Loading...
HomeMy WebLinkAbout04 Erosion Control Plan Final Construction PlansSPECIES SEEDING RATE SUITABLE pH SITE SUITABILITY LBS /ACRE LBS/1000 SFT. DROUGHTY DRAINED WET LEVEL AND SLOPING, OPEN AREAS 3 BU. COVER SEED 1' DEEP ANNUAL RYEGRASS 1.0 LBS. 40 LBS. COVER SEED 1/4' DEEP TALL FESCUE TALL FESCUE RED CLOVER KENTUCKY BLUGRASS CREEPING RED FESCUE 35 25 5 15 15 8 6 12 4 4 5.5 8.3 5.5 8.3 5.5 7.5 2 2 1 1 1 2 STEEP BANKS AND CUTS MED. 1 20-25 12 -18 7 -21 TALL FESCUE KENTUCKY BLUGRASS TALL FESCUE EMERALD CROWNVETCH 15 25 35 10 4 6 8 25 5.8 7.5 5.5 8.3 2 2 1 1 2 LAWNS AND HIGH MAINTENANCE AREAS 1 MED. 1 25-35 12 -18 10 -20 KENTUCKY BLUGRASS CREEPING RED FESCUE PERENNIAL RYEGRASS (TURF TYPE) TALL FESCUE 40 40 170 170 9 9 24 4 5.8 7.5 5.0 7.5 5.5 8.3 2 2 1 1 1 2 KIND OF SEED PER 1.000 SQ. FT. PER ACRE REMARKS WHEAT OR RYE 3.5 LBS. 2 BU. COVER SEED 1' TO 1 112' DEEP SPRING OATS 2.3 LBS. 3 BU. COVER SEED 1' DEEP ANNUAL RYEGRASS 1.0 LBS. 40 LBS. COVER SEED 1/4' DEEP PROPOSED TWO -STORY BUILDING 9,840 SQ. FT. FINISH FLOOR ELEV. 833.75 X 2.33% i >i frit 10 0 CONSTRUCT TEMPORARY CONSTRUCTION DRIVE AND PARKING AREA (SEE DETAIL) resernal BENCHMARK INFORMATION ACE TBM #61 CHISELED "X" SET IN EAST BOLT OF FIRE HYDRANT AT SOUTHWEST CORNER OF THIRD AVE. ADAMS ST. ELEV. 835.12' ZONING INFORMATION C -1 /CITY CENTER DISTRACT 10 SCALE: 1"=10' EXISTING CONTOUR INTERVAL 0.5' PROPOSED CONTOUR INTERVAL 0.5' 20 800 IIIII.I.II ..................i AUTUMN MINNOW 0.5 w w w r r r Mb le r r Ie s .A r■ r a� r r. r M r y L t STR. NO. 2- ■rr rr. r.■ r .r ■..■r■ ■■.r ■rrr■■.r.� LEGEND MULCHED SEEDING EXISTING CONTOURS PROPOSED CONTOURS SILT FENCE SLOPE CHECK CONSTRUCTION LIMITS SANBAG INLET PROTECTION DRIVE r r r. r r e A s r ■.0 CITY CENTER DRIVE CAM t 'I :m ARM E L PROJECT LOCATION 1 ii 1 1■ 1 1 1 1 1 L_ VICINITY MAP NO SCALE 1 11 1 11 111 1 11 1 11 1 11 1 4 1 1 1 11 1 11 I 1 11 1 11 1 11 T 13 11 i11 111 1 rl CI E1 r. •V i% l// I�� /V 7 ii 1 1 i FLOW 3.0% 20' (MIN.) 3.0% er 0 CTTt 0000000 F 00000 00000000000000000000000 0 0 000000 0 0 0 0 0 0 0 0000000 0 0 000000 0 0 0 0 0( 0000,•000000000 000000000000000 0000 00001 6" No. 2 STONE SECTION A-A TEMPORARY CONSTRUCTION DRIVE DETAIL SLOPE CHECK NTS SILT FENCE DETAIL NTS SILT FENCE OVERLAP SAND BAGS BEHIND INLET (TYP.) ONTO CURB WHEN JOINING TWO OR MORE SILT FENCES TIE THE TWO END POSTS TOGETHER WITH EXISTING NYLON CORD SANDBAG INLET PROTECTION NO SCALE SOIL MAP DESCRIPTION NO SCALE JOINING FENCES (SIDEWALK) 11V: 4 41 N\ (GRASS STRIP) CROSBY SILT LOAM, 0% TO 2% SLOPES, (CrA) THIS NEARLY LEVEL SOIL IS ON BROAD PLAINS, ON RIDGETOPS IN ROLLING AREAS, OR IN LOW