HomeMy WebLinkAboutL1.2 Landscape Plan��ii..iii■i►d �Tri
t■.■■■mmemsr rl
GRan. ASK Rik gin. OP 4
I. LANDSCAPE ARCHITECT TO INSPECT ALL PLANT LOCATIONS AND PLANT
BED EDGES PRIOR TO INSTALLATION. ON -SITE ADXSTMENTS MAY BE
REQUIRED.
2. PLANT COUNTS INDICATED ON DRAWING ARE FOR LANDSCAPE ARCHITECT'S
USE ONLY. CONTRACTOR SHALL MAKE OWN PLANT QUANTITY TAKEOFFS USING
DRAWINGS, SPECIFICATIONS, AND PLANT SCHEDULE REQUIREMENTS. (IE.
SPACING) DICTATED, UNLL' OTHERWISE DIRECTED BY LANDSCAPE
ARCHITECT. CONTRACTOR TO VERIFY BED MEASUREMENTS AND INSTALL
APPROPRIATE QUANTITIES AS GOVERNED BY PLANT SPACING PER SCHEDULE.
PLANT MATERIAL QUANTITIES SHOWN ON PLAN ARE MINIIIJM QUANTITIES.
ADDITIONAL MATERIAL MAY BE NEEDED TO MEET SPACING REQUIREMENTS
AND FIELD CONDITIONS.
3. RECONDITION AND SEED/RE -SEED ALL. AREAS DISTURBED BY
CONSTRUCTION ACTIVITIES THAT ARE NOT TO RECEIVE OTHER SURFACE
TREATMENT (PRESERVED, RENOVATED AREAS, MULCH, GROUNDGOVER, ETC.)
5. AVOID INSTALLING TREES AND SHRUBS ON GROWN OF BERMS. VERIFY
LOCATIONS OF AND ALIGNMENT OF PLANTS ON BERMS WITH LANDSCAPE
ARCHITECT.
6. EARTHWORK CONTRACTOR SHALL INSTALL TOPSOIL IN ALL PROPOSED
MULCHED PLANT BED AREAS AND ALL. PROPOSED/DISTURBED LAWN AREAS.
REFER TO PLANTING PLAN FOR PLANT BEDS NOTED TO RECEIVE MULCH.
GENERAL EARTHWORK AND LANDSCAPE CONTRACTOR SHALL COORDINATE
QUANTITY AND PLACEMENT OF TOPSOIL. LANDSCAPE CONTRACTOR SHALL
VERIFY DEPTH OF TOPSOIL PRIOR TO PLANT INSTALLATION. REFER TO
GT LGIFIGATIONS FOR TESTING AND PLACEMENT OF REQUIREMENTS OF
TOPSOIL.