HomeMy WebLinkAboutC801 General Details & SpecificationsEARTHWORK 1. PE OF WORK A. Extent: The work required under this section consists of all excavating, filling, rough grading and related items necessary to complete the work indicated on the drawings and described in the specifications. The Contractor shall notify in writing the owners and the Engineer of any changes, errors, or omissions found on the plans or in the field, before work is started or resumed. 1. In general, the items of work to be performed under this section shall include: clearing and grubbing, removal of trees and stumps (where required), protection of trees to remain, stripping and storage of topsoil, fill compaction and rough grading of entire site. 2. Excavated material that is suitable may be used for fills. All unsuitable material and all surplus excavated material not required shall be removed from the site. The location of dump and length of haul shall be the Contractor's responsibility. 3. Provide and place any additional fill material from off the site as may be necessary to produce the grades required. Fill obtained from off site shall be of kind and quality as specified for fills herein and the source approved by the Owner. 4. The Contractor shall accept the site as he finds it and shall remove all trash, rubbish and debris from the site prior to starting excavation. B. Work not included: The following items of related work are specified and included in other sections of these specifications: 1. Excavation, grading and backfilling for utility lines 2. Storm drainage systems 3. Sanitary sewer systems 4. Streets and paving 5. Water supply system 2. BENCH MARKS Maintain carefully all bench marks, monuments and other reference points; if disturbed or destroyed, contractor shall contact engineer. 3. REMOVAL OF TREES A. Remove all trees and stumps from area to be occupied by road and surfaced areas. Removal of trees outside these areas shall only be done as noted on drawings or approved by the Owner. B. All brush, stumps, wood and other refuse from the trees shall be buried onsite or removed to disposal areas off of the site. Disposal by burning shall not be permitted unless proper permits are obtained (where applicable). The location of on site bury pits shall be designated by the owner or the Engineer. 4. PROTECTION OF TREES A. General Protection: The Contractor shall be responsible for the protection of tops, trunks and roots of existing trees on the project site that are to remain. Existing trees subject to construction damage shall be boxed, fenced or otherwise protected before any work is started; do not stockpile within branch spread. Remove interfering branches without injury to trunks and cover scars with tree paint. 5. HANDLING OF TOPSOIL A. Remove all organic material from the areas to be occupied by buildings, roads, walks and parking areas. Pile and store topsoil at a location where it will not interfere with construction operations. Topsoil shall be reasonably free from subsoil, debris, weeds, grass, stones, ect. B. After completion of site grading and subsurface utility installation, top soil shall be replaced in areas designated on the erosion control plan for seeding and /or sodding. Any remaining top soil shall be used for finished grading around structures and landscaping areas. 6. DISPOSITION OF UTILITIES: A. Rules and regulations governing the respective utilities shall be observed in executing all work under this section. B. If active utilities are encountered but not shown on the drawings, the Engineer shall be advised before work is continued. C. Inactive and abandoned utilities encountered in excavating and grading operations shall be reported to the Engineer. They shall be removed, plugged or capped as directed by the Utility Company and the Engineer. D. It shall be the responsibility of each contractor to verify all existing utilties and conditions pertaining to his phase of the work. It shall also be the contractors responsibility to contact the owners of the various utilities before work is started. 7. SITE GRADING: A. Grades: Contractor shall perform all cutting, filling, compacting of fills and rough grading required to bring entire project area to grade as shown on the drawings. B. Rough Grading: the tolerance for paved areas shall not exceed 0.04 feet plus or minus above the established subgrade. All other areas shall not exceed 0.10 feet plus or minus the established grade. All banks and other breaks in grade shall be rounded at top and bottom. C. Compaction Requirements: 1. All building pad areas shall be compacted to standards specified by local and /or state building codes. 2. For compaction requirements of paved areas, see street specifications. 