Loading...
HomeMy WebLinkAboutC103 Pre-Construction Stormwater Pollution Prevention PlanDATE: 04/01 /04 PROJECT NO.: 1238.033 DRAWN BY: BET CHECKED BY: SHEET TITLE: PER- CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN DRAWING FILES: N: \1238 \033 \DWGS \C103.DWG XREF: 005bs.DWG, 033bs.DWG XREF: 3001AbsS.DWG, 3004bs.DWG SHEET NO.: C .4"" 03 CURB INLET PROTECTION EXISTING VILLAGE OF WESTCLAY SECTION 3004 BLOCK "D" o 0 CONCRETE SIDEWALK PERIMETER PROTECTION: SILT FENCE 0 EXISTING CURB GUTTER 1 BLILDI 0 \G AREA TO BE TOPSOILED, SEEDED AND MULCHED BY OWNER AT COMPLETION OF CONSTRUCTION (TYP.), �Q a 0 9 w w w CC v U EROSION /SEDIMENT CONTROL PRACTICE PLAN FOR A TYPICAL BUILDING UNDER CONSTRUCTION EXISTING VILLAGE OF WESTCLAY SECTION 3001 -A THE VILLAGE CENTER PART 2, BLOCK "E" 0 PERIMETER PROTECTION: SILT FENCE CURB INLET PROTECTION X S \G HROCCO Fs LP81D \C (\D— CO\STCT 0\ MEM ors DROP INLET PROTECTION 000 0 INDIVIDUAL LOT EROSION CONTROL PLAN LEGEND EROSION CONTROL BY BUILDERS ASSUMED NORTH SCALE: 1 =10 PROPERTY LINE/ DRAINAGE SWALE SILT FENCE FINISHED DRAINAGE EXISTING DRAINAGE TREE CONSERVATION GRAVEL ENTRANCE/ EXIT PAD DROP INLET PROTECTION SOIL SALVAGE AND UTILIZATION PS PERMANENT SEEDING I I CURB INLET b—b PROTECTION HOLEY MOLEY SAYS DON'T DIG BLIND" A. Temporary seeded areas established by the developer will be maintained by the builder and his sub contractors. Silt fences previously installed will be maintained. B. A construction drive to the building —site from the existing drive shall be installed of Number 2 Stone, 6" thick and a minimum of 12' wide. This shall be utilized for access to the building and any mud or dirt tracked into the drive shall be promptly removed to a stable area (water shall not be used to flush silt or mud into the storm sewer). C. Prior to construction, silt fence is to be installed along the back of curb at the front of the property and along the streets or at the edge of the rear drainage easement at the rear of the property. The silt fence is to be installed prior to construction and maintained until permanent vegetation (grass) is established. D. When time is appropriate, and as soon as possible, roof down spout extenders of non perforated drain tile should be extended to the street or other solid outlet until a lawn is established. E. Establish permanent ground cover and remove silt fence. 'IT'S THE LAW" CALL 2 WORKING DAYS BEFORE YOU DIG 1- 800 382 -5544 CALL TOLL FREE PER INDIANA STATE LAW IC- 8- 1 -26 -1 ET SEQ. AS AMENDED AND SUPPLEMENTED, IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. RECEIVING WATER= ELLIOT CREEK CO \TACT PIRSO\ -V P LI BR \W C< 3IV=LOPM \T CO. 12821 E. -W vlAR <=T ST., S CARM -L, I \DIA \A 46032 (317) 574 -3400 200 ,„0,011"111188,,,„, SE —o No. 9500028 1D STATE OF AND I ANP S /ANA ��������lll 1 1111111/ DATE: 4/1/04 THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. COPYRIGHTED BY THE SCHNEIDER CORP. (2004) t Schneider THE SCHNEIDER CORPORATION 12821 E. New Market Street Suite 100 Carmel, IN 46032 Telephone: 317.569.8112 Fax: 317.826.6410 www.schneidercorp.com Architecture Civil Engineering Environmental Engineering Geotechnical Services GIS *LIS Home Builder Services Interior Design Land Surveying Landscape Architecture Transportation Engineering O z z