Loading...
HomeMy WebLinkAboutSite Plans 5 of 10 Grading Plan893.91 894.14 255.07' STORM INL T.C. 895. INV.NE IN STORM INLET IG, 895 7C1 INV.SW 893.90 94.76 896.70 896.20 895.86 896.55 896.05 896.50 896.52 896.02 96.41 896.70 896.26 896.10 896.61 896.11 96.30 897.20 896.59 896.09 896.75 897.20 896.4 896.60 896.10 896.60 896.10 896.54 896.83 896.6 897.20 896.54 896.04 897.20 897.0 896.50 1 896.67 896.17 896.64 896.14 897.20 897.10 896.68 896.18 897.20 897.1 897.10 895.82 896.73 896.89 896.39 896.63 896.13 896.73 896.23 897.20 896.25 896.30 897.20 897.10 896.6 896.07 897.20 896.88 897.10 896.60 896.10 1NV.SW 893.70 897.10 896.60 896.70 897.19 896.69 897.03 896.53 897.37 896.87 896.85 897.37 96.87 897.25 896.75 95.20 M.E.G. mK EMU M E.G. 89 rja i 896.74 896.24 896.47 896.47 895.97 895.82 895.97 895.47 896.59 896.09 M.E.G. 896.39 896.58 896.08 896.82 896.32 896.74 896.24 896.41 895.92 896.15 896.32 895.82 896.24 895.74 896.69 896.19 896.73 896.23 896.49 895.99 896.40 895.90 896.61 896.11 896.67 896.17 896.82 896.32 896.60 896.30 896.60 896.10 896.22 895.82 895.54 0 O 896.02 (t) NOTE_ OFFSITE IS UNDER CONSTRUCTION, CURBING SHOWN HEI E. LSJ IT_ :ii�iaii�i►ii�s:�._BJECT TO CHANGE. 60 FOUND 896.52 898.02 896.74 896.24 896.59 896.09 9564 1893.64 896.64 896.14 STORM I fL Street LIT') 895.80 895.32 896.22 •6 01. ",f 896.70 896.20 .I r 4 •i ..u. 'ft urster Trust o. 2000 -50549 896.85 896.35 "DON'T DIG BLIND" 1- 800 -382 -5544 CALL BEFORE YOU DIG EXISTING BENCHMARK NOTE GRADING GENERAL NOTES: SCALE 1" 20' 0' 20' LEGEND STORM MANHOLE STORM INLET SANITARY MANHOLE SANITARY CLEANOUT STORM SWALE CONTOUR x �c EXISTING GRADE GRADING BOX MATCH EXISTING GRADE HIGH POINT STRUCTURE NO. STRUCTURE NO. FLOW DIRECTION PROPOSED FINISHED FLOOR PROPOSED 111 886.50 886.00 M.E.G. 886.00 (STORM) (SAN ITARY) 3. PROVIDE POSITIVE DRAINAGE WITHOUT PONDING, IN ALL AREAS AFTER INSTALLATION, CONTRACTOR TO TEST FOR, AND CORRECT, IF ANY, "BIRD BATH" CONDITIONS. 5. ALL PROPOSED SPOT ELEVATIONS ARE THE FINAL PAVEMENT AND FINAL GRADE ELEVATIONS. 7, SEE APPROPRIATE DETAILS TO DETERMINE SUBGRADE ELEVATIONS BELOW FINISH GRADE ELEVATIONS INDICATED. F.F.EL. 896.60 BM #S 78 STATION LOCATED APPROXIMATELY 1.2 MILES SE OF ZIONSVILLE; APPROXIMATELY 0.24 MI NW OF THE INTERSECTION OF US 421 WEST 106th STREET, ON THE EAST SIDE OF US 421, SET IN THE TOP OF A CONCRETE POST, 0.5 FOOT ABOVE THE GROUND; A U.S.C. AND G.S. BENCH MARK TABLET, STAMPED S: 78 1945". ELEVATION 901.375 US FOOT 1 THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIFI n DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM THE ACTUAL FIELD CONDMONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 2. THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY UNES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTOR'S ANDOR UTILITY COMPANIES SO AS NOT TO CAUSE DAMAGE. 4. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE CONSTRUCTION IS TO START, TO VERIFY IF ANY UTILITIES ARE PRESENT ON SITE. ALL VERIFICATIONS (location, size, and depth) SHALL BE MADE BY THE APPROPRIATE UTILITY COMPANIES. WHEN EXCAVATING IS AROUND OR OVER EXISTING UTILITIES, THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY SO A REPRESENTATNE OF THAT U11UTY COMPANY CAN BE PRESENT TO INSTRUCT AND OBSERVE DURING CONSTRUCTION. 6. TRENCHES FOR ALL STORM PIPES ARE TO BE BACKFILLED COMPLETELY WITH ENGINEERED GRANULAR MATERIAL IF WITHIN 5 FEET OF PAVEMENT. 8. CONTACT U11UTY COMPANIES PRIOR TO REMOVAL OR ABANDONING OF ANY EXISTING UTILITY UNE. 9. SEE SHEET 4 FOR SITE PLAN. 10. SEE SHEET 6 FOR UTILITY PLAN. DATE: December 5, 2003 SCALE: 1" =20' J CD CD PROJECT NO. 122-0083 SHEET NO.