HomeMy WebLinkAboutC802 Site DetailsRUNOFF GRAVEL GS ARE HALF FILLED WITH COURSE "L" GRAVEL IN OPEN MESH BAGS PACKED CLOSE TOGETHER 0 ELIMINATE GAPS. MAINTENANCE 1. INSPECT FREQUENTLY FOR DAMAGE BY VEHICULAR D REPAIR IF NEEDED. 2. INSPERCT AFTER EACH STORM EVENT. 3. REMOVE SEDIMENT (BUT NOT BY FLUSHING) WHEN IT REACHES HALF THE HEIGHT OF THE BARRIER. 4. DEPOSIT REMOVED SEDIMENT WHERE IT WILL NOT ENTER M DRAINS. GRAVEL AG EROSION PROTECTION FLOW 6" STONE DEPTH (MIN) 25' 1% NO SCALE 100' PLAN PROFILE GRADE 1%: OR AS SHOWN BELOW NOTE: 1. NORTH ENTRANCE TO MAIN STREET TO BE USED FOR TEMPORARY CONSTRUCTION ENTRANCE. 2. STONE SIZE SHALL CONFORM TO ASTM D48 SIZE #1 (1 1/2" TO 3 1/2" DIA.). 3. PERIODIC 2" STONE TOP DRESSING WASHING AS REQUESTED BY COUNTY /CITY. 5, REPAIR ANY BROKEN ROAD PAVMENT IMMEDIATLY. 25' 2% MAINTENANCE 1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM EVENTS OR HEAVY USE. 2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. 3. TOPDRESS WITH CLEAN STONE AS NEEDED. 4. IMMEDIATLEY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN. TEMPORARY CONSTRUCTION ENTRANCE DETAIL 2X4 IN. WOOD FRAME SEASONAL SOIL PROTECTION CHART FABRIC AMOCO 4535 NONWOVEN COMPACTED SOIL EX. SUBGRADEJ 4" POST SPACED z 6' O.C. SEDIMENT CONTROL FENCE co A MAINTENANCE 1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. 2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. 4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. BURIED FABRIC COMPACTED FILL Z 1 11: 11.41 OVERFLOW LEVEL SET TO PREVENT BY -PASS FLOW IIIIhIIIIIllHhI 'IIIIUIII'Iitl111ll BURIED FABRIC APPROACH 1% MAINTENANCE 1. INSPECT THE FABRIC BARRIER AFTER STORM EVENTS, AND MAKE NEEDED REPARIS IMEDIATELY. 2. REMOVE SEDIMENT FROM THE POOL AREA TO PROVIDE STORAGE FOR THE NEXT STORM. AVOID DAMAGING OR UNDERCUTTING THE FABRIC DURING SEDIMENT REMOVAL. 3. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABLIZED REMOVE AND PROPERLY DISPOSE OF ALL CONSTRUCTION MATERIAL AND SEDIMENT, GRADE THE AREA TO THE ELEVATION OF THE TOP OF THE INLET, THEN STABILIZE. FABRIC DROP INLET PROTECTION FLOW D 50= 12 PIPE CULVERT 2" WOVEN GEOTEXT1LE PLAN VIEW PIPE RIP -RAP 3 X DIA. (MINIMUM) END VIEW END SECTION 3:1 ORIGINAL GROUND CROSS SECTION 12" OF RIP -RAP N 2" WOVEN GEOTEXT1LE 6' -0" MINIMUM D50 =50% OF RIP -RAP EQUALS THE SIZE FLOW NO OVERFALL COMPACTED SOIL MAINTENANCE 1. INSPECT ROCK CHUTES AFTER STORM EVENTS FOR STONE DISPLACEMENT AND FOR EROSION AT THE SIDES AND ENDS OF THE APRON. 