HomeMy WebLinkAbout05 Erosion Control Plan"DON'T DIG BLIND"
"IT'S THE LAW"
Silt Fence
pw
1
Waglan
SF
INDIANA UNDERGROUND PROTECTION SERVICE, INC.
Cali 1- 800 -382 -5544
2 Working Days
Before You Dig.
1r
s
ENTERPRISE LEASING CO PANY OF INDIANAPOLIS INC.
Silt Fence
,r SANITARY MANHOLE 1 j
t
LAND
Co truc ion
LEBO
AREAS TO BE SEEDED BLANKETED OR HYDRO SEEDED
SE: B-6
t
.trance
CONCRETE-
0-
111/ LR
N.-- SANITARY MANHOLE
ASPHALT
MARE oFwE
GERALD W. CURRY TRUSTEE OF REVOCABLE GRANTOR TRUST
LAND USE: B-6
AREAS TO BE SEEDED W/ PERMANENT SEED EROSI ❑N CONTROL BLANKETS
GRAVEL ENTRANCE
SILT FENCE
INLET SEDIMENT PROTECTION (SEE DETAIL)
30
44 iss 0 1 Jr *Ix r ar
4 74 1 r 01 Pi 0.1
Ate*, 46 04 111 A* At#A0446
tag
11111111111111
North
0
Silt Fence
15
GRAPHIC SCALE
0
60
IN FEET
1 inch 30 ft.
NOTE:
Survey and boundary 1nformation provided
by AMERICAN CONSULTING, INC.. Survey
dated 11/15/02.
FLOOD MAP INFORMATION
FLOOD INSURANCE RATE MAP
THE SITE DOES NOT LIE WITHIN A FLOODWAY OR FLOODWAY
FRINGE PER HAMILTON COUNTY, INDIANA. AND INCORPORATED
AREAS. PANEL 0236, MAP 4 18057CO236F. EFFECTIVE DATE
FEBRUARY 19, 2003. THE SITE IS ZONED 'X'.
EDMUND W. MA TIN TN/ R. KINNICK
LAND USE: B -6
1
-752 4
120
0 Q
ST0
EROSION CONTROL RIGHT-OF-WAY
M INLET
N)
01
11
THE AREA BEHIND THE CURB WILL BE SEEDED
FOR A DISTANCE OF 25 FEET ONCE THE CURB
HAS BEEN BACKFILLED,
Cn
Silt Fence
t. S k ov;
N, axisTEiPf�.,
NO.
880573
i
,o'• STATE OF
/O N
1 11 IIiuifl
1. The contractor shall schedule a Pre- construction meeting with the Hamilton County Soil
and Water Conservation District prior to any construction on the site being started.
2. The construction entrance installed.
3. Sediment basin for pond constructed.
4, Outlet pipe and control structure for pond constructed for pond.
5. Temporary stone swale across main entrance drive constructed.
6. Silt fence entire project site.
7, Maintenance and refueling area constructed.
8. Concrete washout area constructed.
9. Posting information area shall be constructed. All items, as outlined in the 0 M
manual for Post Construction water quality measures shalt be placed in this area.
10. Forebays for pond constructed.
11. Grade the site (side swales, and ponds to be seeded and mulched immediately upon
completion). Temporary seeding shall be recommended for all swates and disturbed
areas that cannot be final seeded within a time period that will prevent slope
erosion, For temporary seeding, the contractor shalt utilize a fast growing seed
of either oats, annual rye grass, wheat or rye depending on time of year.
Disturbed areas should be kept to a minimum at all times.
12. Storm inlets are to be protected immediately after installation.
13. Contractor shalt control mud accumulation on all streets surrounding project by
installing stone surface at all locations where construction traffic Leaves the site.
Dust shall be kept to a minimum by utilizing sprinkling, Calcium Chloride,
Vegetative cover, spray on adhesives or other approved methods.
14. Maintain att fitters and traps during construction to prevent any blockages from
accumulated sediment. Additional seeding and straw bates may be required during
construction as specified by Engineer or Soil Conservation Service. Payment for
additional straw bales shalt be at the contractor's expense. Payment for additional
rip -rap (not shown on plans) and seeding shall be paid for on a unit cost basis.
15. Contractor shall install all storm sewers, and subsurface drains. Straw bale filters
shall be installed at all storm inlets (including street inlets).
Z.
EROSION CONTROL LEASURES A SCHEDULE
2' -3' WASHED STONE
(IND ❑T CA, 4t2)
MINIMUM LENGTH 50'
STONE DRVE EW RANCE DETAL
1. FILL GEOTEXTILE BAGS APPROXIMATELY HALF FULL
WITH 2 TO 3 INCH STONE OR GRAVEL.
