HomeMy WebLinkAboutC901 Site Specification PlanGENERAL NOTES
1. REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION INDOT) STANDARD
SPECIFICATIONS, LATEST EDITION, FOR BASIC MATERIALS AND CONSTRUCTION
METHODS. THE SECTIONS BELOW FOR VARIOUS ITEMS ARE TO CLARIFY THE INTENT
OF THE REQUIREMENTS FOR THIS PROJECT. PLEASE NOTE THAT OTHER SECTIONS OF
THE DOT STANDARD SPECIFICATIONS MAY ALSO BE APPLICABLE.
CONTRACTORS SHALL CHECK WITH ENGINEER PRIOR TO START OF CONSTRUCTION TO
VERIFY DATE OF PLANS. MINOR CHANGES MAY BE MADE IF ALL REVIEWING AGENCY
APPROVALS ARE NOT GRANTED BEFORE BIDDING. CHANGES IN COST SHALL BE
NEGOTIATED PRIOR TO PHYSICAL CONSTRUCTION.
3. ACTORS SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE ALL MAINS,
CONDUITS, SERVICE LINES, ETC. IN THE AFFECTED CONSTRUCTION AREA.
EXISTING UTILITY STRUCTURES ARE SHOWN HERE IN ACCORDANCE WITH AVAILABLE
INFORMATION. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES AND
FACILITIES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION
OPERATION WITH APPLICABLE UTILITY), IS THE EXPRESSED
RESPONSIBILITY OF THE CONTRACTOR IN THE PERFORMANCE OF THE CONTRACT
AND IN PREPARATION OF THE BID.
4. LL AROUND ALL STRUCTURES AND IN ALL TRENCHES BENEATH PAVED AREAS
SHALL BE COMPACTED GRANULAR MATERIAL IN ACCORDANCE WITH INDOT SECTION 211.
5. FILL MATERIAL SHALL CONSIST OF EARTH OBTAINED FROM CUT AREAS, BORROW
PITS OR OTHER APPROVED SOURCES. EARTH SHALL BE FREE FROM ORGANIC MATTER
AND ETHER DELETERIOUS SUBSTANCES AND LARGE ROCKS. THE FILL MATERIAL SHALL
BE ACED IN LAYERS NOT TO EXCEED SIX INCHES FOLLOWING COMPACTION, PROPER
MOISTURE CONTENT OF FILL MATERIAL WILL BE SUCH TO ACHIEVE SPECIFIED
COMPACTION DENSITY. ALL FILL BENEATH PAVED AREAS, FLOOR SLABS AND FUTURE
BUILDINGS SHALL BE COMPACTED TO AT LEAST 95% OF THE MAXIMUM DRY DENSITY
PER ASTM D -1557.
FIELD COMPACTION TEST SHALL BE RUN ON EACH LIFT, IN FILL SECTIONS, AND
THE SQUIRED COMPACTION ON EACH LIFT SHALL BE ATTAINED PRIOR TO PLACING
THE NEXT LIFT. COMPACTION TESTS SHALL BE IN ACCORDANCE WITH INDOT
SECTION 211.
CLEARING AND GRUBBING
1. VG AND GRUBBING SHALL CONSIST OF CUTTING, REMOVING AND SATISFACTORY
DISPOSING OF ALL TREES, DOWNED TIMBER, BRUSH, PROJECTING ROOTS, STUMPS,
RUBBISH, BOULDERS, BROKEN CONCRETE, FENCING (AS DESIGNATED), AND OTHER
MATERIAL ON THE PROJECT SITE AND WITHIN THE BOUNDARY AS SHOWN ON THE
CONSTRUCTION DOCUMENTS AND /OR AS DESIGNATED BY "CONSTRUCTION LIMITS
2. ALL "UNSUITABLE MATERIAL" FROM CLEARING OPERATIONS SHALL BE REMOVED TO
DISPOSAL AREA(S) OFF OF THE PROJECT SITE; UNLESS A "BURY PIT" SHALL BE
LOCATED WHERE IMPOUNDMENT OF SURFACE WATER MAY OCCUR.
3. MATERIALS SHALL NOT BE DISPOSED OF BY BURNING UNLESS APPROVED BY THE LOCAL
FIRE MARSHAL.
TREE REMOVAL AND PROTECTION
1. TREES SHALL BE REMOVED FROM THE PROJECT ONLY WHERE THE AREA IS TO BE
OCCUPIED BY ROAD AND SURFACED AREAS.
2. TREES SHALL BE REMOVED FROM THE PROJECT SITE AS DIRECTED BY THE DEVELOPER.
3. TREES SHALL BE REMOVED FROM THE PROJECT SITE WHERE THEY INTERFERE DIRECTLY
WITH THE PLACEMENT OF STORM OR SANITARY SEWERS, AND THAT SUCH EXCAVATION
IS OR WILL BE FATAL TO SUCH ADJACENT TREES.
4. THE CONTRACTOR SHALL ENDEAVOR TO SAVE AND PROTECT TREES OF VALUE AND
WORTH WHICH DO NOT IMPAIR CONSTRUCTION OF IMPROVEMENTS AS DESIGNATED.
IN THE EVENT CUT OR FILL EXCEEDS 0.5 FEET OVER THE ROOT AREA, THE
DEVELOPER SHALL BE CONSULTED WITH RESPECT TO PROTECTIVE MEASURES TO BE
TAKEN, IF ANY, TO PRESERVE SUCH TREES.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE METHOD FOR
PROTECTION OF TOPS, TRUNKS AND ROOTS OF EXISTING TREES ON THE PROJECT SITE
THAT ARE TO REMAIN. EXISTING TREES SUBJECT TO CONSTRUCTION DAMAGE SHALL
BE BOXED, FENCED OR OTHER MATERIAL AND EQUIPMENT SHALL NOT BE STOCKPILED
OR STORED WITHIN THE SPREAD OF BRANCHES. BRANCHES WHICH NEED TO BE
REMOVED OR ARE BROKEN SHALL BE NEATLY TRIMMED AND SCARS SHALL BE COVERED
WITH TREE PAINT.
STRIPPING OF TOPSOIL
1. THE CONTRACTOR SHALL VERIFY THAT ALL TOPSOIL HAS BEEN REMOVED IN THE AREAS
TO BE OCCUPIED BY ROAD, WALKS AND DESIGNATED BUILDING AREAS. TOPSOIL
SHALL BE REMOVED TO A DEPTH OF SIX (6) INCHES OR DEEPER, IF NECESSARY, TO
REMOVE ORGANIC MATTER WHERE REQUIRED.
2. TOPSOIL SHALL BE KEPT SEPARATED FROM SUITABLE FILL MATERIALS AND SHALL NOT
BE USED AS FILL UNDER PAVEMENT, BUILDING AREAS AND /OR FUTURE STRUCTURAL
AREAS.
3. TOPSOIL SHALL BE STORED AT A LOCATION WHERE IT DOES NOT INTERFERE WITH
CONSTRUCTION OPERATIONS. EXCESS TOPSOIL SHALL BE REMOVED FROM THE SITE.
4. TOPSOIL SHALL BE REASONABLY FREE FROM SUBSOIL DEBRIS AND STONES.
PAVEMENT CONSTRUCTION
1. THE INDIANA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, LATEST
EDITION SHALL APPLY TO WORKMANSHIP AND MATERIALS IN CONSTRUCTION OF
SUBGRADE, PAVEMENT, CURBS AND WALKS.
a. PREPARE THE SUBGRADE IN ACCORDANCE WITH INDOT SECTION 207. NO TRAFFIC
WILL BE PERMITTED ON THE PREPARED SUBGRADE PRIOR TO PAVING.
b. BITUMINOUS PAVEMENT IN ACCORDANCE WITH INDOT SECTION 402.
c. FINISHING EARTH GRADED SHOULDERS, DITCHES AND SLOPES IN ACCORDANCE
WITH INDOT SECTION 208.
CONCRETE CURB AND WALKS
SEE DETAIL SHEET FOR TYPE AND DETAILS.
2. CONCRETE SHALL BE READY MIXED PORTLAND CEMENT AND WATER CONFORMING TO
A.S.T.M C -150. AGGREGATES SHALL CONFORM TO A.S.T.M. C -33. COMPRESSIVE
STRENGTH OF CONCRETE AT 28 DAYS SHALL BE 4000 P.S.I. WHERE REQUIRED,
REINFORCEMENT SHALL BE WELDED STEEL WIRE FABRIC CONFORMING TO A.S.T.M.
A -185.
3. ALL EXTERIOR CONCRETE SHALL CONTAIN 3% TO 6% AIR ENTRAINMENT.
4. APPLICATION
a. PLACE CONCRETE ONLY ON A MOIST, COMPACT SUBGRADE OR BASE FREE FROM
LOOSE MATERIAL. PLACE NO CONCRETE ON MUDDY OR FROZEN SUBGRADE IN
ACCORDANCE WITH INDOT SECTION 604 AND 605.
b. CONCRETE SHALL BE DEPOSITED SO AS TO REQUIRE AS LITTLE REHANDLING AS
PRACTICAL. WHEN CONCRETE IS TO BE PLACED AT AN ATMOSPHERIC
TEMPERATURE OF 35 DEGREES F OR LESS, PARAGRAPH 702.11 OF THE INDOT
SPECIFICATIONS SHALL APPLY.
c. EXCEPT AS OTHERWISE SPECIFIED, CURE ALL CONCRETE BY ONE OF THE METHODS
DESCRIBED IN INDOT SECTION 501.17.
