Loading...
HomeMy WebLinkAboutC901 General SpecificationsPipe Diameter In. Minimum Time, min:s Length for Minimum Time, ft Time for Longer Length, S Specification Time for Length (L) Shown, min:s DRAWING FILES: 5: \1211 \020 \dwgs \C901 XREF: 5: \i 211 \020 \dwgs \Titlel .dwg SHEET NO.: C901. 100 ft 150 ft 200 ft 250ft 300ft 350ft 400 ft 450 ft 4 3:48 597 0.360 L 3:46 3:46 3:46 3:46 3:46 3:46 3:46 3:46 6 5:40 386 0.854 L 5:40 5:40 5:40 5:40 5:40 5:40 5:42 6:24 8 7:34 298 1.520 L 7:34 7:34 7:34 7:34 7:36 8:52 10:08 11:24 10 8:26 239 2.374 L 9:28 9:28 9:28 9:63 11:52 13:51 15:49 17:48 12 11:20 199 3.418 L 11:20 11:20 11:24 14:15 17:05 19:58 22:47 25:38 16 14:10 158 5.342 L 14:10 14:10 17:48 22:15 26:42 31:09 35:36 40:04 18 17:00 133 7.682 L 17:00 19:13 25:38 32:03 38:27 44:52 51:16 57:41 21 19:50 114 10.470 L 18:60 26:10 34 :54 43 :37 52:21 61:00 69:48 78:31 24 22:40 89 13.674 L 22:47 34 :11 45:34 56:58 68:22 79:46 91:10 102:33 27 25:30 88 17.306 L 28:51 43 :16 57:41 72:07 86:32 100:57 115:22 129 :48 30 28:20 80 21.388 L 35:37 53:26 71:13 89:02 108:50 124:38 142:25 160:15 33 31:10 72 25.852 L 49:05 64:38 88:10 107:49 129:18 150:43 172 :21 193:53 38 34:00 86 30.788 L 61:17 76:55 102:12 128:12 153:80 179:29 205:07 230:46 DATE: 04/02/04 PROJECT NO.: 1211.020 DRAWN BY: RDR CHECKED BY: RLD SHEET TITLE: GENERAL SPECIFICATIONS DRAWING FILES: 5: \1211 \020 \dwgs \C901 XREF: 5: \i 211 \020 \dwgs \Titlel .dwg SHEET NO.: C901. EARTHWORK SCOPE OF NCRF`. torrn .dr a;nage systems Sanitary Sewer systems 4. Streets and paving t Water suppl v system 11 CH MAR REM 0 r D. L <te ,t; The work required under this sec 5nsists of all e <c 'vatrng, filling, rough rowing 'nd r eiated items necessary to complete the wort, i r1d1( 'del; 5! n the r wings .r !d aces,.:! ir)e'J in the ;ei t i i The 'n t a t i d e now n c t �I f%� iE: r writina the owners drl.a the Eng neeis C;; ur', r "1ar1a+=' k'rriJr or or1 four on the C the field, before work is started or resumed. the iten it, of work to p m e d ,der this section sha i r lecirnu an grubbing, rerr:c vt1I c?f stumps ps where r "+equired protection n to remain, 'stripping aria stCI aq5 f fr! Df pas-tion :and roa gra (In of enter,_: liu E- a nd back filling for utility I,.ies L F WEE Provide and i i ac r r: y spec f otei ;C from off e site is T1u'v be rnr.� a' fr.' +I�,- required. Fill obtained fron 5 >fi site shall be of !r an r quailt.' 'is spec ifled and the ource ar%nroved the Owner. tide: an re t Cavated rr: ter i that i_ritral?i m l e ssJ for Ail unsuitable ri if ericl shall he iu' Ie +i on s;te, �:r irrlov'e+_+ off site, and disposed by the c!,ntrscti: r. T HE t' ac tor shall accept the site as he flea a., it 5nd shall r f rho e all trash, rubt ish and debris .r_ f m the site prior to starting e><_,JVatssn. P. r l l r ..l u d iL The tall o w ina ten e r e! a r.eci wsrh Uri. S pecified and included rn trier" sec t .;r;5 of these -peciti:ationc: M aint :Ili ''retuliy all f'ee`l, r, ..oar} c i s ':an'. other, refere! r} 1f r "l, t 1. destr� F:'1, scntr :kJ t'>>r sla';al contcss. engineer. Remove aii trees aria stumps fiuri. o, cupie+a by r o,od and surfaced areas. 1=', erns+ial trees cLl rside these areas shall onl be done r,s r,stea i.Tl drawings or +approved by the wner All brush, stumps, wood and other refuse from the site shall be buried onsite or removed to disposal areas off of the site. Disposal by burning shall not be permitted unless proper permits are obtained (where applicable). The location of on site bury pits shall be designated by the owner or the Engineer. 4. PROTECTION OF TREES A. General Protection: The !Contractor shall be responsible for the protection of tops, trunks and roots of existing trees on the project site that are to remain. Existing trees subject to construction damage shall be boxed, fenced or otherwise protected before any work is started; do not stockpile within branch spread. Remove interfering branches without injury to trunks and cover scars with tree paint. 5 HANDLING OF TOPSOL A_ Remove ail organic material frorn the areas to be occupied by buildings, roads, walks, and parking areas. Pile anca store topsoil at a location where it will not interfere with construction operations. Topsoil shall be reasonably free from subsoil, debris, weeds, grass, stones, ect. After completion of site grading and subsurface utility' installation, top soil snail be replaced in areas designated on the erosion control pearl for seeding and /or sodding. Any remaining top soil shall be used for finished grading around structures and landscaping areas. DISPOSITION OF UTILITIES: SITE GRADING: Rules and regulations governing the respective utilities shall be observed in