HomeMy WebLinkAboutC802 Erosion Control NotesEROSION CONTROL SCHEDULE EROSION CONTROL MEASURE MAINTENANCE INSTALLATION SEQUENCE SHEET TITLE: EROSION CONTROL NOTES AS NEEDED PRIOR 10 CLEARING AND GRADING STONE ENTRANCE SILT FENCE WEEKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING EXISTING INLET PROTECTION WEEKLY, AFTER STORM EVENTS AND AS NEEDED PRIOR 10 CLEARING AND GRADING TREE PROTECTION WEEKLY, AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING TEMPORARY DIVERSIONS WEEKLY, AFTER STORM EVENTS AND AS NEEDED WATER AS NEEDED ALONG WI 1H ROUGH GRADING AFTER ROUGH GRADING TEMPORARY SEEDING PERMANENT SEEDING WATER AS NEEDED AFTER FINISH GRADING EROSION CONTROL MATTING WEEKLY, AFTER STORM EVENTS AND AS NEEDED WEEKLY, AFTER STORM EVENTS AND AS NEEDED AFTER FINISH GRADING AFTER FINISH GRADING STRAW BALES INLET PROTECTION WEEKLY, AFTER STORM EVEN 1 S AND AS NEEDED AFTER E ACH INLET IS PLACED SEED, SOD LANDSCAPE AROUND WATER AS NEEDED AFTER FINISHED GRADING AROUND FINISHED UNITS (Sc UNITS FINISHED 2 1 REMOVAL OF STRAW BALES N/A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF INLET PROTECTION N/A N/A AFTER ALL AREAS DRAINING 10 THESE AREAS ARE STABILIZED AFTER ALL A EAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF SILT FENCE DATE: 10/01/02 PROJECT NO.: 1238.026 DRAWN BY: BET CHECKED BY: SHEET TITLE: EROSION CONTROL NOTES DRAWING FILES: N:\1238\026\DWGSV803.DWG SHEET NO.: C 02 SOIL CONDITION spaaN A}i11} B Flooding Tolerance (days) f Emergence Time (days) Salt Tolerance Wet Vorrr Dry Gen. Soil A -B EROSION CON I I \uL MEASURES MAINTENANCE EN REQUIREMENTS STRAW BALE DAM MAINTENANCE REQUIREMENTS 1. INSPECT STRAW BALE DAMS AFTER EACH STORM EVENT AND PROMPTLY REMOVE ANY SEDIMENT DEPOSITS TO ENSURE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN, TAKING CARE NOT TO UNDERMINE THE ENTRENCHED BALES. 2. INSPECT PERIODICALLY FOR DETERICIRATION OR DAMAGE FROM CONSTRUCTION ACTIVITIES AND REPAIR IMMEDIATELY. 3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE IT. SILT FENCE MAINTENANCE REQUIREMENTS 1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. 2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. 4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE„ AND STABILIZE. TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS 1. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT AND IMMEDIATELY REPAIR ANY EROSION AND PIPING HOLES. 2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF THE DESIGN DEPTH. 3. REPLACE SPILLWAY GRAVEL FACING IF CLOGGED. 4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY. 5. CHECK THE SPILLWAY DEPTH PERIODICALLY TO ENSURE A MINIMUM OF 1.5 FT. DEPTH FROM THE LOWEST POINT OF THE SETTLED EMBANKMENT TO HIGHEST POINT OF THE SPILLWAY CREST, AND FILL ANY LOW AREAS TO MAINTAIN DESIGN ELEVATION. 6. PROMPTLY REPLACE ANY DISPLACED RIPRAP, BEING CAREFUL THAT NO STONES IN THE SPILLWAY ARE ABOVE DESIGN GRADE. 7. AFTER ALL DISTURBED AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE AND SEDIMENT, SMOOTH THE SITE TO BLEND WITH ADJOINING AREAS, AND STABILIZE. SANDBAG CURB INLET SEDIMENT BARRIER MAINTENANCE REQUIREMENTS 1. INSPECT FREQUENTLY FOR DAMAGE BY VEHICULAR TRAFFIC, AND REPAIR IF NECESSARY. 2. INSPECT AFTER EACH STORM EVENT. 3. REMOVE SEDIMENT, WITHOUT FLUSHING, WHEN IT REACHES HALF THE HEIGHT OF THE BARRIER. 4. DEPOSIT REMOVED SEDIMENT WHERE' IT WELL NOT ENTER STORM DRAINS. BLOCK AND GRAVEL CURB INLET PROTECTION MAINTENANCE REQUIREMENTS 1. AFTER EACH STORM EVENT, REMOVE THE SEDIMENT AND REPLACE THE GRAVEL; REPLACE THE GEOTEXTILE FABRIC, IF USED. 2. PERIODICALLY REMOVE SEDIMENT AND TRACKED -ON SOIL FROM THE STREET, WITHOUT FLUSHING, TO REDUCE THE SEDIMENT LOAD ON THE CURB INLET PROTECTION. 3. INSPECT PERIODICALLY FOR DAMAGE AND REPAIR; KEEP GRATES FREE OF DEBRIS. 4. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE GRAVEL, WIRE MESH, GEOTEXTILE FABRIC, AND ANY SEDIMENT, AND DISPOSE OF THEM PROPERLY. EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS 1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY EROSION BELOW THE BLANKET. 