Loading...
HomeMy WebLinkAboutC402 Street Plan & ProfilesBEGIN CONS 110N STA. 0 +00 CURVE DATA D =26 °25'40" R=200.00' L= 92.25' T= 46.96' 137) I 7 i 920 O O O U) z 0 910 (n O CD DATUM ELEVm 905.00 0 +00 69 0 +50 SEE SHEET C404 FOR DETAIL 25 1 +12.76 I 5_50' 1+00 POINT OF TANGENCY STA. 0 +92.25 co 45 B —B R/W 0 0 1+50 STREET D 43 2 +00 44 2 +50 42> 3+00 29 30 3 3 +50 STREET 4+00 VD 30' B —B 50' R/W Y+ m 1'.. L 40' VC SEE SHEET C404 FOR DETAIL —rn W it 0 cn t 0 0' B —B HIGH POINT ELEV 920.21 HIGH POINT STA 4 +16.54 PVI STA 4 +18.11 PVI ELEV 920.28 A.D. —1.30 K 30.82 CO rn D3 0.60% 0) O U z W Z H LL O 1- z O 0 N ao 0) c0 N N U w Z 03 V) 00 0) M 00 0.60% EXISTING GRADE 03 a0 0) 00 M O SCALE: 1"=50' HOR. 1"=5' VERT. PROPOSED GRADE 12 O IN N 6 0) R.C.P. 912.35± 0) 0) 8" S[ INV.= 0) �R -35 P.V.C. 807.01 Q 00 0) 00 rr) r) O 0 N 0)) c0 0 0) O U m N 6 N 03) w 0 N 0) U w 12 INV N 0) 0) R.C.P. =915.5 Po 10 0)) 7 O N 0o L0 1- z O 1= Z z 0 0 0 z O 0) 4 +50 5 +00 14 INTERSECTION STA. 4+18.11 STA. 5 +71.58 NdIS 13 STREET D 5 +50 6 0) c0 0) .12 920 910 END CONSTRUCTION STA. 5 +78.12 INTERSEC110N END CONSTRUCTION STA. 1+60 920 Z 0 910 D CC z 0 U 0 z w SCALE: 1"=50' HOR. 1"=5' VERT. 1+50 1+00 70 73 46 0 +15.86 SEE SHEET C404 FOR DETAIL LOW POINT ELEV 918.97 LOW POINT STA 0 +44.46 PVI STA 0 +50.86 PVI ELEV 918.83 A.D. 3.03 K 13.22 40' VC 0 +50 0o O O O 0) CD 1-7 o t 0 0 I t 0 +00 920 910 STREET C N Jr) 6 DATUM ELEV 905.00 129 r SCALE: 1"= 50' W IC43 O Z W W 0 W LJ.J w w 0 0 J 0 II X LL JOB NO.47175S1 m LiJ 0 0 0 N) z 0 z z _J w Ch U SHEET NO. C402 CONSULTING ENGINEERS LAND SURVEYORS ADD STRUCTURE NUMBER TO PLAN MEW STA. 4+18.11 REVISIONS 2. Opq GRADE L� 12' EXISTING R.C.P. :„A, X w U GRADE 0 :5OAK r z L (3 n 0 PROPOSED INV. 915.25± STA. 0 +15.86 00 +0 •V1S 1.0 GRADE CHANGE 919.19 INTERSECTIOt L9'0Z6 lc'OZ6 L 6l6 L9'6l6 26'91.6 Ol'6l6 BEGIN CONS 110N STA. 0 +00 CURVE DATA D =26 °25'40" R=200.00' L= 92.25' T= 46.96' 137) I 7 i 920 O O O U) z 0 910 (n O CD DATUM ELEVm 905.00 0 +00 69 0 +50 SEE SHEET C404 FOR DETAIL 25 1 +12.76 I 5_50' 1+00 POINT OF TANGENCY STA. 0 +92.25 co 45 B —B R/W 0 0 1+50 STREET D 43 2 +00 44 2 +50 42> 3+00 29 30 3 3 +50 STREET 4+00 VD 30' B —B 50' R/W Y+ m 1'.. L 40' VC SEE SHEET C404 FOR DETAIL —rn W it 0 cn t 0 0' B —B HIGH POINT ELEV 920.21 HIGH POINT STA 4 +16.54 PVI STA 4 +18.11 PVI ELEV 920.28 A.D. —1.30 K 30.82 CO rn D3 0.60% 0) O U z W Z H LL O 1- z O 0 N ao 0) c0 N N U w Z 03 V) 00 0) M 00 0.60% EXISTING GRADE 03 a0 0) 00 M O SCALE: 1"=50' HOR. 1"=5' VERT. PROPOSED GRADE 12 O IN N 6 0) R.C.P. 912.35± 0) 0) 8" S[ INV.= 0) �R -35 P.V.C. 807.01 Q 00 0) 00 rr) r) O 0 N 0)) c0 0 0) O U m N 6 N 03) w 0 N 0) U w 12 INV N 0) 0) R.C.P. =915.5 Po 10 0)) 7 O N 0o L0 1- z O 1= Z z 0 0 0 z O 0) 4 +50 5 +00 14 INTERSECTION STA. 4+18.11 STA. 5 +71.58 NdIS 13 STREET D 5 +50 6 0) c0 0) .12 920 910 END CONSTRUCTION STA. 5 +78.12 INTERSEC110N END CONSTRUCTION STA. 1+60 920 Z 0 910 D CC z 0 U 0 z w SCALE: 1"=50' HOR. 1"=5' VERT. 1+50 1+00 70 73 46 0 +15.86 SEE SHEET C404 FOR DETAIL LOW POINT ELEV 918.97 LOW POINT STA 0 +44.46 PVI STA 0 +50.86 PVI ELEV 918.83 A.D. 3.03 K 13.22 40' VC 0 +50 0o O O O 0) CD 1-7 o t 0 0 I t 0 +00 920 910 STREET C N Jr) 6 DATUM ELEV 905.00 129 r SCALE: 1"= 50' W IC43 O Z W W 0 W LJ.J w w 0 0 J 0 II X LL JOB NO.47175S1 m LiJ 0 0 0 N) z 0 z z _J w Ch U SHEET NO. C402 CONSULTING ENGINEERS LAND SURVEYORS ADD STRUCTURE NUMBER TO PLAN MEW STA. 4+18.11 REVISIONS