HomeMy WebLinkAboutSite Plans 6 of 10 Utility PlanEXISTING UTILITY COMPANIES AMERITECH 5858 N. COLLEGE AVENUE INDIANAPOLIS, IN 46220 (317) 252 -4274 INDIANAPOLIS WATER COMPANY 1220 WATERWAY BOULEVARD INDIANAPOLIS, IN 46205 (317) 263 -6446 ATTN.: MARK SHOCKLEY VECTERN ENERGY 16000 ALLISONVILLE ROAD NOBLESVILLE, IN 46060 (317) 776 -5573 ATTN.: JIM SCOTT AES'IPALCO 3600 N. ARLINGTON AVENUE INDIANAPOLIS, IN 46218 (317) 261 -5277 ATTN.: NORM SCHOPPENHORST GAS UNE FI FCTRICAL UNE TELEPHONE UNE WATER UNE SANITARY SEWER UNE STORM SEWER UNE ARE HYDRANT REDUCER WATER METER POWER POLE SANITARY CLEAN OUT SANITARY SEWER MANHOLE sT STORM SEWER MANHOLE STORM INLET NOT OFFSITE IS UNDER CONSTRUCTION. CURBING SHOWN BED l _NST_ JECT TO CHANGE. PROPOSED INV. 889.94 INV. NE= 887.53 Right -of -Way Line N 89° 05'48 "E 206.76' Street Lic) ITARY C.O. INV.NE =889 9 =889.86 STORM INL T. =895.7 INV.NE :93.64 NV(N+ 893.64 .57 893.33 SW 893.27 SANITARY C.O. 45 fitting TS' u I La T.C. 895.70 INV.SW 893.90 T.C. 896,10 I NV. SW 893.70 INV. W 50 4" PVC CONDUIT Pi EMI ,W;111 T. r i X 11 M I N 1•11. in iiiii 111• ■I1IMI IMP •i 1 1 1 ii�i II 1111111MWES_- IIIIIIIIIILIMIIIIIMIIIIIIIII E1I►1IIil[ ■rN11■ ■1111111111 NOTES: PLAN SCALE: 1" 20' PROFILE SCALES: HORIZONTAL 1" 20' VERTICAL 1" 5' LENGTHS OF PIPES INDICATED ARE FROM CENTER TO CENTER OF STRUCTURES AND ARE NOT ACTUAL PIPE LENGTHS. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL PERMIT ISSUING AGENCIES WITHIN THE TIME SPECIFIED BY THAT AGENCY PRIOR TO BEGINNING CONSTRUCTION. GRANULAR BACKFILL REQUIRED 900 895 890 885 1. ALL POINTS OF CONNECTION OF PROPOSED SANITARY AND STORM SEWERS TO EXISTING SYSTEMS MUST BE VERIFIED FROM A KNOWN BENCHMARK VERTICALLY AND HORIZONTALLY BEFORE START OF CONSTRUCTION. ANY CONFUCT WITH THE PLANS MUST BE REPORTED IMMEDIATELY. 2. ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT ALL AFFECTED UTILITIES AND THE LOCAL UTILITIES PROTECTION SERVICE PRIOR TO ANY CONSTRUCTION. 3. LENGTHS OF PIPES INDICATED ARE FROM CENTER TO CENTER OF STRUCTURES AND ARE NOT ACTUAL PIPE LENGTHS. 4. CONTRACTOR SHALL CALL 1- 800-382 -5544 FORTY -EIGHT (48) HOURS PRIOR TO CONSTRUCTION FOR ALL EXISTING UTILITY LOCATIONS. NOTE: 5. SEE SHEET 4 FOR SITE PLAN. 6. SEE SHEET 5 FOR GRADING PLAN. 7. SEE SHEET 10 FOR CONSTRUCTION DETAILS. 8. 4" PVC CONDUIT REQUIRED FOR ALL ELECTRIC, TELEPHONE, CABLE, ETC. CROSSINGS UNDER PAVEMENT. 9. GRANULAR BACKFILL REQUIRED FOR ALL UTILITY TRENCHES IF ANY PART OF TRENCH IS WITHIN 5'0F EDGE OF PAVEMENT, INCLUDING SIDEWALKS. SEE SPECIFICATIONS FOR MORE INFORMATION. UTILITIES CONDUITS TO BE PLACED IN APPROPRIATE LOCATIONS REFERENCING ARCHITECTUAL PLANS NOTE: ALL INSTALLATION AND'OR EXTENSION OF UTILITIES ACROSS 106th STREET MUST BE DONE THROUGH PUSH/BORE. NOTE: ACTUAL LOCATION OF GAS PIPELINES IS SHOWN ON THE PLANS PER FIELD VERIFICATION DATED 04 SCALE I" 20' 11.111 162' OF15HRC 0.23% 900 895 890 885 900 895 890 885 DATE: December 5, 2003 SCALE: 1" =20' PROJECT NO. 122-0083 SHEET NO. 0083 -u1. DGN