EROSION CONTROL MEASURE
INSTALLATION SEQUENCE
STONE ENTRANCE
PRIOR TO CLEARING AND GRADING
SILT FENCE
PRIOR TO CLEARING AND GRADING
EXISTING INLET PROTECTION
PRIOR TO CLEARING AND GRADING
TREE PROTECTION
PRIOR TO CLEARING AND GRADING
TEMPORARY DIVERSIONS
ALONG WITH ROUGH GRADING
TEMPORARY SEDIMENT TRAP
ALONG WITH ROUGH GRADING
TEMPORARY SEEDING
AFTER ROUGH GRADING
PERMANENT SEEDING
AFTER FINISH GRADING
EROSION CONTROL MATTING
AFTER FINISH GRADING
STRAW BALES
AFTER FINISH GRADING
INLET PROTECTION
AFTER EACH INLET IS PLACED
SEED, SOD LANDSCAPE AROUND
AFTER FINISHED GRADING AROUND FINISHED UNITS
FINISHED UNITS
8'
REMOVAL OF STRAW BALES
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF INLET PROTECTION
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF SILT FENCE
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
PIPE SIZE
B
La
W
RIPRAP
SIZE d50
42'
10.5'
25'
18'
12"
36'
9'
20'
15'
9"
30'
7.5'
15'
12'
9`
24'
6'
12'
10'
6'
12' -21'
4'
10'
8'
6'
6' -8'
2'
5'
4'
6'
DATE:
03/01/04
PROJECT NO.:
4702.002
DRAWN BY:
RDR
CHECKED BY:
RLD
SHEET TITLE:
STORMWATER POLLUTION
PREVENTION DETAILS
DRAWING FILES:
N: \4k \4702 \002 \dwgs \020604 \C801 -C801 A.dwg
XREF: N:\41A4702\002\dwgs\020604\Titlel.dwg
SHEET NO.:
CBOT.
SILT FENCE
Silt Fence shall be a machine produced, non -woven geotextile of 100%
polypropylene meeting the physical properties below.
All stakes shall be 2" X 2" hardwood 36" tall with 24" tall lath stapled
to stakes over fabric as reinforcement.
All silt fence shall be prefabricated by the supplier. No field assembly
will be accepted.
4 oz /syd
Warp 125 lbs.
Warp 50
Strength 50 lbs.
200 psi
70
50 -80
225 gpm /sq. ft
75
Fabric Weight
Grab Strength
Elongation
Trapezoidal Tear
Burst Strength
UV Resistance
A.O.S
Slurry Flow Rate
Sediment Retention
Silt Fence Material
Fence Post
Fence Post Should)
be Buried 1' Below
Ground Surface
SILT FENCE DETAIL
N TS
INDOT CA #5 OR 12"
#8 STONE 12' THICK v 1 U
45 Oe.
/A/
V/ \/7/\/ \i
V� AV A
\Z \\�i� /(A
SUBGRADE
2: 1
MAX.
UNDERDRAIN"
W /SOCK PER DETAIL
Similar for culvert outlets
ROCK DONUT DROP INLET PROTECTION
NO SCALE
SIGN TO INDICATE THE
LOCATION OF THE
CONCRETE WASHOUT AREA
12"
COMPACTED EMBANKMENT
MATERIAL TYP.
7- Stakes 5' O.C.
Ground Surface
\--Silt e c F n e Material Should
be Buried 6" Below Ground
Surface.
#5 STONE
BERM AROUND PERIMETER
15x15' MIN OR
AS REQUIRED TO CONTAIN
WASTE CONCRETE
2 stakes (typ)
per bale
bindings to be
placed parallel
to ground
0
12" MIN
3: 1 OR FLAIIER
SIDE SLOPES
12"
1
L
CONCRETE WASHOUT DETAIL
i!
Plan
(n.t.s.)
Profile
(n.t.s.