executing all work. under this section. R. If active utilities are encountered but not shown an the drawings, the Engineer shall be advised before work is continued. Inactive and abandoned utilities encountered in excavating and grading operations shall be reported to the Engineer. They shall be removed, plugged or capped as directed by the Utility Company and the Engineer. It shall be the responsibility of each contractor to verify all existing utiities and conditions pertaining to his phase of the work.. It shah also be the contractors responsibility to contact the owners of the various utilities before work is started. A. Grades: Contractor shall perform all cutting, filling, compacting of fills and rough grading required to bring entire project area to grade as shown on the drawings. B. Rough Grading: the tolerance for paved areas shall not exceed 0.04 feet plus or minus above the established subgrade. Ail other areas shall not exceed 0.10 feet plus or minus the established grade. Ail banks and other breat s in grade shall be rounded at top and bottom. Adjust subgrade elevations for topsoil thickness for areas receiving topsoil and seed. Compaction Requirements: sorrpacted to All building pad areas shall be standards specified by local and /nor state building codes. Minimum compaction shall be 100% of Standard Proctor Density. For compaction requirements of paved areas, see street specifications. Earth Work E3ai once the Contractor shall confirm all earthwork quantities prior ru` start of constri "l+ ti +.;rl. if an es,: c,ess or shortage of earth is encountered, the Contractor shall n±r:n with the Owner and Engineer the requirements for stockpiling, removal or importing of earth. Minor adjustments to `he Curades nlav be required to h':al earthwork wi'.en nor er ;5 r TfClt':•rial or t- the shortages are r_ilcuiJrl;�'f reed t IS r r }ctril<_ed by t lr parties hereto that the c,diculations ofthe Engineer in determining earthwork quantities shall be ac- complished in accordance with the American Jcciet of ail Engineers Standards for such calculations. Further, that these calculations are subject to the interpretations of soil borings as the physical Lmlts o f the various soil types, i_]i'so the allowable variation in finish grate and compaction permitted the contractor, and that all of these parameters may >T:ause either an e :ecs or shortage nt actual earthwork materials to complete the project. If vru n; :_In actual !minor e;.c:ess or _shortage c:f raterials occurs, the contractor shcill contact the engineer to determine if adjustment can be mode to correct the imbalance, of earth. SANITARY SEWER SYSTEMS SCOPE OF WOF''.i The work under this se+ r!sn includes all sanitary sewers, manh -'les, cieanr:+uts and !elated items including excavating and backfilling, necessary to complete the work shown ;n the drawings, starting five feet outside the building walls. The ends of sewers shall be tightly plugged or capped at the terminal points, ints, Jai' cent to buildings, p €nainq the connecting :tie of all such lines to the building drabs gas spr'v Pied In the plumbing specifications and architectural drawings. MATERIALS Sanitary Sewers Ail gravity plastic 'sewer pipe and fittings shall conform to ASTM D3034 with a cell i Iassif+cat an of 1 2454 C. Flexible gcasketed compression joints shall be used for PVC pipe_ No solvent cement joints shall be allowed. A.PPLICATi A,. Permits and :odes The contractors bid on contractor's bid on the work covered herein shall be based upon the drawings and 'specifications and m liance with all a !_;oble codes and requiatians as amended by 'any waivers. Contractor shall I1 furnish '']II bonds necessary to get permits for cuts anI connections to existing sewers;. B. Loco! Standards The term "local standards" as used herein means the standards of design and construction of the respective municipal department or utility company: City of Car Existing Improvements Maintain in operating condition all active utilities, sewers and other drains encountered in the sewer installation. Repair to the satisfaction of the owner any damage to existing active improvements. D. Workmanship To conform to all local, state and national codes and to be approved by all local and state agencies having jurisdiction. E. Trenching Lay all pipe in open trenches, except when the local authority gives written permission for tunneling. Open the trench sufficiently ahead of pipe laying to reveal any obstructions. The width of the trench shall be the inside pipe diameter plus 24 inches for 12 inches above the pipe. Sheet and brace trench as necessary to protect workmen and adjacent structures. All trenching to comply with Occupational Safety and Health Administration Standards. Keep trenches free from water while construction is in progress. Under no circumstances shall pipe or appurtenances be laid in standing water. Conduct the discharge from trench dewatering to drains or natural drainage channels. F. Special Supports Whenever, in the opinion of the Engineering, the soil at or below the pipe grade is unsuitable for supporting sewers and appurtenances specified in this section, such special support, in addition to those shown or specified, shall be provided as the Engineer may direct, and the contract will be adjusted. 