2. MAKE NEEDED REPAIRS IMMEDIATELY; USE APPROPRIATE SIZE STONE, AND DO NOT PLACE THEM ABOVE FINISHED GRADE. END SECTION-DISCHARGE-RIPRAP INSTALLATION 1L45 21 1/4" DIA. 33" YARD TYPE CASTING NEENAH R -4342 OR APPROVED EQUAL -LIGHT DUTY N 33" Om- W W W W W 4. W W V• .Y W IV W W W W V• 4 W W W W .Y y W W W W y W J' MOM EEO ON A SLOPE W Al lik48.6 (5cm- 12.5cm) EROSION CONTROL BLANKET INSTALLATION (30 cm (15 cm) (7.5cm 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL -O -SEED DO NOT SEED PREPARED AREA. CELL -0 -SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES /STAKES APPROXIMATELY 12" (30cm) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 1 2" (30cm) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES /STAKES SPACED APPROXIMATELY 12" (30cm) APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES /STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM TM, STAPLES /STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2 -5" (5cm- 12.5cm) OVERLAP DEPENDING ON BLANKET TYPE. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH THE COLORED SEAM STITCH' ON THE PREVIOUSLY INSTALLED BLANKET. 5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" (7.5cm) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30cm) APART ACROSS ENTIRE BLANKET WIDTH. NOTE: *IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15cm) MAY BE NECESSARY TO PROPERLY SECURE THE BLANKETS. 6" (15 cm) MAINTENANCE 1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY EROSION BELOW THE BLANKET. 2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET. 3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY. 300 275 250 w 225 200 Z 150 175 0 125 w 100 w 75 0 50 25 0 0.7' 0.7 STAPLES PER SQ. YD. 4 :1 x x A 3: 1 2: 1 SLOPE GRADIENT M 1:1 0.4' 0.7' 0.4' x GENERAL STAPLE RECOMMENDATIONS 0.7' x B A C B A C B C B D E LOW MED /HIGH FLOW FLOW CHANNEL CHANNEL AND AND SHORELINE SHORELINE 1.15 STAPLES PER SQ. YD. x 0 0.4' 0.7' x x C 0.7' 0.4' EROSION CONTROL BLANKET STAPLE PATTERN 1.7 STAPLES PER SQ. YD. x 6 x x 6 U o v x --x 0.4' 0.4' 0.4' x x x 0.7' 0.4' 3.4 STAPLES PER SQ. YD. 3.75 STAPLES PER SQ. YD. NOTES: 1. STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN GREEN EROSION BLANKETS. 2. STAPLE PATTERNS MAY VARY DEPENDING UPON SOIL TYPE AND AVERAGE ANNUAL RAINFALL. 3. AT SLOPE LENGTHS GREATER THAN 300 FEET OR WHERE DRAINAGE OVER LARGE AREAS IS DIRECTED ONTO BLANKETS, STAPLE PATTERN "C" SHOULD BE UTILIZED. 4. CHANNEL LININGS REQUIRE A 2' (MIN.) OVERLAP AT LONGITUDINAL JOINTS AND SIDE SLOPES REQUIRE A 6" (MIN.) OVERLAP. WHERE OVERLAPS OCCUR, THE UPSTREAM BLANKET SHALL OVERLAP THE DOWNSTREAM. 5. IF OTHER THAN NORTH AMERICAN GREEN EROSION CONTROL BLANKETS ARE INSTALLED FOLLOW THE INSTALLATION DIRECTIONS RECOMMENDED BY THAT MANUFACTURER. PRINTED JAN 2 92004 NS GHTENG►NEERiNG S:\ Projects10335\dwg\0335c801.dwg, 01/29/2004 03:21:17 PM, Field1 EXISTING ROADWAY S-ASO\AL SO L PRO 11-CT 0\ C AR nee STABILIZATION PRACTICE JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC. PERMANENT SEEDING DORMANT SEEDING //I «/I/' ✓aiiiaaia. B A ia ir�✓ iaoi✓✓ aiaiiiaiar✓ ai// i// aiaaiiiirrriaaiaaaiiaiiiiirr�iiiiaioaioaiiaoioiiiiaiiairraiiii aaaiaiaiaiaiar B aiiriaiaaiiaiiiaair ✓oaiiaiaa TEMPORARY SEEDING SODDING MULCHING N0. DATE REVISION DESCR /P1TON .