NOTES:
1. CONCRETE WASHOUT AREA SHALL BE INSTALLED PRIOR TO ANY CONCRETE PLACEMENT ON SITE.
2. SIGNS SHALL BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE WASHOUT AREA, AND
ELSEWHERE AS NECESSARY TO CLEARLY INDICATE THE. LOCATION OF THE CONCRETE WASHOUT AREA TO
OPERATORS OF CONCRETE TRUCKS AND PUMP RIGS.
3. THE CONCRETE WASHOUT AREA SHALL BE REPAIRED AND ENLARGED OR CLEANED OUT AS
NECESSARY TO MAINTAIN CAPACITY FOR WASTED CONCRETE.
4. AT THE END OF CONSTRUCTION, ALL CONCRETE SHALL BE REMOVED FROM THE SITE AND DISPOSED
OF AT AN APPROVED WASTE SITE.
5. WHEN THE CONCRETE WASHOUT ARE IS REMOVED, THE DISTURBED AREA SHALL BE SEEDED AND
MULCHED OR OTHERWISE STABILIZED IN A MANNER APPROVED BY THE INSPECTOR.
7
C801
--f f l o w
straw bale
stake (typ)
straw bale
11 /l
3 6 undertoe
SEDIMENT FILTER DETAIL
GROUND SURFACE
SILT FENCE MATERIAL
NOTE:
1. SEE SILT FENCE DETAIL
FOR MATERIAL SPECIFICATIONS.
2. SILT FENCE SHALL BE
PREASSEMBLED BY SUPPLIER.
INLET PROTECTION SILT FENCT)
BEEHIVE INLET OR
DRAINAGE COVER
2 -3" COARSE
AGGREGATE
GEOTEXTILE FABRIC TO STABILIZE
FOUNDATION (ESPECIALLY IMPORTANT
WHERE WETNESS IS ANTICIPATED)
TEMPORARY CONSTRUCTION
ENTRANCE DETAIL
'CLI "CL 'C� �C� "FL "��I T�
RAP '��i
DIRECTION `t`���1`•►=
OF FLOW r w •w O VER
'r- GEOTEXTILE RIP
i
'lir ;�i i J i �i �i i i i i NOTES
1. MINIMUM THICKNESS OF RIPRAP TO BE 12".
PIPE Q
CULVERT s
2. GEOTEX11LE TO BE POLYFELT TS700 OR
APPROVED EQUAL.
SLop
VA
PIPE
CULVERT o
RIPRAP GEOTEXTILE
UNDER END SECTION
END
SECTION
TOE ANCHOR
LATHS
SILT FENCE EXTENDS
6" BELOW FINISHED GRADE
PLAN VIEW
CROSS SECTION
La
OR TO EDGE OF
SAFETY LEDGE
RIPRAP GEOTEXTILE
(SEE NOTES)
2'
2'
RIPRAP DETAIL CD END SECTION
SEE NOTES ON SHEET C801A FOR MAINTENANCE REQUIREMENTS
SITE SPECIFIC CONSTRUCTION SEQUENCE
The purpose of staging construction during the earthwork phase of the project is to
limit the amount of ground disturbed at any given time and to control silt from the
areas that are disturbed to prevent silt from leaving the site. For this reason, the
following sequencing should be followed as much as possible.
1. Install construction entrance, silt fence, and tree protection.
2. Install construction fence.
3. Demolish building, trees, and site improvements in vicinity of new building.
4. Strip topsoil, Grading.
5, Construct new building and utilities.
6. Construct paved areas.
7. Install roof drains.
8. Landscaping.
9. Spread topsoil and seeding.
POST CONSTRUCTION ACTIVITIES
1. Inspect and maintain all erosion control measures as detailed in the erosion control
measures and maintenance requirements beginning immediately after installation.
STORMWATER POLLUTION PREVEN110N DATA PLAN INDEX
A3. Project Nature Purpose: Demolish Existing Clubhouse Construct New
A4. Vicinity Map: See Cover Sheet C100.
A5. Legal Description: See Topography Sheet B101 and /or Site Plan
A6. Proposed Site Improvements: See Site Plan Sheet C101.