0. Backfilling for a depth of at least 12 inches above the top of the pipe, backfill with 12" of #8 crushed stone or #8 fractured face aggregate. Compact this backfill thoroughly, taking care not to disturb the pipe. For the remaining trench depth, backfill with earth or granular material containing stones or rocks not larger than 4 inches. Backfill under and within 5' of walks, parking areas, driveways and streets shall be granular material only thoroughly compacted, by approved methods. H. Flow Channels The flow channels within manholes shall be an integral part of the precast base. The channels shall be shaped and formed for a clean transition with proper hydraulics to allow the smooth conveyance of flow through the manhole. The bench wall shall be formed to the crown of the inlet and outlet pipes to form a "U" shaped channel. The bench wall shall slope back from the crown at 1/2 inch per foot to the manhole wall. Infiltration The contractor shall furnish necessary equipment to test sewers for infiltration. Infiltration rates shall not exceed the Local Standards. All sanitary sewer lines upon completion will be required to pass a low pressure air test, unless otherwise directed by Aqua Source. Said test shall be conducted according to NCPI Standard Method, and shall be witnessed by an inspector authorized by Aqua Source. Infiltration under test shall not exceed 100 gallons per inch of inside diameter of sewer pipe per mile of sewer in 24 hours and inclusive of all appurtenances within the section being tested such as manholes, house connections, etc. J. Flushing Sewers Flush all sanitary sewers except building sewers with water to obtain free flow through each line. Remove all silt and trash from appurtenances just prior to acceptance of work. K. Plastic Sewer Pipe Installation Plastic sewer pipe shall be installed in a accordance with ASTM D2321 per latest revision and no plastic pipe shall exceed a deflection of 5 L. Storm Water Connections No roof drains, footing drains and /or surface water drains may be connected to the sanitary sewer systems, including temporary connections during construction. M. Waterline Crossing Waterlines and sanitary sewers shall maintain a minimum of 10 foot horizontal separation and a minimum 18 inches of clearance between pipes at crossings. Otherwise, sanitary sewer within 10 feet of waterlines shall be constructed of water works grade Ductile Pipe mechanical joints and fittings. N. Utilities It shall be the responsibility of each contractor to verify all existing utilities and conditions pertaining to his phase of the work. It shall also be the contractors responsibility to contact the owners of the various utilities before work is started. The contractor shall notify in writing the owners and the engineer of any changes, errors or omissions found on these plans or in the field before work is started or resumed. 0. Service Laterals Individual lot service lines shall be 6" in diameter and of material equal to that specified in 2A of this section. Service lines shall be connected to the main sewer by a wye at locations generally shown within these plans. Service lines shall be extended and capped at a point 5 feet beyond the right -of -way line or one pipe length for those services on the same side of the street as the main. Sewer service lines shall be marked on the curb. TABLE 1 MINIMUM SPECIFIED TIME REQUIRED FOR A 1.0 psig DROP FOR SIZE AND LENGTH OF PIPE INDICATED STORM SEWER SYSTEMS 1. SCOPE OF WORK. The work under this section includes all storm sewers, storm water inlets, and related items, including excavating and backfilling, necessary to complete the work shown on the drawings. PATERIALS A. Storm Sewers B. Manholes C. A. Silttight Couplings: PE sleeve with ASTM D 1056, Type 2, Class A Grade 2 gasket material that mates with pipe and fittings to form siittight joints. SUBDRAINS 3. APPLICATION Reinforced concrete sewer pipe shall confirm to ASTM C -76 latest revision, with joints conforming to ASTM C -443 latest revision. Corrugated PE Pipe and Fittings: AASHTO