Loading...
HomeMy WebLinkAboutC601 Storm Sewer Plan01 eNJ 915 910 905 900 895 890 885 880 875 1 2 2 3 \N 3 4 .sz\ 4 1 5 5 1 V VILLAGE OF WESTCLAY MEETING HOUSE 6 6 7 EXISTING VILLAGE OF WESTCLAY VILLAGE CENTER BLOCK STORK SFW STORK 7 AREA FOR FUTURE BUILDINGS AND /OR EXPANSION OF COMMON PARKING LOT AREA FOR FUTURE BUILDINGS AND /OR EXPANSION OF COMMON PARKING LOT 8 8 9 IR PLAN 7 yr* 11.so ,11. HORSEFERRY ROAD 9 3 V) 00 O 0005 to in OC) c p CD CO CO wtn�z? w w CO 10' STUB 12" RCP SEWER PROFILE 50' STUB 12" RCP 10 *N. .0101100. Oftlit N CT) 00 CO 00 O 00 0 00 10 Cr m W t 11 Existing Grode 11 VILLAGE OF WESTCLAY FUTURE SECTION LIE 1F t New Grade 12 7/////// Granular Backfill 12 13 STORM MANHOLE STORM STRUCTURE No. (TYPICAL) Too STRAIGHT CURB INLET 13 14 BEEHIVE INLET 14 HOLEY MOLEY SAYS "DON'T DIG BLIND" STORM SEWER LEGEND 15 "IT'S THE LAW" CALL 2 WORKING DAYS BEFORE YOU DIG 1-800-382-5544 CAII TOLL FREE PER INDIANA STATE LAW IS -69 -1991. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. PRECAST CONCRETE END SECTION STORM sEwER EMBEDMENT DETAL PIPE UNDERDRAIN SCALE: 1"=50' HORZ.: 1"=50' SCALE: 15 915 910 905 900 895 890 885 880 875 C3 1"4 1. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL AND STATE STANDARDS. 2. ALL CONSTRUCTION ACTIVITY ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH APPLICABLE O.S.H.A. STANDARDS FOR WORKER SAFETY. 3. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY ALL UTILITY LOCATIONS BEFORE CONSTRUCTION BEGINS. 4. CONTRACTORS SHALL MINIMIZE DAMAGE TO EXISTING TREES. 5. THIS STORM SEWER PLAN IS PART OF THE OVERALL DRAINAGE PLAN FOR THE VILLAGE OF WESTCLAY, PREVIOUSLY APPROVED BY THE COUNTY SURVEYOR. Revisions TES TENCIHEMLAIRIK. TBM #44 USGS BENCHMARK CUT "X" NORTH BONNET BOLT IN FIRE HYDRANT EAST SIDE HOOVER RD. ±100' SOUTH OF CLARIDGE FARM ENTRANCE. ELEVATION 893.39 at,,„t .'v' ltIt, �,uu,,,,,/ S N 0 9800085 STATE OF k I NDIANS^. N N Nititi► CERTIFIED BY THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED FEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION AND ARE NOT TO 13E USED OR REPRODUCED W4 WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIO€R CORPORATION. 1999, The Schneider Corporation r me 6:21 Schneider L J Corporation 1276 Hamilton Crossing Blvd. Carmel. Indiana 460 :Q 317-574-3797 317 -'574 -:3799 Fax Form erly Schneider Engineering Corp. Bohlen. Meyer, (;ibkcfn Assoc. Date Project No. 08/06/99 I 1238.005 Computer Files J `1238 \005 \DWWGS \C601.DWG XREF: BRENWICK DEVELOPMENT CO. BrenWick Building Village of WestClay STORM SEWER PLAN Drawn MG Sheet No. Engineering Surveying Landscape Architecture CIS U; Geology Approv. C60i1 L