Loading...
HomeMy WebLinkAbout02 Demolition Plan1 1/ LE GBD 1 SAW CUT PAVEMENT AND REMOVE 94' x 2' OF PAVEMENT AND SUBBASE. REPLACE FULL DEPThASPHALT (SEE R/W PATCH STUMPS DEBRIS TO BE REMOVED CONCRETE CURB TO BE REMOVED SANITARY MANHOLE 130.80' To Beginning Of Proposed Curb Removal Y 4 4 6 e' 4 4 t f N 4 k tf t 4 i t 3 4} d 4 H t S 00'QQ :00" E DETAIL SHEET) North CONCRETE "FAD 7 l 0 ITARY MANHOLE q_ 4 4 t 3 4 d t t o t 3 4 4. 15 ASPHALT GRAPHIC SCALE 60 IN FEET 1 inch 30 ft. MARE DRNE SAW CUT CURB AND REMOVE 94' OF EXISTING CURB TO BE REPLACED \AI/ DEPRESSED CURB (SEE DETAIL SHEET FOR DEPRESSED CURB DETAIL) WOODED FIELD N 4 4 t f d d 4 Y t 4 4 4 t 4 a 9 4 t i 4'4'9'4'4'4+4 d t Y t 4 4 3 t �fR 446,41' 120 i 6.54' h1 REMOVE STUMPS, BRUSH, OLD BROKE i 'ET BLOCK FROM THIS AREA OF SITE- N maimesImp FLOOD MAP INF❑RMATI ❑N FLOOD INSURANCE RATE MAP THE SITE DOES NOT LIE WITHIN A FLOODWAY OR FLOODWAY FRINGE PER HAMILTON COUNTY, INDIANA, AND INCORPORATED AREAS, PANEL 236, MAP 18057CO236F, EFFECTIVE DATE FEBRUARY 19, 2003. DIE SITE IS ZONED 'X'. N t55__ 752.21 G r t i I i r II 1) V CO t! BENCHMARK HAM G -30 A BRONZE PLATE SET IN SOUTH END OF THE WEST PARAPET OF AN 18 FOOT SLAB TOP CULVERT. ALSO, 0.8 MILE NORTH OF MARION HAMILTON COUNTY LINE ON SR -431. 2.8 MILES SOUTH OF SR -234. GREENFIELD DISTRICT. ELEVATION OF 773.50'. TBM #1 5/8" REBAR WITH CAP, SET, LOCATED 3.9 FEET NORTH OF NORTH CURB UNE OF E. 96TH STREET AND 3.5 FOOT EAST OF A POWERPOLE GENERALLY ALONG THE SUBJECT EAST UNE ELEVATION OF 75438'. TBM #2 MAG NAIL 39.7 FEET SOUTH OF 8" BLOCK WALL AND 21.5 FEET EAST OF 8" BLOCK WALL CORNER. ELEVATION OF 753.78'. TBM #3 MAG NAIL 39.7 FEET SOUTH OF 8" BLOCK WALL AND 21.5 FEET EAST OF 8" BLOCK WALL CORNER. ELEVATION OF 751.09'. No. Date 6/03/04 SAW CUT CURB 152' AND PAVEMENT 152' x 2', REMOVE BOTH AND REPLACE WITH 152' OF DEPRESSED CURB AND FULL DEPH ASPHALT Revision Notes per CED Comments Cie citg: gn carr B n y et MFH 8 70, TOM WOOD BAUER DRFVE LOT Clay Tome*, Drawn By MFH DEMOLITION PLAN Hamilton County, Checked By AES CONSTRUCTION NOTES 1. CONTRACTOR WILL CAP AND SEAL ALL UTILITIES BEING ABANDONED PRIOR TO BEGINNING THE PROPOSED CONSTRUCTION OF THE PARKING LOT. 2. A PRE CONSTRUCTION MEETING WITH THE CITY OF CARMEL INSPECTORS IS REQUIRED PRIOR TO BEGINNING ANY DEMOLITION WORK ON THE PROJECT. 3. IT SHALL BE THE RESPONSIBILITY OF EACH SUBCONTRACTOR TO VERIFY ALL EXISTING UTILITIES AND CONDITIONS PERTAINING TO THE PHASE OF WORK. IT SHALL ALSO BE THE SUBCONTRACTOR'S RESPONSIBILITY TO CONTACT THE OWNERS OF THE VARIOUS UTILITIES FOR PROPER STAKE LOCATION OF EACH UTILITY BEFORE WORK IS STARTED. THE SUBCONTRACTOR SHALL NOTIFY IN WRITING THE OWNER AND ENGINEER OF ANY CHANGES, OMISSIONS, OR ERRORS FOUND ON THESE PLANS OR IN FIELD BEFORE WORK IS STARTED OR RESUMED. A PRE CONSTRUCTION MEETING MAY BE REQUIRED WITH ALL UTILITIES PRIOR TO BEGINNING ANY DEMOLITION AND NEW INSTALLATION OF THE UTILITIES. 4. STANDARD SPECIFICATIONS FOR THE LOCAL GOVERNING AGENCY SHALL APPLY FOR ALL SANITARY SEWERS, STORM SEWERS, AND WATER MAINS. 5. ALL MATERIALS FROM THE DEMOLITION ACTIVITIES WILL BE REMOVED FROM SITE BY THE CONTRACTOR AND DISPOSED OF AT THE APPROPRIATE LOCATIONS FOR THE MATERIALS. 6. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL AND STATE STANDARDS. 7. ALL CONSTRUCTION ACTIVITY ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH O.S.H.A. STANDARDS FOR WORKER SAFETY. 8. VERIFY SIGN LOCATIONS AND SIGN REQUIREMENTS WITH LOCAL GOVERNING AUTHORITIES. 9. CLEAR SITE OF ALL STUMPS, BRUSH, AND EXISTING PLANTS PRIOR TO BEGINNING CONSTRUCTION PER IDEM RULE 5 CODES (SEE EROSION CONTROL SHEETS FOR BETTER DESCRIPTION OF CLEARING PRACTICES). Indiana Approved By AES falcon ENGINEERING, INC. 13110 Promise Road, Noblesville, IN 46060 Phone: (317) 841 -3141 Fax: (317) 841 -9951 "DON'T DIG BLIND" "IT'S THE LAW" INDIANA UNDERGROUND PROTECTION SERVICE. INC. CaII 1 -800- 382 -5544 2 Working Days Before You Dig. Date March 29, 2004 Job No. 100,0 1' =30' Sheet No. 2 OF 0