PER- CONSTRUCTION STORMWATER
POLLUTION PREVENTION PLAN
DRAWING FILES:
N: \1238 \033 \DWGS \C103.DWG
XREF: 005bs.DWG, 033bs.DWG
XREF: 3001AbsS.DWG, 3004bs.DWG
SHEET NO.:
C .4""
03
CURB INLET PROTECTION
EXISTING VILLAGE OF
WESTCLAY SECTION 3004
BLOCK "D"
o 0
CONCRETE SIDEWALK
PERIMETER PROTECTION: SILT FENCE
0
EXISTING CURB GUTTER
1
BLILDI
0
\G
AREA TO BE TOPSOILED,
SEEDED AND MULCHED
BY OWNER AT COMPLETION
OF CONSTRUCTION (TYP.),
�Q a
0
9
w
w
w
CC
v
U
EROSION /SEDIMENT CONTROL PRACTICE PLAN FOR A TYPICAL
BUILDING UNDER CONSTRUCTION
EXISTING VILLAGE OF
WESTCLAY SECTION 3001 -A
THE VILLAGE CENTER PART 2,
BLOCK "E"
0
PERIMETER PROTECTION: SILT FENCE
CURB INLET PROTECTION
X S \G HROCCO
Fs LP81D \C
(\D—
CO\STCT 0\
MEM
ors
DROP INLET PROTECTION
000
0
INDIVIDUAL LOT
EROSION CONTROL
PLAN LEGEND
EROSION CONTROL BY BUILDERS
ASSUMED NORTH
SCALE: 1 =10
PROPERTY LINE/
DRAINAGE SWALE
SILT FENCE
FINISHED DRAINAGE
EXISTING DRAINAGE
TREE CONSERVATION
GRAVEL ENTRANCE/
EXIT PAD
DROP INLET
PROTECTION
SOIL SALVAGE AND
UTILIZATION
PS PERMANENT SEEDING
I I CURB INLET
b—b PROTECTION
HOLEY MOLEY SAYS
DON'T
DIG
BLIND"
A. Temporary seeded areas established by the developer will be maintained by the
builder and his sub contractors. Silt fences previously installed will be maintained.
B. A construction drive to the building —site from the existing drive shall be
installed of Number 2 Stone, 6" thick and a minimum of 12' wide. This shall be
utilized for access to the building and any mud or dirt tracked into the drive shall
be promptly removed to a stable area (water shall not be used to flush silt or
mud into the storm sewer).
C. Prior to construction, silt fence is to be installed along the back of curb at
the front of the property and along the streets or at the edge of the rear
drainage easement at the rear of the property. The silt fence is to be installed
prior to construction and maintained until permanent vegetation (grass) is
established.
D. When time is appropriate, and as soon as possible, roof down spout extenders
of non perforated drain tile should be extended to the street or other solid outlet
until a lawn is established.
E. Establish permanent ground cover and remove silt fence.
'IT'S THE LAW"
CALL 2 WORKING DAYS BEFORE YOU DIG
1- 800 382 -5544
CALL TOLL FREE
PER INDIANA STATE LAW IC- 8- 1 -26 -1
ET SEQ. AS AMENDED AND SUPPLEMENTED,
IT IS AGAINST THE LAW TO EXCAVATE
WITHOUT NOTIFYING THE UNDERGROUND
LOCATION SERVICE TWO (2) WORKING
DAYS BEFORE COMMENCING WORK.
RECEIVING WATER= ELLIOT CREEK
CO \TACT PIRSO\
-V P LI
BR \W C< 3IV=LOPM \T CO.
12821 E. -W vlAR <=T ST., S
CARM -L, I \DIA \A 46032
(317) 574 -3400
200
,„0,011"111188,,,„,
SE
—o
No.
9500028
1D STATE OF
AND I ANP
S /ANA
��������lll 1 1111111/
DATE: 4/1/04
THIS DRAWING AND THE IDEAS, DESIGNS AND
CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF THE SCHNEIDER
CORPORATION, AND ARE NOT TO BE USED OR
REPRODUCED, IN WHOLE OR IN PART, WITHOUT
THE WRITTEN CONSENT OF THE SCHNEIDER
CORPORATION.
COPYRIGHTED BY THE SCHNEIDER CORP. (2004)
t
Schneider
THE SCHNEIDER CORPORATION
12821 E. New Market Street
Suite 100
Carmel, IN 46032
Telephone: 317.569.8112
Fax: 317.826.6410
www.schneidercorp.com
Architecture
Civil Engineering
Environmental Engineering
Geotechnical Services
GIS *LIS
Home Builder Services
Interior Design
Land Surveying
Landscape Architecture
Transportation Engineering
O
z
z