1. ALL RADII AND STREET DIMENSIONS SHALL BE MEASURED TO BACK OF CURB OR FACE OF INTEGRAL CURB AND WALK. ALL DIMENSIONS TO THE BUILDING ARE TO THE OUTSIDE OF BUILDING FOUNDATION WALL. 2. ALL PAVEMENT AND /OR CURB RADII TO BE FIVE (5) FOOT UNLESS OTHERWISE NOTED. 3. BEARINGS, DIMENSIONS AND EASEMENTS ARE SHOWN FOR REFERENCE ONLY. SEE RECORD SURVEYS AND PLATS FOR EXACT INFORMATION. 4. SEE ARCHITECTURAL PLANS FOR DETAILS OF BUILDINGS AND BUILDING DIMENSIONS. 5. ALL PARKING AREAS TO BE CURBED WITH CHAIRBACK CURB OR INTEGRAL CURB AND WALK AS SHOWN. 6. ALL PARKING STALLS SHALL BE 10' X 20' OR 10' X 18' WHERE ADJACENT TO SIDEWALK OR GRASS AREA. WHERE INTEGRAL CURB AND WALK IS ADJACENT TO A PARKING STALL, TWO (2) FEET OF SIDEWALK SHALL BE UTILIZED AS PARKING AREA OVERHANG. PARKING STALLS ARE DIMENSIONED TO THE FACE OF CURBS. 7. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL STANDARDS. 8. SEE UTILITY PLAN FOR SANITARY AND STORM STRUCTURE LOCATIONS. 9. SEE SHEETS C303 AND C801 FOR DETAILS REFERENCED. LEGAL DESCRIPTION. PROJECT DATA. PROJECT ADDRESS ADDRESS PROJECT AREA 00.00 ACRES REGULAR PARKING SPACES No. ACCESSIBLE SPACES No. TOTAL PARKING SPACES No. PUBLIC STREET NAME LENGTH BUILDING AREA SF No. OF EMPLOYEES NO. BUILDING SETBACK LINE EASEMENT LINE RIGHT -OF -WAY CENTERLINE FENCE GUARD RAIL 1 1 SITE PLAN LEGEND PROPOSED CONSTRUCTION KEY NOTE DESCRIPTION PROPOSED CONCRETE PAVEMENT (SEE DETAIL PV -36) VACUUM ISLAND (SEE ARCHITECTURAL) STRAIGHT CURB (SEE DETAIL PV -18) PROTECTIVE POST (SEE DETAIL MI -3) PAVEMENT MARKING (SEE DETAIL TR -6) CURB END TRANSITION (SEE DETAIL PV -7) VALLEY GUTTER (SEE DETAIL PV -3C) DUMPSTER ENCLOSURE (SEE DETAIL ST -17) SIGN (SEE ARCHITECTURAL MODULAR BLOCK RETAINING WALL (SEE DETAIL MI -33) <1 dIUS 2, AiYY lam 1,1 L .ra 1.:::..;.: ra. .X'.... Yt:. .)*Misraotele aB Yi"1'° 1 1 1 U 2UUJ IUJO4U!\2000U \C;adltniyr\C:UsiC 2U1.dwy, 12/15/2003 12 21.36 PM, mwaytier, 1:1 1 3 co N O I N to 0 0 N a) cr Z .0- a E =ZQ 'L o J U O �Q Q�w ES 00 M 0) W CERTIFIED BY: Drawn By: MAW Checked By: Quality Assurance: Scale: 0 Scale: 1' 20' M Sheet C201 Date Project Number 0030407-20000