‘“Ittili till G. P 1: p 900119 *1- '2D STATE OF ,r-t" 'SWAM \\\`\e I, IIIttl1l\" iaaaiaaaiaiai CLIENT; MAI GT LAZA 9 LLC 0 ,i E aaaiaiaiiiaiir�iaiaioiiaiaaa��aiiiiiiiaiaiaiarr CONf1DENTIALI Y STATEMENT understands that owned by IEI, and also, priviledged and confidential Accordingly, the recipient in strict confidence these materials to any not to make copies of agrees to use the purpose for which ID and recipient agrees either upon completion of the request of IEI, The recipient of these materials copyright in the materials is that the materials contain business information of IEI. agrees to retain these materials and agrees not to disclose other party and further agrees the materials. The recipient materials only for the limited has made the materials available, to return all materials to IEI the intended purpose or upon whichever comes first. SITE ADDRESS• VIAI\ STREET GUILFORD ROAD INDIANA 811 WEST MAIN STREET CARMEL, SCALE: none a41E 01/30/04 DESIGNED BY: DGP DRAWN BK. M EC CHECKED BY. DGP FIELD BOOK N/A flLE NAME 0335c801.dwg DRANK TITLE SITE DETAILS SHEET N0: C8O2 RUNOFF GRAVEL GS ARE HALF FILLED WITH COURSE "L" GRAVEL IN OPEN MESH BAGS PACKED CLOSE TOGETHER 0 ELIMINATE GAPS. MAINTENANCE 1. INSPECT FREQUENTLY FOR DAMAGE BY VEHICULAR D REPAIR IF NEEDED. 2. INSPERCT AFTER EACH STORM EVENT. 3. REMOVE SEDIMENT (BUT NOT BY FLUSHING) WHEN IT REACHES HALF THE HEIGHT OF THE BARRIER. 4. DEPOSIT REMOVED SEDIMENT WHERE IT WILL NOT ENTER M DRAINS. GRAVEL AG EROSION PROTECTION FLOW 6" STONE DEPTH (MIN) 25' 1% NO SCALE 100' PLAN PROFILE GRADE 1%: OR AS SHOWN BELOW NOTE: 1. NORTH ENTRANCE TO MAIN STREET TO BE USED FOR TEMPORARY CONSTRUCTION ENTRANCE. 2. STONE SIZE SHALL CONFORM TO ASTM D48 SIZE #1 (1 1/2" TO 3 1/2" DIA.). 3. PERIODIC 2" STONE TOP DRESSING WASHING AS REQUESTED BY COUNTY /CITY. 5, REPAIR ANY BROKEN ROAD PAVMENT IMMEDIATLY. 25' 2% MAINTENANCE 1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM EVENTS OR HEAVY USE. 2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. 3. TOPDRESS WITH CLEAN STONE AS NEEDED. 4. IMMEDIATLEY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN. TEMPORARY CONSTRUCTION ENTRANCE DETAIL 2X4 IN. WOOD FRAME SEASONAL SOIL PROTECTION CHART FABRIC AMOCO 4535 NONWOVEN COMPACTED SOIL EX. SUBGRADEJ 4" POST SPACED z 6' O.C. SEDIMENT CONTROL FENCE co A MAINTENANCE 1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. 2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. 