Loading...
HomeMy WebLinkAboutC-3 Site Development PlanPAVEMENT. GRANULAR BACKFILL. EMERGENCY SPILLWAY ELEVATION 826.00' VARIES 8' -12" 6' GOMPAC,1 ED SUBGRADE THE UPPER 6 INCHES SHALL COMPLY WITH THE DENSITY REQUIREMENTS OF THE CONTRACT IMMEDIATELY PRIOR TO PLACING THE MATERIAL THEREON. ALL SOFT,YIELDING OR UNSUITABLE MATERIAL, WHIGH CANNOT BE COMPAQ I ED SATIFAGTORILY, SHALL BE REMOVED. ALL ROCK ENCOUNTERED SHALL BE REMOVED OR BROKEN OFF AT LEAST 6 INCHES BELOW THE SUBGRADE SURFACE. ANY HOl FS OR DEPRESSIONS RESULTING FROM THE REMOVAL OF UNSUITABLE MATERIAL, SHALL BE FILLED WITH SATIFAGTIORY MATERIAL AND COMPACTED TO CONFORM WITH THE SURROUNDING SUBGRADE SURFACE. WHERE SIDEWALK IS CONSTRUCTED ADJACENT TO THE CURB, THE SPACE BEHIND THE NEW GURB SHALL BE FILLED \MTH GRANULAR MATERIAL TO THE REQUIRED ELEVATION AND GOMPAC.1 ED IN LAYERS NOT TO EXCEED 4 INCHES WHERE SIDEWALK IS NOT CONSTRUCTED ADJGENT TO THE CURB THE SPACE BEHIND THE CURB SHALL BE FILLED WITH SUITABLE MATERIAL_ TO THE REQUIRED ELEVATION ,AND COMPACTED IN LAYERS NOT TO EXCEED 4 INCHES. STRAIGHT CURB SECTION 1/2" 1 1 I O' 1" 2 3 15' -0' DRAINAGE EASEMENT FROM TOP OF BANK OF HAWKINS REGULATED DRAIN AS ESTABLISHED BY NON- ENFORGEMENT AGREEMENT FOR D 1 ENTION AREA AND RECORDED AS INSTRUMENT 8814018. HIGH POINT OF NATURAL GRADE. 13 ACKFILL. TOPSOIL. (STING GROUND. 5-0" DRAINAGE EASEMENT FROM TOP OF BANK OF HAWKINS REGULATED DRAIN AS ESTABLISHED BY NON ENFORCEMENT AGREEMENT FOR DRIVE AND PARKING AND RECORDED AS INSTRUMENT 9104036. 70 DRAINAGE EASEMENT FROM TOP OF BANK OF HAWKINS REGULATED DRAIN AS ESTABLISHED BY NON ENFORCEMENT AGREEMENT FOR PROPOSED BUILDINGS AND RECORDED AS INSTRUMENT 8814018. APPROXIMATE TOP OF BANK OF HAWKINS REGULATED DRAIN PER CERTIFIED SURVEY DATED MARCH 27,1972, (JOB NO. 711172 -72536 WEIHE ENGINEERS, INC.) AS ACCEPTED BY HAMILTON GO. SURVEYOR FOR ENCROACHMENT INSTRUMENT 8814018 AND 8814012. z /7 zz 1 4 111 1 BENSIMIN A dr- 1 g i m A API 25 SCREENING AND PLANTING STRIP O fir!, O' IP �c �0 •po 0 00 0 0c o°oc) 00 c poc) oo�o� 8qS::cTh Op (2o°000( c 'o0 000 00161,006 OO Q 0 00 o O O Q8c5S r O t ii Opo p 0 po O °Oc90 O O o�o0ouo90 =uo 0 -:0:� o o TYPICAL PAVEMENT SECTION 3" =1' -0" O' 1" 2 3 0 NEW 6' HIGH CONCRE h CURB. SEE DETAIL 2/G-3. ZONING CLASSIFICATION: 1 -1. 