HomeMy WebLinkAboutduplicatePLANTING SCHEDULE
KEY
ITEM
COMMON NAME
REMARKS
O
STONE BED COVER
1' RIVER STONE
2' THICK OVER WEED BARRIER FABRIC
C)
GROUND COVER
URIOPE
4 POT START
0
LARGE SHRUB
MENTOR BARBERRY
30' HIGH START
0
MEDIUM SHRUB
POINTED CONIFER
24° HIGH START
1 :la 01.4 44'4 1 14.‘ t* %;44 a' 141' :14 .4 4 4 i,I 1
A I
nlnnnnn�n�nnnnnn�._
I/iL.NI iriii■■� I Trii= =i� ii ■die iD r �Fi /1
R /Ql /1 \/i ►./r�'�\/ %Q` \/1 %/r"`ilt/1 X15 l.1
Itmanl
O 'O TYP. O TYP.
New Dumpeter
Cedar Dog -Ear
Screen
Face Brick Pier
with Decorative
Header
Wrought iron
Gate
New Cond
Pad
Existing
Bldg
B -1
Q
SCALE: 1/r =1' -0'
Vacant Lot
B -2
Ex. Stone Surface
New Park
Pearring 1_
by City this Area
Unlacing
Sidewalks, Landscape, HC Access, and Parking
PROPOWD LANDSCAPE PLAN
New Condenser
Pad
Parking Lot
8 -2
Proposed
Building Face
WW
Proposed
3' f Planter Urn
Terra Cotta
Nik
L.
11111
il .+R ni fir
Ft r J� t j
rron 1I 111 sip 1.
T v P. O-:\JH). 0
T YP.
ENLARGED SIDEWALK PLANTER BED
SCALE: 1/4' m1•-t•
GENERAL NOTES
1. ALL BALLED, BURLAPPED, AND CONTAINER TREES SHRUBS SHALL
8E CAREFULY HANDLED TO PREVENT DANK:NG AND LOOSENING
THE BALLS PLANTS SHALL BE HANDLED AND PLANTED N1HWT
USING THE TOPS FOR CA FCAMG, CR SETTING TREES
2. PLANTING SOIL FCR 8? tF1t1 OF TREES ANO SHRUBS 91AL1. CONSIST
OF (4 PARIS CLEMI AND NEW TOPSOL: MID (1) PART NOV PEAT.
3 ALL PLANTS SHALL BE '1MTEtED IN' BY FLOODING THE BACK11U HOLE
1 MN THE WORK DAY UPON MICR THEY WE PLATED.
4. LOOSEN TIES ON BALLED AND BURLAPPED MATERIAL LEA\E
BUSAP ON BALL
S TREES MID SHRUBS SHALL BE PLANTED AT THE SANE DEPTH AS
THEY NRE GROWING a THE NORSERY.
TYP.
I D3A
TECHNE KRAFT
Indianapolis, lr>dare
Proposed Dr's Lauck Conway Opticians Office
30 1st Street SW
Carmel, Indiana
Copr. 2004 ID3A- Techne Kraft
Landscape Plan
ALDS SUBMITTAL
April 30, 2004
Dr's Lauck Conway
April 30, 2004
SCHEME 'A'