2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET. 3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS 1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM EVENTS OR HEAVY USE. 2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. 3. TOPDRESS WITH CLEAN STONE AS NEEDED. 4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN. 5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY. EROSION SEDIMENT CONTROL INFORMATION PROJECT INFORMATION: 1A Project Location Map: See Sheet C100 for the location map. 1B Narrative: This project consists of the construction of one commercial building. Site construction is scheduled to begin in the Winter of 2002 and be completed in the Spring of 2003. 1C Location of Planned and /or Existing Roads, Utilities, Structures, Highways, etc: See Sheets C102 for proposed and existing improvements. 1D Lot and /or Building Locations: See Sheet C101 for building location. TOPOGRAPHIC, DRAINAGE AND GENERAL SITE FEATURES: 2A Existing Vegetation: The parcel of real estate to be developed has existing vegetation comprised of grass. 2B Location and Name of All Wetlands, Lakes, and Water Courses On and Adjacent to the Site: south along the eastern boundary of the overall project. 2C 100 Year Floodplains, Floodwoy Fringes, and Floodways: None 2D Soils Information: See Sheet C100 for the Soils Map showing the soils information. 2E Existing and Planned Contour Lines: See Sheets C102 for existing and proposed contour lines. 2F Location of Specific Points Where Stormwater Discharge Will Leave the Site: Stormwater is collected via an off -site system of inlets, pipes and swales and conveyed to the proposed retention pond. The storm water outfall for this project is the Elliot Creek. 2G Identify All Receiving Waters: Receiving waters: Elliot Creek, White River 2H Potential Areas Where Stormwater May Enter Groundwater. The proposed retention pond facility is a potential area where stormwater may enter ground water. 21 Location of Stormwater System: See Sheet C102 for proposed stormwater system. LAND DISTURBING ACTIVITIES: 3A Location and Approximate Dimensions of all Disturbed Areas: See Sheets C103 showing the limits of construction. 3B Soil Stockpiles and /or Borrow Areas: Areas to be designated by the developer. EROSION AND SEDIMENT CONTROL MEASURES: 4A Sequence of When Each Measure Will be Implemented: See Sheet C103 for Erosion Control Schedule showing installation sequence. 4B Monitoring and Maintenance Guidelines for Each Measure: See Sheet C802 for Erosion Control Schedule showing maintenance schedule. 4C Perimeter Sediment Control Measures: See Sheet C103 for location of perimeter control and Sheet C802 for details and specifications. 4D Temporary Seeding: See Sheet C103 for location of temporary seeding and Sheet C802 for details and specifications. 4E Temporary Erosion and Sediment Control Measures: See Sheet C103 for location of temporary erosion and sediment control measures and Sheet C802 for details and specifications. 4F Permanent Erosion and Sediment measures and Sheet C802 for details and permanent erosion and sediment control and specifications. 4G Storm Drain Inlet Protection: See Sheet C103 for location of storm drain inlet protection and Sheet C802 for details and specifications. 4H Stormwater Outlet Protection: See Sheet C103 for location of stormwater outlet protection and Sheet C802 for details and specifications. 41 Stable Construction Entrance: See Sheet C103 for location of construction entrance and Sheet C802 for details and specifications. 4J Erosion and Sediment Control on Individual Building Lots: builders. 4K Permanent Seeding: See Sheet C103 for location of permanent seeding and Sheet C802 for details and specifications. Elliot Creek See sheet C802 for additional specifications for house HOLEY MOLEY SAYS "DON'T DIG BLIND" "IT'S THE LAW" CALL 2 WORKING DAYS BEFORE YOU DIG 1 -800 -382 5544 CALL TOLL FREE PER INDIANA STATE LAW IS -69 -1991. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. flows EROSION CONTROL AND SEQUENCING 1 CONTRACTOR SHALL INSTALL ALL REQUIRED SILT FENCES, SILT TRAPS, TREE PROTECTION AND INLET PROTECTION FOR EXISTING INLETS PRIOR TO THE START OF ANY EARTH MOVING OR STRIPPING. 2 CONTRACTOR SHALL INSTALL A STONE CONSTRUCTION ENTRANCE OR SOME OTHER DEVICE PRIOR TO THE START OF EARTHWORK AS NECESSARY TO PREVENT SOIL FROM BEING TRACKED OR WASHED INTO EXISTING ROADWAYS. 3 LAND ALTERATIONS WHICH STRIP THE LAND OF VEGETATION, INCLUDING REGRADING, SHALL BE DONE IN A WAY THAT WILL MINIMIZE EROSION. WHENEVER FEASIBLE, NATURAL VEGETATION SHALL BE RETAINED AND PROTECTED. AS GRADING IS DONE, INSTALL SILT TRAPS, SILT FENCES ,SLOPE DRAINS, TEMPORARY DIVERSIONS AND OTHER RUNOFF CONTROL MEASURES AT APPROPRIATE LOCATIONS TO KEEP SEDIMENT CONTAINED ON SITE. 4 ALL DISTURBED AREAS SHALL BE SEEDED AND STRAW MULCHED AS SHOWN ON THE PLANS IMMEDIATELY AFTER COMPLETION OF GROUND ACTIVITY. FOR LARGE PROJECTS, THIS SEEDING SHOULD BE COMPLETED IN PHASES AS THE DIFFERENT AREAS OF THE SITE ARE COMPLETED. 5 PERMANENT AND FINAL VEGETATION OR STRUCTURAL EROSION CONTROL DEVICES SHALL BE INSTALLED AS SOON AS PRACTICAL UNDER THE CIRCUMSTANCES. 6 THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM DEPENDING UPON THE WEATHER. IF CONSTRCTION ACTIVITY IS TO CEASE FOR MORE THAN TWO WEEKS, THE DISTURBED AREAS SHALL BE TEMPORARILY SEEDED. 7 ALL STORM SEWER INLET PROTECTION DEVICES SHALL BE PUT IN PLACE AT THE TIME EACH INLET IS CONSTRUCTED. 8 CONTRACTOR SHALL MAINTAIN EROSION CONTROL MEASURES AND DEVICES DURING CONSTRUCTION AND UNTIL SILTATION OF THE STREETS AND STORM SEWERS WILL NO LONGER OCCUR. 9 ONCE ONSITE EROSION AND SILTATION OF THE STREETS AND STORM SEWERS WILL NO LONGER OCCUR, THE CONTRACTOR SHALL REMOVE AND DISPOSE OF THE TEMPORARY EROSION CONTROL DEVICES. 10 THESE GENERAL PROCEDURES MAY NOT COVER ALL SITUATIONS. REFER TO EROSION CONTROL PLANS FOR SPECIFIC NOTES AND ADDITIONAL DETAILS. 11 EROSION CONTROL TO COMPLY WITH INDIANA 327 IAC AND RULE #5, AND INDIANA HANDBOOK FOR EROSION CONTROL IN DEVELOPING AREAS. 12 THE INSPECTOR HAS THE AUTHORITY TO REQUEST ADDITIONAL EROSION CONTROL MEASURES OR AMEND EROSION CONTROL PLANS SUBJECT TO ACTUAL SITE CONDITIONS. bindings to be placed parallel to ground 24" Ill ;III�u� 2 stakes (typ) per bale Profile (n.t.s.) SEEDING EXISTING GRADE EROSION CONTROL MATTING DETAIL Plan (n.t.s.) flow straw bale stake (typ) straw bale t -6 "undertoe SEDIMENT FILTER DETAIL CROSSBARS BEEHIVE INLET OR DRAINAGE COVER SILT FENCE MATERIAL NOTE: .w 1. SEE SILT FENCE DETAIL FOR MATERIAL SPECIFICATIONS. 2. SILT FENCE SHALL BE PREASSEMBLED BY SUPPLIER. EROSION CONTROL (NORTH AMERICAN S -75 OR EQUAL) LATHS SILT FENCE EXTENDS 6" BELOW FINISHED GRADE INLET PROTECTION SILT FENCE 6" MIN. TURN DOWN BLANKET GREEN SILT FENCE THE BLANKET SHOULD NOT BE STRETCHED BUT ALLOWED TO LAY LOOSELY ON THE SOIL SURFACE TO ACHIEVE MAXIMUM BLANKET TO 5011 CONTACT. 300 275 250 225 200 SLOPE 175 LENGTH 150 (FT.) 125 100 75 50 25 0 1 5 HIGH VELOCITY CHANNEL APPLICATIONS, CITED( SLOTS SHOULD BE ESTABUSHED EVERY 35 40'. THE SLOTS SHOULD BE 6' WIDE BY 6' DEEP WITH THE BLANKET STAPLED IN THE BOTTOM OF THE SLOT, 1HEN BACKFILLED AND SEEDED. Silt Fence Material Fence Post Fence Post Should be Buried 1' Below Ground Surface 1 STAPLE PER SQ. YD. 1 -1/2 STAPLES PER SQ. YD. N STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN EROSION CONTROL BLANKETS. STAPLE PATTERNS MAY VARY DEPENDING UPON SOIL TYPE AND AVERAGE ANNUAL RAINFALL AT SLOPE LENGTHS GREATER THAN 300 FEET OR MIRE DRAINAGE OVER LARGE AREAS IS DIRECTED ONTO THE BLANKETS, STAPLE PATTERN 'C" SHOULD BE UTIUZED. 