4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. BURIED FABRIC COMPACTED FILL Z 1 11: 11.41 OVERFLOW LEVEL SET TO PREVENT BY -PASS FLOW IIIIhIIIIIllHhI 'IIIIUIII'Iitl111ll BURIED FABRIC APPROACH 1% MAINTENANCE 1. INSPECT THE FABRIC BARRIER AFTER STORM EVENTS, AND MAKE NEEDED REPARIS IMEDIATELY. 2. REMOVE SEDIMENT FROM THE POOL AREA TO PROVIDE STORAGE FOR THE NEXT STORM. AVOID DAMAGING OR UNDERCUTTING THE FABRIC DURING SEDIMENT REMOVAL. 3. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABLIZED REMOVE AND PROPERLY DISPOSE OF ALL CONSTRUCTION MATERIAL AND SEDIMENT, GRADE THE AREA TO THE ELEVATION OF THE TOP OF THE INLET, THEN STABILIZE. FABRIC DROP INLET PROTECTION FLOW D 50= 12 PIPE CULVERT 2" WOVEN GEOTEXT1LE PLAN VIEW PIPE RIP -RAP 3 X DIA. (MINIMUM) END VIEW END SECTION 3:1 ORIGINAL GROUND CROSS SECTION 12" OF RIP -RAP N 2" WOVEN GEOTEXT1LE 6' -0" MINIMUM D50 =50% OF RIP -RAP EQUALS THE SIZE FLOW NO OVERFALL COMPACTED SOIL MAINTENANCE 1. INSPECT ROCK CHUTES AFTER STORM EVENTS FOR STONE DISPLACEMENT AND FOR EROSION AT THE SIDES AND ENDS OF THE APRON. 2. MAKE NEEDED REPAIRS IMMEDIATELY; USE APPROPRIATE SIZE STONE, AND DO NOT PLACE THEM ABOVE FINISHED GRADE. END SECTION-DISCHARGE-RIPRAP INSTALLATION 1L45 21 1/4" DIA. 33" YARD TYPE CASTING NEENAH R -4342 OR APPROVED EQUAL -LIGHT DUTY N 33" Om- W W W W W 4. W W V• .Y W IV W W W W V• 4 W W W W .Y y W W W W y W J' MOM EEO ON A SLOPE W Al lik48.6 (5cm- 12.5cm) EROSION CONTROL BLANKET INSTALLATION (30 cm (15 cm) (7.5cm 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL -O -SEED DO NOT SEED PREPARED AREA. CELL -0 -SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES /STAKES APPROXIMATELY 12" (30cm) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 1 2" (30cm) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES /STAKES SPACED APPROXIMATELY 12" (30cm) APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES /STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM TM, STAPLES /STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2 -5" (5cm- 12.5cm) OVERLAP DEPENDING ON BLANKET TYPE. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH THE COLORED SEAM STITCH' ON THE PREVIOUSLY INSTALLED BLANKET. 5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" (7.5cm) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30cm) APART ACROSS ENTIRE BLANKET WIDTH. NOTE: *IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15cm) MAY BE NECESSARY TO PROPERLY SECURE THE BLANKETS. 6" (15 cm) MAINTENANCE 1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY EROSION BELOW THE BLANKET. 