M 294, Type S, with smooth waterway coupling joints. Precast reinforced concrete manhole sections and steps shall conform to ASTM C -478 latest revision. Casting shall be of uniform quality, free from blow holes, porosity, hard spots, shrinkage distortion or other defects. They shall be smooth and well cleaned by shot blasting or by some other approved method. They shall be coated with asphalt paint which shall result in a smooth coating, tough and tenacious when cold, not tacky or brittle. They shall be gray iron meeting ASTM A -48 latest revision. Joints Manhole sections shall be jointed with rubber type gaskets. The rubber type gaskets shall meet ASTM C -443 latest revision. Perforated plastic pipe subdrains shall conform to ASTM F -405. A. Permits and Codes The contractor's bid on contractor's bid on the work covered herein shall be based upon the drawings and specifications and compliance with all applicable codes and regulations as amended by any waivers. Contractor shall furnish all bonds necessary to get permits for cuts and connections to existing sewers. B. Local Standards the term "Local Standards" as used herein means the standards of design and construction of the respective municipal department or utility company. C. Existing improvements Maintain in operating condition all active utilities, sewers and other drains encountered in the sewer installation. Repair to the satisfaction of the owner any damage to existing active improvements. See also Earthwork Note 6.C. D. Workmanship To conform to all local, state and national codes and to be approved by all local and state agencies having jurisdiction. E. Trenching Lay all pipe in open trenches, except when the local authority gives written permission for tunneling. Open the trench sufficient ahead of pipelaying to reveal any obstructions. The width of the trench shall be the inside pipe diameter plus 24 inches for 12 inches above the pipe. Sheet and brace trench as necessary to protect workmen and adjacent structures. All trenching to comply with Occupational Safety and Health Administration Standards. Keep trenches free from water while construction is in progress. Under no circumstances lay pipe or appurtenances in standing water. Conduct the discharge from trench dewatering to drains or natural drainage channels. Special Supports Whenever in the opinion of the Engineer the soil at or below the pipe grade is unsuitable for supporting sewers and appurtenances specified in this section, such special support, in addition to those shown or specified, shall be provided as the Engineer may direct, and the contract will be adjusted. G. Backfilling for a depth of at least 12 inches above the top of the pipe, backfill with earth or granular material free from large stones, rock fragments, roots or sod. Tamp this backfill thoroughly, taking care not to disturb the pipe. For the remaining trench depth, backfill with earth or granular material containing stones or rocks not larger than 4 inches. Backfill under and within 5' of walks, parking areas, driveways and street shall be granular material only thoroughly compacted by approved methods. H. Manhole Inverts Construct manhole flow channels of concrete sewer pipe or brick, smoothly finished and of semi circular section conforming to the inside diameter of the connecting sewers. Make changes in size or grade gradually and changes in direction by true curves. Provide such channels for all connecting sewers at each manhole. I. Subdrains All subdrains shall be of the size shown on the plans and shall be constructed to the grades shown. Utilities It shall be the responsibility of each contractor to verify all existing utilities and conditions pertaining to his phase of the work. It shall also be the contractors responsibility to contact the owners of the various utilities before work is started. The contractor shall notify in writing the owners or the engineer of any changes, errors or omissions found on these plans or in the field before work is started or resumed. K. Contractor to grout joints inside storm structures where pipes enter or exit and between structure and casting. STREETS SCOPE OF WORK The work required under this section includes all concrete and bituminous paving and related items necessary to complete the work indicated on drawings and described in the specifications, including but not limited to: 2. MATERIALS A. Concrete Concrete shall be ready -mixed concrete and shall be a mix of proportioned fine and coarse aggregates with Portland cement and water. Minimum cement content shall be 6 bags per cubic yard of concrete and maximum water content shall be 5.5 U.S. gallons per sack of cement, including