2. AT A POSITION DOMM SLOPE OF THE 1.01 AND UPSLOPE
OF THE INLE1, LAY BAGS TIGHTLY IN A ROW CURING
UPSLOPE FROM CURB AND AWAY FROM INLET.
3. OVERLAP BAGS ONTO THE CURB AND EXTEND A MIN
IMUM OF 3 FEET INTO THE STREET.
4. FOR ADDITIONAL LAYERS. OVERLAP BAGS WITH THE
ROW BENEATH, AND LEAVE A ONE -BAG GAP IN THE
MIDDLE OF THE TOP ROW TO SERVE AS A SPILLWAY,
5. PLACE BAGS IN AN ARC AROUND CURB INLETS THAT
ARE IN A SUMP POSITION.
B. SET UP SAFETY /TRAFFIC BARRIERS TO KEEP VEHICLES
FROM HITTING BAGS, CAUSING POSSIBLE INJURY.
7. INSPECT AND REPAIR AS NEEDED, AND REMOVE ANY
ACCUMULATED SEDIMENTS AFTER EVERY STORM.
TRENC
PACKE
STRAW
PLAN
ELEVATION
POINTS "A" SHOULD BE
HIGHER THAN POINT "B"
GRAVEL BAGS OVERLAP ONTO THE CURB
0
J
GAP BETYEEN BAGS
ACTS AS A SPILLWAY
CURB INLET PROTECTION DETAIL
OR
1 ESCAVATE A TRENCH ST OOD STAK
4' DEEP AND THE
WIDTH WIDTH OF A STRAW
BALE.
STRAW BAL
3 WEDGE LOOSE STRAW
BETWEEN BALES TO
CREATE A CONTINUOUS
BARRIER.
COMPACTED
BACKFILL
DRAINAGE WAY
I .I =iI
STRAW BALE BARRIER
3 FT. (MIN.)
`RUNOFF
R UNOF \WO
PLACE AND
STAKE STRAW
BALES, TWO
STAKES PER
BALE.
m I I tIL BINDING WIRE
OR TWINE
J4 BACKFILL AND
COMPACT THE
EXCAVATED SOIL
AS SHOWN ON THE
UPHILL SIDE OF
THE BARRIER TO
PREVENT PIPING.
EROSION CONTROL MEASURES MANTENANCE MOMS
STRAW BALE DAM MAINTENANCE REQUIREMENTS
1. INSPECT STRAW BALE DAMS AFTER EACH STORM EVENT AND PROMPTLY REMOVE ANY
SEDIMENT DEPOSITS.
2. INSPECT PERIODICALLY FOR DETERIORATION OR DAMAGE FROM CONSTRUCTION
AND REPAIR IMMEDIATELY,
3, AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL
STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
SILT FENCE MAINTENANCE REQUIREMENTS
1. INSPECT SILT FENCE AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS OR BECOMES INEFFECTIVE, REPLACE THE AFFECTED AREA
IMMEDIATELY.
3. REMOVE SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST
POINT OR IS CAUSING THE FABRIC TO BULGE.
4. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL
FENCE AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS
1. INSPECT TEMPORARY SEDIMENT TRAP AFTER EACH STORM EVENT.
2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH.
3. REPLACE SPILLWAY GRAVEL FACING IF CLOGGED.
4, INSPECT VEGETATION, AND RE -SEED IF NECESSARY.
5. PROMPTLY REPLACE ANY DISPLACED RIPRAP.
6. AFTER ALL DISTURBED AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE
AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
CURB INLET SEDIMENT BARRIER MAINTENANCE REQUIREMENTS
1. INSPECT CURB INLET SEDIMENT BARRIER PERIODICALLY AND AFTER EACH STORM
EVENT AND REPAIR IF NEEDED.
2. REMOVE SEDIMENT WITHOUT FLUSHING, WHEN IT REACHES HALF THE HEIGHT OF
THE BARRIER.
3. DEPOSIT SEDIMENT WHERE IT WILL NOT ENTER STORM DRAINS.
EROSION CONTROL BLANKET MAINTENANCE REQUIREMENTS
1. INSPECT EROSION CONTROL BLANKET PERIODICALLY AND AFTER EACH STORM EVENT,
2. IF ANY AREA SHOWS EROSION, ADD SOIL AND RE -SEED THE AREA, RE -LAY AND STAPLE
THE BLANKET.