1 THE EDGES OF THE BLANKET SHOULD BE BUTTED AGAINST EACH OTHER, THE EDGES OF THE SCC225 SHOULD BE OVERLAPPED 2 x A B 3' 1 1/2' 3' 1 1/2' GENERAL STAPLE RECOMMENDATIONS 4:1 3:1 2:1 SLOPE GRADIENT 1:1 7 ROLL BLANKETS OUT IN DIRECTION OF WATER FLOW. CHANNEL LINING X 7 ROLL BLANKETS OUT IN DIRECTION OF WATER FLOW. SILT FENCE x 4 SILT FENCE DETAIL N TS x c 3' x. 2 STAPLES PER SQ. YD. ADDITIONAL STAPLES AS REQUIRED DUE TO DEPTH OF FLOW. CHANNEL LININGS UTILIZE STAPLE PATTERN 'C' WITH ADDITIONAL STAPLES ON SIDE SLOPES AT PROJECTED WATER LINE. Ground Surface EROSION BLANKET INSTALLATION 10' TYPICAL Stakes 5' O.C. 2 ON SLOPE APPLICATIONS, THE TOP OF THE BLANKET SHOULD BE 'SLOTTED IN" ABOVE THE BREAK OF THE SLOPE OR AT A MINIMUM, STAPLED IN PLACE WITH STAPLES 6' APART ON THE END OF THE BLANKET. 4 ON LONG SLOPES, THE ENDS OF THE BLANKETS SHOULD BE OVERLAPPED 4 6" IN A 'SHINGLE EFFECT'. P REPARATION OF THE SEED BED, INCLUDING APPLICATION OF LIME, FERTIUZER AND SEED SHOULD BE CONDUCTED AS NORMAL PRIOR TO INSTALLATION OF BLANKET. X X TYPICAL TOPSOIL STOCKPILE Silt Fence shall be a machine produced, non -woven geotextile of 100% polypropylene meeting the physical properties below. All stakes shall be 2" X 2" hardwood 36" tall with 24" tall lath stapled to stakes over fabric as reinforcement. All silt fence shall be prefabricated by the supplier. No field assembly will be accepted. Fabric Weight 4 oz /syd Grab Strength Warp 125 Ibs. Elongation Warp 50 Trapezoidal Tear Strength 50 Ibs. Burst Strength 200 psi UV Resistance 70 A.O.S 50-80 Slurry Flow Rate 225 gpm /sq. ft Sediment Retention 75 Silt Fence Material Should be Buried 6" Below Ground Surface. Wheat or Rye Oats Annual Ryegrass Non Irrigated* Irrigated Dormant Seeding Species Jan /r Feb Permanent Seeding Dates 7 lip A A 4 Mar Apr May Jun Jul lug Sep Oct (77,7, Nov Dec Wheat or Rye Spring Oats Annual ryegrass 1 Ib. 1. Tall Fescue 2. Tall Fescue Red Clover Steep Banks and Cuts Temporary Seeding Dates Irrigation needed during this period. To control erosion at times other than in the shaded areas, use mulch. Late summer seeding dates may be extended 5 days if mulch is applied. Increase seeding application by 50 FIGURE 5-3 Temporary Seedings Kind of Seed 1000 Sq. Ft. Acre Remarks 3.5 lbs. 2 bu. Cover seed 1" to 1 1/2" deep 2.3 lbs. 3 bu. Cover seed 1" deep Not necessary where mulch is applied. Seedbed Preparation Apply lime to raise the pH to the level needed for species being seeded. Apply 23 pounds of 12 -12 -12 analysis fertilizer (or equivalent) per 1000 sq. ft. (approximately 1000 pounds per acre) or fertilize according to test. Application of 150 lbs. of ammonium nitrate on areas low in organic matter and fertility will greatly enhance vegetative growth. Work the fertilizer and lime into the soil to a depth of 2 -3 inches with a harrow, disk or rake operated across the slope as much as possible. Seeding Select a seed mixture based on projected use of the area (Figure 5 -2), while considering best seeding dates. See Figure 5 -3 this sheet. If toler- ances are a problem, such as salt tolerance of seedings adjacent to streets and highways, see Figure 5 -4 this sheet before final selection. Level and Sloping, Open Areas 3. Kentucky Bluegrass 15 .4 Creeping Red Fescue 15 .4 4. Tall Fescue 15 Kentucky Bluegrass 25 .6 5. Tall Fescue 35 Emerald Crownvetch 10 .25 Figure 5 -2: Permanent Seed Mixtures Seeding Rate Suitable pH Ibs /acre Ibs /1000 sq. ft. 35 .8 5.5 -8.3 2 1 25 .6 5.5 -8.3 5 .12 .8 5.5 -8.3 2 1 Lawns and High Maintenance Areas 6. Kentucky Bluegrass 40 .9 5.8 -7.5 Creeping Red Fescue 40 .9 7. Perennial Ryegrass 170 4.0 5.0 -7.5 (Turf Type) 8. Tall Fescue 170 4.0 5.5 -8.3 Ranking: 1 Good 2 Medium Not tolerant FIGURE 5-4 40 lbs. Cover seed 1/4"deep* Site Suitability* well Droughty Drained Wet 5.5 -7.5 2 1 .4 5.8 -7.5 2 1 2 2 1 2 1 2 1 Preferred 2 Will Tolerate Inoculate with specific Inoculant. 