moisture in the aggregate. Slump for normal weight concrete shall be a maximum of 4 inches and a minimum of 2 inches. the slump of machine placed concrete shall be no less than 1-1/4 inches nor more than 3 inches. Standard test ASTM C -143 shall be used to measure slump. Compressive strength of concrete at 28 days shall be 4000 psi. All exterior concrete shall have air entrainment of 5% to 8% by volume per ASTM C -260. Retempering of delivered concrete will not be allowed. Concrete shall be composed of: 3. APPLICATION All streets, parking areas in contract limits Curbs and gutters Sidewalks and concrete slabs, exterior steps 1. Portland cement Conforming to ASTM 0 -150, Type IA or Type ILIA. 2. Aggregates: Conforming to ASTM C -33 3. Water Shall be clear and free from injurious amounts of oils, acids, alkalies, organic materials or other deleterious substances. B. Welded Steel Wire Fabric Where required for concrete reinforcement shall conform to ASTM A185. C. Premoulded Joint Filler Shall be of non extruding type meeting ASTM D -544 except that premoulded joint filler used in concrete walk construction may be either non extruding or resilient. D. Bituminous Pavement Materials All materials proposed for the construction of bituminous pavements shall comply with the Indiana Department of Transportation specifications, per latest revision. E. Compacted Aggregate Subbase: Shall be crushed stone or gravel. Crushed gravel shall be a minimum of 35% crushed material. Chert shall be limited to a maximum of 8% of the total. Material shall be free from an excess of flat, elongated, thinly laminated, soft or disintegrated pieces; and shall be free from fragments coated with dirt. Compacted aggregate shall be graded as follows: SIEVE SIZE PASSING 1 -1/2" 1" 3/4" 1 /2" #30 #200 100 80 -100 70 -90 55-80 35 -60 25 -50 12 -30 5 -10 A. Grading Do any necessary grading in addition to that performed in accordance with Earthwork Section, to bring subgrades, after final compaction, to the required grades and sections for site improvement. B. Preparation of Subgrade Remove spongy and otherwise unsuitable material and replace with stable material. No traffic will be allowed on prepared subgrade prior to paving. C. Compaction of Subgrade The first 6 inches below the subgrade shall be compacted to at least 100% of the maximum dry density as determined by the provisions of AASHO T -99. Water shall be prevented from standing on the compacted subgrode. D. Utility Structures Check for correct elevation of all manhole covers, valve boxes and similar structures located within areas to be paved, and make, or have made, any necessary adjustments in such structures. E. Placing Concrete 1. Subgrade Place concrete only on a moist, compacted subgrade or base free from loose material. Place no concrete on a muddy or frozen subgrade. 2. Forms All forms shall be free from warp, tight enough to prevent leakage and substantial enough to maintain their shape and position without springing or settling, when concrete is placed. Forms shall be clean and smooth immediately before concreting. 3. Placing Concrete Concrete shall be deposited so as to require as little rehandling as practicable. When concrete is to be placed at an atmospheric temperature of 35 degrees F. or less, paragraph 702.10 of the Indiana Department of Transportation Specifications latest revision shall be followed. F. Concrete Curb G. 1. Expansion Joints Shall be 1/2 inch thick premoulded between storm structures curb. Contraction /Control Joints Unless otherwise provided, contraction joints shall be sawed or scored joints spaced 10 feet on center, except for intersection radii where joints shall be placed 5' o.c. 3. Finish Tamp and screed concrete as soon as placed, and fill any honey combed places. Finish square corners to 1 /4" radius and other corners to radii shown. Concrete Walks and Exterior Steps 1. Slopes Provide 1/4 inch per foot cross slope. Make adjustments in slopes at walk intersections as necessary to provide proper drainage. 2. Dimensions Walks and steps shall be one course construction and of widths and details shown on the drawings. 