HomeMy WebLinkAboutC-1 Site Demolition PlanDEMOLISH EXISTING CONCRETE PATIO.
DEMOLISH EXISTING RAILROAD TIE
WHEELSTOPS.
DEMOLISH EXISTING GARAGE INCLUDING
FOUNDATION AND FOOTINGS.
1
cNoSYOM NIENC AL
954 SQUARE FEET
DEMOLISH EXISTING ASPHALT PAVING.
o LEb
0
0
WTR
WTR
m
ALL DEMOLITION WORK IN R.O.W. BY OTHERS.
I
0
z
SITE DEMOLITION PLAN
pia„ I 0
O' 5'
15' 25' 40'
NAM
SWANSON
ASSOCUTES
N1C0
ARCHITECTURE
AN
OFFCE
AMMON
FON
YANG
HEALTH
CENTER
IMO
CWfl:[
Cal.EGIE
AVENUE
o
ll1kfl1
462BC
REVISIONS:
DATE:
DATE: 05 APRIL 2004
DRAWN BY: D. L. Lockwood
CHECKED BY: M. A Swanson
APPROVED BY: M. A Swanson
PROJECT NUMBER: Yang Hlth Gtr
SHEET
NUMBER:
OF:
a COPYRIGHT 2004
MARK SWANSON ASSOCIATES, INC.