5. TOP OF CASTING ELEVATIONS REFER TO THE CASTING'S RIM OR TOP OF CURB. THE
CURB CONTRACTOR SHALL INSURE THAT CURB INLET CASTINGS ARE SET AT PROPER
ELEVATION PRIOR TO CONSTRUCTION OF ADJACENT CURB.
S:1 Projects\03351dwg\0335C901.dwg, 01/29/2004 03:22:33 PM, Field1
DEMOLITION
1. THE CONTRACTOR SHALL EXCAVATE, DEMOLISH, REMOVE AND DISPOSE OF THE DEBRIS
FROM THE AREAS SHOWN ON THE SITE DEVELOPMENT PLAN.
a. BUILDING WALLS.
b. FOUNDATIONS.
c. PAVEMENT (CONCRETE, ASPHALT AND BRICK).
d. CONCRETE SLABS.
2. ALL MATERIAL AS A RESULT OF THE GENERAL DEMOLITION SHALL BE THE PROPERTY
OF THE CONTRACTOR. THE CONTRACTOR'S LUMP SUM BID PRICE FOR THE DEMOLITION
SHALL TAKE INTO ACCOUNT THE SALVAGEABLE VALUE OF MATERIALS AND SAID BID
PRICE SHALL REFLECT SAID SAVINGS.
3. THE CONTRACTOR SHALL BE REQUIRED TO DEMOLISH AND REMOVE DESIGNATED
FOUNDATION WALLS, RETAINING WALLS, CURBING, CONCRETE SLABS, PAVING, TANKS,
STRUCTURES, PIPES, MANHOLES AS SHOWN ON THE CONTRACT DOCUMENTS. ALL
EXISTING BASEMENT FLOOR SLABS THAT ARE NOT REMOVED SHALL BE BROKEN UP
SUFFICIENTLY TO PERMIT DRAINAGE THROUGH THE SLAB. ALL EXISTING BASEMENT
WALLS, FOUNDATIONS, FLOOR SLABS, AND ETC. SHALL BE REMOVED TO AN ELEVATION
SUCH THAT THEY WILL NOT SUPPORT PROPOSED FLOOR SLABS OR PAVEMENTS.
4. THE CONTRACTOR SHALL OBTAIN FROM THE CITY OF CARMEL, AND ALL OTHER
APPLICABLE GOVERNMENTAL AUTHORITIES, NECESSARY PERMITS REQUIRED, A COPY
OF SUCH PERMITS TO BE FURNISHED TO THE OWNER PRIOR TO COMMENCEMENT OF ANY
WORK REQUIRED HEREIN. THE CONTRACTOR SHALL FURTHER FURNISH TO THE OWNER
PROOF THAT HE HAS COMPLIED WITH THE PROVISIONS OF THE MUNICIPAL CODE OF
CARMEL, INDIANA.
UTILITIES
1. ALL WATER LINES FROM THE CITY OF CARMEL UTILITY COMPANY MAIN TO ANY LOT
SHALL BE INSTALLED OF MATERIAL AND WORKMANSHIP AS APPROVED BY THE CITY
OF CARMEL UTILITY COMPANY.
2. CONDUIT SHALL BE REQUIRED FOR ALL ELECTRICAL AND TELEPHONE LINES UNDER
PAVED AREAS.
3. COMPACTED GRANULAR BACKFILL SHALL BE REQUIRED FOR ALL CROSSINGS OF PAVED
AREAS PER HAMILTON COUNTY HIGHWAY DEPARTMENT DETAILS AND SPECIFICATIONS.
SANITARY SEWER SPECIFICATIONS
1. STANDARD SPECIFICATIONS FOR THE CITY OF CARMEL, INDIANA DEPARTMENT OF
TRANSPORTATION, INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT AND CLAY
TOWNSHIP REGIONAL WASTE DISTRICT SHALL APPLY FOR ALL WORK AND MATERIALS.
PIPE SHALL BE INSTALLED IN ACCORDANCE WITH INDOT SECTION 715, ASTM AND
MANUFACTURER SPECIFICATIONS.
2. SANITARY SEWER PIPE SHALL BE PVC IN ACCORDANCE WITH ASTM D -3034
(S.D.R. 35) AND ASTM 2321. PVC PIPE SHALL HAVE GROOVED BELL AND GASKET.
THE PIPE SHALL BE MADE OF PVC PLASTIC HAVING A CELL CLASSIFICATION OF
12454B.
3. PVC SEWER FITTINGS SHALL CONFORM TO THE REQUIREMENTS OF ASTM
D- 3034 -89 SPECIFICATION. FITTINGS IN SIZES THROUGH 8" SHALL BE MOLDED IN
ONE PIECE WITH ELASTOMERIC JOINTS AND MINIMUM SOCKET DEPTHS AS
SPECIFIED IN SECTIONS 6.2 AND 7.3.2. FITTINGS 10" AND LARGER SHALL BE
MOLDED OR FABRICATED IN ACCORDANCE WITH SECTION 7.11 WITH
MANUFACTURERS STANDARD PIPE BELLS AND GASKETS. WALL THICKNESS OF
FITTINGS SHALL BE SDR 26 AS DEFINED IN SECTION 7.4.1 OF SPECIFICATIONS.
GASKETS FOR ELASTOMERIC JOINTS SHALL BE MOLDED WITH A MINIMUM
CROSS SECTIONAL AREA OF 0.20 SQUARE INCHES AND CONFORM TO ASTM F -477
SPECIFICATION. FITTINGS SHALL BE MANUFACTURED BY HARCO OR EQUAL.
4. ALL SANITARY MANHOLES SHALL BE PRECAST CONCRETE MANHOLES IN
ACCORDANCE WITH ASTM C -478 AND SECTION 720. 0 -RINGS SHALL CONFORM
TO C -443. KENT SEAL OR EQUIVALENT SHALL ALSO BE APPLIED TO ALL JOINTS
AND BETWEEN RISER RINGS AND CASTINGS. MANHOLE STEP SPACING SHALL BE
NO MORE THAN 16- INCHES. MANHOLES SHALL BE AIR TESTED FOR LEAKAGE IN
ACCORDANCE WITH ASTM C1244 -93, STANDARD TEST METHOD FOR CONCRETE
SEWER MANHOLES BY THE NEGATIVE AIR PRESSURE (VACUUM) TEST.
A. INSTALLATION AND OPERATION OF VACUUM EQUIPMENT AND INDICATING
DEVICES MUST BE IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS AND
PERFORMANCE SPECIFICATIONS WHICH HAVE BEEN PROVIDED BY THE
MANUFACTURER AND ACCEPTED BY THE ENGINEER. THE VACUUM EQUIPMENT MUST
BE CAPABLE OF TESTING THE ENTIRE MANHOLE, INCLUDING THE CASTING AND
RISER RINGS.
B. WITH THE VACUUM TESTER SET IN PLACE:
1. CONNECT THE VACUUM PUMP TO THE OUTLET PORT WITH THE VALVE OPEN.
2. DRAW A VACUUM OF TEN (10) INCHES OF HG. AND CLOSE THE VALVE.
C. ACCEPTED STANDARDS FOR LEAKAGE WILL BE ESTABLISHED FROM THE
ELAPSED TIME FOR A NEGATIVE PRESSURE CHANGE FROM TEN (10) INCHES TO
NINE (9) INCHES OF MERCURY. THE MAXIMUM ALLOWABLE LEAKAGE RATE FOR A
FOUR (4) FOOT DIAMETER MANHOLE MUST BE IN ACCORDANCE WITH THE
FOLLOWING:
MANHOLE DEPTH
10 FEET OR LESS
>10 FEET BUT <15 FEET
>15 FEET BUT <25 FEET
MINIMUM ELAPSED TIME FOR A
PRESSURE CHANGE OF 1 INCH HG
60 SECONDS
75 SECONDS
90 SECONDS
FOR MANHOLES FIVE (5) FEET IN DIAMETER, ADD AN ADDITIONAL FIFTEEN (15)
SECONDS AND FOR MANHOLES SIX (6) FEET IN DIAMETER, ADD AN ADDITIONAL
THIRTY (30) SECONDS TO THE TIME REQUIREMENTS FOR FOUR (4) FOOT DIAMETER
MANHOLES. FOR ALL MANHOLES DEEPER THAN TWENTY -FIVE (25) FEET, THE
ENGINEER WILL DETERMINE THE APPLICABLE MINIMUM ELAPSED TIME.
D. IF THE MANHOLE FAILS THE TEST, NECESSARY REPAIRS MUST BE MADE
AND THE VACUUM TEST AND REPAIRS MUST BE REPEATED UNTIL THE MANHOLE
PASSES THE TEST.
E. IF MANHOLE JOINT SEALANTS ARE PULLED OUT DURING THE VACUUM TEST, THE
MANHOLE MUST BE DISASSEMBLED AND THE JOINT SEALANTS REPLACED.
F. MANHOLES WILL BE SUBJECT TO VISUAL INSPECTION WITH ALL VISUAL LEAKS
BEING REPAIRED.
5. BUTYL RUBBER COATING SHALL BE APPLIED AROUND EACH MANHOLE JOINT FROM
6- INCHES ABOVE TO 6- INCHES BELOW EACH JOINT. THE APPROPRIATE PRIMER SHALL
BE APPLIED PRIOR TO APPLYING THE RUBBER COATING. INSIDE JOINTS TO BE FILLED
WITH PRECOAT PLUG MATERIAL.
6. THE MANHOLE CHIMNEYS, INCLUDING ALL RISER RINGS SHALL BE SEALED USING
INFI- SHIELD UNIBAND OR APPROVED EQUAL. PRIOR TO PLACEMENT, THE TOP 4- INCHES
OF THE MANHOLE CONE AND CASTING FRAME SHALL BE CLEANED AND PRIMED. THE
UNIBAND SHALL EXTEND FROM 3- INCHES BELOW THE TOP OF THE CONE SECTION TO
2- INCHES OVER THE FLANGE OF THE MANHOLE CASTING FRAME.