2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET. 3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY. 300 275 250 w 225 200 Z 150 175 0 125 w 100 w 75 0 50 25 0 0.7' 0.7 STAPLES PER SQ. YD. 4 :1 x x A 3: 1 2: 1 SLOPE GRADIENT M 1:1 0.4' 0.7' 0.4' x GENERAL STAPLE RECOMMENDATIONS 0.7' x B A C B A C B C B D E LOW MED /HIGH FLOW FLOW CHANNEL CHANNEL AND AND SHORELINE SHORELINE 1.15 STAPLES PER SQ. YD. x 0 0.4' 0.7' x x C 0.7' 0.4' EROSION CONTROL BLANKET STAPLE PATTERN 1.7 STAPLES PER SQ. YD. x 6 x x 6 U o v x --x 0.4' 0.4' 0.4' x x x 0.7' 0.4' 3.4 STAPLES PER SQ. YD. 3.75 STAPLES PER SQ. YD. NOTES: 1. STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN GREEN EROSION BLANKETS. 2. STAPLE PATTERNS MAY VARY DEPENDING UPON SOIL TYPE AND AVERAGE ANNUAL RAINFALL. 3. AT SLOPE LENGTHS GREATER THAN 300 FEET OR WHERE DRAINAGE OVER LARGE AREAS IS DIRECTED ONTO BLANKETS, STAPLE PATTERN "C" SHOULD BE UTILIZED. 4. CHANNEL LININGS REQUIRE A 2' (MIN.) OVERLAP AT LONGITUDINAL JOINTS AND SIDE SLOPES REQUIRE A 6" (MIN.) OVERLAP. WHERE OVERLAPS OCCUR, THE UPSTREAM BLANKET SHALL OVERLAP THE DOWNSTREAM. 5. IF OTHER THAN NORTH AMERICAN GREEN EROSION CONTROL BLANKETS ARE INSTALLED FOLLOW THE INSTALLATION DIRECTIONS RECOMMENDED BY THAT MANUFACTURER. PRINTED JAN 2 92004 NS GHTENG►NEERiNG S:\ Projects10335\dwg\0335c801.dwg, 01/29/2004 03:21:17 PM, Field1 EXISTING ROADWAY S-ASO\AL SO L PRO 11-CT 0\ C AR STABILIZATION PRACTICE JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC. PERMANENT SEEDING DORMANT SEEDING //I «/I/' ✓aiiiaaia. B A ia ir�✓ iaoi✓✓ aiaiiiaiar✓ ai// i// aiaaiiiirrriaaiaaaiiaiiiiirr�iiiiaioaioaiiaoioiiiiaiiairraiiii aaaiaiaiaiaiar B aiiriaiaaiiaiiiaair ✓oaiiaiaa TEMPORARY SEEDING SODDING MULCHING /aiaaiaiiiiaiaiiaaiaiiiaaaooi iaaaiaaaiaiai 0 C il F raaaaaiaaaaa✓ E aaaiaiaiiiaiir�iaiaioiiaiaaa��aiiiiiiiaiaiaiarr e. aaiaiiaiaiaio/raiaaaiaiiioiii% ////7; rai/ r✓ raiaaaiaar ✓oiaaaaaiaiiiaraiaiaaoaaaa r/ G a r a a r a a r r/ r i i �r rr✓ r A KENTUCKY BLUEGRASS 40 LBS /ACRE; CREEPING RED FESCUE 40 LBS /ACRE; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 20 LBS /ACRE FERTILIZE AS RECOMMENDED BY SOIL TEST. IF TESTING IS NOT DONE, APPLY 400 -600 LBS. /ACRE OF 12 -12 -12 ANALYSIS, OR EQUIVALENT, FERTILIZER. B KENTUCKY BLUEGRASS 60 LBS /ACRE; CREEPING RED FESCUE 60 LBS /ACRE; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 30 LBS /ACRE FERTILIZE AS RECOMMENDED BY SOIL TEST. IF TESTING IS NOT DONE, APPLY 400 -600 LBS. /ACRE OF 12 -12 -12 ANALYSIS, OR EQUIVALENT, FERTILIZER. C SPRING OATS 3 BUSHELS /ACRE FERTILIZE AS RECOMMENDED BY SOIL TEST. IF TESTING IS NOT DONE, APPLY 400 -600 LBS. /ACRE OF 12 -12 -12 ANALYSIS, OR EQUIVALENT, FERTILIZER. D WHEAT OR RYE 2 BUSHELS /ACRE FERTILIZE AS RECOMMENDED BY SOIL TEST. IF TESTING IS NOT DONE, APPLY 400 -600 LBS. /ACRE OF 12 -12 -12 ANALYSIS, OR EQUIVALENT, FERTILIZER. E ANNUAL RYEGRASS 40 LBS /ACRE (1 LB /1000 SQ. FT.) FERTILIZE AS RECOMMENDED BY SOIL TEST. IF TESTING IS NOT DONE, APPLY 400 -600 LBS. /ACRE OF 12 -12 -12 ANALYSIS, OR EQUIVALENT, FERTILIZER. F SOD G STRAW MULCH 2 TONS /ACRE 4 /I/ IRRIGATION NEEDED DURING JUNE, JULY, AUGUST AND /OR SEPTEMBER IRRIGATION NEEDED FOR 2 WEEKS AFTER SUPPLYING SOD RUNOFF GRAVEL GS ARE HALF FILLED WITH COURSE "L" GRAVEL IN OPEN MESH BAGS PACKED CLOSE TOGETHER 0 ELIMINATE GAPS. MAINTENANCE 1. INSPECT FREQUENTLY FOR DAMAGE BY VEHICULAR D REPAIR IF NEEDED. 