8. Earth Work Balance The Contractor shall confirm all earthwork quantities prior to start of construction. If an excess or shortage of earth is encountered, the Contractor shall confirm with the Owner and Engineer the requirements for stockpiling, removal or importing of earth. Minor adjustments to the grades may be required to earthwork balances when minor excess material or shortages are encountered. It is recognized by the parties hereto that the calculations of the Engineer in determining earthwork quantities shall be ac- complished in accordance with the American Society of Civil Engineers Standards for such calculations. Further, that these calculations are subject to the interpretations of soil borings as the physical limits of the various soil types, also the allowable variation in finish grade and compaction permitted the contractor, and that all of these parameters may cause either an excess or shortage of actual earthwork materials to complete the project. If such an actual minor excess or shortage of materials occurs, the contractor shall contact the engineer to determine if adjustment can be made to correct the imbalance of earth. STREETS 1. SCOPE OF WORK The work required under this section includes all concrete and bituminous paving and related items necessary to complete the work indicated on drawings and described in the specifications, including but not limited to: 2. MATERIALS 3. APPLICATION E. Placing Concrete All streets, parking areas in contract limits Curbs and gutters Sidewalks and concrete slabs, exterior steps A. Concrete Concrete shall be ready -mixed concrete and shall be a mix of proportioned fine and coarse aggregates with Portland cement and water. Minimum cement content shall be 6 bags per cubic yard of concrete and maximum water content shall be 5.5 U.S. gallons per sack of cement, including moisture in the aggregate. Slump for normal weight concrete shall be a maximum of 4 inches and a minimum of 2 inches. the slump of machine placed concrete shall be no less than 1 -1/4 inches nor more than 3 inches. Standard test ASTM C -143 shall be used to measure slump. Compressive strength of concrete at 28 days shall be 4000 psi. All exterior concrete shall have air entrainment of 5% to 8% by volume per ASTM C -260. Retempering of delivered concrete will not be allowed. Concrete shall be composed of: 1. Portland cement Conforming to ASTM C -150, Type IA or Type IIIA. 2. Aggregates: Conforming to ASTM C -33 3. Water Shall be clear and free from injurious amounts of oils, acids, alkalies, organic materials or other deleterious substances. B. Welded Steel Wire Fat,.ic Where required for concrete reinforcement shall conform to ASTM A185. C. Premoulded Joint Filler Shall be of non extruding type meeting ASTM D -544 except that premoulded joint filler used in concrete walk construction may be iither non extruding or resilient. D. Bituminous Pavement Materials All materials proposed for the construction of bituminous pavements shall comply with the Indiana Department of Transportation specifications, per latest revision. E. Compacted Aggregate Subbase: Shall be crushed stone or gravel. Crushed gravel shall be a minimum of 35% crushed material. Chert shall be limited to a maximum of 8% of the total. Material shall be free from an excess of flat, elongated, thinly laminated, soft or disintegrated pieces; and shall be free from fragments coated with dirt. Compacted aggregate shall be graded as follows: SIEVE SIZE PASSING 1-1/2" 1 3/4" 1 /2" #30 #200 100 80 -100 70 -90 55-80 35 -60 25 -50 12 -30 5 -10 A. Grading Do any necessary grading in addition to that performed in accordance with Earthwork Section, to bring subgrades, after final compaction, to the required grades and sections for site improvement. B. Preparation of Subgrade Remove spongy and otherwise unsuitable material and replace with stable material. No traffic will be allowed on prepared subgrade prior to paving. C. Compaction of Subgrade The first 6 inches below the subgrade shall be compacted to at least 100% of the maximum dry density as determined by the provisions of AASHO T -99. Water shall be prevented from standing on the compacted subgrade. D. Utility Structures Check for correct elevation of all manhole covers, valve boxes and similar structures located within areas to be paved, and make, or have made, any necessary adjustments in such structures. 1. Subgrade Place concrete only on a moist, compacted subgrade or base free from loose material. Place no concrete on a muddy or frozen subgrade. 2. Forms All forms shall be free from warp, tight enough to prevent leakage and substantial enough to maintain their shape and position without springing or settling, when concrete is placed. Forms shall be clean and smooth immediately before concreting. 