0 0 z, 0 .j LIMIT OF DETENTION AREA HIGH POINT OF NATURAL GRADE. ry #11B SURFACE. tNi #9 BINDER. (9 #53 STONE. COMPACTED AND WELL DRAINED SUBGRADE. NEW ASPHALT GONGRETE PAVING. SEE DETAIL 1/C-3. NEW PRECAST CONCRETE WHEELSTOPS. An MINIM MIMI C -3 N 89'43'09" W 66634 6 -O 12' N ZONING CLASSIFICATION: R -1. WIDE CONCRE E STOOP. END TO DRIVEWAY. SEE HEET A-1. EXISTING MANUFACTURING 5,515 SQ. FT. EMOLISH EXISTING PAVEMENT. FT A r STOOP. -0 WIDE CONCRETE S ND TO PARKING LOT. SEE ��HEET A -1. (STING ELECTRICAL RANSFORMER EQUIPMENT. EW YARD TO MATCH f�i l I., /Llli 10 DRAINAGE EASEMENT 15-0" UTILITY EASEMENT HIGH POINT OF NATURAL GRADE. r x8' -0" CONCRETE MECHANICAL PAD. EE SHEET Art. NEW 6" HIGH CONCRETE CURB. SEE DETAIL 2/G -3. NEW ASPHALT CONCRE E PAVING. SEE DETAIL VG NEW COOLING TOWER EXISTING COOLING TOWER NEW 12-0n0 x 32-O HIGH BULK MATERIAL SILO. 18' -0" 18' -0" R5' EXISTING WAREHOUSE 34,607 SQ. FT. 4 NEW ASPHALT GONGRETE PAVING. SEE DETAIL 1 /C-3. NEW 6" CONCRETE CURB. SEE DETAIL 2/C-3. P" o 0 cP EXISTING WAREHOUSE 4,080 SQ. FT. EXISTING GUARDRAILS i L FFE 829.27 EXISTING MANUFACTURING 26,151 SQ. FT. 7J d EXISTING OFFICE 1ST FLOOR 1,800 2ND FLOOR 5,878 SQ. FT. ANCILLARY SPACE (TOILETS, BREAK ROOM, LUNCH ROOM) 3,558 SQ. FT. f f 0 PPO G EXISTING GONG. WALK 0 0 0 0 C r L N89 °51'24° 70. 1" 30—O" 0 cn 0 0 A 7 ryY ZONING CLASSIFICATION: I -1. O'5' 10' 25' 50' OFFICE SPACE MANUFACTURING WAREHOUSE ADDITION MANUFACTURING WAREHOUSE ZONING CLASSIFICATION: 11. -.e PARKING SPACE REQUIREMENTS: SITE DEVELOPMENT PLAN LEGEND PROPERTY LINE EXISTING EASEMENT LINE EXISTING 15' NON ENFORCEMENT EASEMENT FOR STORM D)r 1 ]✓NYLON EXISTING 70 NON ENFORGEMENT EASEMENT FOR BUILDINGS EXISTING 5-O' NON ENFORCEMENT EASEMENT FOR PARKING AND DRIVE EXISTING DRAN/SWALE FLOWLINE MATERIAL TO BE DEMOLISHED. NEW 6' HIGH GONGRE 1 E GURB. SEE DETAIL 2/A-3. NEW PAVEMENT. SEE DETAIL 1/C-3. EXISTING PARKING SPACES 88 PROPOSED PARKING SPACES 33 TOTAL SITE PARKING SPADES 121 7,678 SQ. FT. 300 SQ. FT. PER PARKING SPACE 31,666 SQ. FT. 500 SQ. FT. PER PARKING SPACE 38,687 SQ. FT. 15 EMPLOYEES 2,500 SQ. FT. 500 SQ. FT. PER PARKING SPACE 5 2940 SQ. FT. NO ADDITIONAL EMPLOYEES TOTAL ZONING REQUIRED PARKING SPACES 109 100 150 26 63 15 (4 N ARCHITECTURE N HIMIANA 462E304020 644-13115 PROJEC BUILDING N0m5 EXPANSION FOR°. ENGINEERED COOLING SYSTEMS 201 WEST CARMEL BRINE CA �IIVIIEL IND[IANA 46032 REVISIONS: DATE: DRAWN BY: SHEET NUMBER: OF: c/ igs C -3 THREE DATE: Og MAY 2004 D. L. Lockwood CHECKED BY: M. A Swanson APPROVED BY: M. A Swanson PROJECT NUMBER: EGSBLDGS COPYRIGHT 2004 MARK SWANSON ASSOCIATES, INC.