2 Salt Tolerance (to both soil salts spray): T Tolerance MT Medium Tolerance S Slight Tolerance DATE: I D 11 C am.. THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. COPYRIGHTED BY THE SCHNEIDER CORP. (2002) 1 Schneider THE SCHNEIDER CORPORATION 12821 E. New Market Street Suite 100 Carmel, IN 46032 Telephone: 317.569.8112 Fax: 317.826.6410 www.schneidercorp.com Architecture Civil Engineering Environmental Engineering Geotechnical Services GIS LIS Home Builder Services Interior Design Land Surveying Landscape Architecture Transportation Engineering z U z Q CD E-4 AGENCY BUILDING INDIANAPOLIS, INDIANA CARMEL, INDIAN SOIL CONDITION Shade Tolerance Close Mowing to 2 -3 1/2inches Tromping Tolerance spaaN A}i11} Winter Hardiness Flooding Tolerance (days) Mature Height (inches) f Emergence Time (days) Salt Tolerance Wet Vorrr Dry Gen. Soil Spray S Creeping Red Fescue Festuca rubra 2 1 2 1 1 1 Med. 1 20 -25 12 -18 7 -21 Kentucky Bluegrass Poo pratinsis 2 1 2 1 1 1 Med. 1 25 -35 12 -18 10 -20 MT Tall Fescue Festuca L arundinacea 2 1 1 1 1 1 Low 1 24 -35 24 -36 5 -14 T Perennial ryegrass Lolium perenne 2 1 2 1 2 Med- High 2 15 -20 12 -18 5 -10 MT Crownvetch Coronilla varia 1 1 2 Low 1 5 -10 24 14 -21 T Red Clover Trifolium pratense 1 2 Med. 1 7 -10 18 5 -10 S S EROSION CON I I \uL MEASURES MAINTENANCE EN REQUIREMENTS STRAW BALE DAM MAINTENANCE REQUIREMENTS 1. INSPECT STRAW BALE DAMS AFTER EACH STORM EVENT AND PROMPTLY REMOVE ANY SEDIMENT DEPOSITS TO ENSURE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN, TAKING CARE NOT TO UNDERMINE THE ENTRENCHED BALES. 2. INSPECT PERIODICALLY FOR DETERICIRATION OR DAMAGE FROM CONSTRUCTION ACTIVITIES AND REPAIR IMMEDIATELY. 3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE IT. SILT FENCE MAINTENANCE REQUIREMENTS 1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. 2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. 4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE„ AND STABILIZE. TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS 1. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT AND IMMEDIATELY REPAIR ANY EROSION AND PIPING HOLES. 2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF THE DESIGN DEPTH. 3. REPLACE SPILLWAY GRAVEL FACING IF CLOGGED. 4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY. 5. CHECK THE SPILLWAY DEPTH PERIODICALLY TO ENSURE A MINIMUM OF 1.5 FT. DEPTH FROM THE LOWEST POINT OF THE SETTLED EMBANKMENT TO HIGHEST POINT OF THE SPILLWAY CREST, AND FILL ANY LOW AREAS TO MAINTAIN DESIGN ELEVATION. 6. PROMPTLY REPLACE ANY DISPLACED RIPRAP, BEING CAREFUL THAT NO STONES IN THE SPILLWAY ARE ABOVE DESIGN GRADE. 7. AFTER ALL DISTURBED AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE AND SEDIMENT, SMOOTH THE SITE TO BLEND WITH ADJOINING AREAS, AND STABILIZE. SANDBAG CURB INLET SEDIMENT BARRIER MAINTENANCE REQUIREMENTS 1. INSPECT FREQUENTLY FOR DAMAGE BY VEHICULAR TRAFFIC, AND REPAIR IF NECESSARY. 2. INSPECT AFTER EACH STORM EVENT. 3. REMOVE SEDIMENT, WITHOUT FLUSHING, WHEN IT REACHES HALF THE HEIGHT OF THE BARRIER. 4. DEPOSIT REMOVED SEDIMENT WHERE' IT WELL NOT ENTER STORM DRAINS. BLOCK AND GRAVEL CURB INLET PROTECTION MAINTENANCE REQUIREMENTS 1. AFTER EACH STORM EVENT, REMOVE THE SEDIMENT AND REPLACE THE GRAVEL; REPLACE THE GEOTEXTILE FABRIC, IF USED. 2. PERIODICALLY REMOVE SEDIMENT AND TRACKED -ON SOIL FROM THE STREET, WITHOUT FLUSHING, TO REDUCE THE SEDIMENT LOAD ON THE CURB INLET PROTECTION. 3. INSPECT PERIODICALLY FOR DAMAGE AND REPAIR; KEEP GRATES FREE OF DEBRIS. 4. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE GRAVEL, WIRE MESH, GEOTEXTILE FABRIC, AND ANY SEDIMENT, AND DISPOSE OF THEM PROPERLY. EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS 1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY EROSION BELOW THE BLANKET. 2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET. 3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS 1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM EVENTS OR HEAVY USE. 2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. 3. TOPDRESS WITH CLEAN STONE AS NEEDED. 