3. Placing Concrete Concrete shall be deposited so as to require as little rehandling as practicable. When concrete is to be placed at an atmospheric temperature of 35 degrees F. or less, paragraph 702.10 of the Indiana Department of Transportation Specifications latest revision shall be followed. F. Concrete Curb 1. Expansion Joints Shall be 1/2 inch thick premoulded between storm structures curb. 2. Contraction /Control Joints Unless otherwise provided, contraction joints shall be sawed or scored joints spaced 10 feet on center, except for intersection radii where joints shall be placed 5' o.c. 3. Finish Tamp and screed concrete as soon as placed, and fill any honey combed places. Finish square corners to 1/4" radius and other corners to radii shown. G. Concrete Walks and Exterior Steps 1. Slopes Provide 1/4 inch per foot cross slope. Make adjustments in slopes at walk intersections as necessary to provide proper drainage. 2. Dimensions Walks and steps shall be one course construction and of widths and details shown on the drawings. 3. Finish Screed concrete and trowel with a steel trowel to a hard dense surface after surface water has disappeared. Apply medium broom finish and scribe control joints at 5 foot spacing. Provide 1/2" expansion joints where sidewalks intersect, and at a maximum spacing of 48 feet between expansion joints. H. Curing Concrete Except as otherwise specified, cure all concrete by one of the methods described in Section 501.17 of the Indiana Department of Transportation Specifications, latest revision. I. Bituminous Pavement Hot asphalt concrete pavement shall be as specified in Section 403 and must comply with Section 401.05 of the Indiana Department of Transportation Specifications latest revisions. Paving will not be permitted during unfavorable weather or when the temperature is 40 degrees F. and falling. J. Compacted Aggregate Subbase the thickness shown on the drawings is the minimum thickness of the fully compacted subbase. Compaction shall be accomplished by rolling with a smooth wheeled roller weighing 8 to 10 tons. Compact to 90% compaction using Standard Testing Procedures. Along curbs, headers and walls and at all placed not accessible to the roller, the aggregate material shall be tamped with mechanical tampers or with approved hand tampers. TYPICAL PAVEMENT SECTION ceoi 3" OF TOPSOIL 1" H.A.C. SURFACE #11 3" N.A.C. BINDER #9 2" #53 STONE 6" #2 STONE PREPARED SUBGRADE PER INDOT No. 201 6 7 \j \j \j \j \T j BACKFILL 6 24" 24" 18" COMPACTED SUBGRADE ro cD 2' CONCRETE CHAIRBACK CURB (WITHOUT GUTTER) PAVEMENT PAVEMENT TRANSVERSE EXPANSION JOINTS BACKFILL 100' *SEE D.O.T. STD. SHT. 12 -03 FOR GENERAL NOTES CURB JOINT DETAIL SEALED EXPANSION JOINT WHEELCHAIR RAMP DETAIL cea1 3" OF TOPSOIL 6" 6" 1:10 4'- 0" 1:10 j 50' -0" BETWEEN EXPANSION JOINTS (MAX.) CONCRETE SIDEWALK NOT TO SCALE SIDEWALK DETAIL SECTION A-A PLAN VIEW 6' -0" I L II I II 11= CONCRETE CURB 24" 3/4" 24" 18" COMPACTED SUBGRADE NO SCALE MAX. 1:12 SLOPE 111=-1 2' CONCRETE CHAIRBACK CURB AND GUTTER 7 TOP OF CURB TRANSVERSE EXPANSION JOINTS X= WIDTH OF SIDEWALK X IF X< 48" THEN SLOPE OF FLARED SIDE SHALL NOT EXCEED 1:12 ro CO (1) 0 in w t L4 G1STE', y O No. 9800085 STATE OF F N�I ANP S iONAL �l IIIi111ill1111 DATE: THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. 0 COPYRIGHTED BY THE SCHNEIDER CORP. (2001) Schneider THE SCHNEIDER CORPORATION 12821 E. New Market Street Suite 100 Carmel, I N 46032 Telephone: 317.569.8112 Fax: 317.826.6410 www.schneidercorp.com Architecture Civil Engineering Environmental Engineering Geotechnical Services GIS LIS Home Builder Services Interior Design Land Surveying Landscape Architecture Transportation Engineering DATE: 03/28/02 PROJECT NO.: 1238.020 DRAWN BY: DCC CHECKED BY: SHEET TITLE: GENERAL DETAILS AND SPECIFICATIONS DRAWING FILES: N: \1238 \020 \DWGS \ITALIAN R \C801.DWG SHEET NO.: C 1 46 c) 0 wilLi TRANSVERSE JOINTS EARTHWORK 1. PE OF WORK A. Extent: The work required under this section consists of all excavating, filling, rough grading and related items necessary to complete the work indicated on the drawings and described in the specifications. The Contractor shall notify in writing the owners and the Engineer of any changes, errors, or omissions found on the plans or in the field, before work is started or resumed. 1. In general, the items of work to be performed under this section shall include: clearing and grubbing, removal of trees and stumps (where required), protection of trees to remain, stripping and storage of topsoil, fill compaction and rough grading of entire site. 2. Excavated material that is suitable may be used for fills. All unsuitable material and all surplus excavated material not required shall be removed from the site. The location of dump and length of haul shall be the Contractor's responsibility. 3. Provide and place any additional fill material from off the site as may be necessary to produce the grades required. Fill obtained from off site shall be of kind and quality as specified for fills herein and the source approved by the Owner. 4. The Contractor shall accept the site as he finds it and shall remove all trash, rubbish and debris from the site prior to starting excavation. B. Work not included: The following items of related work are specified and included in other sections of these specifications: 1. Excavation, grading and backfilling for utility lines 2. Storm drainage systems 3. Sanitary sewer systems 4. Streets and paving 5. Water supply system 2. BENCH MARKS Maintain carefully all bench marks, monuments and other reference points; if disturbed or destroyed, contractor shall contact engineer. 