DRAINAGEWAYS. RUNOFF IS SLOW. 7 FLOW WHEAT OR RYE SPRING OATS ANNUAL RYEGRASS NON IRRIGATED IRRIGATED DORMANT SEEDING TEMPORARY SEEDING DATES JAN FEB MAR APR MAY JUN JUL AUG SD ■1111111 111111111111 P 'MANE T S ED NG DA P OCT ES NOV DEC IRRIGATION NEEDED DURING THIS PERIOD TO CONTROL EROSION AT TIMES OTHER THAN IN THE SHADED AREAS, USE MULCH. LATE SUMMER SEEDING DATES MAY BE EXTENDED 5 DAYS IF MULCH IS APPLIED. INCREASE SEEDING APPLICATION BY 50X TEMPORARY SEEDINGS 1 PREFERRED 2 -WILL TOLERATE INNOCULATE WITH SPECIFIC INNOCULANTS RANKING 1 GOOD 2 MEDIUM NOT TOLERANT NOT NECESSARY WHERE MULCH IS APPLIED. PERMANENT SEED MIXTURES SALT TOLERANCE (TO BOTH SOIL SALTS AND SPRAY) T TOLERANCE MT MEDIUM TOLERANCE S SLIGHT TOLERANCE SEEDBED PREPARATION APPLY LIME TO RAISE THE pH TO THE LEVEL NEEDED FOR SPECIES BEING SEEDED. APPLY 23 LBS. OF 12 -12 -12 ANALYSIS FERTILIZER (OR EQUIVALENT) PER 1,000 SQ. FT. (APPROXIMATELY 1,000 LBS. PER ACRE) OR FERTILIZE ACCORDING TO TEST. APPLICATION OF 150 LBS. OF AMMONIUM NITRATE ON AREAS LOW IN ORGANIC MATTER AND FERTILITY WILL GREATLY ENHANCE VEGETATIVE GROWTH. WORK THE FERTILIZER AND LIME INTO THE SOIL A DEPTH OF 2 TO 3 INCHES WITH A HARROW, DISK, OR RAKE OPERATED ACROSS THE SLOPE AS MUCH AS POSSIBLE. FERTILIZER AND LIME SHALL MEET REQUIREMENTS OF INDOT STANDARD SPECIFICATIONS 1995. SEEDING SELECT A SEED MIXTURE BASED ON PROJECTED USE OF THE AREA WHILE CONSIDERING BEST SEEDING DATES. JOB No. DATE JANUARY 30, 2004 MONITORING AND MAINTENANCE GUIDELINES GRAVEL CONSTRUCTION DRIVE AND PARKING AREA: A. INSPECT WEEKLY AND AFTER EACH STORM EVENT. TOPSOIL: A. INSPECT WEEKLY UNTIL VEGETATION IS ESTABLISHED. TEMPORARY AND PERMANENT SEEDING: A. INSPECT PERIODICALLY, ESPECIALLY AFTER STORM EVENTS, UNTIL THE STAND IS SUCCESSFULLY ESTABLISHED. B. PLAN TO ADD FERTILIZER THE FOLLOWING GROWING SEASON ACCORDING TO SOIL TEST RECOMMENDATIONS. C. REPAIR DAMAGED, BARE, OR SPARSE AREAS BY FILLING ANY GULLIES, RE- FERTILIZING, OVER- OR RE- SEEDING, AND MULCHING. D. IF PLANT COVER IS SPARSE OR PATCHY, REVIEW THE PLANT MATERIALS CHOSEN, SOIL FERTILITY, MOISTURE CONDITION, AND MULCHING; REPAIR THE AFFECTED AREA EITHER BY OVER SEEDING OR BY RE- SEEDING AND MULCHING AFTER RE- PREPARING THE SEED BED. E. IF VEGETATION FAILS TO GROW, CONSIDER SOIL TESTING TO DETERMINE ACIDITY OR NUTRIENT DEFICIENCY PROBLEMS. F. IF ADDITIONAL FERTILIZATION IS NEEDED TO GET A SATISFACTORY STAND, DO SO ACCORDING TO SOIL TEST RECOMMENDATIONS. G. REFERENCE INDOT SPECIFICATION 621.05. MULCHING: A. INSPECT AFTER STORM EVENTS TO CHECK FOR MOVEMENT OF MULCH OR FOR EROSION. B. IF WASHOUT, BREAKAGE, OR EROSION IS PRESENT, REPAIR THE SURFACE, THEN RE -SEED, RE- MULCH, AND IF APPLICABLE, INSTALL NEW NETTING. C. CONTINUE INSPECTIONS UNTIL VEGETATION IS FIRMLY ESTABLISHED. D. REFERENCE INDOT SPECIFICATION 621.05. SILT FENCE: A. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. B. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. C. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. D. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. E. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE AND STABILIZE. SANDBAG INLET PROTECTION: A. INSPECT THE SANDBAG INLET PROTECTION PERIODICALLY AND AFTER EACH STORM EVENT. B. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE SANDBAGS AT THE LOWEST POINT. C. REMOVE THE SANDBAG INLET PROTECTION AND SEDIMENT DEPOSITS PRIOR TO THE COMMENCEMENT OF PAVING OPERATIONS. CONSTRUCTION SEQUENCE SCHEDULE OF EROSION CONTROL IMPLEMENTATION 1. SILT FENCE SHALL BE PLACED AS SHOWN IN THESE PLANS BEFORE ANY LAND DISTURBING ACTIVITIES ARE STARTED. 2. CONSTRUCT TEMPORARY GRAVEL ENTRANCE AND PARKING AREA IN ACCORDANCE WITH THE "INDIANA HANDBOOK FOR EROSION CONTROL IN DEVELOPING AREAS." 3. STRIP TOPSOIL AND REMOVE FROM SITE. 4. ROUGH GRADE SITE. DISTURBED AREAS SHOULD BE SEEDED IMMEDIATELY FOLLOWING ROUGH GRADING. AREAS THAT WILL NOT BE DISTURBED AGAIN SHOULD BE PERMANENTLY SEEDED. NO UNVEGETATED AREAS SHOULD BE EXPOSED FOR MORE THAN SEVEN DAYS. 6. CONSTRUCT BUILDING STRUCTURES, INSTALL CURB, STORM STRUCTURES AND FINAL GRADE SITE. INSTALL STORM SEWER RELATED EROSION CONTROL MEASURES AS SOON AS INSTALLATION AND FINAL GRADING IS COMPLETE. ALL EROSION CONTROL BLANKETS SHALL BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS AS SOON AS FINAL GRADING IS COMPLETE. 7. FINAL PAVING OPERATIONS. TEMPORARY EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL VEGETATION IS SECURE. PROJECT DESCRIPTION AND GENERAL NOTES: 1. THIS PROJECT INVOLVES THE CONSTRUCTION OF A COMMERCIAL OFFICE BUILDING. CURBS, WALKS, AND PARKING NECESSARY FOR THE DEVELOPMENT SHALL BE CONSTRUCTED AS WELL. A STORM SEWER SYSTEM SHALL BE UTILIZED FOR STORM WATER COLLECTION. DRAINAGE WILL BE DISCHARGED INTO AN ADJACENT EXISTING STORM SEWER MANHOLE. WATER, SANITARY SEWER, GAS, AND ELECTRIC UTILITIES SHALL ALSO SERVICE THE PROPERTY. 2. NO WETLANDS ARE LOCATED WITHIN THESE PROJECT LIMITS. 3. THE PROJECT LIES WITHIN THE W.R. FERTIG WATERSHED. THE RECEIVING WATER FOR THE SITE IS THE J.W. HAWKIN REGULATED DRAIN. 4. THERE ARE NO POTENTIAL AREAS WHERE STORM WATER MAY ENTER THE GROUNDWATER. 