3. Finish Screed concrete and trowel with a steel trowel to a hard dense surface after surface water has disappeared. Apply medium broom finish and scribe control joints at 5 foot spacing. Prcvide 1/2" expansion joints where sidewalks intersect, and at a maximum spacing of 48 feet between expansion joints. H. Curing Concrete Except as otherwise specified, cure all concrete by one of the methods described in Section 501.17 of the Indiana Department of Transportation Specifications, latest revision. Bituminous Pavement Hot asphalt concrete pavement shall be as specified in Section 402 and must comply with Section 401.05 of the Indiana Department of Transportation Specifications latest revisions. Paving will not be permitted during unfavorable weather or when the temperature is 40 degrees F. and falling. J. Compacted Aggregate Subbase the thickness shown on the drawings is the minimum thickness of the fully compacted subbase. Compaction shall be accomplished by rolling with a smooth wheeled roller weighing 8 to 10 tons. Compact to 90% compaction using Standard Testing Procedures. Along curbs, headers and walls and at all placed not accessible to the roller, the aggregate material shall be tamped with mechanical tampers or with approved hand tampers. LAKE LINER SPECIFICATION It may be necessary to construct a liner to seal the more permeable sandy clays and sand seams which may be present at a shallow depth within the side slope or bottom of the excavation. The contractor shall perform soils analysis tests in the lake area(s) to determine if the lake(s) will require a liner. In the event that construction of a liner becomes necessary, Lake Liner specifications have been included below. Acceptable liners are as follows: I. Natural Clay Liner A. Laboratory testing shall be performed on the designated liner material to determine the optimum liner compaction criteria. Subsequent to determining this compaction criteria, permeability testing shall be performed on remolded samples, compacted to this standard. Laboratory testing shall be performed at least one (1) month prior to initiating lining activities. B. The contractor shall identify and retain the engineer approved liner material for use on sealing the side slopes and bottom of the lake. The optimum natural liner material shall not be used for other portions of site work prior to verification that adequate resources are available and have been stockpiled. It is important that the stockpiled soils be stored in as small an area as possible to retain natural moisture. The contractor should anticipate that additional soil work may be required to bring the liner material to required uniform moisture level. C. A representative of the testing engineer shall be present for inspection of the base and side slopes of the lake prior to and during compaction of the liner materials. D. The clay lining material, approved by the testing engineer, shall be compacted to a minimum of 12 inches thick on the upper two thirds of the side slopes and 18 inches on the lower one third. A compacted minimum of 18 to 24 inches approved lining material shall be placed across the base of the lake. E. The clay liner material shall be regularly sampled and tested for conformance to the moisture and Atterberg limits established for the approved liner material(s). Field density and moisture testing shall also be performed frequently during construction to establish a correlation between density and field permeability. It is imperative that moisture levels be maintained over optimum as determined in laboratory testing. Only by maintaining this condition will it be possible to approach the zero voids condition and maximize natural liner capabilities. Off -site sources for clay liner material may be used with approval by the Owner's representative and on -site testing engineer. F. Compaction of the natural liner shall be performed by equipment operating up and down the slope. Engineered natural clay liners shall not be compacted by equipment operating around the slopes on or near the same elevation. It is important that hydration of the clay liners takes place after installation is complete. This is typically accomplished by natural rainfall or by application of fresh water at the rate of one quarter gallon per square foot for at least 72 hours. This recommended rate of hydration will help prevent shrinkage and cracking of the clay liner and maintain its integrity. II. Bentonite A. Materials and installation method to be reviewed by the testing engineer and approved by the Engineer. III. Synthetic Liner A. Materials and installation method to be reviewed by the testing engineer and approved by the Engineer. DATE: J THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTEL 1 FCTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. 0 COPYRIGHTED BY THE SCHNEIDER CORP. (2004) Schneider THE SCHNEIDER CORPORATION Historic Fort Harrision 8901 Otis Avenue Indianapolis, IN 46216 -1037 Telephone: 317.826.7100 Fax: 317.826.7200 www.schneidercorp.com Architecture Civil Engineering Environmental Engineering Geotechnical Services GIS LIS Home Builder Services Interior Design Land Surveying Landscape Architecture Transportation Engineering