3. REMOVAL OF TREES A. Remove all trees and stumps from area to be occupied by road and surfaced areas. Removal of trees outside these areas shall only be done as noted on drawings or approved by the Owner. B. All brush, stumps, wood and other refuse from the trees shall be buried onsite or removed to disposal areas off of the site. Disposal by burning shall not be permitted unless proper permits are obtained (where applicable). The location of on site bury pits shall be designated by the owner or the Engineer. 4. PROTECTION OF TREES A. General Protection: The Contractor shall be responsible for the protection of tops, trunks and roots of existing trees on the project site that are to remain. Existing trees subject to construction damage shall be boxed, fenced or otherwise protected before any work is started; do not stockpile within branch spread. Remove interfering branches without injury to trunks and cover scars with tree paint. 5. HANDLING OF TOPSOIL A. Remove all organic material from the areas to be occupied by buildings, roads, walks and parking areas. Pile and store topsoil at a location where it will not interfere with construction operations. Topsoil shall be reasonably free from subsoil, debris, weeds, grass, stones, ect. B. After completion of site grading and subsurface utility installation, top soil shall be replaced in areas designated on the erosion control plan for seeding and /or sodding. Any remaining top soil shall be used for finished grading around structures and landscaping areas. 6. DISPOSITION OF UTILITIES: A. Rules and regulations governing the respective utilities shall be observed in executing all work under this section. B. If active utilities are encountered but not shown on the drawings, the Engineer shall be advised before work is continued. C. Inactive and abandoned utilities encountered in excavating and grading operations shall be reported to the Engineer. They shall be removed, plugged or capped as directed by the Utility Company and the Engineer. D. It shall be the responsibility of each contractor to verify all existing utilties and conditions pertaining to his phase of the work. It shall also be the contractors responsibility to contact the owners of the various utilities before work is started. 7. SITE GRADING: A. Grades: Contractor shall perform all cutting, filling, compacting of fills and rough grading required to bring entire project area to grade as shown on the drawings. B. Rough Grading: the tolerance for paved areas shall not exceed 0.04 feet plus or minus above the established subgrade. All other areas shall not exceed 0.10 feet plus or minus the established grade. All banks and other breaks in grade shall be rounded at top and bottom. C. Compaction Requirements: 1. All building pad areas shall be compacted to standards specified by local and /or state building codes. 2. For compaction requirements of paved areas, see street specifications. 8. Earth Work Balance The Contractor shall confirm all earthwork quantities prior to start of construction. If an excess or shortage of earth is encountered, the Contractor shall confirm with the Owner and Engineer the requirements for stockpiling, removal or importing of earth. Minor adjustments to the grades may be required to earthwork balances when minor excess material or shortages are encountered. It is recognized by the parties hereto that the calculations of the Engineer in determining earthwork quantities shall be ac- complished in accordance with the American Society of Civil Engineers Standards for such calculations. Further, that these calculations are subject to the interpretations of soil borings as the physical limits of the various soil types, also the allowable variation in finish grade and compaction permitted the contractor, and that all of these parameters may cause either an excess or shortage of actual earthwork materials to complete the project. If such an actual minor excess or shortage of materials occurs, the contractor shall contact the engineer to determine if adjustment can be made to correct the imbalance of earth. STREETS 1. SCOPE OF WORK The work required under this section includes all concrete and bituminous paving and related items necessary to complete the work indicated on drawings and described in the specifications, including but not limited to: 2. MATERIALS 3. APPLICATION E. Placing Concrete All streets, parking areas in contract limits Curbs and gutters Sidewalks and concrete slabs, exterior steps A. Concrete Concrete shall be ready -mixed concrete and shall be a mix of proportioned fine and coarse aggregates with Portland cement and water. Minimum cement content shall be 6 bags per cubic yard of concrete and maximum water content