HomeMy WebLinkAboutC501 Utility Plani■ Anew
r �c� y7P "X0 n
Jim o wo ?�IjilNi(M
2 71
9
STRUCTURE
STORM MANH TYPE1
EEL 1 /C601—
h ,L RIM 833.00
12" INV. 828.19 (N)
12" INV. 828.19 (E)
STRUCTURE
STORM INLET TYPE 1 (PVMT.)
SEE DETAIL 18/C601
RIM 831.40
12" INV. 828.45,
4" (N,S,E,w).40
STRUCTURE #3
STORM INLET TYPE 1 (YARD)
S =ED TAIL 01�/C501
RIM 832.00
12" INS/. 827.98 (w)
15" INV. 827.88 (E)
tattetA@��'Nk tZw'wu
i
440
#fl
13T21 STORM MANHOLE
RIM ELEV 831
[31211 SANITARY MANHOL
RIM ELEV 831.62
INV IN (8" W 822.14
VIN (8" N) 822.06
INPUT (8" E) 821.98
7
t r T 4 O
tr.) 7 y
,RAIN
.44
8" PVC 0 1 %(MIN.) TYP.
STRUCTURE 4 -i
INLET TYPE 1 YAR
SEE DETAIL 01/C501\
RIM 32.62
15" INV. 827.3 (w)
5" INV. 827.3 (SE)
8" INV. /830.00 (N)
�t ,5
-4 -f-
S) 82■
ABOVE P
ARKING
o3sa�§`A Il
-i r--- m
S 8`p :5404" t 185.40' 2" TE
V' 2" WATER
�r� 3 f6i1 (URB g r.
X71 i M�
8" PVC 1 %(MIN.)
107 LF 15" RCP 0.50
2t
it _A STRUCTURE �#5 tA;t "i
CURS
SEE DETAIL1501
RIM 830.61
15 INV. 826.80 (NW)
1" INV. 8
tramp o
w
ws
t
v
K
s 4 i�
r
1I j(ff. #1*;wf
GRASS
WALL
CONNE
DEPT.
3:',57S51 SANITARY t
3327i SANITARY MANHOLE
RIM ELEV 833.48
RIM
INV
1
k,, Ir Atiwww.izogas:Vpil 2: '1 \\T
INV
INV
Forces
INV
INVO1
4" SUMP PUMP UNE
SEE MECHANICAL PLANS
SEE MECH. PLAN
STORM
ELEV 8_ 1.7
N 12" E
N 24" S
DUT (24" i
ttaltai
4 P
,FORM MANHOLE 1
r e/ 832.41_
12» 826.1 4
j
yy r !.'c a g 1 rl P
CO
co
COMMUNLCAI
ELECTRICALITRANSFOR
M 8
1 %MIN.)
5
Cr
-Ex, Stn. MH
/7 tor 832.69
Inv, (L) 826,49
ca
4 .o
'rcp
..t.� ti r
BITUMINOUS
BITUMINOUS
CONC. CURB
PVMT.
NTS
5
CCW......... z a �p�1 +7%:S�M$ib04%IDC:A'�GeFAwSLA
Ex, Sirs, Inlet) s
for (gutt8r3 831,11
r I .21
E x. Stn. Mh
tor 832,34
irly, ('1) 826,69
lr�v. (N)
Inv. .",82€ 6-T'
I, 48" X 36" I,
NEENAH R3246 -8V
CURB INLET
#4 REBAR
12" O.C.
BOTH WAYS
II:
.,;III„ I I
CURB INLET DETAIL
GRASS MEDIAN 1 26TH STS ET
SCALE:
1 /2" MESH GALV. HARD-
WARE CLOTH VARMENT
STOP SUBDRAIN
FILL W/ CONC.
WARP TO MEET INVERT
NOTE: CONTRACTOR'S OPTION: PRECAST W/
SAME REINFORCING. (INDOT TYPE "A
d
1 =30'
rri
.��`�;J��.�:; ors: h- ,.P�.�,��wa„�.�..,.�..�?,�
0
UTILITY PLAN
15'
30'
60'
SCALE: 1" 30'
1 Ex, Sim inlet is
tor (c utter
In
54
Ex, Stri, Mh
7-Ex,
tor 831,30
irw, (W) 826,50
lo Inv, (N) 827,00„,<,
ir�v, (E) 826('b G
t GRASS
FINISH GRADE
NTS
amm=. tsusx. i�ac .cns�.a =:ac.'.z +r�v.cc
24 "r•cp
R/W
NORTH
ADJUSTMENT RING
ECCENTRIC CONE
OR CONCCENTRIC
CONE
POLYPROPYLENE
PLASTIC STEPS
48" PRECAST
CONC. MANHOLE
STORM PIPE
6'X 6'X 8" CONC.