5. THE EXISTING SITE IS PRESENTLY COVERED IN GRASS WITH TREES AS NOTED ON THE PLAN. 2/24/04 DATE MISCELLANEOUS REVISIONS PER CITY OF CARMEL REVIEW REVISIONS CROSSROAD ENGINEERS, PC EROSION CONTROL PLAN PARCEL #9 CITY CENTER DRAWN RH DESIGNED TEN CHECKED TEN APPROVED TEN TEN RPPR. Transportation Development Consultants 7 S. ERMAN F. BEECH b. E, IN 46101 (3171 780 -1555 SHEET 4 DE 5 SOIL CONDITION SALT TOLERANCE WET NORM DRY GEN. SOIL SPRAY CREEPING RED FESCUE FESTUCA RUBRA 2 1 2 1 1 1 MED. 1 20-25 12 -18 7 -21 S KENTUCKY BLUEGRASS POA PROTINSIS 2 1 2 1 1 1 MED. 1 25-35 12 -18 10 -20 MT TALL FESCUE FESTUCA L ARUNDINACEA 2 1 1 1 1 1 LOW 1 24-35 24-36 5 -14 T PERENNIAL RYEGRASS LOLIUM PERENNE 2 1 2 1 2 MED- HIGH 2 15-20 12 -18 5 -10 MT CROWNVETCH CORANILLA VARIA 1 1 2 LOW 1 5 -10 24 14-21 T RED CLOVER TRIFOUUM PRATENSE 1 2 MED. 1 7 -10 18 5 -10 S S PROPOSED TWO -STORY BUILDING 9,840 SQ. FT. FINISH FLOOR ELEV. 833.75 X 2.33% i >i frit 10 0 CONSTRUCT TEMPORARY CONSTRUCTION DRIVE AND PARKING AREA (SEE DETAIL) resernal BENCHMARK INFORMATION ACE TBM #61 CHISELED "X" SET IN EAST BOLT OF FIRE HYDRANT AT SOUTHWEST CORNER OF THIRD AVE. ADAMS ST. ELEV. 835.12' ZONING INFORMATION C -1 /CITY CENTER DISTRACT 10 SCALE: 1"=10' EXISTING CONTOUR INTERVAL 0.5' PROPOSED CONTOUR INTERVAL 0.5' 20 800 IIIII.I.II ..................i AUTUMN MINNOW 0.5 w w w r r r Mb le r r Ie s .A r■ r a� r r. r M r y L t STR. NO. 2- ■rr rr. r.■ r .r ■..■r■ ■■.r ■rrr■■.r.� LEGEND MULCHED SEEDING EXISTING CONTOURS PROPOSED CONTOURS SILT FENCE SLOPE CHECK CONSTRUCTION LIMITS SANBAG INLET PROTECTION DRIVE r r r. r r e A s r ■.0 CITY CENTER DRIVE CAM t 'I :m ARM E L PROJECT LOCATION 1 ii 1 1■ 1 1 1 1 1 L_ VICINITY MAP NO SCALE 1 11 1 11 111 1 11 1 11 1 11 1 4 1 1 1 11 1 11 I 1 11 1 11 1 11 T 13 11 i11 111 1 rl CI E1 r. •V i% l// I�� /V 7 ii 1 1 i FLOW 3.0% 20' (MIN.) 3.0% er 0 CTTt 0000000 F 00000 00000000000000000000000 0 0 000000 0 0 0 0 0 0 0 0000000 0 0 000000 0 0 0 0 0( 0000,•000000000 000000000000000 0000 00001 6" No. 2 STONE SECTION A-A TEMPORARY CONSTRUCTION DRIVE DETAIL SLOPE CHECK NTS SILT FENCE DETAIL NTS SILT FENCE OVERLAP SAND BAGS BEHIND INLET (TYP.) ONTO CURB WHEN JOINING TWO OR MORE SILT FENCES TIE THE TWO END POSTS TOGETHER WITH EXISTING NYLON CORD SANDBAG INLET PROTECTION NO SCALE SOIL MAP DESCRIPTION NO SCALE JOINING FENCES (SIDEWALK) 11V: 4 41 N\ (GRASS STRIP) CROSBY SILT LOAM, 0% TO 2% SLOPES, (CrA) THIS NEARLY LEVEL SOIL IS ON BROAD PLAINS, ON RIDGETOPS IN ROLLING AREAS, OR IN LOW DRAINAGEWAYS. RUNOFF IS SLOW. 7 FLOW WHEAT OR RYE SPRING OATS ANNUAL RYEGRASS NON IRRIGATED IRRIGATED DORMANT SEEDING TEMPORARY SEEDING DATES JAN FEB MAR APR MAY JUN JUL AUG SD ■1111111 111111111111 P 'MANE T S ED NG DA P OCT ES NOV DEC IRRIGATION NEEDED DURING