shall be 5.5 U.S. gallons per sack of cement, including moisture in the aggregate. Slump for normal weight concrete shall be a maximum of 4 inches and a minimum of 2 inches. the slump of machine placed concrete shall be no less than 1 -1/4 inches nor more than 3 inches. Standard test ASTM C -143 shall be used to measure slump. Compressive strength of concrete at 28 days shall be 4000 psi. All exterior concrete shall have air entrainment of 5% to 8% by volume per ASTM C -260. Retempering of delivered concrete will not be allowed. Concrete shall be composed of: 1. Portland cement Conforming to ASTM C -150, Type IA or Type IIIA. 2. Aggregates: Conforming to ASTM C -33 3. Water Shall be clear and free from injurious amounts of oils, acids, alkalies, organic materials or other deleterious substances. B. Welded Steel Wire Fat,.ic Where required for concrete reinforcement shall conform to ASTM A185. C. Premoulded Joint Filler Shall be of non extruding type meeting ASTM D -544 except that premoulded joint filler used in concrete walk construction may be iither non extruding or resilient. D. Bituminous Pavement Materials All materials proposed for the construction of bituminous pavements shall comply with the Indiana Department of Transportation specifications, per latest revision. E. Compacted Aggregate Subbase: Shall be crushed stone or gravel. Crushed gravel shall be a minimum of 35% crushed material. Chert shall be limited to a maximum of 8% of the total. Material shall be free from an excess of flat, elongated, thinly laminated, soft or disintegrated pieces; and shall be free from fragments coated with dirt. Compacted aggregate shall be graded as follows: SIEVE SIZE PASSING 1-1/2" 1 3/4" 1 /2" #30 #200 100 80 -100 70 -90 55-80 35 -60 25 -50 12 -30 5 -10 A. Grading Do any necessary grading in addition to that performed in accordance with Earthwork Section, to bring subgrades, after final compaction, to the required grades and sections for site improvement. B. Preparation of Subgrade Remove spongy and otherwise unsuitable material and replace with stable material. No traffic will be allowed on prepared subgrade prior to paving. C. Compaction of Subgrade The first 6 inches below the subgrade shall be compacted to at least 100% of the maximum dry density as determined by the provisions of AASHO T -99. Water shall be prevented from standing on the compacted subgrade. D. Utility Structures Check for correct elevation of all manhole covers, valve boxes and similar structures located within areas to be paved, and make, or have made, any necessary adjustments in such structures. 1. Subgrade Place concrete only on a moist, compacted subgrade or base free from loose material. Place no concrete on a muddy or frozen subgrade. 2. Forms All forms shall be free from warp, tight enough to prevent leakage and substantial enough to maintain their shape and position without springing or settling, when concrete is placed. Forms shall be clean and smooth immediately before concreting. 3. Placing Concrete Concrete shall be deposited so as to require as little rehandling as practicable. When concrete is to be placed at an atmospheric temperature of 35 degrees F. or less, paragraph 702.10 of the Indiana Department of Transportation Specifications latest revision shall be followed. F. Concrete Curb 1. Expansion Joints Shall be 1/2 inch thick premoulded between storm structures curb. 2. Contraction /Control Joints Unless otherwise provided, contraction joints shall be sawed or scored joints spaced 10 feet on center, except for intersection radii where joints shall be placed 5' o.c. 3. Finish Tamp and screed concrete as soon as placed, and fill any honey combed places. Finish square corners to 1/4" radius and other corners to radii shown. G. Concrete Walks and Exterior Steps 1. Slopes Provide 1/4 inch per foot cross slope. Make adjustments in slopes at walk intersections as necessary to provide proper drainage. 2. Dimensions Walks and steps shall be one course construction and of widths and details shown on the drawings. 3. Finish Screed concrete and trowel with a steel trowel to a hard dense surface after surface water has disappeared. Apply medium broom finish and scribe control joints at 5 foot spacing. Provide 1/2" expansion joints where sidewalks intersect, and at a maximum spacing of 48 feet between expansion joints. H. Curing Concrete Except as otherwise specified, cure all concrete by one of the methods described in Section 501.17 of the Indiana Department of Transportation Specifications, latest revision. I. Bituminous Pavement Hot asphalt concrete pavement shall be as specified in Section 403 and must comply with Section 401.05 of the Indiana Department of Transportation Specifications latest revisions. Paving will not be permitted during unfavorable weather or when the temperature is 40 degrees F. and falling. J. Compacted Aggregate Subbase the thickness shown on the drawings is the minimum thickness of the fully compacted