4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN. 5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY. EROSION SEDIMENT CONTROL INFORMATION PROJECT INFORMATION: 1A Project Location Map: See Sheet C100 for the location map. 1B Narrative: This project consists of the construction of one commercial building. Site construction is scheduled to begin in the Winter of 2002 and be completed in the Spring of 2003. 1C Location of Planned and /or Existing Roads, Utilities, Structures, Highways, etc: See Sheets C102 for proposed and existing improvements. 1D Lot and /or Building Locations: See Sheet C101 for building location. TOPOGRAPHIC, DRAINAGE AND GENERAL SITE FEATURES: 2A Existing Vegetation: The parcel of real estate to be developed has existing vegetation comprised of grass. 2B Location and Name of All Wetlands, Lakes, and Water Courses On and Adjacent to the Site: south along the eastern boundary of the overall project. 2C 100 Year Floodplains, Floodwoy Fringes, and Floodways: None 2D Soils Information: See Sheet C100 for the Soils Map showing the soils information. 2E Existing and Planned Contour Lines: See Sheets C102 for existing and proposed contour lines. 2F Location of Specific Points Where Stormwater Discharge Will Leave the Site: Stormwater is collected via an off -site system of inlets, pipes and swales and conveyed to the proposed retention pond. The storm water outfall for this project is the Elliot Creek. 2G Identify All Receiving Waters: Receiving waters: Elliot Creek, White River 2H Potential Areas Where Stormwater May Enter Groundwater. The proposed retention pond facility is a potential area where stormwater may enter ground water. 21 Location of Stormwater System: See Sheet C102 for proposed stormwater system. LAND DISTURBING ACTIVITIES: 3A Location and Approximate Dimensions of all Disturbed Areas: See Sheets C103 showing the limits of construction. 3B Soil Stockpiles and /or Borrow Areas: Areas to be designated by the developer. EROSION AND SEDIMENT CONTROL MEASURES: 4A Sequence of When Each Measure Will be Implemented: See Sheet C103 for Erosion Control Schedule showing installation sequence. 4B Monitoring and Maintenance Guidelines for Each Measure: See Sheet C802 for Erosion Control Schedule showing maintenance schedule. 4C Perimeter Sediment Control Measures: See Sheet C103 for location of perimeter control and Sheet C802 for details and specifications. 4D Temporary Seeding: See Sheet C103 for location of temporary seeding and Sheet C802 for details and specifications. 4E Temporary Erosion and Sediment Control Measures: See Sheet C103 for location of temporary erosion and sediment control measures and Sheet C802 for details and specifications. 4F Permanent Erosion and Sediment measures and Sheet C802 for details and permanent erosion and sediment control and specifications. 4G Storm Drain Inlet Protection: See Sheet C103 for location of storm drain inlet protection and Sheet C802 for details and specifications. 4H Stormwater Outlet Protection: See Sheet C103 for location of stormwater outlet protection and Sheet C802 for details and specifications. 41 Stable Construction Entrance: See Sheet C103 for location of construction entrance and Sheet C802 for details and specifications. 4J Erosion and Sediment Control on Individual Building Lots: builders. 4K Permanent Seeding: See Sheet C103 for location of permanent seeding and Sheet C802 for details and specifications. Elliot Creek See sheet C802 for additional specifications for house HOLEY MOLEY SAYS "DON'T DIG BLIND" "IT'S THE LAW" CALL 2 WORKING DAYS BEFORE YOU DIG 1 -800 -382 5544 CALL TOLL FREE PER INDIANA STATE LAW IS -69 -1991. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. flows EROSION CONTROL AND SEQUENCING 1 CONTRACTOR SHALL INSTALL ALL REQUIRED SILT FENCES, SILT TRAPS, TREE PROTECTION AND INLET PROTECTION FOR EXISTING INLETS PRIOR TO THE START OF ANY EARTH MOVING OR STRIPPING. 