THIS PERIOD TO CONTROL EROSION AT TIMES OTHER THAN IN THE SHADED AREAS, USE MULCH. LATE SUMMER SEEDING DATES MAY BE EXTENDED 5 DAYS IF MULCH IS APPLIED. INCREASE SEEDING APPLICATION BY 50X TEMPORARY SEEDINGS 1 PREFERRED 2 -WILL TOLERATE INNOCULATE WITH SPECIFIC INNOCULANTS RANKING 1 GOOD 2 MEDIUM NOT TOLERANT NOT NECESSARY WHERE MULCH IS APPLIED. PERMANENT SEED MIXTURES SALT TOLERANCE (TO BOTH SOIL SALTS AND SPRAY) T TOLERANCE MT MEDIUM TOLERANCE S SLIGHT TOLERANCE SEEDBED PREPARATION APPLY LIME TO RAISE THE pH TO THE LEVEL NEEDED FOR SPECIES BEING SEEDED. APPLY 23 LBS. OF 12 -12 -12 ANALYSIS FERTILIZER (OR EQUIVALENT) PER 1,000 SQ. FT. (APPROXIMATELY 1,000 LBS. PER ACRE) OR FERTILIZE ACCORDING TO TEST. APPLICATION OF 150 LBS. OF AMMONIUM NITRATE ON AREAS LOW IN ORGANIC MATTER AND FERTILITY WILL GREATLY ENHANCE VEGETATIVE GROWTH. WORK THE FERTILIZER AND LIME INTO THE SOIL A DEPTH OF 2 TO 3 INCHES WITH A HARROW, DISK, OR RAKE OPERATED ACROSS THE SLOPE AS MUCH AS POSSIBLE. FERTILIZER AND LIME SHALL MEET REQUIREMENTS OF INDOT STANDARD SPECIFICATIONS 1995. SEEDING SELECT A SEED MIXTURE BASED ON PROJECTED USE OF THE AREA WHILE CONSIDERING BEST SEEDING DATES. JOB No. DATE JANUARY 30, 2004 MONITORING AND MAINTENANCE GUIDELINES GRAVEL CONSTRUCTION DRIVE AND PARKING AREA: A. INSPECT WEEKLY AND AFTER EACH STORM EVENT. TOPSOIL: A. INSPECT WEEKLY UNTIL VEGETATION IS ESTABLISHED. TEMPORARY AND PERMANENT SEEDING: A. INSPECT PERIODICALLY, ESPECIALLY AFTER STORM EVENTS, UNTIL THE STAND IS SUCCESSFULLY ESTABLISHED. B. PLAN TO ADD FERTILIZER THE FOLLOWING GROWING SEASON ACCORDING TO SOIL TEST RECOMMENDATIONS. C. REPAIR DAMAGED, BARE, OR SPARSE AREAS BY FILLING ANY GULLIES, RE- FERTILIZING, OVER- OR RE- SEEDING, AND MULCHING. D. IF PLANT COVER IS SPARSE OR PATCHY, REVIEW THE PLANT MATERIALS CHOSEN, SOIL FERTILITY, MOISTURE CONDITION, AND MULCHING; REPAIR THE AFFECTED AREA EITHER BY OVER SEEDING OR BY RE- SEEDING AND MULCHING AFTER RE- PREPARING THE SEED BED. E. IF VEGETATION FAILS TO GROW, CONSIDER SOIL TESTING TO DETERMINE ACIDITY OR NUTRIENT DEFICIENCY PROBLEMS. F. IF ADDITIONAL FERTILIZATION IS NEEDED TO GET A SATISFACTORY STAND, DO SO ACCORDING TO SOIL TEST RECOMMENDATIONS. G. REFERENCE INDOT SPECIFICATION 621.05. MULCHING: A. INSPECT AFTER STORM EVENTS TO CHECK FOR MOVEMENT OF MULCH OR FOR EROSION. B. IF WASHOUT, BREAKAGE, OR EROSION IS PRESENT, REPAIR THE SURFACE, THEN RE -SEED, RE- MULCH, AND IF APPLICABLE, INSTALL NEW NETTING. C. CONTINUE INSPECTIONS UNTIL VEGETATION IS FIRMLY ESTABLISHED. D. REFERENCE INDOT SPECIFICATION 621.05. SILT FENCE: A. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. B. