HomeMy WebLinkAboutD101 Demolition PlanREVISIONS:
PROJECT NO.:
4702.002
100% CONSTRUCTION DOCUMENTS
F
DATE: ?A: THIS DRAWING AND THE ID DESIGNS AND
CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF THE SCHNEIDER
CORPORATION, AND ARE NOT TO BE USED OR
REPRODUCED, IN WHOLE OR IN PART, WITHOUT
THE WRITTEN CONSENT OF THE SCHNEIDER
CORPORATION.
COPYRIGHTED BY THE SCHNEIDER CORP. (2004)1
DATE:
03/01/04
PROJECT NO.:
4702.002
DRAWN BY:
RDR
CHECKED BY:
MSO
SHEET TITLE:
DEMOLITION
PLAN
DRAWING FILES:
N: \4k \4702 \002 \dwgs \020604 \D101.dwg
XREF: N: \4k\ 4702 \002 \dwgs \020604 \4702002C.dwg
XREF: N: \4k\ 4702 \002 \dwgs \020604 \Titlel.dwg
XREF:
SHEET NO.:
.r
2.
oo tt 4041 'I. r
0 1 1
TELEPHONE SEMI vN
REMOVAL OF THIS EXISTING
TIE WALL TO BE BY OWNER
PI{; f:N
INSTALL TEMPORARY GATE
DRIPUNE
SNOW FENCE
(OR OTHER BARRIER)
SCALE: NOT TO SCALE
REMOVE SEPTIC TANK
FIELD WITHIN AREA OF NEW
CONSTRUCTION.
(EXACT LOCATION UNKNOWN)
BACVILL COMPACT EXCAVATION
IN 8 MAX. UFTS.
\IMUM
DISTA CE i.
ELAN.
NOTE:
V
B NOTE: DO NOT PLACE MATERIALS OR 7
EQUIPMENT UNDER TREE.
A
THE BEST METHOD IS TO PLACE THE PROTECTIVE FENCE AT THE DRIPLINE
OF THE TREE OR AT THE MAXIMUM DISTANCE POSSIBLE FROM ALL SIDES OF THE TRUNK:
B
IF METHOD A' IS NOT POSSIBLE BECAUSE OF OBSTRUCTIONS,
METHOD 'B' IS TO PLACE A TRIANGULAR BARRIER AROUND THE TRUNK.
C
IF EITHER "A' OR "B' ARE NOT POSSIBLE, TRUNK PROTECTION CAN BE
ACHIEVED BY WIRING LATH TO THE TRUNK TO PREVENT DAMAGE FROM EQUIPMENT CONTACT.
IF THIS METHOD IS USED, UMIT EQUIPMENT TRAFFIC IN ROOT ZONE TO MINIMIZE SOIL COMPACTION.
TRIMBING LOWER UMBS PRIOR TO CONSTRUCTION MAY IMPROVE SURVIVAL RATE.
CONSULT AN ARBORIST PRIOR TO PERFORMING WORK.
TRHE PROT H CTION D IH:TAIL
TREE TRUNK
6' TALL FENCE
POST CO 10' -0"
O.C. TYP.
NTS
PROTECT EXISTING
SANITARY MANHOLE,
FROM DAMAGE
EXISTING TREE TO BE
PROTECTED FROM DAMAGE
DURING CONSTRUCTION.
PROTECTIVE FENCING SHALL BE
SENTRY SECURA SAFETY FENCING
AS MANUFACTURED BY TENAX.
PROTECTIVE FENCING TO BE 4' HIGH,
HDPE WITH A DIAMOND SHAPED
MESH. COLOR TO BE ORANGE.
EXISTING GRADES WITHIN
DRIP LINE TO REMAIN
UNCHANGED.
DRIP LINE
TREE PROTECTION DETAIL
I
Is
IRRIGATION VAL. V
DRIP LINE
l-i rL =T I—" I I yi
ql
�5
GAPING
iR C;A 'HON VALVES
RAN
IC;
10 0
NV
C Nf
x�.
I RAP
AREA TO BE RE— STRIPPED
r }S� i
DEMOUTION BY OTHERS
I
1
I
1 f I I I
I T -4 _..i.._._ 1 I i
L
r
DEER FOR THE USE OF DIGITAL ALES
THE INFORMATION CONTAINED WITHIN THIS DISK OR
ELECTRONIC MAIL IS AS IT APPEARS ON THE SCHNEIDER
CORPORATION'S ELECTRONIC FILES.
By accepting delivery of this Digital File, the receiver agrees to indemnify
and hold harmless The Schneider Corporation, their clients, officers, agents,
and employees from and against any damages, including but not limited to
reasonable attorney's fees, resulting from the use, distribution, change, or
modification of the information contained within without the express written
permission from The Schneider Corporation.
