Loading...
HomeMy WebLinkAboutA1.1 Foundation Plan6" CONCRETE BLOCK M N 24' -0" 1a 41/411/ 1 0 0 1 1 4" BRICK LEDGE 0$ 0 00 ..t." 0 c .4,t 1 J L ___L___ J T/F 481 r ii I is 1 DROP 6' BLOCK AT DOOR OPENING 3' -6 -1 N 13' -53 N Li j M h 0 anorArArArAl0 0 I ---r-4) 1 4.) II F1 V I L 1 T/F 48') F 5 F I I T/PIFR -(8") 0 L 0 I i T 0 0 1 4' -7 15 15-8 3/e 0 1,0 0 M 0 0 0 0 0 0 0 0 0 0 0 0 10" CONCRETE BLOCK 0 FOUNDATION 0 L W 6 m N 5-9" L SUMP PIT P PIT +_G F4 T /PIER -(8") T/F (2' -8') 71' -10" (OUT TO OUT OF 10" BLOCK) 71' -2" (OUT TO OUT OF 6" BLOCK) 1/4" 1' -O" 23' -2" 23' 2" 4" C C. FLOOR SLAB WITH 6x6- yy1.4xW1.4 W.W.F. OVER 6 MIL VAPOR BARRIER OVER 4" MINI COMPACTED GRANULAR FILL .4 4 44)0- F 6.0 T/F -(8') /I /ICI /I 71' -2" (OUT TO OUT OF 6" BLOCK) F7 T/F -(81 FOUNDATION PLAN L 2 0' -0" dPrAIIP'AWIIIVADMPAP'AF'A/AllrAIIIP•AP N 1 0 0 5t' 0; 0 0 0 4' BRICK LEDGE 0 11 0 N -cn 0 0 0 0 (t) 0 r 0 F 6 A1.2 L 1 1 T/F -On h 0 0 L i is i 0 r d MI 24' -O" DROP 6" BLOCK AT DOOR OPENING 24' -0" X 00 15' -8 POURED IN PLACE CONCRETE FOOTING WITH 2 NO. 5 REBARS CONTINUXUS 11 O M O h CI F2 B/F -(3'-8� -6 rrArArArdsrArAarAmrArArArrmrrArArArAmrArArmAmr i 0 L_ p so ArArA r 0 0 0 0 0 0 0 0 0 0 -0" 0 5 F2 T/F -(8') B/F (3' -8') N N io N NORTH CONCRETE NOTES 1. CONCRETE FOOTING DESIGN BASED ON ASSUMED 2000 PSF SOIL BEARING CAPACITY. 2. READY -MIX CONCRETE 28 DAY COMPRESSIVE STRENGTH: A. WALL FOOTINGS, SPREAD FOOTINGS, AU. C( CRETE BELOW FROST UNE 3000 PSI. 8. EXTERIOR SLABS, SIDEWALKS, ALL CONCRETE EXPOSED TO FREEZE/THAW CONDITIONS 4000 PSI, 4% 6% AIR. C. INTERIOR SLABS, 3000 PSI. 3. CONTRACTOR SHALL MODIFY FOOTING DESIGN AS REQUIRED TO COMPLY WITH SITE CONINTIONS AND LOCAL BUILDING CODES AFTER CONSULTING 18TH ARCHITECT. 4. ALL FOOTINGS SHALL BE PLACED ON UNDISTURBED SOIL AND BELOW FROST UNE. 5. ALL FLOOR SLABS ARE FULL 4" THICK WITH 6 X 6 10/10 YARE MESH. (OP11ONAL FIBER MESH) 6. ALL EXTERIOR SIDEWALK SLABS SMALL BE NATURAL GRAY CON- CRETE 4000 PSI, AIR- E WITH BROOM FINISH. PROVIDE TOOLED JOINTS AT 5-0 O.C. AND EXPANSION JOLTS AT 20-0" O.C. 7. PROVIDE 4' MINIMUM COMPACTED SAND OR PEA GRAVEL FILL UNDER ALL SLABS AND SIDEWALKS. PROVIDE SAND OR PEA GRAVEL BACKF1LL AROUND ALL FOUNDATION WALLS. 8. PROVIDE 2" THICK STYROFOAM PERIMETER INSULATION ON INSIDE FACE OF ALL FOUNDATION WALLS; SEE WALL SECTIONS. 9. COORDINATE ALL SLAB PENETRATIONS WITH MECHANICAL, PLUMBING AND ELECTRICAL CONTRACTORS. FOOTING SCHEDULE ALL TOP OF FOOTINGS -0' -8" UNLESS NOTED OTHERWISE Fl 4'-0" x 4' -0" x 1' -0" DEEP FOOTING WITH #5 BARS AT 8" O.C. EACH WAY F2 4' -0" x 4' -0" x 3' -8" DEEP FOOTING WITH 8-. 5 BARS AND #3� TIES AT 12" IN O. VERTICAL F3 5' -6" x 5' -6" x 1' -0" DEEP FOOTING WITH #5 BARS AT 8" O.C. EACH WAY F4 5' -6" x 5' -6" x 1' -0" DEEP FOOTING WITH #5 BARS AT 8" O.C. EACH WAY, 1' -4" x 1' -4" x 2' -0" PIER WITH 4 #5 BARS VERTICAL AND #3 TIES AT 10" O.C. F5 6' -0" x 6' -0" x 1' -0" DEEP FOOTING WITH #5 BARS AT 8" O.C. EACH WAY, 1' -4" x 1' -4" x 2' -O" PIER WITH 4 #5 BARS VERTICAL AND #3 TIES AT 10" O.C. F6 6' -0" x 6' -0" x 1' -0" DEEP FOOTING WITH #5 BARS AT 8" O.C. EACH WAY FY 7' -O" x 7' -0" x 1' -4" DEEP FOOTING WITH MI5 BARS AT 8" O.C. EACH WAY cERTFED BY r 4 E O v sn 13 e 0 .0 H 0 0 0 0 W E 0 0 0 0 s 0 0 0 3t 3 0 in GO 03 op I N N A N t (DATE 3/01/04 PROJECT NO. 02074 DRAWS4G SCALE 1 /4.. 1.-0. DRAWN BY BL CCucwn 8Y KAS PLOT SCALE 1/4 0 FILE HAW 02074A1.1 v FOUNDATION PLAN