2 CONTRACTOR SHALL INSTALL A STONE CONSTRUCTION ENTRANCE OR SOME OTHER DEVICE PRIOR TO THE START OF EARTHWORK AS NECESSARY TO PREVENT SOIL FROM BEING TRACKED OR WASHED INTO EXISTING ROADWAYS. 3 LAND ALTERATIONS WHICH STRIP THE LAND OF VEGETATION, INCLUDING REGRADING, SHALL BE DONE IN A WAY THAT WILL MINIMIZE EROSION. WHENEVER FEASIBLE, NATURAL VEGETATION SHALL BE RETAINED AND PROTECTED. AS GRADING IS DONE, INSTALL SILT TRAPS, SILT FENCES ,SLOPE DRAINS, TEMPORARY DIVERSIONS AND OTHER RUNOFF CONTROL MEASURES AT APPROPRIATE LOCATIONS TO KEEP SEDIMENT CONTAINED ON SITE. 4 ALL DISTURBED AREAS SHALL BE SEEDED AND STRAW MULCHED AS SHOWN ON THE PLANS IMMEDIATELY AFTER COMPLETION OF GROUND ACTIVITY. FOR LARGE PROJECTS, THIS SEEDING SHOULD BE COMPLETED IN PHASES AS THE DIFFERENT AREAS OF THE SITE ARE COMPLETED. 5 PERMANENT AND FINAL VEGETATION OR STRUCTURAL EROSION CONTROL DEVICES SHALL BE INSTALLED AS SOON AS PRACTICAL UNDER THE CIRCUMSTANCES. 6 THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM DEPENDING UPON THE WEATHER. IF CONSTRCTION ACTIVITY IS TO CEASE FOR MORE THAN TWO WEEKS, THE DISTURBED AREAS SHALL BE TEMPORARILY SEEDED. 7 ALL STORM SEWER INLET PROTECTION DEVICES SHALL BE PUT IN PLACE AT THE TIME EACH INLET IS CONSTRUCTED. 8 CONTRACTOR SHALL MAINTAIN EROSION CONTROL MEASURES AND DEVICES DURING CONSTRUCTION AND UNTIL SILTATION OF THE STREETS AND STORM SEWERS WILL NO LONGER OCCUR. 9 ONCE ONSITE EROSION AND SILTATION OF THE STREETS AND STORM SEWERS WILL NO LONGER OCCUR, THE CONTRACTOR SHALL REMOVE AND DISPOSE OF THE TEMPORARY EROSION CONTROL DEVICES. 10 THESE GENERAL PROCEDURES MAY NOT COVER ALL SITUATIONS. REFER TO EROSION CONTROL PLANS FOR SPECIFIC NOTES AND ADDITIONAL DETAILS. 11 EROSION CONTROL TO COMPLY WITH INDIANA 327 IAC AND RULE #5, AND INDIANA HANDBOOK FOR EROSION CONTROL IN DEVELOPING AREAS. 12 THE INSPECTOR HAS THE AUTHORITY TO REQUEST ADDITIONAL EROSION CONTROL MEASURES OR AMEND EROSION CONTROL PLANS SUBJECT TO ACTUAL SITE CONDITIONS. bindings to be placed parallel to ground 24" Ill ;III�u� 2 stakes (typ) per bale Profile (n.t.s.) SEEDING EXISTING GRADE EROSION CONTROL MATTING DETAIL Plan (n.t.s.) flow straw bale stake (typ) straw bale t -6 "undertoe SEDIMENT FILTER DETAIL CROSSBARS BEEHIVE INLET OR DRAINAGE COVER SILT FENCE MATERIAL NOTE: .w 1. SEE SILT FENCE DETAIL FOR MATERIAL SPECIFICATIONS. 2. SILT FENCE SHALL BE PREASSEMBLED BY SUPPLIER. EROSION CONTROL (NORTH AMERICAN S -75 OR EQUAL) LATHS SILT FENCE EXTENDS 6" BELOW FINISHED GRADE INLET PROTECTION SILT FENCE 6" MIN. TURN DOWN BLANKET GREEN SILT FENCE THE BLANKET SHOULD NOT BE STRETCHED BUT ALLOWED TO LAY LOOSELY ON THE SOIL SURFACE TO ACHIEVE MAXIMUM BLANKET TO 5011 CONTACT. 300 275 250 225 200 SLOPE 175 LENGTH 150 (FT.) 125 100 75 50 25 0 1 5 HIGH VELOCITY CHANNEL APPLICATIONS, CITED( SLOTS SHOULD BE ESTABUSHED EVERY 35 40'. THE SLOTS SHOULD BE 6' WIDE BY 6' DEEP WITH THE BLANKET STAPLED IN THE BOTTOM OF THE SLOT, 1HEN BACKFILLED AND SEEDED. Silt Fence Material Fence Post Fence Post Should be Buried 1' Below Ground Surface 1 STAPLE PER SQ. YD. 1 -1/2 STAPLES PER SQ. YD. N STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN EROSION CONTROL BLANKETS. STAPLE PATTERNS MAY VARY DEPENDING UPON SOIL TYPE AND AVERAGE ANNUAL RAINFALL AT SLOPE LENGTHS GREATER THAN 300 FEET OR MIRE DRAINAGE OVER LARGE AREAS IS DIRECTED ONTO THE BLANKETS, STAPLE PATTERN 'C" SHOULD BE UTIUZED. 1 THE EDGES OF THE BLANKET SHOULD BE BUTTED AGAINST EACH OTHER, THE EDGES OF THE SCC225 SHOULD BE OVERLAPPED 2 x A B 3' 1 1/2' 3' 1 1/2' GENERAL STAPLE RECOMMENDATIONS 4:1 3:1 2:1 SLOPE GRADIENT 1:1 7 ROLL BLANKETS OUT IN DIRECTION OF WATER FLOW. CHANNEL LINING X 7 ROLL BLANKETS OUT IN DIRECTION OF WATER FLOW. SILT FENCE x 4 SILT FENCE DETAIL N TS x c 3' x. 2 STAPLES PER SQ. YD. ADDITIONAL STAPLES AS REQUIRED DUE TO DEPTH OF FLOW. CHANNEL LININGS UTILIZE STAPLE PATTERN 'C' WITH ADDITIONAL STAPLES ON SIDE SLOPES AT PROJECTED WATER LINE. Ground Surface EROSION BLANKET INSTALLATION 10' TYPICAL Stakes 5' O.C. 2 ON SLOPE APPLICATIONS, THE TOP OF THE BLANKET SHOULD BE 'SLOTTED IN" ABOVE THE BREAK OF THE SLOPE OR AT A MINIMUM, STAPLED IN PLACE WITH STAPLES 6' APART ON THE END OF THE BLANKET. 