Loading...
HomeMy WebLinkAboutC800 Construction Details11 /2 F'KtFUKMtU JOINT FILLER 5' -0" MIN. "OP!! TRANSVERSE JOINT 6' -0" BETWEEN TRANSVERSE 1 z o In o z 0 CC o U N JOINT FILLER JOINTS 2' ROLL CURB MAX. RAMP SLOPE 1 /FT. 4 SECTION A -A C CONTRACTION JOINT (TYP.) N' /1 L SECTION C -C 1/4"/FT. MIN. SIDEWALK PLAN VIEW SIDEWALK A-i RAMP, A, C "A" LASS CONC. NOTE° WHERE STORM DRAINS CONFLICT WITH RAMP, RAMPS SHALL BE MOVED TO SIDE OF DRAIN. 6' -0" 1O' -O" �RTa S D Si.aJC sIiiF� Nr N 1z* iJ41. E° 11ax. PIPE UNDERDRAIN 'sa E, ALE PLACE EXPANSION JOINT AT BACK OF CURB LINE B OR AT SIDEWALK LINE TYPICAL ASPHALT PEDESTRIAN PATH X- SECTION SIDEWA K TYPICAL SIDEWALK RAMP DETAIL FOR HANDICAPPED SLOPE ASPHALT PATH TO ROAD OR TOWARD TOP OF BANK OF DIT';H VAR. VAR. I WIDTH OF RAMP 4' MIN SECTION B -B £Pl i ■,■aRF; CONFER hIM. 5' :iJ8 5i F .CE D AIN NOTES: Insta3 +af,;c. of un•;+: :has ca <a Rau :ic' !1> G'. iz, Staadcrtl Speciftc9irf6. EJ'+eterci. ^.s Act rot t rstslee un fey rc,Inr• t:: a aacilxc .s .^,oniFtete1 st.bgrodt. ,!1 o:r:carr!ine<ic st uder'Srcc: c `I: ~.zi te• rrrr+a.+re Friar to •c-.xlnt of eggreve arse. I3neerr:°ai'i3 shat. rot :re rsisle' u' <lliCes ,acotte Eeneclh U•t ur6E4'roir,: are ic. pl Wctertrains, stern sexh3s. !.T+•.r%g sewn. ect.' 1" H.A.C. SURFACE #11 3" H.A.C. BINDER #9 9" COMPACTED STONE BASE #53 V/V /V /V /V /V COMPACTED SUBGRADE PAVEMENT COMPOSITIONS NOT —TO —SCALE ASPHALT PATH 110# SYD. BITUM SURFACE NO. 11. LV ON 220# SYD. BITUM BINDER NO. 8, LV ON 5" COMPACTED AGGREGATE BASE, SIZE NO. 53 SHOULDER, TOPSOIL, SEED OR SOD, AS REQUIRED TO MATCH EXISTING RESIDEN11AL STREETS ONLY w z J a: PAVEMENT GRANULAR BACKFILL LIMITS OF FULL DEPTH PAVEMENT WI GRANULAR BACKFILL TH VARIABLE SHOULDER SECTION CURB SECTION GRANULAR BACKFILL ALL CUTS MADE IN OR UNDER ANY ROAD SURFACE SHALL BE BACKFILLED WITH B. BORROW WHERE A CUT EITHER TRANSVERSES OR PARALLELS THE ROAD SURFACE. GRANULAR BACKFILL SHALL BE PLACED IN THAT PORTION OF THE CUT. THE ENTIRE EXCAVATED AREA WITHIN THE RIGHT -OF WAY. 100' 1111111111ME TRANSVERSE EXPANSION JOINTS CURB JOINT DETAIL TOP OF CURB TRANSVERSE CONTRACTION JOINTS WHEN BUILT IN CONJUCTION WITH CONCRETE PAVEMENT, EXPANSION AND CONTRACTION JOINTS SHOULD BE PLACED AT THE SAME LOCATIONS AS IN THE PAVEMENT SLABS. THE CURB AND GUTTER SHOULD BE TIED TO THE PAVEMENT BY 1/2" ROUND DEFORMED BARS AT ABOUT 3 FOOT INTERVALS. IF NO CONCRETE PAVEMENT IS BEING BUILT AT THE TIME THE CURB IS CONSTRUCTED, EXPANSION JOINTS SHOULD BE PLACED AT THE ENDS OF ALL RETURNS AND AT INTERVALS NOT TO EXCEED 100 FEET. CONTRACTION JOINTS SHOULD BE INSTALLED AT 20 FOOT SPACING. 