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. C. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. D. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. E. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE AND STABILIZE. SANDBAG INLET PROTECTION: A. INSPECT THE SANDBAG INLET PROTECTION PERIODICALLY AND AFTER EACH STORM EVENT. B. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE SANDBAGS AT THE LOWEST POINT. C. REMOVE THE SANDBAG INLET PROTECTION AND SEDIMENT DEPOSITS PRIOR TO THE COMMENCEMENT OF PAVING OPERATIONS. CONSTRUCTION SEQUENCE SCHEDULE OF EROSION CONTROL IMPLEMENTATION 1. SILT FENCE SHALL BE PLACED AS SHOWN IN THESE PLANS BEFORE ANY LAND DISTURBING ACTIVITIES ARE STARTED. 2. CONSTRUCT TEMPORARY GRAVEL ENTRANCE AND PARKING AREA IN ACCORDANCE WITH THE "INDIANA HANDBOOK FOR EROSION CONTROL IN DEVELOPING AREAS." 3. STRIP TOPSOIL AND REMOVE FROM SITE. 4. ROUGH GRADE SITE. DISTURBED AREAS SHOULD BE SEEDED IMMEDIATELY FOLLOWING ROUGH GRADING. AREAS THAT WILL NOT BE DISTURBED AGAIN SHOULD BE PERMANENTLY SEEDED. NO UNVEGETATED AREAS SHOULD BE EXPOSED FOR MORE THAN SEVEN DAYS. 6. CONSTRUCT BUILDING STRUCTURES, INSTALL CURB, STORM STRUCTURES AND FINAL GRADE SITE. INSTALL STORM SEWER RELATED EROSION CONTROL MEASURES AS SOON AS INSTALLATION AND FINAL GRADING IS COMPLETE. ALL EROSION CONTROL BLANKETS SHALL BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS AS SOON AS FINAL GRADING IS COMPLETE. 7. FINAL PAVING OPERATIONS. TEMPORARY EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL VEGETATION IS SECURE. PROJECT DESCRIPTION AND GENERAL NOTES: 1. THIS PROJECT INVOLVES THE CONSTRUCTION OF A COMMERCIAL OFFICE BUILDING. CURBS, WALKS, AND PARKING NECESSARY FOR THE DEVELOPMENT SHALL BE CONSTRUCTED AS WELL. A STORM SEWER SYSTEM SHALL BE UTILIZED FOR STORM WATER COLLECTION. DRAINAGE WILL BE DISCHARGED INTO AN ADJACENT EXISTING STORM SEWER MANHOLE. WATER, SANITARY SEWER, GAS, AND ELECTRIC UTILITIES SHALL ALSO SERVICE THE PROPERTY. 2. NO WETLANDS ARE LOCATED WITHIN THESE PROJECT LIMITS. 3. THE PROJECT LIES WITHIN THE W.R. FERTIG WATERSHED. THE RECEIVING WATER FOR THE SITE IS THE J.W. HAWKIN REGULATED DRAIN. 4. THERE ARE NO POTENTIAL AREAS WHERE STORM WATER MAY ENTER THE GROUNDWATER. 5. THE EXISTING SITE IS PRESENTLY COVERED IN GRASS WITH TREES AS NOTED ON THE PLAN. 2/24/04 DATE MISCELLANEOUS REVISIONS PER CITY OF CARMEL REVIEW REVISIONS CROSSROAD ENGINEERS, PC EROSION CONTROL PLAN PARCEL #9 CITY CENTER DRAWN RH DESIGNED TEN CHECKED TEN APPROVED TEN TEN RPPR. Transportation Development Consultants 7 S. ERMAN F. BEECH b. E, IN 46101 (3171 780 -1555 SHEET 4 DE 5