Loading...
HomeMy WebLinkAboutC300 Storm Water Pollution & Preventnion PlanTHIS SHEET TO BE USED FOR EROSION CONTROL ONLY. PERSON ONSITE RESPONSIBLE FOR EROSION CONTROL: NAME: TIM WALTER COMPANY: PLATINUM PROPERTIES PHONE: (317)- 818 -2900 w 0 U W w w z z 0 ?1,0 4 7 7 7 cc) 5 O W W Z W U Q 0: w Z m a W ....J.. Or z W Q w m >z w W J J CO W D D O L_ 8z Z <<0 W F Z OO- U z. 0 O 1 O O H Q Z .o :.4 4 t 4- t• 4- 4- 4- .t. K 4: 4- 4- 4- 4- 4. 4- 4- 4- 4- i- 4- 4- 4 4 4 4.. ..4 4- 4. 4- 4- 4- 4- 4- 4- 4- 4- 4- :4 4- 4- 4- 4- 4- 4- 4 4 4 4 4 +.....4- 4 4 4 4 4. 4 4 4 4 t 4- 4. h 4 t 1 :4 4 t 4-- t ++1 +4+ f '4 .....4 4- 4- 4- 4 t 4.. 4- 4- ar 4-' -1 4- 4- 4 4 4 t 4. 4. 4 4 4 4- 4 4- +...4- 4- �2 4 4 4- 4- 4- 4- 4- 4- 4- r NOTES: ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BY THE HAMILTON COUNTY SURVEYOR'S OFFICE. ALL EXISTING WELLS ARE TO BE ABANDONED IN ACCORDANCE WITH HEALTH DEPARTMENT REQUIREMENTS AND WITH A PERMIT. +i I I I I I I MO II+ 111 I I I II /+4t P" 4 t f 4 4 4-------4.4. i .i>•.+ 4- 4- 4- 4- 4- 4. t t Q ::31. nn t t t t t t t t t t t t Q 4 4- 4- 4- 4- 4- 4- 4- 4- 4- 4- 4- 4- W H a W CC Hr Z:.': 0 O U Q 4- t ':t... 4- t::: •4- 4- 4- 4- 4- 4- 4- 4-., 4- 4- 4 t t r+ t 4- j 4- +7 4- t 4- 4 -I- j 4- k t t Inn O Temporary 'Drop Inlet Protection Basket" N N Denotes permanent seeding mulch areas Seeding rate: 130# /acre or 3# /1000 S.F. Seeding mixture: 25% creeping red fescue 35% perennial rye 40% Kentucky bluegrass Denotes seeding w /fiber blanket #5150 by North American Green Seeding rate: 110# /acre or 2.5# /1000 S.F. Seeding mixture: 38% Kentucky 31 fescue 19% perennial rye 19% annual rye 14% orchard grass 10% Kentucky bluegrass Denotes existing seeding Sc mulching. N Denotes Construction Limits 77 Curb inlet N Stone or Mulch bags shall be placed around curb inlets. x x Silt Fence NOTE: IF A 30' WIDE GRASS FILTER CANNOT BE MAINTAINED. A SILT FENCE WILL BE REQUIRED TO BE INSTALLED. THE FOLLOWING IS A LIST ON SEQUENCE OF CONSTRUCTION TO CONTROL SOIL EROSION SCALE: 1 30' 1. THE CONTRACTOR SHALL SCHEDULE A PRE CONSTRUCTION MEETING WITH THE HAMILTON COUNTY SOIL, WATER CONSERVATION DISTRICT PRIOR TO ANY CONSTRUCTION ON THE SITE BEING STARTED. 2. THE CONSTRUCTION ENTRANCE INSTALLED 3. SILT FENCE INSTALLED 4. MAINTENANCE AND REFUELING AREA CONSTRUCTED. 5. CONCRETE WASHOUT AREA CONSTRUCTED 6. POSTING INFORMATION AREA SHALL BE CONSTRUCTED. ALL ITEMS AS OUTLINED IN THE OSM MANUAL FOR PAST CONSTRUCTION WATER QUALITY MEASURER SHALL BE PLACED IN THE AREA. 7. GRADE OUT THE PARKING AREA, SIDEWALK AND POOL DECK AREAS. 8. ALL STORM INLETS HAVE TO BE PROTECTED DURING CONSTRUCTION. 9. CONTRACTOR SHALL CONTROL MUD ACCUMULATIONS ON ALL STREETS SURROUNDING PROJECT BY INSTALLING STONE SURFACE AT ALL LOCATIONS WHERE CONSTRUCTION TRAFFIC LEAVES THE SITE. DUST SHALL BE KEPT AT A MINIMUM BY UTILIZING SPRINKLING, CALCIUM CHLORIDE, VEGATATIVE COVER, SPRAY ON AHHESIVES OR OTHER APPROVED METHODS. w a H- LIJ U LL H- m Y U O J c".5 II N N. w 0 w 5 w cr SHEET NO. C300 m a✓ a W H Q 0 Q z Q 0 z U CC w U) z 0 z JOB NO.43405PLA —A