1. Fill geotextile bags approximately half full with 2 to 3 inch stone or gravel. 2. At a position downslope of the lot and upslope of the inlet, lay bags tightly in a row curving upslope from curb and away from inlet. 3. Overlap bags onto the curb and extend a min— imum of 3 feet into the street. 4. For additional layers, overlap bags with the row beneath, and leave a one —bag gap in the middle of the top row to serve as a spillway. 5. Place bags in an arc around curb inlets that are in a sump position. 6. Set up safety /traffic barriers to keep vehichles from hitting bags, causing possible injury. 7. Inspect and repair as needed, and remove any accumulated sediments after every storm. w z J a: SIDEWALK, TOPSOIL, SEED OR SOD, AS REQUIRED TO MATCH EXISTING BOTTOM OF CURB COMBINATION CURB SIDEWALK DETAIL NOT TO SCALE a COMPACTED SUBGRADE 5' -0" OR 6' -0" CONCRETE WALK SLOPE 1/4" FT. ow- 4 U GRANULAR BACKFILL Gravel bags overlap onto the curb *A Ti 4 k 71% \Ilk L Runoff Gap between bags acts as a spillway CURB INLET PROTECTION DETAIL r: BACK OF CURB GRADED LAWNS TOP SOIL 5-0" MIN. 3 ft. (min.) 1 -0 1" �1 1/2" RAD Oa NOT -TO -SCALE 03 COMPACTED SUBGRADE 5'-0" MIN. SLOPE 1/4" FT. PAVEMENT SURFACE -111- III III III —Ill �III1IIillIlil�liIIlil _IIII I T I I II_I 111 111 11) I MIN. 4 BACKFILL I MIN. 3 PREPARED SUBGRADE PROPERTY LINE TYPICAL SIDEWALK SECTION THE SPACE BEHIND THE CURB SHALL BE FILLED WITH SUITABLE MATERIAL TO THE REQUIRED ELEVATION AND COMPACTED IN LAYERS NOT TO EXCEED 6" IN DEPTH. /II SUBBASE UNDER ALL CURBS, SIDEWALKS, PATHS, AND DRIVES SHALL BE PLACED IN ACCORDANCE WITH SECTION 304 OF THE INDOT STANDARD SPECIFICATIONS I I- -�I -III 1' -O" R/W TOP SOIL 1 1 1/4" RAD. U O) 6 PAVEMENT SURFACE NOT -TO -SCALE ASPHALT PAVEMENT CURB ON ASPHALT DETAIL STANDARD FULL DEPTH GRANULAR BACKFILL DETAILS NOT -TO -SCALE 48' -0" BETWEEN EXPANSION JOINTS (MAX.) t 4" MIN CONCRETE SIDEWALK NOT -TO -SCALE 3" TOPSOIL, SEED OR SOD AS REQUIRED >TO MATCH EXISTING EXISTING GRADE IIIII �-(1�l 61.. i. 4 CO o 2:y if% N 1 Z C`•1Y Z a 0 V) N) 0 LLJ Qz 0 O z X L- SHEET NO. U I— C z 0 z z z C800 w JOB NO.43405PLA AA CONSULTING ENGINEERS LAND SURVEYORS CERTIFIED INDIANAPOLIS REVISIONS REVISED PER TAC COMMENTS