7. THE CASTING ELEVATIONS ARE SET BY PLAN. HOWEVER, THE CASTINGS ARE TO BE
ADJUSTED IN THE FIELD BY THE ENGINEERS REPRESENTATIVE SHOULD A DISCREPANCY
OCCUR BETWEEN PLAN GRADE AND EXISTING GRADE. NEW MANHOLE RING AND COVER
SHALL BE INSTALLED TO ESTABLISH GRADE. MAXIMUM HEIGHT OF ADJUSTING RINGS
SHALL BE 12- INCHES.
8. BACKFILL AROUND ALL STRUCTURES AND ALL CUTS UNDER PAVED AREAS WITH
GRANULAR MATERIAL. TRENCHES OPENING WITHIN 5 -FEET OF PAVED ROADWAYS SHALL
BE BACKFILLED WITH GRANULAR MATERIAL IN ACCORDANCE WITH SECTION 211. BACKFILL
UNDER SIDEWALKS SHALL BE GRANULAR, UNLESS THE WALKS ARE CONSTRUCTED A
MINIMUM OF 6 MONTHS AFTER BACKFILL HAS BEEN IN PLACE.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT ALL STATE HIGHWAYS,
CITY, AND COUNTY PERMITS HAVE BEEN OBTAINED BY THE DEVELOPER PRIOR TO START
OF CONSTRUCTION.
10. THE CONTRACTOR SHALL BE REQUIRED TO FURNISH THE DEVELOPER'S ENGINEER WITH
A SET OF PRINTS, MARKED IN RED PENCIL, SHOWING ACTUAL SEWER LOCATION AND
INVERT, TO INCLUDE LATERAL LOCATION, DEPTH AND LENGTH. SUCH ASBUILT PRINTS
MUST BE RECEIVED BY THE ENGINEER BEFORE THE FINAL CONTRACT PAYMENT CAN BE
AUTHORIZED. THE SANITARY SEWER LATERALS AND STUBS TERMINATION SHALL BE
INDICATED ON THE SURFACE WITH A METAL FENCE POST SET IMMEDIATELY ABOVE THE
SAID TERMINATION POINT.
11. ALL SANITARY SEWER LINES UPON COMPLETION WILL BE REQUIRED TO PASS A LOW
PRESSURE AIR TEST. SAID TEST SHALL BE CONDUCTED ACCORDING TO ASTM 1417 -92,
AND SHALL BE WITNESSED BY AN ENGINEER AND A REPRESENTATIVE OF THE DISTRICT.
THE TESTING SHALL BE IN ACCORDANCE WITH TABLE 1. ADD 0.5 PSIG FOR EACH FOOT
OF WATER ABOVE THE SEWER LINE BEING TESTED.
12. DEFLECTION TESTS SHALL BE PERFORMED ON ALL FLEXIBLE* PIPE AFTER THE FINAL
BACKFILL HAS BEEN IN PLACE AT LEAST 30 DAYS. NO PIPE SHALL EXCEED A VERTICAL
DEFLECTION OF 5% DEFLECTION TEST RESULTS. *THE FOLLOWING ARE CONSIDERED
NON- FLEXIBLE PIPES: CONCRETE PIPE, DUCTILE IRON PIPE, AND CAST IRON PIPE). THE
DEFLECTION TEST SHALL BE PERFORMED WITH A NINE -POINT MANDREL. PROVING RINGS
SHALL BE AVAILABLE.
13. ALL MANDREL TESTING SHALL BE OBSERVED BY A PROFESSIONAL ENGINEER
REPRESENTATIVE FOR CERTIFICATION AND A REPRESENTATIVE OF THE DISTRICT.
14. THE ENDS OF LATERALS ARE TO BE PLUGGED TIGHT WITH A BRACED PLASTIC DISC
OR CAP CAPABLE OF WITHSTANDING A LOW PRESSURE AIR TEST WITHOUT LEAKAGE.
15. BEDDING FOR FLEXIBLE PIPE SHALL BE NO. 8 CRUSHED STONE FROM 6- INCHES
BELOW TH E PIPE TO 12- INCHES ABOVE THE PIPE. BEDDING FOR RIGID PIPE SHALL BE
NO. 8 CRUSHED STONE FROM 6- INCHES BELOW THE PIPE TO THE SPRING LINE OF THE
PIPE AND FROM THIS POINT TO 12- INCHES ABOVE SHALL BE FILL SAND OR EQUIVALENT.
MANHOLES SHALL BE PLACED ON NO LESS THAN 6- INCHES OF NO. 8 CRUSHED STONE
BEDDING.
16. WATER AND SEWER LINE CROSSINGS AND SEPARATIONS SHALL BE IN ACCORDANCE
WITH 327 IAC 3 -6 -9.
17. TRENCH SHALL BE OPENED SUFFICIENTLY AHEAD OF PIPE LAYING TO REVEAL
OBSTRUCTION, AND SHALL BE PROPERLY PROTECTED AND /OR BARRICADED WHEN
LEFT UNATTENDED.
18. NO WATER SHALL BE PERMITTED TO FLOW INTO THE SANITARY SEWER SYSTEM
DURING CONSTRUCTION. CONTRACTOR SHALL UTILIZE A PUMP TO KEEP THE WATER
LEVEL BELOW THE PIPE. PUMP DISCHARGE SHALL BE DIRECTED TO A STORM OUTLET IN
ACCORDANCE WITH STATE AND FEDERAL LAWS AND REGULATIONS (327 IAC 3- 6 -20).
ANY PIPE ENTERING EXISTING SEWERS SHALL BE PLUGGED WITH SCREW TYPE
MECHANICAL, BRACED PLUG UNTIL SUCH TIME AS ALL TESTS ON THE SEWERS HAVE
BEEN COMPLETED AND THE LINES HAVE PASSED ALL PUNCH LISTS.
19. ALL SEWER LATERALS INSTALLED BY THE MAINLINE CONTRACTOR SHALL BE BEDDED
THE SAME AS THE MAIN LINE SEWER.
20. FORTY -EIGHT (48) HOURS NOTICE SHALL BE GIVEN TO THE DISTRICT PRIOR TO THE
START OF SEWER CONSTRUCTION. ALSO, 48 HOURS NOTICE SHALL BE GIVEN PRIOR TO
DOING ANY TESTING ON THE SEWER.
21. MANHOLE CASTINGS SHALL BE STAMPED SANITARY SEWER (NEENAH CASTING R
1642A OR EQUAL) AND BE SELF SEALING TYPE. THE CASTING FLANGE SHALL BE 34
INCHES AND THE CLEAR OPENING SHALL BE 24 INCHES. WATERPROOF CASTINGS SHALL
BE
NEENAH R- 916 -F1 AND STAMPED SANITARY SEWER.
22. THE MINIMUM SLOPE FOR SEWER ACCEPTANCE BY THE CLAY TOWNSHIP REGIONAL
WASTE DISTRICT ARE:
SIZE OF PIPE MINIMUM CONSTRUCTED SLOPE
8 -INCH 0.40%
10 -INCH 0.28%
12 -INCH 0.22%
15 -INCH 0.15%
18 -INCH 0.12%
23. THE CONTRACTOR SHALL PROVIDE MEASUREMENTS OF THE SLOPE OF THE SEWER
FOR EACH MANHOLE SECTION AS CONSTRUCTION PROGRESSES. SUCH MEASUREMENTS
SHALL BE CERTIFIED BY A REGISTERED LAND SURVEYOR OR ENGINEER AND BE
AVAILABLE ON -SITE FOR OBSERVATION BY THE DISTRICT'S INSPECTOR. NO MORE THAN
THREE MANHOLE SECTIONS CAN BE CONSTRUCTED IN ADVANCE OF SUCH MEASUREMENTS.
24. IN THE EVENT THE CONTRACTOR DOES NOT MEET THE MINIMUM SLOPES, THE SEWER
SECTION AND ANY OTHER AFFECTED SEWER SECTIONS SHALL BE RECONSTRUCTED TO
MEET SUCH MINIMUM SLOPES.
25. LATERALS ARE TO BE TRACED WITH A MINIMUM SIZE OF 14 -GAUGE WIRE FROM THE
WYE TO THE TERMINUS. THE CONTRACTOR FOR THE BUILDING OR HOME WILL EXTEND
THE WIRE FROM THIS TERMINUS TO THE BUILDING CLEANOUT ADJACENT TO THE BUILDING.
STORM SEWER SPECIFICATIONS
1. STANDARD SPECIFICATIONS OF THE HAMILTON COUNTY SURVEYORS OFFICE AND INDIANA
DEPARTMENT OF TRANSPORTATION SHALL APPLY FOR ALL WORK AND MATERIALS. PIPE
SHALL BE INSTALLED IN ACCORDANCE WITH INDOT SECTION 715.
2. ALL REINFORCED CONCRETE STORM SEWER PIPE (RCP) SHALL CONFORM TO ASTM
DESIGNATION C -76 CLASS III. ALL HELICALLY CORRUGATED STEEL PIPE (HCSP)
SHALL CONFORM AASHTO M36, 16 GAUGE IN ACCORDANCE WITH INDOT SECTION 907.
3. BACKFILL AROUND ALL STRUCTURES AND CUTS UNDER PAVED AREAS WITH COMPACTED
GRANULAR MATERIAL IN ACCORDANCE WITH INDOT SECTION 21.1 AND 715.