2. INSPERCT AFTER EACH STORM EVENT. 3. REMOVE SEDIMENT (BUT NOT BY FLUSHING) WHEN IT REACHES HALF THE HEIGHT OF THE BARRIER. 4. DEPOSIT REMOVED SEDIMENT WHERE IT WILL NOT ENTER M DRAINS. GRAVEL AG EROSION PROTECTION FLOW 6" STONE DEPTH (MIN) 25' 1% NO SCALE 100' PLAN PROFILE GRADE 1%: OR AS SHOWN BELOW NOTE: 1. NORTH ENTRANCE TO MAIN STREET TO BE USED FOR TEMPORARY CONSTRUCTION ENTRANCE. 2. STONE SIZE SHALL CONFORM TO ASTM D48 SIZE #1 (1 1/2" TO 3 1/2" DIA.). 3. PERIODIC 2" STONE TOP DRESSING WASHING AS REQUESTED BY COUNTY /CITY. 5, REPAIR ANY BROKEN ROAD PAVMENT IMMEDIATLY. 25' 2% MAINTENANCE 1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM EVENTS OR HEAVY USE. 2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. 3. TOPDRESS WITH CLEAN STONE AS NEEDED. 4. IMMEDIATLEY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN. TEMPORARY CONSTRUCTION ENTRANCE DETAIL 2X4 IN. WOOD FRAME SEASONAL SOIL PROTECTION CHART FABRIC AMOCO 4535 NONWOVEN COMPACTED SOIL EX. SUBGRADEJ 4" POST SPACED z 6' O.C. SEDIMENT CONTROL FENCE co A MAINTENANCE 1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. 2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. 4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. BURIED FABRIC COMPACTED FILL Z 1 11: 11.41 OVERFLOW LEVEL SET TO PREVENT BY -PASS FLOW IIIIhIIIIIllHhI 'IIIIUIII'Iitl111ll BURIED FABRIC APPROACH 1% MAINTENANCE 1. INSPECT THE FABRIC BARRIER AFTER STORM EVENTS, AND MAKE NEEDED REPARIS IMEDIATELY. 2. REMOVE SEDIMENT FROM THE POOL AREA TO PROVIDE STORAGE FOR THE NEXT STORM. AVOID DAMAGING OR UNDERCUTTING THE FABRIC DURING SEDIMENT REMOVAL. 3. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABLIZED REMOVE AND PROPERLY DISPOSE OF ALL CONSTRUCTION MATERIAL AND SEDIMENT, GRADE THE AREA TO THE ELEVATION OF THE TOP OF THE INLET, THEN STABILIZE. FABRIC DROP INLET PROTECTION FLOW D 50= 12 PIPE CULVERT 2" WOVEN GEOTEXT1LE PLAN VIEW PIPE RIP -RAP 3 X DIA. (MINIMUM) END VIEW END SECTION 3:1 ORIGINAL GROUND CROSS SECTION 12" OF RIP -RAP N 2" WOVEN GEOTEXT1LE 6' -0" MINIMUM D50 =50% OF RIP -RAP EQUALS THE SIZE FLOW NO OVERFALL COMPACTED SOIL MAINTENANCE 1. INSPECT ROCK CHUTES AFTER STORM EVENTS FOR STONE DISPLACEMENT AND FOR EROSION AT THE SIDES AND ENDS OF THE APRON. 