subbase. Compaction shall be accomplished by rolling with a smooth wheeled roller weighing 8 to 10 tons. Compact to 90% compaction using Standard Testing Procedures. Along curbs, headers and walls and at all placed not accessible to the roller, the aggregate material shall be tamped with mechanical tampers or with approved hand tampers. TYPICAL PAVEMENT SECTION ceoi 3" OF TOPSOIL 1" H.A.C. SURFACE #11 3" N.A.C. BINDER #9 2" #53 STONE 6" #2 STONE PREPARED SUBGRADE PER INDOT No. 201 6 7 \j \j \j \j \T j BACKFILL 6 24" 24" 18" COMPACTED SUBGRADE ro cD 2' CONCRETE CHAIRBACK CURB (WITHOUT GUTTER) PAVEMENT PAVEMENT TRANSVERSE EXPANSION JOINTS BACKFILL 100' *SEE D.O.T. STD. SHT. 12 -03 FOR GENERAL NOTES CURB JOINT DETAIL SEALED EXPANSION JOINT WHEELCHAIR RAMP DETAIL cea1 3" OF TOPSOIL 6" 6" 1:10 4'- 0" 1:10 j 50' -0" BETWEEN EXPANSION JOINTS (MAX.) CONCRETE SIDEWALK NOT TO SCALE SIDEWALK DETAIL SECTION A-A PLAN VIEW 6' -0" I L II I II 11= CONCRETE CURB 24" 3/4" 24" 18" COMPACTED SUBGRADE NO SCALE MAX. 1:12 SLOPE 111=-1 2' CONCRETE CHAIRBACK CURB AND GUTTER 7 TOP OF CURB TRANSVERSE EXPANSION JOINTS X= WIDTH OF SIDEWALK X IF X< 48" THEN SLOPE OF FLARED SIDE SHALL NOT EXCEED 1:12 ro CO (1) 0 in w t L4 G1STE', y O No. 9800085 STATE OF F N�I ANP S iONAL �l IIIi111ill1111 DATE: THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. 0 COPYRIGHTED BY THE SCHNEIDER CORP. (2001) Schneider THE SCHNEIDER CORPORATION 12821 E. New Market Street Suite 100 Carmel, I N 46032 Telephone: 317.569.8112 Fax: 317.826.6410 www.schneidercorp.com Architecture Civil Engineering Environmental Engineering Geotechnical Services GIS LIS Home Builder Services Interior Design Land Surveying Landscape Architecture Transportation Engineering 5' -0" BETWEEN TRANSVERSE JOINTS EARTHWORK 1. PE OF WORK A. Extent: The work required under this section consists of all excavating, filling, rough grading and related items necessary to complete the work indicated on the drawings and described in the specifications. The Contractor shall notify in writing the owners and the Engineer of any changes, errors, or omissions found on the plans or in the field, before work is started or resumed. 1. In general, the items of work to be performed under this section shall include: clearing and grubbing, removal of trees and stumps (where required), protection of trees to remain, stripping and storage of topsoil, fill compaction and rough grading of entire site. 2. Excavated material that is suitable may be used for fills. All unsuitable material and all surplus excavated material not required shall be removed from the site. The location of dump and length of haul shall be the Contractor's responsibility. 3. Provide and place any additional fill material from off the site as may be necessary to produce the grades required. Fill obtained from off site shall be of kind and quality as specified for fills herein and the source approved by the Owner. 4. The Contractor shall accept the site as he finds it and shall remove all trash, rubbish and debris from the site prior to starting excavation. B. Work not included: The following items of related work are specified and included in other sections of these specifications: 1. Excavation, grading and backfilling for utility lines 2. Storm drainage systems 3. Sanitary sewer systems 4. Streets and paving 5. Water supply system 2. BENCH MARKS Maintain carefully all bench marks, monuments and other reference points; if disturbed or destroyed, contractor shall contact engineer. 3. REMOVAL OF TREES A. Remove all trees and stumps from area to be occupied by road and surfaced areas. Removal of trees outside these areas shall only be done as noted on drawings or approved by the Owner. B. All brush, stumps, wood and other refuse from the trees shall be buried onsite or removed to disposal areas off of the site. Disposal by burning shall not be permitted unless proper permits are obtained (where applicable). The location of on site bury pits shall be designated by the owner or the Engineer. 4. PROTECTION OF TREES A. General Protection: The Contractor shall be responsible for the protection of tops, trunks and roots of existing trees on the project site that are to remain. Existing trees subject to construction damage shall be boxed, fenced or otherwise protected before any work is started; do not stockpile within branch spread. Remove interfering branches without injury to trunks and cover scars with tree paint. 5. HANDLING OF TOPSOIL A. Remove all organic material from the areas to be occupied by buildings, roads, walks and parking areas. Pile and store topsoil at a location where it will not interfere with construction operations. Topsoil shall be reasonably free from subsoil, debris, weeds, grass, stones, ect. B. After completion of site grading and subsurface utility installation, top soil shall be replaced in areas designated on the erosion control plan for seeding and /or sodding. Any remaining top soil shall be used for finished grading around structures and landscaping areas. 