4. SEE STANDARD DETAIL SHEET FOR CONSTRUCTION DIMENSIONS OF STORM STRUCTURES.
MANHOLE, INLETS AND CATCH BASINS SHALL BE IN ACCORDANCE WITH INDOT SECTION
720. PRECAST CONCRETE AND STEEL FOR MANHOLES AND INLETS SHALL BE IN
ACCORDANCE WITH ASTM C -478.
5. STORM SEWER DISCHARGE AREAS AND INVERTS ARE TENTATIVE AND ARE SUBJECT TO
FIELD MODIFICATIONS BY THE ENGINEER OR HIS REPRESENTATIVE.
6. THE CONTRACTOR SHALL PROVIDE AT LEAST 2' OF COVER OVER ALL STORM SEWERS,
UNLESS OTHERWISE INDICATED BY PLANS.
7. RIP RAP SHALL BE A MINIMUM OF 1/3 CUBIC FOOT IN SIZE AND A MINIMUM 18" IN
DEPTH. DIMENSIONS FOR RIP RAP IN THESE PLANS ARE FOR ESTIMATING PURPOSES
ONLY. ACTUAL BEST PLACEMENT OF RIP RAP SHALL BE DETERMINED BY FIELD
CONDITIONS AND SHALL BE IN ACCORDANCE WITH INDOT SECTION 616.
8. ALL DRAINAGE PIPE AND DITCH OUTFALLS TO RECEIVING STREAMS SHALL BE
CONSTRUCTED IN ACCORDANCE WITH DRAWINGS, SUBJECT HOWEVER, TO ANY
MODIFICATION REQUIRED BY THE ENGINEER AT THE TIME INSTALLATION IS
COMPLETED AND TO ANY ADJUSTMENTS NEEDED FOR FIELD CONDITIONS NOT
ADEQUATELY ANTICIPATED BY THE DESIGN DRAWING.
9. CASTINGS SHALL BE AS SHOWN ON DETAIL SHEET FOR MANUFACTURER, TYPE AND
NUMBER. ALL CASTINGS SHALL BE NEENAH OR EAST JORDAN APPROVED EQUAL.
SOIL EROSION CONTROL SUMMARY
1. CONTRACTOR SHALL INSTALL SEDIMENT TRAPS AND STRAW BALE FILTERS AS SHOWN.
2. MASS GRADE THE SITE (SIDES OF SWALES, MOUNDS AND PONDS TO BE SODDED OR
SEEDED AND MULCHED IMMEDIATELY UPON COMPLETION). TEMPORARY SEEDING SHALL
BE RECOMMENDED FOR ALL SWALES AND DISTURBED AREAS THAT CANNOT BE FINAL
SEEDED WITHIN A TIME PERIOD THAT WILL PREVENT SOIL EROSION, FOR TEMPORARY
SEEDING THE CONTRACTOR SHALL UTILIZE A FAST GROWING SEED OF EITHER OATS,
ANNUAL RYEGRASS, WHEAT OR RYE DEPENDING UPON TIME OF YEAR. DISTURBED
AREAS SHOULD BE KEPT TO A MINIMUM AT ALL TIMES.
3. CONTRACTOR SHALL CONTROL MUD ACCUMULATION ON ALL STREETS SURROUNDING THE
PROJECT BY INSTALLING STONE SURFACE AT ALL LOCATIONS WHERE CONSTRUCTION
TRAFFIC LEAVES THE SITE. DUST SHALL BE KEPT TO A MINIMUM BY UTILIZING
SPRINKLING, CALCIUM CHLORIDE, VEGETATIVE COVER, SPRAY ON ADDITIVES OR
OTHER APPROVED METHODS.
4. MAINTAIN ALL FILTERS AND TRAPS DURING CONSTRUCTION TO PREVENT ANY
BLOCKAGES FROM ACCUMULATED SEDIMENT. ADDITIONAL SEEDING AND STRAW
BALES MAY BE REQUIRED DURING CONSTRUCTION AS SPECIFIED BY ENGINEER OR
SOIL CONSERVATION SERVICE. RIP RAP SHALL BE PLACED IN AREAS OF HIGH
VELOCITY STREAM FLOW (MINIMUM SIZE 1/3 CU.FT.). PAYMENT FOR ADDITIONAL
STRAW BALES AND RIP RAP NOT SHOWN ON PLANS AND SEEDING SHALL BE ON A UNIT
BASIS.
5. CONTRACTOR SHALL INSTALL ALL STORM SEWER INLET FILTERS AS STORM SEWER
SYSTEM IS INSTALLED.
6. ALL PROPOSED STREET AREAS TO BE PAVED AS SOON AS POSSIBLE AFTER SUBGRADE
IS PREPARED.
7. CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROLS ONLY
WHEN THERE IS A SUFFICIENT GROWTH OF GROUND COVER TO PREVENT FURTHER
EROSION.
8. ALL SWALES SHALL BE SEEDED IMMEDIATELY AFTER FINAL GRADING.
SEEDING SPECIFICATIONS
1. SWALES /GRASSED WATERWAYS: PERMANENT SEEDING SHALL TAKE PLACE BETWEEN
MARCH 1 AND MAY 15 OR FROM AUGUST 10 TO OCTOBER 15 WITH THE FOLLOWING
PER ACRE:
25 LBS. KENTUCKY 31 FESQUE
15 LBS. KENTUCKY BLUE GRASS
1000 LBS. 12 -12 -12 FERTILIZER
3000 LBS. MULCH (STRAW)
2. IF GRADES ARE ESTABLISHED BETWEEN MAY 15 AND AUGUST 10, A TEMPORARY
SEEDING CONSISTING OF 40 LBS. OF ANNUAL RYEGRASS SHALL BE PLANTED
PER ACRE.
3. IF GRADES ARE ESTABLISHED BETWEEN OCTOBER 15 AND DECEMBER 30, EITHER RYE
(GRAIN) OR WHEAT MAY BE USED AT THE RATE OF 2 BUSHELS /AC. OATS MAY BE
USED FOR EARLY SPRING PLANTING AT THE RATE OF 3 BUSHELS /AC. ALL GRAINS
SHOULD BE CUT AT TIME OF PERMANENT SEEDING. ALL GRAINS SHOULD BE CUT
PRIOR SEED MATURING.
4. IF TEMPORARY SEEDING IS ESTABLISHED PRIOR TO PERMANENT SEEDING, THE MULCH
MAY BE ELIMINATED EXCEPT IN "BARE" AREAS.
5. IF GRADING OCCURS DURING DECEMBER, JANUARY OR FEBRUARY, NO SEEDING TO
TAKE PLACE TILL SPRING PLANTING; HOWEVER, IT IS IMPERATIVE THAT ALL
SEDIMENT FILTERS AND TRAPS ARE IN PLACE PRIOR TO BULK EARTH MOVING OR
CLEARING
EROSION PROTECTION DURING CONSTRUCTION AND SEEDING
1. THE CONTRACTOR SHALL PROVIDE ADEQUATE EROSION PROTECTION MEASURE DURING
CONSTRUCTION SUCH AS, BUT NOT LIMITED TO:
A.
B.
C.
D.
E.
F.
G.
SILTATION BASINS
SILT TRAPS
STRAW BALE DAMS
SOIL CEMENT
MULCH AND SEEDING
SOIL STABILIZATION FABRIC
JUTE NETTING
2. DETAILS AND PLACEMENT SPECIFICATION FOR THE ABOVE ITEMS ARE AVAILABLE ON
REQUEST FROM THE ENGINEER.
3. ALL CONSTRUCTION AREAS ARE TO BE SEEDED IMMEDIATELY FOLLOWING GRADING.
4. SWALE AND LAKE SLOPE SEEDING: SEED AND FERTILIZE WITHIN CONSTRUCTION
LIMITS IMMEDIATELY AFTER CONSTRUCTION WITH 5# /ACRE "RED TOP" GRASS, 20
ACRE "RYE GRASS 20# /ACRE "BLUE GRASS 25# /ACRE "TALL FESCUE" GRASS AND
600# /ACRE 12/12/12 FERTILIZER. CUT AND FILL SEEDING ALONG STREETS:
25# /ACRE "TALL FESCUE" GRASS, 20# /ACRE "RYE GRASS 15# /ACRE "BLUE GRASS"
AND 600# /ACRE 12/12/12 FERTILIZER. (APPROXIMATELY 25 FEET BEHIND CURB FOR
SEEDING ALONG STREET). PAD AND PARKING AREAS SHALL BE SEEDED WITH
40# /ACRE OF ANNUAL RYE GRASS.
5. WOOD CELLULOSE FIBER, STRAW OR MULCH SHALL BE APPLIED AT A RATE OF 3/4
TONS PER ACRE AND SHALL BE REQUIRED FOR ALL SWALE, LAKE SLOPE AND STREET
SEEDING.
6. STONE RIPRAP (MINIMUM 1/3 CUBIC FOOT) IS TO BE UTILIZED IN AREAS OF HIGH
VELOCITY STREAM FLOW.
pANTED
JAN 29 7004
iNS1GNTEN
Heel
NO.
DATE
REti1S/ON DESCRIPTION
„„„lltllltII
G.p
G \S T£Rt .f�
900119
0\ STATE
,n
e {ND I
',f`,' 4NAL`��`
film
*1
O
F
A%
ltiO
CL /ENT
Gu
AIN
LLC
PLAZA,
CONF70ENTIQL/TY STATEMENT
understands that
owned by IEI, and also,
and confidential
Accordingly, the recipient
in strict confidence
these materials to any
not to make copies of
agrees to use the
purpose for which IEI
and recipient agrees
either upon completion of
the request of IEI,
The recipient of these materials
copyright in the materials is
that the materials contain priviledged
business information of IEI.
agrees to retain these materials
and agrees not to disclose
other party and further agrees
the materials. The recipient
materials only for the limited
has made the materials available,
to return all materials to IEI
the intended purpose or upon
whichever comes first.