4 ON LONG SLOPES, THE ENDS OF THE BLANKETS SHOULD BE OVERLAPPED 4 6" IN A 'SHINGLE EFFECT'. P REPARATION OF THE SEED BED, INCLUDING APPLICATION OF LIME, FERTIUZER AND SEED SHOULD BE CONDUCTED AS NORMAL PRIOR TO INSTALLATION OF BLANKET. X X TYPICAL TOPSOIL STOCKPILE Silt Fence shall be a machine produced, non -woven geotextile of 100% polypropylene meeting the physical properties below. All stakes shall be 2" X 2" hardwood 36" tall with 24" tall lath stapled to stakes over fabric as reinforcement. All silt fence shall be prefabricated by the supplier. No field assembly will be accepted. Fabric Weight 4 oz /syd Grab Strength Warp 125 Ibs. Elongation Warp 50 Trapezoidal Tear Strength 50 Ibs. Burst Strength 200 psi UV Resistance 70 A.O.S 50-80 Slurry Flow Rate 225 gpm /sq. ft Sediment Retention 75 Silt Fence Material Should be Buried 6" Below Ground Surface. Wheat or Rye Oats Annual Ryegrass Non Irrigated* Irrigated Dormant Seeding Species Jan /r Feb Permanent Seeding Dates 7 lip A A 4 Mar Apr May Jun Jul lug Sep Oct (77,7, Nov Dec Wheat or Rye Spring Oats Annual ryegrass 1 Ib. 1. Tall Fescue 2. Tall Fescue Red Clover Steep Banks and Cuts Temporary Seeding Dates Irrigation needed during this period. To control erosion at times other than in the shaded areas, use mulch. Late summer seeding dates may be extended 5 days if mulch is applied. Increase seeding application by 50 FIGURE 5-3 Temporary Seedings Kind of Seed 1000 Sq. Ft. Acre Remarks 3.5 lbs. 2 bu. Cover seed 1" to 1 1/2" deep 2.3 lbs. 3 bu. Cover seed 1" deep Not necessary where mulch is applied. Seedbed Preparation Apply lime to raise the pH to the level needed for species being seeded. Apply 23 pounds of 12 -12 -12 analysis fertilizer (or equivalent) per 1000 sq. ft. (approximately 1000 pounds per acre) or fertilize according to test. Application of 150 lbs. of ammonium nitrate on areas low in organic matter and fertility will greatly enhance vegetative growth. Work the fertilizer and lime into the soil to a depth of 2 -3 inches with a harrow, disk or rake operated across the slope as much as possible. Seeding Select a seed mixture based on projected use of the area (Figure 5 -2), while considering best seeding dates. See Figure 5 -3 this sheet. If toler- ances are a problem, such as salt tolerance of seedings adjacent to streets and highways, see Figure 5 -4 this sheet before final selection. Level and Sloping, Open Areas 3. Kentucky Bluegrass 15 .4 Creeping Red Fescue 15 .4 4. Tall Fescue 15 Kentucky Bluegrass 25 .6 5. Tall Fescue 35 Emerald Crownvetch 10 .25 Figure 5 -2: Permanent Seed Mixtures Seeding Rate Suitable pH Ibs /acre Ibs /1000 sq. ft. 35 .8 5.5 -8.3 2 1 25 .6 5.5 -8.3 5 .12 .8 5.5 -8.3 2 1 Lawns and High Maintenance Areas 6. Kentucky Bluegrass 40 .9 5.8 -7.5 Creeping Red Fescue 40 .9 7. Perennial Ryegrass 170 4.0 5.0 -7.5 (Turf Type) 8. Tall Fescue 170 4.0 5.5 -8.3 Ranking: 1 Good 2 Medium Not tolerant FIGURE 5-4 40 lbs. Cover seed 1/4"deep* Site Suitability* well Droughty Drained Wet 5.5 -7.5 2 1 .4 5.8 -7.5 2 1 2 2 1 2 1 2 1 Preferred 2 Will Tolerate Inoculate with specific Inoculant. 2 Salt Tolerance (to both soil salts spray): T Tolerance MT Medium Tolerance S Slight Tolerance DATE: I D 11 C am.. THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. COPYRIGHTED BY THE SCHNEIDER CORP. (2002) 1 Schneider THE SCHNEIDER CORPORATION 12821 E. New Market Street Suite 100 Carmel, IN 46032 Telephone: 317.569.8112 Fax: 317.826.6410 www.schneidercorp.com Architecture Civil Engineering Environmental Engineering Geotechnical Services GIS LIS Home Builder Services Interior Design Land Surveying Landscape Architecture Transportation Engineering z U z Q CD E-4 AGENCY BUILDING INDIANAPOLIS, INDIANA CARMEL, INDIAN