A7. Hydrologic Unit Code: 05120201090060
A8. State or Federal Water Quality Permits: None
A9. Stormwater Discharge Points: Site Sheet Drains to West and South. (See Utility Plan)
A10. Wetlands, Lakes or Water Courses: None in Vicinity
All. Receiving Waters: Spring Mill Run
Al2. Potential Discharges to Groundwater: None known
A13. 100 Year Floodplains /Floodways: See Sheet C100
A14. Storm Flows: No Net Change in Storm Water Flows or Patterns
A15. Adjacent Land Use: See sheet C100 and Topography Sheet B101. No
upstream watershed.
A16. Location of Disturbed Areas: See sheet C104
A17. Existing Vegetation: See Topography Sheet B101.
A18. Soils Map, Description and Limitations: See sheet C104.
A19. Proposed Stormwater System: See Utility Plan C103
A20. Off -site Construction Activity: None proposed
A21. Stockpile, Borrow, and /or Disposal Areas: None Proposed
A22. Existing Site Topography: See Topography Sheet B101.
A23. Proposed Topography. See Grading Plan C102
CONSTRUCTION COMPONENTS
B1. Potential Construction Pollutant Sources: Sediment particles, possibly oils,
hydraulic fluids, fuel, grease.
B2. Construction Sequence: See Stormwater Pollution Prevention Sequence on
this Sheet.
B3. Construction Entrance: See Sheet C104 for location.
B4 to B11. Erosion Control Measures: See this Sheet, C801A and Sheet C104.
B12. Permanent Stabilization: See Sheet 801A, Sheet C104, and Landscape Plan
B13. Material Handling /Spill Prevention: Sediment to be placed in soil stockpile
areas. Oils, hydraulic fluids, fuel, grease and other equipment spills to be
removed from the project site. See Sheet 801A for Stormwater Pollution
Prevention Notes on these.
B14. Monitoring Maintenance Guidelines: See Sheet 801A.
B15. Individual Lot Requirements: Not Applicable
POST CONSTRUCTION REQUIREMENTS
C1. Pollutants Sources Associated with Proposed Use: Sediment particles,
grass clippings, leaves, oils, fuel, heavy metals, road salt, roof tars, trash and
other debris associated with Commercial Residential Development.
C2. Stormwater Quality Implementation Sequence: See this Sheet and C801A.
C3. Post Construction Stormwater Quality Measures:
a. Minimization of site disturbance
b. Directing runoff from impervious areas to vegetated areas
c. Vegetated strips and /or swales
d. Permanent erosion control seeding and plantings
e. Outlet protection velocity dissipation devices, riprap stone protection
f. Mulching
C4. Stormwater Quality Measures: See this sheet, C801A and Sheets C101 -C104
C5. Maintenance Guidelines: Site Owner will be responsible for maintaining
Permanent Water Quality Measures as follows:
a. Maintain lawn areas with minimum of 70% grass plant cover. Fertilize
and irrigate as needed to keep grass healthy. Do not over fertilize.
b. Grass height to be maintained at 6" or less.
c. If erosion occurs, regrade to prevent further erosion and restor lawn
surface.
CONTACT PERSON:
Chris Metzger
Shiel Sexton
902 N. Capital
Indianapolis, IN 46204
317 423 -6041
100% CONSTRUCTION DOCUMENTS
t�s��;lsn� {tie
DATE: 3(2-7'76
THIS DRAWING AND THE IDEAS, DESIGFIS AND
CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE
INTEI I FCTUAL PROPERTY OF THE SCHNEIDER
CORPORATION, AND ARE NOT TO BE USED OR
REPRODUCED, IN WHOLE OR IN PART, WITHOUT
THE WRITTEN CONSENT OF THE SCHNEIDER
CORPORATION.
COPYRIGHTED BY THE SCHNEIDER CORP. (2004)
Schneider
THE SCHNEIDER CORPORATION
Historic Fort Harrision
8901 Otis Avenue
Indianapolis, IN 46216 1037
Telephone: 317.826.7100
Fax: 317.826.7200
www. schneidercorp. corn
Architecture
Civil Engineering
Environmental Engineering
Geotechnical Services
GIS LIS
Home Builder Services
Interior Design
Land Surveying
Landscape Architecture
Transportation Engineering