Loading...
HomeMy WebLinkAboutL1.2 Landscape Plan��ii..iii■i►d �Tri t■.■■■mmemsr rl GRan. ASK Rik gin. OP 4 I. LANDSCAPE ARCHITECT TO INSPECT ALL PLANT LOCATIONS AND PLANT BED EDGES PRIOR TO INSTALLATION. ON -SITE ADXSTMENTS MAY BE REQUIRED. 2. PLANT COUNTS INDICATED ON DRAWING ARE FOR LANDSCAPE ARCHITECT'S USE ONLY. CONTRACTOR SHALL MAKE OWN PLANT QUANTITY TAKEOFFS USING DRAWINGS, SPECIFICATIONS, AND PLANT SCHEDULE REQUIREMENTS. (IE. SPACING) DICTATED, UNLL' OTHERWISE DIRECTED BY LANDSCAPE ARCHITECT. CONTRACTOR TO VERIFY BED MEASUREMENTS AND INSTALL APPROPRIATE QUANTITIES AS GOVERNED BY PLANT SPACING PER SCHEDULE. PLANT MATERIAL QUANTITIES SHOWN ON PLAN ARE MINIIIJM QUANTITIES. ADDITIONAL MATERIAL MAY BE NEEDED TO MEET SPACING REQUIREMENTS AND FIELD CONDITIONS. 3. RECONDITION AND SEED/RE -SEED ALL. AREAS DISTURBED BY CONSTRUCTION ACTIVITIES THAT ARE NOT TO RECEIVE OTHER SURFACE TREATMENT (PRESERVED, RENOVATED AREAS, MULCH, GROUNDGOVER, ETC.) 5. AVOID INSTALLING TREES AND SHRUBS ON GROWN OF BERMS. VERIFY LOCATIONS OF AND ALIGNMENT OF PLANTS ON BERMS WITH LANDSCAPE ARCHITECT. 6. EARTHWORK CONTRACTOR SHALL INSTALL TOPSOIL IN ALL PROPOSED MULCHED PLANT BED AREAS AND ALL. PROPOSED/DISTURBED LAWN AREAS. REFER TO PLANTING PLAN FOR PLANT BEDS NOTED TO RECEIVE MULCH. GENERAL EARTHWORK AND LANDSCAPE CONTRACTOR SHALL COORDINATE QUANTITY AND PLACEMENT OF TOPSOIL. LANDSCAPE CONTRACTOR SHALL VERIFY DEPTH OF TOPSOIL PRIOR TO PLANT INSTALLATION. REFER TO GT LGIFIGATIONS FOR TESTING AND PLACEMENT OF REQUIREMENTS OF TOPSOIL. P: \792WestClay \dwg \L102.dwg, 12/03/2001 09:16:58 AM U Z U SHEET No. LL2 N era co NI jN N. J IC 44. O f ;4 ar. :a Q O f 03 CI CCO C