SITE ADDRESS..
MAI\ STREET
GUILFORD ROAD
CARMEL, INDIANA
811 WEST
MAIN STREET
SCALE none
DATE 01/30/04
DESIGNED BY: DGP
DROWN BY. MEC
CHECKED BY DGP
FIELD BOOK f N/A
F7LE MME 0335C901.dwg
DR4HWC T/TZE
SPECIFICATION
PLAN
SITE
SHEET Na
C901
GENERAL NOTES
1. REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION INDOT) STANDARD
SPECIFICATIONS, LATEST EDITION, FOR BASIC MATERIALS AND CONSTRUCTION
METHODS. THE SECTIONS BELOW FOR VARIOUS ITEMS ARE TO CLARIFY THE INTENT
OF THE REQUIREMENTS FOR THIS PROJECT. PLEASE NOTE THAT OTHER SECTIONS OF
THE DOT STANDARD SPECIFICATIONS MAY ALSO BE APPLICABLE.
CONTRACTORS SHALL CHECK WITH ENGINEER PRIOR TO START OF CONSTRUCTION TO
VERIFY DATE OF PLANS. MINOR CHANGES MAY BE MADE IF ALL REVIEWING AGENCY
APPROVALS ARE NOT GRANTED BEFORE BIDDING. CHANGES IN COST SHALL BE
NEGOTIATED PRIOR TO PHYSICAL CONSTRUCTION.
3. ACTORS SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE ALL MAINS,
CONDUITS, SERVICE LINES, ETC. IN THE AFFECTED CONSTRUCTION AREA.
EXISTING UTILITY STRUCTURES ARE SHOWN HERE IN ACCORDANCE WITH AVAILABLE
INFORMATION. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES AND
FACILITIES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION
OPERATION WITH APPLICABLE UTILITY), IS THE EXPRESSED
RESPONSIBILITY OF THE CONTRACTOR IN THE PERFORMANCE OF THE CONTRACT
AND IN PREPARATION OF THE BID.
4. LL AROUND ALL STRUCTURES AND IN ALL TRENCHES BENEATH PAVED AREAS
SHALL BE COMPACTED GRANULAR MATERIAL IN ACCORDANCE WITH INDOT SECTION 211.
5. FILL MATERIAL SHALL CONSIST OF EARTH OBTAINED FROM CUT AREAS, BORROW
PITS OR OTHER APPROVED SOURCES. EARTH SHALL BE FREE FROM ORGANIC MATTER
AND ETHER DELETERIOUS SUBSTANCES AND LARGE ROCKS. THE FILL MATERIAL SHALL
BE ACED IN LAYERS NOT TO EXCEED SIX INCHES FOLLOWING COMPACTION, PROPER
MOISTURE CONTENT OF FILL MATERIAL WILL BE SUCH TO ACHIEVE SPECIFIED
COMPACTION DENSITY. ALL FILL BENEATH PAVED AREAS, FLOOR SLABS AND FUTURE
BUILDINGS SHALL BE COMPACTED TO AT LEAST 95% OF THE MAXIMUM DRY DENSITY
PER ASTM D -1557.
FIELD COMPACTION TEST SHALL BE RUN ON EACH LIFT, IN FILL SECTIONS, AND
THE SQUIRED COMPACTION ON EACH LIFT SHALL BE ATTAINED PRIOR TO PLACING
THE NEXT LIFT. COMPACTION TESTS SHALL BE IN ACCORDANCE WITH INDOT
SECTION 211.
CLEARING AND GRUBBING
1. VG AND GRUBBING SHALL CONSIST OF CUTTING, REMOVING AND SATISFACTORY
DISPOSING OF ALL TREES, DOWNED TIMBER, BRUSH, PROJECTING ROOTS, STUMPS,
RUBBISH, BOULDERS, BROKEN CONCRETE, FENCING (AS DESIGNATED), AND OTHER
MATERIAL ON THE PROJECT SITE AND WITHIN THE BOUNDARY AS SHOWN ON THE
CONSTRUCTION DOCUMENTS AND /OR AS DESIGNATED BY "CONSTRUCTION LIMITS
2. ALL "UNSUITABLE MATERIAL" FROM CLEARING OPERATIONS SHALL BE REMOVED TO
DISPOSAL AREA(S) OFF OF THE PROJECT SITE; UNLESS A "BURY PIT" SHALL BE
LOCATED WHERE IMPOUNDMENT OF SURFACE WATER MAY OCCUR.
3. MATERIALS SHALL NOT BE DISPOSED OF BY BURNING UNLESS APPROVED BY THE LOCAL
FIRE MARSHAL.
TREE REMOVAL AND PROTECTION
1. TREES SHALL BE REMOVED FROM THE PROJECT ONLY WHERE THE AREA IS TO BE
OCCUPIED BY ROAD AND SURFACED AREAS.
2. TREES SHALL BE REMOVED FROM THE PROJECT SITE AS DIRECTED BY THE DEVELOPER.
3. TREES SHALL BE REMOVED FROM THE PROJECT SITE WHERE THEY INTERFERE DIRECTLY
WITH THE PLACEMENT OF STORM OR SANITARY SEWERS, AND THAT SUCH EXCAVATION
IS OR WILL BE FATAL TO SUCH ADJACENT TREES.
4. THE CONTRACTOR SHALL ENDEAVOR TO SAVE AND PROTECT TREES OF VALUE AND
WORTH WHICH DO NOT IMPAIR CONSTRUCTION OF IMPROVEMENTS AS DESIGNATED.
IN THE EVENT CUT OR FILL EXCEEDS 0.5 FEET OVER THE ROOT AREA, THE
DEVELOPER SHALL BE CONSULTED WITH RESPECT TO PROTECTIVE MEASURES TO BE
TAKEN, IF ANY, TO PRESERVE SUCH TREES.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE METHOD FOR
PROTECTION OF TOPS, TRUNKS AND ROOTS OF EXISTING TREES ON THE PROJECT SITE
THAT ARE TO REMAIN. EXISTING TREES SUBJECT TO CONSTRUCTION DAMAGE SHALL
BE BOXED, FENCED OR OTHER MATERIAL AND EQUIPMENT SHALL NOT BE STOCKPILED
OR STORED WITHIN THE SPREAD OF BRANCHES. BRANCHES WHICH NEED TO BE
REMOVED OR ARE BROKEN SHALL BE NEATLY TRIMMED AND SCARS SHALL BE COVERED
WITH TREE PAINT.
STRIPPING OF TOPSOIL
1. THE CONTRACTOR SHALL VERIFY THAT ALL TOPSOIL HAS BEEN REMOVED IN THE AREAS
TO BE OCCUPIED BY ROAD, WALKS AND DESIGNATED BUILDING AREAS. TOPSOIL
SHALL BE REMOVED TO A DEPTH OF SIX (6) INCHES OR DEEPER, IF NECESSARY, TO
REMOVE ORGANIC MATTER WHERE REQUIRED.
2. TOPSOIL SHALL BE KEPT SEPARATED FROM SUITABLE FILL MATERIALS AND SHALL NOT
BE USED AS FILL UNDER PAVEMENT, BUILDING AREAS AND /OR FUTURE STRUCTURAL
AREAS.
3. TOPSOIL SHALL BE STORED AT A LOCATION WHERE IT DOES NOT INTERFERE WITH
CONSTRUCTION OPERATIONS. EXCESS TOPSOIL SHALL BE REMOVED FROM THE SITE.
4. TOPSOIL SHALL BE REASONABLY FREE FROM SUBSOIL DEBRIS AND STONES.
PAVEMENT CONSTRUCTION
1. THE INDIANA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, LATEST
EDITION SHALL APPLY TO WORKMANSHIP AND MATERIALS IN CONSTRUCTION OF
SUBGRADE, PAVEMENT, CURBS AND WALKS.
a. PREPARE THE SUBGRADE IN ACCORDANCE WITH INDOT SECTION 207. NO TRAFFIC
WILL BE PERMITTED ON THE PREPARED SUBGRADE PRIOR TO PAVING.
b. BITUMINOUS PAVEMENT IN ACCORDANCE WITH INDOT SECTION 402.
c. FINISHING EARTH GRADED SHOULDERS, DITCHES AND SLOPES IN ACCORDANCE
WITH INDOT SECTION 208.
CONCRETE CURB AND WALKS
SEE DETAIL SHEET FOR TYPE AND DETAILS.
2. CONCRETE SHALL BE READY MIXED PORTLAND CEMENT AND WATER CONFORMING TO
A.S.T.M C -150. AGGREGATES SHALL CONFORM TO A.S.T.M. C -33. COMPRESSIVE
STRENGTH OF CONCRETE AT 28 DAYS SHALL BE 4000 P.S.I. WHERE REQUIRED,
REINFORCEMENT SHALL BE WELDED STEEL WIRE FABRIC CONFORMING TO A.S.T.M.
A -185.
3. ALL EXTERIOR CONCRETE SHALL CONTAIN 3% TO 6% AIR ENTRAINMENT.
4. APPLICATION
a. PLACE CONCRETE ONLY ON A MOIST, COMPACT SUBGRADE OR BASE FREE FROM
LOOSE MATERIAL. PLACE NO CONCRETE ON MUDDY OR FROZEN SUBGRADE IN
ACCORDANCE WITH INDOT SECTION 604 AND 605.
b. CONCRETE SHALL BE DEPOSITED SO AS TO REQUIRE AS LITTLE REHANDLING AS
PRACTICAL. WHEN CONCRETE IS TO BE PLACED AT AN ATMOSPHERIC
TEMPERATURE OF 35 DEGREES F OR LESS, PARAGRAPH 702.11 OF THE INDOT
SPECIFICATIONS SHALL APPLY.
c. EXCEPT AS OTHERWISE SPECIFIED, CURE ALL CONCRETE BY ONE OF THE METHODS
DESCRIBED IN INDOT SECTION 501.17.