The receiver further understands that the information that may be included
within is subject to periodic revisions by The Schneider Corporation or the
Client and therefore the information contained within is not warranted in any
way.
MOEMC)INI IDT]ES
1. REMOVAL OF EXISTING IMPROVEMENTS ARE AS NOTED ON THE PLANS. THE MATERIALS REMOVED FROM THE SITE SHALL BE DISPOSED OF IN A
PROPER AND LEGAL MANNER PER FEDERAL, STATE, COUNTY, CITY, AND OR LOCAL LAWS AND ORDINANCES.
2. CONTRACTOR MUST BE AWARE THAT EXISTING BUILDING BASEMENTS AND FOUNDATIONS MAY BE FOUND. PROPER CARE MUST BE USED TO
CONSTRUCT PROPOSED FOUNDATIONS AND UTILITIES. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO USE A SOILS ENGINEER FOR
RECOMMENDATIONS DURING THE SITE CONSTRUCTION PHASE.
3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS IN THE FIELD PRIOR TO START OF CONSTRUCTION. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS AND ELEVATIONS DURING THE ENTIRE CONSTRUCTION SCHEDULE. IF ANY DISCREPANCIES
ARE FOUND IN THESE ENGINEERING PLANS OR LANDSCAPE PLANS FROM ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL CONTACT THE
PROJECT MANAGER IMMEDIATELY. IF ANY DISCREPANCIES FOUND ON THE SURVEY PLAN OR ACTUAL FIELD CONDITIONS, THE CONTRACTOR
SHALL CONTACT THE PROJECT MANAGER IMMEDIATELY FOR INSTRUCTIONS.
4. ALL CONTRACTORS, BUT NOT LIMITED TO THE EXCAVATING CONTRACTOR OR CONTRACTORS, MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN
AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. ACTUAL FIELD LOCATIONS OF ALL THE EXISTING UTILITIES ARE THE RESPONSIBILITY OF
THE CONTRACTOR AND MUST BE LOCATED EITHER BY THE REPRESENTATIVE OF THE LOCAL UTILITY COMPANY OR BY A PRIVATE UNDERGROUND
UTILITY LOCATION COMPANY PRIOR TO THE START OF EXCAVATING. VERIFY MINIMUM COVER REQUIREMENTS BY THE UTILITY CONTRACTOR OR
CONTRACTORS, OR AGENCIES, WHICHEVER UTILITY COMPANY OR AGENCIES, THAT HAS JURISDICTION, SO NOT TO CAUSE DAMAGE.
5. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY ALL THE UTILITY COMPANIES AND DEPARTMENT 72 HOURS BEFORE CONSTRUCTION
IS TO START TO VERIFY ANY UTILITIES THAT MAY BE PRESENT ON THE SITE. ALL VERIFICATIONS, LOCATIONS, SIZE, AND DEPTHS SHALL BE
MADE BY THE APPROPRIATE UTILITY COMPANIES OR DEPARTMENTS. WHEN EXCAVATING AROUND OR OVER EXISTING UTILITIES, THE
CONTRACTOR MUST NOTIFY THE UTILITY COMPANY SO A REPRESENTATIVE OF THE UTILITY CAN BE PRESENT DURING THE EXCAVATION TO
INSTRUCT AND OBSERVE DURING THE EXCAVATION.
6. HEAVY CONSTRUCTION EQUIPMENT TRAFFIC MAY CREATE PUMPING AND GENERAL DETERIORATION OF THE SHALLOWER SOILS IF EXCESS
SURFACE WATER IS PRESENT. PROPER PRECAUTIONARY STEPS MUST BE TAKEN DURING THE ENTIRE CONSTRUCTION SCHEDULE TO ALLEVIATE
SUCH DAMAGE.
7. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO THE CURRENT STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE,
COUNTY, CITY, OR LOCAL REQUIREMENTS, WHICHEVER HAS JURISDICTION.
8. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSPECT EACH DAY AND REMOVE ALL MUD, DIRT, GRAVEL, AND LOOSE MATERIALS
TRACKED, DUMPED, SPILLED OR WIND BLOWN FROM THE SITE ONTO OTHER SITES, RIGHT OF WAYS, PUBLIC OR PRIVATE STREETS OR ROADS,
DRIVEWAYS, YARDS, OR SIDEWALKS. THE CONTRACTOR MUST CLEAN OR PICK UP DAILY IF NECESSARY. THE CONTRACTOR SHALL REDUCE THE
AIRBORNE DUST DURING THE ENTIRE CONSTRUCTION SCHEDULE. WATER MAY BE USED AS A REDUCER,
9. THE UTILITIES INDICATED ON THESE PLANS AND ON THE SURVEY MAY NOT BE A COMPLETE INVENTORY OF ALL THE EXISTING UTILITIES
PRESENT ON AND AROUND THIS SITE. THE LOCATION AND SIZE OF THESE UTILITIES MAYBE APPROXIMATE. THIS INFORMATION WAS GATHERED
OR SUPPLIED BY OTHERS AND USED BY THE ENGINEER AND MAY NOT BE ACTUAL. THE ENGINEER SHALL NOT BE HELD LIABLE FOR ANY
INCORRECT OR MISLEADING UTILITY INFORMATION INDICATED, IMPLIED, OR NOT INDICATED ON THESE PLANS.
