Loading...
HomeMy WebLinkAbout0003.92 ApplicationCarmel -Clay Township Improvement Location Permit Permit No. w ` Date Roll File This permit is valid only if construction is started within 120 days of issuance date; all construction iscompleted (c/o issued) within (2) two years ofiissuance date'unlessan extension of time has been officially gradted by letter by -the Director, Department of Community Development. BUILDER' NAME - �`�1�'T wL PHONE _ _ S ET CITY STATE ZIP CZ+trlCIC -ot i I ILI o TENANT NAME (ifaIlcable) OWNER��£�— NAME PHONE C STREET CITY STATE ZIP LOT -SUBDIVISION SECTION. .LOCATION _ �_ A b616 � ADDRESS OF CONSTRUCTION 1 5 f}h4 Ct ftuo4z 4 c- r1 *& . A. TYPF.OFCONSTRUCTION E. ZONING CLASSIFI ATIONOF PROPERTY 1.. Residential :(One or,Two Family) Present 5—� 2.,0 Residential (Multi -family). F. PRESENT�USE OF PROPERTY 3.0 Commercial 1.o36rm/Vacant 4: 0 Industrial 2. off Residential (One or Two Family) 5.0 Institutional 3.0 Commercial B. TY,,;&SEWAGEDISPOSAL 4.0 Industrial 0 1. V Public (Name of System ) 5. Other (Specify) 2.0 Private (Septic Tank, etc.) G..PR�QOfUP�SEDUSE OF PROPERTY C. TYP�F WATER 1.l'1 One or Two Family Dwelling 1. Public System (Name of. System 2.0 Multi -family 2t0 Private (Well - _ ') 3.0 Commercial D.:TYPF,017 IMPROVEMENT 4. 0 Industrial 1. 0 New Stucture 5.0 Other (Specify) 2: 0 Commercial Tenant Space H. ESTIMATE COST OF CONSTRUCTION eseca 3.0 Addition Per Roo (Excluding.Land Value) 4.0.Remodel `— I Lot Split: Yes No 5.0 Foundation_Only 6 0 Demolition J. Flood Zones: Yes No� i9g1 A. B. C. 7 0 Accessory Building. eC 2 K. Sump Pump: Yes No 8.0 Swimming:Tool �` L. Geothermal Heat Pump: Yes No 9 F,�kaTa8�qq Att �DetaChe�l The tAwyetigrai�t„�rtyt;p�r�struction, enlargement, relocation or alteration of structure, or any change in the use of landg�,r yyrr,�Rssgguesteedd'' b''"" i Et'4l {94M-tofnply with, and conform to, all applicable. laws of the State of Indiana, and the i� (',;r m'�3nYct3YCirrtiliA�I Pdopted.under the authority of Acts of 1979, public Law 178 Sec.1 et seq, General Assembly f'further cert l t f eWnsY tl�wW not used or occupied until a certificate of occupancy has been issued by theDepartment of Community tttisa",( ra.. bath, laundry and'flOOT drains are Inspections Needed:-nr.Nf /Undue d Agent gh' er Base Drainaee Site orate up onunc / 77 Allott �.� 'o�.�. ^ 9 M. P Square Footage �011P _ Permit (Sq..Footage)...................... )hector, epp��rtin fit of. o - m nity Development Inspections /� Certificate ofOccupancy .: Total PAID jAN. t 1 92 Flan Comm./BZA Docket # BUILDINGPERMITINFORMATION CARMEL-CLAY TOWNSHIP Department of Community Development CARMEL ZONING ORDINANCE Z-160, SECTION 29.4.2(3): The Building Commissioner (Director, Department of Community Developrnenvor staff) shall approve or deny the improvement location permit (building permit) within five (5) working -days of the receipt of the written application form and accompanying materials. The improvement location permit (building permit)" shall be 'issued when the proposed structure„ improvement or use and its location conform in all respects to this ordinance. 1. ONE completed Improvement Location Permit,(Building Permit),application.' 2. TWO (2) complete sets,of'construction plans. In compliance with the State Energy Code, must list R-values on walls, ceilings„_etc; if a commercial construction, plans must be stamped approved bv'the Indiana State Department of Fire Prevention & Building Safety.. Indicate total height of building on plans. 3. ONE copy of sewer permit (from, City of Carmel Engineering Dept., Hamilton Western Utilities or Clay Regional Sewer bistrict'whicheverapplies), or septic permit (Hamilton County Health Department). 4. ONE (1) copy of plot plan from'subdivision development plan. 5. THREE (3) copies of a siteplan or plot ':plan showing the following REQUIRED information (can be obtained from the landowner or developer): --Lot drawn to,scale -- all dimensions -Scale and north arrow --All roads;alleys, rights -of -way, etc. --All other utilities and drainage rights -of -way and easements -Any applicable flood plain'area --Building pad elevation and lot corner elevations --All accessory buildings -- existing or'proposed --All sidewalks and driveways --Sewer and.water lines, septic system and well location --Drainage flow arrows --All drainage swales and subsurtace'facilities (retention/detention areas, etc:) --Dimensional cross sections of all drainage swales --Sump pump (sump pump pits),show ng discharge locations --Geothermal heat pump discharge locations Drainage Swales• All required drainage, swales ,must, be shown on the ,plot plan and constructed in all subdivisions prior to the Department,,of Community 'Development performing a final inspection of any structure per plans on,file orpecthe following: Constructed,swales shall be a minimum of 1'6' deep with side slopes of not less`than 4 to"l. Itthis information is -not submitted, it will extend the;time it takes to get an approved building permit. I CERTIFY THAT ALL OF THE ABOVE LISTED INFORMATION IS SHOWN COMPLETELY AND ACCURATELY ON THE ATTACHED'PLOT'OR SITE.PLAN.AS SUBMITTED WITH A BUILDING PERMIT APPLICATION TO THE CARMEL-CLAY DEPARTMENT OF COMMUNITY DEVELOPMENT. I FURTHER CERTIFY THAT THE JOINING OF WATER' SUPPLY PIPING'SHALL'BE MADE WITH.LEAD-FREE SOLDERS AND FLUXES. FAILURE TO COMPLY WILL RESULT IN A REPLACEMENTOF THE SYSTEM. PLUMBING CODE P-509-5. NAME OF PLUMBING CONTRACTOR: HeL&oo3 IIINyNt� LL� -- CODE: BOCA or CABO STATE.P..LUMBING LICENSE PHONE:' 77�� April, 1991 C:\TEXT\1006