FOOTING W_ 6X6
1 0/1 0 W. F. W/
#4 REBAR 12
O.C. BOTH WAYS,
OR PRECAST
f
r
c
NEENAH R- 2560 -C1
INLET DETAIL
c7�
-Ex, Stn. I wp
"tor (gut: ti
--Ex, t N `V Ex,
tore 832,05 tor
In 82635 EiI T UMINodg
r ()828,15 N, q,"")
(E) 826.25 -t'
i
f
8313 e,<, o)4VV
mitir
BITUMINOUS
St i, frig'
(gutter) t *32.1k6
(SE) 829,35
24:
INV IN
INV II'
INV OUT
8
f
N) 825,69
SE) 825,69
Mh
X'X)' 25.58
CO 828,03
"aM ELEV
s Irllet
for (g (ter) 832,36
Irv, (V' 28,55
Inv, 8,65
12 �w
10'p RCP
RS
nv, (91827
1
RA
831. Oil
E
B)r„
11
11
T'G fIEI
,6 1, 1
Mil
<11
—Ex, Stn. M
tor 831,8 J
inv. (N) 97
Inv, (SW 8 6.032
inv. (1) 82-.98
i irly, (S) 82198
GRADING /DRAINAGE NOTES
1. ALL EXCAVATED AREAS TO BE SEEDED OR SODDED AFTER FINAL
GRADING UNLESS OTHERWISE NOTED. SEE LANDSCAPE PLAN AND
OR EROSION CONTROL PLAN FOR DIRECTION AND VERIFICATION.
2. PROVIDE POSITIVE DRAINAGE IN ALL PAVED AREAS WITHOUT PONDING
WATER. THE PAVING CONTRACTOR SHALL TEST ALL PAVED AREAS
FOR BIRD BATH CONDITIONS BY FLOODING THE ENTIRE PAVEMENT
AREA WITH WATER AND MARKING THE PONDED AREAS PRIOR TO THE
INSTALLATION OF THE TOPPING COURSE. CORRECTION SHALL BE
MADE IF NECESSARY.
3. ALL CONTRACTORS BUT NOT LIMITED TO THE EXCAVATING
CONTRACTOR OR CONTRACTORS MUST TAKE PARTICULAR CARE WHEN
EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND
EQUIPMENT. ACTUAL FIELD LOCATIONS OF ALL THE EXISTING
UTILITIES ARE THE CONTRACTORS RESPONSIBILTY AND MUST BE
LOCATED EITHER BY THE REPRESENTATIVE OF THE UTILITY COMPANY
OR BY A PRIVATE UNDERGROUND UTILITY LOCATION COMPANY PRIOR
TO THE START OF EXCAVATING. VERIFY MINIMUM COVER
REQUIREMENTS BY THE UTILITY CONTRACTOR OR CONTRACTORS OR
AGENCIES WHICHEVER UTILITY COMPANIES OR AGENCIES THAT HAS
JURISDICTION SO NOT TO CAUSE DAMAGE.
4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY ALL THE UTILITY
COMPANIES AND DEPARTMENTS 72 HOURS BEFORE CONSTRUCTION
IS TO START TO VERIFY ANY UTILITIES THAT MAY BE PRESENT ON
SITE. ALL VERIFICATIONS, LOCATIONS, SIZE AND DEPTHS SHALL BE
MADE BY THE APPROPRIATE UTILITY COMPANIES OR DEPARTMENTS.
WHEN EXCAVATING AROUND OR OVER EXISTING UTILITIES, THE
CONTRACTOR MUST NOTIFY THE UTILITY COMPANY SO A
REPRESENTATIVE OF THE UTILITY CAN BE PRESENT DURING THE
EXCAVATION TO INSTRUCT AND OBSERVE DURING THE EXCAVATION.
5. TRENCHES FOR ALL UTILITIES SHALL BE BACKFILLED COMPLETELY WITH
APPROVED ENGINEERED GRANULAR MATERIAL SUITABLE TO THE A /E.
SEE THE APPROPRIATE DETAILS AND SPECIFICATIONS FOR THE
APPROVED MATERIALS.
6. ALL PROPOSED SPOT ELEVATIONS ARE THE FINAL TOP OF
PAVEMENT, TOP OF CURB OR FINAL GRADE ELEVATION.
7. TO DETERMINE THE SUBGRADE ELEVATION REQUIRED BELOW A
PROPOSED FINAL ELEVATION, SEE APPROPRIATE DETAIL.
8. HEAVY CONSTRUCTION AND EQUIPMENT TRAFFIC MAY CREATE
GENERAL DETERIORATION OF THE SHALLOWER SOILS
IF EXCESS SURFACE WATER IS PRESENT. PROPER PRECAUTIONARY
STEPS MUST BE TAKEN DURING THE ENTIRE CONSTRUCTION
SCHEDULE TO ALLEVIATE SUCH DAMAGE.
9. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO
CURRENT STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE,
COUNTY, CITY OR LOCAL REQUIREMENTS, WHICHEVER HAS
JURISDICTION.
10. EXISTING PAVEMENT, SIDEWALKS CURBS DRIVEWAYS, ELECTRICAL
TRANSFORMERS AND PADS, DITCHES, DRAINAGE PIPES, AND
STRUCTURES, FENCES, LAWNS, TREES, BUSHES, MAILBOXES, SIGNS,
POWER POLES ETC., TO REMAIN AND BE PROTECTED FROM DAMAGE
BY THE CONTRACTOR. ANY DAMAGE DURING CONSTRUCTION SHALL
BE RESTORED, RECONSTRUCTED OR REPLACED BY THE CONTRACTOR
AT HIS EXPENSE. ALL DAMAGES SHALL BE RESTORED OR
REPLACED TO AT LEAST THEIR ORIGINAL CONDITION OR AS REQUIRED
OR DICTATED BY FEDERAL, STATE, COUNTY, CITY OR LOCAL
AGENCIES.