6. DISPOSITION OF UTILITIES: A. Rules and regulations governing the respective utilities shall be observed in executing all work under this section. B. If active utilities are encountered but not shown on the drawings, the Engineer shall be advised before work is continued. C. Inactive and abandoned utilities encountered in excavating and grading operations shall be reported to the Engineer. They shall be removed, plugged or capped as directed by the Utility Company and the Engineer. D. It shall be the responsibility of each contractor to verify all existing utilties and conditions pertaining to his phase of the work. It shall also be the contractors responsibility to contact the owners of the various utilities before work is started. 7. SITE GRADING: A. Grades: Contractor shall perform all cutting, filling, compacting of fills and rough grading required to bring entire project area to grade as shown on the drawings. B. Rough Grading: the tolerance for paved areas shall not exceed 0.04 feet plus or minus above the established subgrade. All other areas shall not exceed 0.10 feet plus or minus the established grade. All banks and other breaks in grade shall be rounded at top and bottom. C. Compaction Requirements: 1. All building pad areas shall be compacted to standards specified by local and /or state building codes. 2. For compaction requirements of paved areas, see street specifications. 8. Earth Work Balance The Contractor shall confirm all earthwork quantities prior to start of construction. If an excess or shortage of earth is encountered, the Contractor shall confirm with the Owner and Engineer the requirements for stockpiling, removal or importing of earth. Minor adjustments to the grades may be required to earthwork balances when minor excess material or shortages are encountered. It is recognized by the parties hereto that the calculations of the Engineer in determining earthwork quantities shall be ac- complished in accordance with the American Society of Civil Engineers Standards for such calculations. Further, that these calculations are subject to the interpretations of soil borings as the physical limits of the various soil types, also the allowable variation in finish grade and compaction permitted the contractor, and that all of these parameters may cause either an excess or shortage of actual earthwork materials to complete the project. If such an actual minor excess or shortage of materials occurs, the contractor shall contact the engineer to determine if adjustment can be made to correct the imbalance of earth. STREETS 1. SCOPE OF WORK The work required under this section includes all concrete and bituminous paving and related items necessary to complete the work indicated on drawings and described in the specifications, including but not limited to: 2. MATERIALS 3. APPLICATION E. Placing Concrete All streets, parking areas in contract limits Curbs and gutters Sidewalks and concrete slabs, exterior steps A. Concrete Concrete shall be ready -mixed concrete and shall be a mix of proportioned fine and coarse aggregates with Portland cement and water. Minimum cement content shall be 6 bags per cubic yard of concrete and maximum water content shall be 5.5 U.S. gallons per sack of cement, including moisture in the aggregate. Slump for normal weight concrete shall be a maximum of 4 inches and a minimum of 2 inches. the slump of machine placed concrete shall be no less than 1 -1/4 inches nor more than 3 inches. Standard test ASTM C -143 shall be used to measure slump. Compressive strength of concrete at 28 days shall be 4000 psi. All exterior concrete shall have air entrainment of 5% to 8% by volume per ASTM C -260. Retempering of delivered concrete will not be allowed. Concrete shall be composed of: 1. Portland cement Conforming to ASTM C -150, Type IA or Type IIIA. 2. Aggregates: Conforming to ASTM C -33 3. Water Shall be clear and free from injurious amounts of oils, acids, alkalies, organic materials or other deleterious substances. B. Welded Steel Wire Fat,.ic Where required for concrete reinforcement shall conform to ASTM A185. C. Premoulded Joint Filler Shall be of non extruding type meeting ASTM D -544 except that premoulded joint filler used in concrete walk construction may be iither non extruding or resilient. D. Bituminous Pavement Materials All materials proposed for the construction of bituminous pavements shall comply with the Indiana Department of Transportation specifications, per latest revision. E. Compacted Aggregate Subbase: Shall be crushed stone or gravel. Crushed gravel shall be a minimum of 35% crushed material. Chert shall be limited to a maximum of 8% of the total. Material shall be free from an excess of flat, elongated, thinly laminated, soft or disintegrated pieces; and shall be free from fragments coated with dirt. Compacted aggregate shall be graded as follows: SIEVE SIZE PASSING 1-1/2" 1 3/4" 1 /2" #30 #200 100 