10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO BEAR ALL EXPENSES TO REMOVE, RELOCATE AND OR MODIFY ALL UTILITIES,
PRIVATE OR PUBLIC, OR OTHERWISE, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY WITH EACH UTILITY COMPANY AND OR
AGENT WHOM IS RESPONSIBLE TO REMOVE, RELOCATE, AND /OR MODIFY SUCH UTILITY EXISTING OR PROPOSED. IT FURTHER SHALL BE THE
CONTRACTORS' RESPONSIBILITY TO VERIFY IF ANY FUTURE UTILITIES ARE PLANNED AND HOW IT MAY EFFECT THIS PROJECT AND IT'S OWNER AS
TO THEIR FUTURE RESPONSIBILITIES.
M1E 1N
REMOVE EXISTING CURB
SAW CUT CURB /PAVEMENT
REMOVE FLAG POLES, SALVAGE AND RETURN TO OWNER
EXISTING TIE /WALL TO BE REMOVED
EXISTING TIE /CURB TO REMAIN
EXISTING TREE TO BE REMOVED
EXISTING TREE TO BE REMAIN
EXISTING PAVEMENT TO BE REMOVED
EXISTING BUILDING TO BE REMOVED
EXISTING CONCRETE /BRICK TO BE REMOVED
0
EXISTING ASPHALT TO REMAIN UNTIL NEW SITE PAVING IS TO COMMENCE.
IF GRADES ALLOW THIS AREA MAY BE RESURFACED INSTEAD OF REMOVED.
ASSUMED
SCALE: 1
EXISTING LANDSCAPE AREA /WOODS TO BE REMOVED, COORDINATE REMOVAL OF
TREES AND SHRUBS PRIOR TO ANY DEMOLITION OF MATERIAL.
NORTH
=30
FIELD LOCATE EXISTING SERVICE CONNECTIONS. CUT AND TEMPORARILY CAP EXISTING UTILITIES AT LOCATION DIRECTED BY UTILITY CO.
FOR FUTURE RECONNECTION TO NEW BUILDING. RELOCATION OF UTILITIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AS
WELL AS COORDINATION WITH RELATIVE UTILITY COMPANIES. CONTRACTOR TO CARRY ALL COSTS RELATED TO UTILITY EXPENSES AND
COSTS TO ACCOMPLISH SAID RELOCATION.
HOLEY MOLEY SAYS
e DON'T
DIG
BLIND"
"IT'S THE LAW"
CALL 2 WORKING DAYS BEFORE YOU DIG
1 -800- 382 -5544
CALL TOLL FREE
PER INDIANA STATE LAW IS -69 -1991.
IT IS AGAINST THE LAW TO EXCAVATE
WITHOUT NOTIFYING THE UNDERGROUND
LOCATION SERVICE TWO (2) WORKING
DAYS BEFORE COMMENCING WORK.
EXISTING STRIPPING TO BE REMOVED
EXISTING FENCE TO BE REMOVED, SALVAGE AT OWNERS' DISCRETION
SANITARY STRUCTURE /SEPTIC TANK TO BE REMOVED
SANITARY LATERAL TO BE REMOVED
0 TEMPORARY CONSTRUCTION FENCE
TYPE SIZE AS DIRECTED BY CONSTRUCTION MANAGER
MO REMOVE POLE, SEE SITE ELECTRICAL FOR REROUTING POWER
O EXISTING TREE TO BE PROTECTED DURING ENTIRE CONSTRUCTION
PROCESS, SEE DETAIL THIS SHEET.
Schn�ider
THE SCHNEIDER CORPORATION
Historic Fort Harrison
8901 Otis Avenue
Indianapolis, IN 46216 -1037
Telephone: 317.826.7100
Fax: 317.826.7200
www. schneidercorp. corn
Architecture
Civil Engineering
Environmental Engineering
Geotechnical Services
GIS LIS
Home Builder Services
Interior Design
Land Surveying
Landscape Architecture
Transportation Engineering
CROOKED STICK GOLF COURSE
NEW CLUBHOUSE BUILDING
CARMEL, IN
RATIO ARCHITECTS, INC.
INDIANAPOLIS, IN