5. TOP OF CASTING ELEVATIONS REFER TO THE CASTING'S RIM OR TOP OF CURB. THE
CURB CONTRACTOR SHALL INSURE THAT CURB INLET CASTINGS ARE SET AT PROPER
ELEVATION PRIOR TO CONSTRUCTION OF ADJACENT CURB.
S:1 Projects\03351dwg\0335C901.dwg, 01/29/2004 03:22:33 PM, Field1
DEMOLITION
1. THE CONTRACTOR SHALL EXCAVATE, DEMOLISH, REMOVE AND DISPOSE OF THE DEBRIS
FROM THE AREAS SHOWN ON THE SITE DEVELOPMENT PLAN.
a. BUILDING WALLS.
b. FOUNDATIONS.
c. PAVEMENT (CONCRETE, ASPHALT AND BRICK).
d. CONCRETE SLABS.
2. ALL MATERIAL AS A RESULT OF THE GENERAL DEMOLITION SHALL BE THE PROPERTY
OF THE CONTRACTOR. THE CONTRACTOR'S LUMP SUM BID PRICE FOR THE DEMOLITION
SHALL TAKE INTO ACCOUNT THE SALVAGEABLE VALUE OF MATERIALS AND SAID BID
PRICE SHALL REFLECT SAID SAVINGS.
3. THE CONTRACTOR SHALL BE REQUIRED TO DEMOLISH AND REMOVE DESIGNATED
FOUNDATION WALLS, RETAINING WALLS, CURBING, CONCRETE SLABS, PAVING, TANKS,
STRUCTURES, PIPES, MANHOLES AS SHOWN ON THE CONTRACT DOCUMENTS. ALL
EXISTING BASEMENT FLOOR SLABS THAT ARE NOT REMOVED SHALL BE BROKEN UP
SUFFICIENTLY TO PERMIT DRAINAGE THROUGH THE SLAB. ALL EXISTING BASEMENT
WALLS, FOUNDATIONS, FLOOR SLABS, AND ETC. SHALL BE REMOVED TO AN ELEVATION
SUCH THAT THEY WILL NOT SUPPORT PROPOSED FLOOR SLABS OR PAVEMENTS.
4. THE CONTRACTOR SHALL OBTAIN FROM THE CITY OF CARMEL, AND ALL OTHER
APPLICABLE GOVERNMENTAL AUTHORITIES, NECESSARY PERMITS REQUIRED, A COPY
OF SUCH PERMITS TO BE FURNISHED TO THE OWNER PRIOR TO COMMENCEMENT OF ANY
WORK REQUIRED HEREIN. THE CONTRACTOR SHALL FURTHER FURNISH TO THE OWNER
PROOF THAT HE HAS COMPLIED WITH THE PROVISIONS OF THE MUNICIPAL CODE OF
CARMEL, INDIANA.
UTILITIES
1. ALL WATER LINES FROM THE CITY OF CARMEL UTILITY COMPANY MAIN TO ANY LOT
SHALL BE INSTALLED OF MATERIAL AND WORKMANSHIP AS APPROVED BY THE CITY
OF CARMEL UTILITY COMPANY.
2. CONDUIT SHALL BE REQUIRED FOR ALL ELECTRICAL AND TELEPHONE LINES UNDER
PAVED AREAS.
3. COMPACTED GRANULAR BACKFILL SHALL BE REQUIRED FOR ALL CROSSINGS OF PAVED
AREAS PER HAMILTON COUNTY HIGHWAY DEPARTMENT DETAILS AND SPECIFICATIONS.
SANITARY SEWER SPECIFICATIONS
1. STANDARD SPECIFICATIONS FOR THE CITY OF CARMEL, INDIANA DEPARTMENT OF
TRANSPORTATION, INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT AND CLAY
TOWNSHIP REGIONAL WASTE DISTRICT SHALL APPLY FOR ALL WORK AND MATERIALS.
PIPE SHALL BE INSTALLED IN ACCORDANCE WITH INDOT SECTION 715, ASTM AND
MANUFACTURER SPECIFICATIONS.
2. SANITARY SEWER PIPE SHALL BE PVC IN ACCORDANCE WITH ASTM D -3034
(S.D.R. 35) AND ASTM 2321. PVC PIPE SHALL HAVE GROOVED BELL AND GASKET.
THE PIPE SHALL BE MADE OF PVC PLASTIC HAVING A CELL CLASSIFICATION OF
12454B.
3. PVC SEWER FITTINGS SHALL CONFORM TO THE REQUIREMENTS OF ASTM
D- 3034 -89 SPECIFICATION. FITTINGS IN SIZES THROUGH 8" SHALL BE MOLDED IN
ONE PIECE WITH ELASTOMERIC JOINTS AND MINIMUM SOCKET DEPTHS AS
SPECIFIED IN SECTIONS 6.2 AND 7.3.2. FITTINGS 10" AND LARGER SHALL BE
MOLDED OR FABRICATED IN ACCORDANCE WITH SECTION 7.11 WITH
MANUFACTURERS STANDARD PIPE BELLS AND GASKETS. WALL THICKNESS OF
FITTINGS SHALL BE SDR 26 AS DEFINED IN SECTION 7.4.1 OF SPECIFICATIONS.
GASKETS FOR ELASTOMERIC JOINTS SHALL BE MOLDED WITH A MINIMUM
CROSS SECTIONAL AREA OF 0.20 SQUARE INCHES AND CONFORM TO ASTM F -477
SPECIFICATION. FITTINGS SHALL BE MANUFACTURED BY HARCO OR EQUAL.
4. ALL SANITARY MANHOLES SHALL BE PRECAST CONCRETE MANHOLES IN
ACCORDANCE WITH ASTM C -478 AND SECTION 720. 0 -RINGS SHALL CONFORM
TO C -443. KENT SEAL OR EQUIVALENT SHALL ALSO BE APPLIED TO ALL JOINTS
AND BETWEEN RISER RINGS AND CASTINGS. MANHOLE STEP SPACING SHALL BE
NO MORE THAN 16- INCHES. MANHOLES SHALL BE AIR TESTED FOR LEAKAGE IN
ACCORDANCE WITH ASTM C1244 -93, STANDARD TEST METHOD FOR CONCRETE
SEWER MANHOLES BY THE NEGATIVE AIR PRESSURE (VACUUM) TEST.
A. INSTALLATION AND OPERATION OF VACUUM EQUIPMENT AND INDICATING
DEVICES MUST BE IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS AND
PERFORMANCE SPECIFICATIONS WHICH HAVE BEEN PROVIDED BY THE
MANUFACTURER AND ACCEPTED BY THE ENGINEER. THE VACUUM EQUIPMENT MUST
BE CAPABLE OF TESTING THE ENTIRE MANHOLE, INCLUDING THE CASTING AND
RISER RINGS.
B. WITH THE VACUUM TESTER SET IN PLACE:
1. CONNECT THE VACUUM PUMP TO THE OUTLET PORT WITH THE VALVE OPEN.
2. DRAW A VACUUM OF TEN (10) INCHES OF HG. AND CLOSE THE VALVE.
C. ACCEPTED STANDARDS FOR LEAKAGE WILL BE ESTABLISHED FROM THE
ELAPSED TIME FOR A NEGATIVE PRESSURE CHANGE FROM TEN (10) INCHES TO
NINE (9) INCHES OF MERCURY. THE MAXIMUM ALLOWABLE LEAKAGE RATE FOR A
FOUR (4) FOOT DIAMETER MANHOLE MUST BE IN ACCORDANCE WITH THE
FOLLOWING:
MANHOLE DEPTH
10 FEET OR LESS
>10 FEET BUT <15 FEET
>15 FEET BUT <25 FEET
MINIMUM ELAPSED TIME FOR A
PRESSURE CHANGE OF 1 INCH HG
60 SECONDS
75 SECONDS
90 SECONDS
FOR MANHOLES FIVE (5) FEET IN DIAMETER, ADD AN ADDITIONAL FIFTEEN (15)
SECONDS AND FOR MANHOLES SIX (6) FEET IN DIAMETER, ADD AN ADDITIONAL
THIRTY (30) SECONDS TO THE TIME REQUIREMENTS FOR FOUR (4) FOOT DIAMETER
MANHOLES. FOR ALL MANHOLES DEEPER THAN TWENTY -FIVE (25) FEET, THE
ENGINEER WILL DETERMINE THE APPLICABLE MINIMUM ELAPSED TIME.
D. IF THE MANHOLE FAILS THE TEST, NECESSARY REPAIRS MUST BE MADE
AND THE VACUUM TEST AND REPAIRS MUST BE REPEATED UNTIL THE MANHOLE
PASSES THE TEST.
E. IF MANHOLE JOINT SEALANTS ARE PULLED OUT DURING THE VACUUM TEST, THE
MANHOLE MUST BE DISASSEMBLED AND THE JOINT SEALANTS REPLACED.
F. MANHOLES WILL BE SUBJECT TO VISUAL INSPECTION WITH ALL VISUAL LEAKS
BEING REPAIRED.