80 -100 70 -90 55-80 35 -60 25 -50 12 -30 5 -10 A. Grading Do any necessary grading in addition to that performed in accordance with Earthwork Section, to bring subgrades, after final compaction, to the required grades and sections for site improvement. B. Preparation of Subgrade Remove spongy and otherwise unsuitable material and replace with stable material. No traffic will be allowed on prepared subgrade prior to paving. C. Compaction of Subgrade The first 6 inches below the subgrade shall be compacted to at least 100% of the maximum dry density as determined by the provisions of AASHO T -99. Water shall be prevented from standing on the compacted subgrade. D. Utility Structures Check for correct elevation of all manhole covers, valve boxes and similar structures located within areas to be paved, and make, or have made, any necessary adjustments in such structures. 1. Subgrade Place concrete only on a moist, compacted subgrade or base free from loose material. Place no concrete on a muddy or frozen subgrade. 2. Forms All forms shall be free from warp, tight enough to prevent leakage and substantial enough to maintain their shape and position without springing or settling, when concrete is placed. Forms shall be clean and smooth immediately before concreting. 3. Placing Concrete Concrete shall be deposited so as to require as little rehandling as practicable. When concrete is to be placed at an atmospheric temperature of 35 degrees F. or less, paragraph 702.10 of the Indiana Department of Transportation Specifications latest revision shall be followed. F. Concrete Curb 1. Expansion Joints Shall be 1/2 inch thick premoulded between storm structures curb. 2. Contraction /Control Joints Unless otherwise provided, contraction joints shall be sawed or scored joints spaced 10 feet on center, except for intersection radii where joints shall be placed 5' o.c. 3. Finish Tamp and screed concrete as soon as placed, and fill any honey combed places. Finish square corners to 1/4" radius and other corners to radii shown. G. Concrete Walks and Exterior Steps 1. Slopes Provide 1/4 inch per foot cross slope. Make adjustments in slopes at walk intersections as necessary to provide proper drainage. 2. Dimensions Walks and steps shall be one course construction and of widths and details shown on the drawings. 3. Finish Screed concrete and trowel with a steel trowel to a hard dense surface after surface water has disappeared. Apply medium broom finish and scribe control joints at 5 foot spacing. Provide 1/2" expansion joints where sidewalks intersect, and at a maximum spacing of 48 feet between expansion joints. H. Curing Concrete Except as otherwise specified, cure all concrete by one of the methods described in Section 501.17 of the Indiana Department of Transportation Specifications, latest revision. I. Bituminous Pavement Hot asphalt concrete pavement shall be as specified in Section 403 and must comply with Section 401.05 of the Indiana Department of Transportation Specifications latest revisions. Paving will not be permitted during unfavorable weather or when the temperature is 40 degrees F. and falling. J. Compacted Aggregate Subbase the thickness shown on the drawings is the minimum thickness of the fully compacted subbase. Compaction shall be accomplished by rolling with a smooth wheeled roller weighing 8 to 10 tons. Compact to 90% compaction using Standard Testing Procedures. Along curbs, headers and walls and at all placed not accessible to the roller, the aggregate material shall be tamped with mechanical tampers or with approved hand tampers. TYPICAL PAVEMENT SECTION ceoi 3" OF TOPSOIL 1" H.A.C. SURFACE #11 3" N.A.C. BINDER #9 2" #53 STONE 6" #2 STONE PREPARED SUBGRADE PER INDOT No. 201 6 7 \j \j \j \j \T j BACKFILL 6 24" 24" 18" COMPACTED SUBGRADE ro cD 2' CONCRETE CHAIRBACK CURB (WITHOUT GUTTER) PAVEMENT PAVEMENT TRANSVERSE EXPANSION JOINTS BACKFILL 100' *SEE D.O.T. STD. SHT. 12 -03 FOR GENERAL NOTES CURB JOINT DETAIL SEALED EXPANSION JOINT WHEELCHAIR RAMP DETAIL cea1 3" OF TOPSOIL 6" 6" 1:10 4'- 0" 1:10 j 50' -0" BETWEEN EXPANSION JOINTS (MAX.) CONCRETE SIDEWALK NOT TO SCALE SIDEWALK DETAIL SECTION A-A PLAN VIEW 6' -0" I L II I II 11= CONCRETE CURB 24" 3/4" 24" 18" COMPACTED SUBGRADE NO SCALE MAX. 1:12 SLOPE 111=-1 2' CONCRETE CHAIRBACK CURB AND GUTTER 7 TOP OF CURB TRANSVERSE EXPANSION JOINTS X= WIDTH OF SIDEWALK X IF X< 48" THEN SLOPE OF FLARED SIDE SHALL NOT EXCEED 1:12 ro CO (1) 0 in w t L4 G1STE', y O No. 9800085 STATE OF F N�I ANP S iONAL �l IIIi111ill1111 DATE: THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. 0 COPYRIGHTED BY THE SCHNEIDER CORP. (2001) Schneider THE SCHNEIDER CORPORATION 12821 E. New Market Street Suite 100 Carmel, I N 46032 Telephone: 317.569.8112 Fax: 317.826.6410 www.schneidercorp.com Architecture Civil Engineering Environmental Engineering Geotechnical Services GIS LIS Home Builder Services Interior Design Land Surveying Landscape Architecture Transportation Engineering