2. MAKE NEEDED REPAIRS IMMEDIATELY; USE APPROPRIATE SIZE STONE, AND DO NOT PLACE THEM ABOVE FINISHED GRADE. END SECTION-DISCHARGE-RIPRAP INSTALLATION 1L45 21 1/4" DIA. 33" YARD TYPE CASTING NEENAH R -4342 OR APPROVED EQUAL -LIGHT DUTY N 33" Om- W W W W W 4. W W V• .Y W IV W W W W V• 4 W W W W .Y y W W W W y W J' MOM EEO ON A SLOPE W Al lik48.6 (5cm- 12.5cm) EROSION CONTROL BLANKET INSTALLATION (30 cm (15 cm) (7.5cm 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL -O -SEED DO NOT SEED PREPARED AREA. CELL -0 -SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES /STAKES APPROXIMATELY 12" (30cm) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 1 2" (30cm) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES /STAKES SPACED APPROXIMATELY 12" (30cm) APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES /STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM TM, STAPLES /STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2 -5" (5cm- 12.5cm) OVERLAP DEPENDING ON BLANKET TYPE. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH THE COLORED SEAM STITCH' ON THE PREVIOUSLY INSTALLED BLANKET. 5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" (7.5cm) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30cm) APART ACROSS ENTIRE BLANKET WIDTH. NOTE: *IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15cm) MAY BE NECESSARY TO PROPERLY SECURE THE BLANKETS. 6" (15 cm) MAINTENANCE 1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY EROSION BELOW THE BLANKET. 2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET. 3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY. 300 275 250 w 225 200 Z 150 175 0 125 w 100 w 75 0 50 25 0 0.7' 0.7 STAPLES PER SQ. YD. 4 :1 x x A 3: 1 2: 1 SLOPE GRADIENT M 1:1 0.4' 0.7' 0.4' x GENERAL STAPLE RECOMMENDATIONS 0.7' x B A C B A C B C B D E LOW MED /HIGH FLOW FLOW CHANNEL CHANNEL AND AND SHORELINE SHORELINE 1.15 STAPLES PER SQ. YD. x 0 0.4' 0.7' x x C 0.7' 0.4' EROSION CONTROL BLANKET STAPLE PATTERN 1.7 STAPLES PER SQ. YD. x 6 x x 6 U o v x --x 0.4' 0.4' 0.4' x x x 0.7' 0.4' 3.4 STAPLES PER SQ. YD. 3.75 STAPLES PER SQ. YD. NOTES: 1. STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN GREEN EROSION BLANKETS. 2. STAPLE PATTERNS MAY VARY DEPENDING UPON SOIL TYPE AND AVERAGE ANNUAL RAINFALL. 3. AT SLOPE LENGTHS GREATER THAN 300 FEET OR WHERE DRAINAGE OVER LARGE AREAS IS DIRECTED ONTO BLANKETS, STAPLE PATTERN "C" SHOULD BE UTILIZED. 4. CHANNEL LININGS REQUIRE A 2' (MIN.) OVERLAP AT LONGITUDINAL JOINTS AND SIDE SLOPES REQUIRE A 6" (MIN.) OVERLAP. WHERE OVERLAPS OCCUR, THE UPSTREAM BLANKET SHALL OVERLAP THE DOWNSTREAM. 5. IF OTHER THAN NORTH AMERICAN GREEN EROSION CONTROL BLANKETS ARE INSTALLED FOLLOW THE INSTALLATION DIRECTIONS RECOMMENDED BY THAT MANUFACTURER. PRINTED JAN 2 92004 NS GHTENG►NEERiNG S:\ Projects10335\dwg\0335c801.dwg, 01/29/2004 03:21:17 PM, Field1 EXISTING ROADWAY