5. BUTYL RUBBER COATING SHALL BE APPLIED AROUND EACH MANHOLE JOINT FROM
6- INCHES ABOVE TO 6- INCHES BELOW EACH JOINT. THE APPROPRIATE PRIMER SHALL
BE APPLIED PRIOR TO APPLYING THE RUBBER COATING. INSIDE JOINTS TO BE FILLED
WITH PRECOAT PLUG MATERIAL.
6. THE MANHOLE CHIMNEYS, INCLUDING ALL RISER RINGS SHALL BE SEALED USING
INFI- SHIELD UNIBAND OR APPROVED EQUAL. PRIOR TO PLACEMENT, THE TOP 4- INCHES
OF THE MANHOLE CONE AND CASTING FRAME SHALL BE CLEANED AND PRIMED. THE
UNIBAND SHALL EXTEND FROM 3- INCHES BELOW THE TOP OF THE CONE SECTION TO
2- INCHES OVER THE FLANGE OF THE MANHOLE CASTING FRAME.
7. THE CASTING ELEVATIONS ARE SET BY PLAN. HOWEVER, THE CASTINGS ARE TO BE
ADJUSTED IN THE FIELD BY THE ENGINEERS REPRESENTATIVE SHOULD A DISCREPANCY
OCCUR BETWEEN PLAN GRADE AND EXISTING GRADE. NEW MANHOLE RING AND COVER
SHALL BE INSTALLED TO ESTABLISH GRADE. MAXIMUM HEIGHT OF ADJUSTING RINGS
SHALL BE 12- INCHES.
8. BACKFILL AROUND ALL STRUCTURES AND ALL CUTS UNDER PAVED AREAS WITH
GRANULAR MATERIAL. TRENCHES OPENING WITHIN 5 -FEET OF PAVED ROADWAYS SHALL
BE BACKFILLED WITH GRANULAR MATERIAL IN ACCORDANCE WITH SECTION 211. BACKFILL
UNDER SIDEWALKS SHALL BE GRANULAR, UNLESS THE WALKS ARE CONSTRUCTED A
MINIMUM OF 6 MONTHS AFTER BACKFILL HAS BEEN IN PLACE.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT ALL STATE HIGHWAYS,
CITY, AND COUNTY PERMITS HAVE BEEN OBTAINED BY THE DEVELOPER PRIOR TO START
OF CONSTRUCTION.
10. THE CONTRACTOR SHALL BE REQUIRED TO FURNISH THE DEVELOPER'S ENGINEER WITH
A SET OF PRINTS, MARKED IN RED PENCIL, SHOWING ACTUAL SEWER LOCATION AND
INVERT, TO INCLUDE LATERAL LOCATION, DEPTH AND LENGTH. SUCH ASBUILT PRINTS
MUST BE RECEIVED BY THE ENGINEER BEFORE THE FINAL CONTRACT PAYMENT CAN BE
AUTHORIZED. THE SANITARY SEWER LATERALS AND STUBS TERMINATION SHALL BE
INDICATED ON THE SURFACE WITH A METAL FENCE POST SET IMMEDIATELY ABOVE THE
SAID TERMINATION POINT.
11. ALL SANITARY SEWER LINES UPON COMPLETION WILL BE REQUIRED TO PASS A LOW
PRESSURE AIR TEST. SAID TEST SHALL BE CONDUCTED ACCORDING TO ASTM 1417 -92,
AND SHALL BE WITNESSED BY AN ENGINEER AND A REPRESENTATIVE OF THE DISTRICT.
THE TESTING SHALL BE IN ACCORDANCE WITH TABLE 1. ADD 0.5 PSIG FOR EACH FOOT
OF WATER ABOVE THE SEWER LINE BEING TESTED.
12. DEFLECTION TESTS SHALL BE PERFORMED ON ALL FLEXIBLE* PIPE AFTER THE FINAL
BACKFILL HAS BEEN IN PLACE AT LEAST 30 DAYS. NO PIPE SHALL EXCEED A VERTICAL
DEFLECTION OF 5% DEFLECTION TEST RESULTS. *THE FOLLOWING ARE CONSIDERED
NON- FLEXIBLE PIPES: CONCRETE PIPE, DUCTILE IRON PIPE, AND CAST IRON PIPE). THE
DEFLECTION TEST SHALL BE PERFORMED WITH A NINE -POINT MANDREL. PROVING RINGS
SHALL BE AVAILABLE.
13. ALL MANDREL TESTING SHALL BE OBSERVED BY A PROFESSIONAL ENGINEER
REPRESENTATIVE FOR CERTIFICATION AND A REPRESENTATIVE OF THE DISTRICT.
14. THE ENDS OF LATERALS ARE TO BE PLUGGED TIGHT WITH A BRACED PLASTIC DISC
OR CAP CAPABLE OF WITHSTANDING A LOW PRESSURE AIR TEST WITHOUT LEAKAGE.
15. BEDDING FOR FLEXIBLE PIPE SHALL BE NO. 8 CRUSHED STONE FROM 6- INCHES
BELOW TH E PIPE TO 12- INCHES ABOVE THE PIPE. BEDDING FOR RIGID PIPE SHALL BE
NO. 8 CRUSHED STONE FROM 6- INCHES BELOW THE PIPE TO THE SPRING LINE OF THE
PIPE AND FROM THIS POINT TO 12- INCHES ABOVE SHALL BE FILL SAND OR EQUIVALENT.
MANHOLES SHALL BE PLACED ON NO LESS THAN 6- INCHES OF NO. 8 CRUSHED STONE
BEDDING.
16. WATER AND SEWER LINE CROSSINGS AND SEPARATIONS SHALL BE IN ACCORDANCE
WITH 327 IAC 3 -6 -9.
17. TRENCH SHALL BE OPENED SUFFICIENTLY AHEAD OF PIPE LAYING TO REVEAL
OBSTRUCTION, AND SHALL BE PROPERLY PROTECTED AND /OR BARRICADED WHEN
LEFT UNATTENDED.
18. NO WATER SHALL BE PERMITTED TO FLOW INTO THE SANITARY SEWER SYSTEM
DURING CONSTRUCTION. CONTRACTOR SHALL UTILIZE A PUMP TO KEEP THE WATER
LEVEL BELOW THE PIPE. PUMP DISCHARGE SHALL BE DIRECTED TO A STORM OUTLET IN
ACCORDANCE WITH STATE AND FEDERAL LAWS AND REGULATIONS (327 IAC 3- 6 -20).
ANY PIPE ENTERING EXISTING SEWERS SHALL BE PLUGGED WITH SCREW TYPE
MECHANICAL, BRACED PLUG UNTIL SUCH TIME AS ALL TESTS ON THE SEWERS HAVE
BEEN COMPLETED AND THE LINES HAVE PASSED ALL PUNCH LISTS.
19. ALL SEWER LATERALS INSTALLED BY THE MAINLINE CONTRACTOR SHALL BE BEDDED
THE SAME AS THE MAIN LINE SEWER.
20. FORTY -EIGHT (48) HOURS NOTICE SHALL BE GIVEN TO THE DISTRICT PRIOR TO THE
START OF SEWER CONSTRUCTION. ALSO, 48 HOURS NOTICE SHALL BE GIVEN PRIOR TO
DOING ANY TESTING ON THE SEWER.
21. MANHOLE CASTINGS SHALL BE STAMPED SANITARY SEWER (NEENAH CASTING R
1642A OR EQUAL) AND BE SELF SEALING TYPE. THE CASTING FLANGE SHALL BE 34
INCHES AND THE CLEAR OPENING SHALL BE 24 INCHES. WATERPROOF CASTINGS SHALL
BE
NEENAH R- 916 -F1 AND STAMPED SANITARY SEWER.
22. THE MINIMUM SLOPE FOR SEWER ACCEPTANCE BY THE CLAY TOWNSHIP REGIONAL
WASTE DISTRICT ARE:
SIZE OF PIPE MINIMUM CONSTRUCTED SLOPE
8 -INCH 0.40%
10 -INCH 0.28%
12 -INCH 0.22%
15 -INCH 0.15%
18 -INCH 0.12%
23. THE CONTRACTOR SHALL PROVIDE MEASUREMENTS OF THE SLOPE OF THE SEWER
FOR EACH MANHOLE SECTION AS CONSTRUCTION PROGRESSES. SUCH MEASUREMENTS
SHALL BE CERTIFIED BY A REGISTERED LAND SURVEYOR OR ENGINEER AND BE
AVAILABLE ON -SITE FOR OBSERVATION BY THE DISTRICT'S INSPECTOR. NO MORE THAN
THREE MANHOLE SECTIONS CAN BE CONSTRUCTED IN ADVANCE OF SUCH MEASUREMENTS.
24. IN THE EVENT THE CONTRACTOR DOES NOT MEET THE MINIMUM SLOPES, THE SEWER
SECTION AND ANY OTHER AFFECTED SEWER SECTIONS SHALL BE RECONSTRUCTED TO
MEET SUCH MINIMUM SLOPES.
25. LATERALS ARE TO BE TRACED WITH A MINIMUM SIZE OF 14 -GAUGE WIRE FROM THE
WYE TO THE TERMINUS. THE CONTRACTOR FOR THE BUILDING OR HOME WILL EXTEND
THE WIRE FROM THIS TERMINUS TO THE BUILDING CLEANOUT ADJACENT TO THE BUILDING.
STORM SEWER SPECIFICATIONS
1. STANDARD SPECIFICATIONS OF THE HAMILTON COUNTY SURVEYORS OFFICE AND INDIANA
DEPARTMENT OF TRANSPORTATION SHALL APPLY FOR ALL WORK AND MATERIALS. PIPE
SHALL BE INSTALLED IN ACCORDANCE WITH INDOT SECTION 715.