11. IT IS THE RESPONSIBILITY OF THE CONTRACTOR OR CONTRACTORS
TO OBTAIN ALL FEDERAL, STATE, COUNTY, CITY OR LOCAL PERMITS
FOR ANY AND ALL WORK REQUIRED UNLESS OTHERWISE NOTED.
THE CONTRACTOR OR CONTRACTORS ARE RESPONSIBLE TO PAY FOR
ALL REQUIRED PERMITS BY ANY OR ALL AGENCIES MENTIONED
ABOVE UNLESS OTHERWISE NOTED IN THE CONTRACT OR
SPECIFICATIONS.
12. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSPECT EACH
DAY AND REMOVE ALL MUD, DIRT, GRAVEL AND LOOSE MATERIALS
TRACKED, DUMPED, SPILLED OR WIND BLOWN FROM THE SITE ONTO
OTHER SITES, RIGHT OF WAYS, PUBLIC OR PRIVATE STREETS OR
ROADS, DRAIVEWAYS, YARDS OR SIDEWALKS. THE CONTRACTOR
MUST CLEAN OR PICK UP DAILY IF NECESSARY. THE CONTRACTOR
SHALL REDUCE THE AIRBORNE DUST DURING THE ENTIRE
CONSTRUCTION SCHEDULE. WATER MAY BE USED AS A REDUCER.
13. THE UTILITIES INDICATED ON THESE PLANS AND ON THE SURVEY
MAY NOT BE A COMPLETE INVENTORY OF ALL THE EXISTING
UTILITIES PRESENT ON AND AROUND THIS SITE. THE LOCATION AND
SIZE OF THESE UTILITIES MAY BE APPROXIMATE. THIS
INFORMATION WAS GATHERED OR SUPPLIED BY OTHERS AND USED
BY THE A/E AND MAY NOT BE ACTUAL. THE A/E SHALL NOT BE
HELD LIABLE FOR ANY INCORRECT OR MISLEADING UTILITY
INFORMATION INDICATED, IMPLIED OR NOT INDICATED ON THESE
PLANS.
14. THE EXCAVATING CONTRACTOR OR LANDSCAPE CONTRACTOR SHALL
INSTALL THE FINISHED GRADE AT 1/2" BELOW PAVEMENT WHEN
SHEET DRAINAGE IS PROPOSED ACROSS THAT SEEDED AREA.
15. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ACQUAINT
THEMSELVES WITH THE SOIL CONDITIONS.
16. ALL EXISTING MANHOLES AND CATCH BASIN GRATES, WATER OR GAS
VALUES SHALL BE ADJUSTED TO NEW FINISH GRADE ELEVATION.
LEGEND
G
E
T
W
ST
o
x
SANITARY SEWER, SEE SHEET C602 FOR DETAILS
STORM SEWER, SEE DETAILS 21 22/C601
GAS UNE, SEE MECHANICAL PLANS
ELECTRIC UNE, SEE ELECTRICAL PLANS
TELEPHONE UNE, SEE ELECTRICAL PLANS
WATER LINE, SEE SHEET C603
PAVEMENT SUBDRAIN, SEE DETAIL 16/C601
ROOF /DOWNSPOUT COLLECTOR, SEE DETAILS 19 24/C601
STORM CLEAN —OUT, SEE DETAIL 23/C601
PROPOSED PAD MOUNTED TRANSFORMER. CONTACT CINERGY /PSI.
PROPOSED LIGHT POLE
HOLEY MOLEY SAYS,
"DON'T
DIG
BLIND"
1- 800 -382 -5544
CALL TOIL FREE
1- 800 428-5200
FOR CALLS OUTSDE OF INDIANA
CM Engineer:
cso
280 East 96th Street
Suite 200
Indianapolis, IN 46240
317.848.7800 (voice)
317.574.0957 (fax)
Architect:
8132 Hunters Place
Indianapolis, Indiana 46236
317.823.6653 (voice)
317.826.8584 (fax)
@Cop 2002
Developer:
Pedcor Investments, LLC
8888 Keystone Crossing, Suite 900
Indianapolis, Indiana 46240
317.587.0320
Scope Drawings:
These drawings indicate the general scope of the project
in terms of architectural design concept, the dimensions of
the building, the major architectural elements and the type
of structural, mechanical, and electrical systems.
The drawings do not necessarily indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope indicated or described,
the trade contractor's shall furnish all items required for the
proper execution and completion of the work.
Project:
Carmel
City Center
Parcel 2B
Phase 2
3rd Avenue
Southwest
Carmel, Indiana
Drawing TING:
UTILITY
PLAN
Issue Date
01/26/04
Drawn By
KRS
Checked By
RO
Drawing Number:
C501
Project Number:
23465