2. ALL REINFORCED CONCRETE STORM SEWER PIPE (RCP) SHALL CONFORM TO ASTM
DESIGNATION C -76 CLASS III. ALL HELICALLY CORRUGATED STEEL PIPE (HCSP)
SHALL CONFORM AASHTO M36, 16 GAUGE IN ACCORDANCE WITH INDOT SECTION 907.
3. BACKFILL AROUND ALL STRUCTURES AND CUTS UNDER PAVED AREAS WITH COMPACTED
GRANULAR MATERIAL IN ACCORDANCE WITH INDOT SECTION 21.1 AND 715.
4. SEE STANDARD DETAIL SHEET FOR CONSTRUCTION DIMENSIONS OF STORM STRUCTURES.
MANHOLE, INLETS AND CATCH BASINS SHALL BE IN ACCORDANCE WITH INDOT SECTION
720. PRECAST CONCRETE AND STEEL FOR MANHOLES AND INLETS SHALL BE IN
ACCORDANCE WITH ASTM C -478.
5. STORM SEWER DISCHARGE AREAS AND INVERTS ARE TENTATIVE AND ARE SUBJECT TO
FIELD MODIFICATIONS BY THE ENGINEER OR HIS REPRESENTATIVE.
6. THE CONTRACTOR SHALL PROVIDE AT LEAST 2' OF COVER OVER ALL STORM SEWERS,
UNLESS OTHERWISE INDICATED BY PLANS.
7. RIP RAP SHALL BE A MINIMUM OF 1/3 CUBIC FOOT IN SIZE AND A MINIMUM 18" IN
DEPTH. DIMENSIONS FOR RIP RAP IN THESE PLANS ARE FOR ESTIMATING PURPOSES
ONLY. ACTUAL BEST PLACEMENT OF RIP RAP SHALL BE DETERMINED BY FIELD
CONDITIONS AND SHALL BE IN ACCORDANCE WITH INDOT SECTION 616.
8. ALL DRAINAGE PIPE AND DITCH OUTFALLS TO RECEIVING STREAMS SHALL BE
CONSTRUCTED IN ACCORDANCE WITH DRAWINGS, SUBJECT HOWEVER, TO ANY
MODIFICATION REQUIRED BY THE ENGINEER AT THE TIME INSTALLATION IS
COMPLETED AND TO ANY ADJUSTMENTS NEEDED FOR FIELD CONDITIONS NOT
ADEQUATELY ANTICIPATED BY THE DESIGN DRAWING.
9. CASTINGS SHALL BE AS SHOWN ON DETAIL SHEET FOR MANUFACTURER, TYPE AND
NUMBER. ALL CASTINGS SHALL BE NEENAH OR EAST JORDAN APPROVED EQUAL.
SOIL EROSION CONTROL SUMMARY
1. CONTRACTOR SHALL INSTALL SEDIMENT TRAPS AND STRAW BALE FILTERS AS SHOWN.
2. MASS GRADE THE SITE (SIDES OF SWALES, MOUNDS AND PONDS TO BE SODDED OR
SEEDED AND MULCHED IMMEDIATELY UPON COMPLETION). TEMPORARY SEEDING SHALL
BE RECOMMENDED FOR ALL SWALES AND DISTURBED AREAS THAT CANNOT BE FINAL
SEEDED WITHIN A TIME PERIOD THAT WILL PREVENT SOIL EROSION, FOR TEMPORARY
SEEDING THE CONTRACTOR SHALL UTILIZE A FAST GROWING SEED OF EITHER OATS,
ANNUAL RYEGRASS, WHEAT OR RYE DEPENDING UPON TIME OF YEAR. DISTURBED
AREAS SHOULD BE KEPT TO A MINIMUM AT ALL TIMES.
3. CONTRACTOR SHALL CONTROL MUD ACCUMULATION ON ALL STREETS SURROUNDING THE
PROJECT BY INSTALLING STONE SURFACE AT ALL LOCATIONS WHERE CONSTRUCTION
TRAFFIC LEAVES THE SITE. DUST SHALL BE KEPT TO A MINIMUM BY UTILIZING
SPRINKLING, CALCIUM CHLORIDE, VEGETATIVE COVER, SPRAY ON ADDITIVES OR
OTHER APPROVED METHODS.
4. MAINTAIN ALL FILTERS AND TRAPS DURING CONSTRUCTION TO PREVENT ANY
BLOCKAGES FROM ACCUMULATED SEDIMENT. ADDITIONAL SEEDING AND STRAW
BALES MAY BE REQUIRED DURING CONSTRUCTION AS SPECIFIED BY ENGINEER OR
SOIL CONSERVATION SERVICE. RIP RAP SHALL BE PLACED IN AREAS OF HIGH
VELOCITY STREAM FLOW (MINIMUM SIZE 1/3 CU.FT.). PAYMENT FOR ADDITIONAL
STRAW BALES AND RIP RAP NOT SHOWN ON PLANS AND SEEDING SHALL BE ON A UNIT
BASIS.
5. CONTRACTOR SHALL INSTALL ALL STORM SEWER INLET FILTERS AS STORM SEWER
SYSTEM IS INSTALLED.
6. ALL PROPOSED STREET AREAS TO BE PAVED AS SOON AS POSSIBLE AFTER SUBGRADE
IS PREPARED.
7. CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROLS ONLY
WHEN THERE IS A SUFFICIENT GROWTH OF GROUND COVER TO PREVENT FURTHER
EROSION.
8. ALL SWALES SHALL BE SEEDED IMMEDIATELY AFTER FINAL GRADING.
SEEDING SPECIFICATIONS
1. SWALES /GRASSED WATERWAYS: PERMANENT SEEDING SHALL TAKE PLACE BETWEEN
MARCH 1 AND MAY 15 OR FROM AUGUST 10 TO OCTOBER 15 WITH THE FOLLOWING
PER ACRE:
25 LBS. KENTUCKY 31 FESQUE
15 LBS. KENTUCKY BLUE GRASS
1000 LBS. 12 -12 -12 FERTILIZER
3000 LBS. MULCH (STRAW)
2. IF GRADES ARE ESTABLISHED BETWEEN MAY 15 AND AUGUST 10, A TEMPORARY
SEEDING CONSISTING OF 40 LBS. OF ANNUAL RYEGRASS SHALL BE PLANTED
PER ACRE.
3. IF GRADES ARE ESTABLISHED BETWEEN OCTOBER 15 AND DECEMBER 30, EITHER RYE
(GRAIN) OR WHEAT MAY BE USED AT THE RATE OF 2 BUSHELS /AC. OATS MAY BE
USED FOR EARLY SPRING PLANTING AT THE RATE OF 3 BUSHELS /AC. ALL GRAINS
SHOULD BE CUT AT TIME OF PERMANENT SEEDING. ALL GRAINS SHOULD BE CUT
PRIOR SEED MATURING.
4. IF TEMPORARY SEEDING IS ESTABLISHED PRIOR TO PERMANENT SEEDING, THE MULCH
MAY BE ELIMINATED EXCEPT IN "BARE" AREAS.
5. IF GRADING OCCURS DURING DECEMBER, JANUARY OR FEBRUARY, NO SEEDING TO
TAKE PLACE TILL SPRING PLANTING; HOWEVER, IT IS IMPERATIVE THAT ALL
SEDIMENT FILTERS AND TRAPS ARE IN PLACE PRIOR TO BULK EARTH MOVING OR
CLEARING
EROSION PROTECTION DURING CONSTRUCTION AND SEEDING
1. THE CONTRACTOR SHALL PROVIDE ADEQUATE EROSION PROTECTION MEASURE DURING
CONSTRUCTION SUCH AS, BUT NOT LIMITED TO:
A.
B.
C.
D.
E.
F.
G.
SILTATION BASINS
SILT TRAPS
STRAW BALE DAMS
SOIL CEMENT
MULCH AND SEEDING
SOIL STABILIZATION FABRIC
JUTE NETTING
2. DETAILS AND PLACEMENT SPECIFICATION FOR THE ABOVE ITEMS ARE AVAILABLE ON
REQUEST FROM THE ENGINEER.
3. ALL CONSTRUCTION AREAS ARE TO BE SEEDED IMMEDIATELY FOLLOWING GRADING.
4. SWALE AND LAKE SLOPE SEEDING: SEED AND FERTILIZE WITHIN CONSTRUCTION
LIMITS IMMEDIATELY AFTER CONSTRUCTION WITH 5# /ACRE "RED TOP" GRASS, 20
ACRE "RYE GRASS 20# /ACRE "BLUE GRASS 25# /ACRE "TALL FESCUE" GRASS AND
600# /ACRE 12/12/12 FERTILIZER. CUT AND FILL SEEDING ALONG STREETS:
25# /ACRE "TALL FESCUE" GRASS, 20# /ACRE "RYE GRASS 15# /ACRE "BLUE GRASS"
AND 600# /ACRE 12/12/12 FERTILIZER. (APPROXIMATELY 25 FEET BEHIND CURB FOR
SEEDING ALONG STREET). PAD AND PARKING AREAS SHALL BE SEEDED WITH
40# /ACRE OF ANNUAL RYE GRASS.
5. WOOD CELLULOSE FIBER, STRAW OR MULCH SHALL BE APPLIED AT A RATE OF 3/4
TONS PER ACRE AND SHALL BE REQUIRED FOR ALL SWALE, LAKE SLOPE AND STREET
SEEDING.
6. STONE RIPRAP (MINIMUM 1/3 CUBIC FOOT) IS TO BE UTILIZED IN AREAS OF HIGH
VELOCITY STREAM FLOW.
pANTED
JAN 29 7004
iNS1GNTEN