3. AFTER VEGETATIVE COVER IS ESTABLISHED, CHECK THE AREA PERIODICALLY.
TEMPORARY CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS
1. INSPECT ENTRANCE WEEKLY AND AFTER EACH STORM EVENT OR HEAVY USE.
2. RESHAPE ENTRANCE AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
3. ADD CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY
BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED
INTO A SEDIMENT TRAP OR BASIN.
5, REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY,
EROSION GAMBOL HMV
NMI AMERICAN GREEN 5150
OR EQUAL F R SECURING 7HE
BLANKET. USE USE EROS i
CON1ROL BLANKET.
NTAL Eft204
1. FILL GEOTEXTILE BAGS APPROXIMATELY HALF FULL
WITH 2 TO 3 INCH STONE OR GRAVEL.
2. OVERLAP BAGS AROUND INLET AND EXTEND A MIN-
IMUM OF 3 FEET AWAY FROM CASTING.
3. FOR ADDITIONAL LAYERS, OVERLAP BAGS WITH THE
ROW BENEATH, AND LEAVE A ONE -BAG GAP IN THE
MIDDLE OF THE TOP ROW TO SERVE AS A SPILLWAY.
4. PLACE BAGS IN AN ARC AROUND INLETS THAT
ARE IN A SUMP POSITION.
5. SET UP SAFETY /TRAFFIC BARRIERS TO KEEP VEHICLES
FROM HITTING BAGS, CAUSING POSSIBLE INJURY.
6. INSPECT AND REPAIR AS NEEDED, AND REMOVE ANY
ACCUMULATED SEDIMENTS AFTER EVERY STORM.
INLET PROTECTION DETAIL
1. PREPARE SOL BRIE INSWING BLANKET% INCLUDING
APPLICATION OF LM FER1LIZER MD SEED"
2. BEGIN AT 7HE ltP W 11E CHANNEL BY ARMGHO NliG 7HE
BLANKET N A d' DEEP x 8' NNE TRENCH. BAt1CFILt AND
Cl 'ACT THE WENCH AFTER STAPLING.
ROt.L CENTER OUWKET Ili DIRECTION G OMER FLOW ON
BOTTOM OF CHANNEL
4 PLACE ELAN= END OVER EN! (S IPA2E SftE IMTH
A 3' OVERLAP. US A DOUBLE ROIV OF STAGGERED STAPLES
4' APART 10 SECURE BLA NCEI5
Yid SEE CRAM PLAN
NOTES RJR INSTALLATION
(swALE)
TYPICAL SECTION
FABRIC OVER THE CASTING INLET
falcon
ENGINEERING, INC.
13110 Promise Road, Noblesville, IN 46060
Phone: (317) 841 -3141 Fax: (317) 841 -9951
PROPOSED GRADE
TOP VIEW
Job No.
SAW BAGS
CONTRACTOR SHALL SURROUND ALL EXrIST1NG
DRAINAGE STRUCTURES W/ SAND BAGS
THESE SILT CONTROL DEWCES HILL BE
MAINTAINED BY THE CONTRACTOR UNTIL
ENQP EER AUTHORIZES REMOVAL,
WERE STRUCTURES ARE PLACED IN PAVED
SURFACE AREAS, EROSIOY CONTROL MEASURES
CAN BE REMOVED W1EN PAWNG IS STARTED IN
THE AFFECTED AREA.
B FLLL WENGJH a: t AIMS AT TOP OF SIDE SLOPES
MST OE ANCHORS) N 6' DEEP x 8' NfE 1REINCt>I`
MOM. AND COMPACT DIE 7RDICH AFTER STAPLNMG.
RAN= 0 S PE SLOPES MUST OE OVERLAPPED 4'
OVER THE CENTER LINNET MD STAPLED.
7. NNE MOM EN) OF 711E BLANGEIS MST OE WHORED
DI A 6"' DEEP x 6' NVE TRENCH BACKFIL AND COMPACT IHE
WENCH AFTER STAPI.NMG.
Date March 29, 2004
100.0
1'' 30'
Sheet No. 5 OF t t
NOTE] DRAWING IS FOR EROSION CONTROL ONLY
"DON'T DIG BLIND"
"IT'S THE LAW"
Silt Fence
pw
1
Waglan
SF
INDIANA UNDERGROUND PROTECTION SERVICE, INC.
Cali 1- 800 -382 -5544
2 Working Days
Before You Dig.
1r
s
ENTERPRISE LEASING CO PANY OF INDIANAPOLIS INC.
Silt Fence
,r SANITARY MANHOLE 1 j
t
LAND
Co truc ion
LEBO
AREAS TO BE SEEDED BLANKETED OR HYDRO SEEDED
SE: B-6
t
.trance
CONCRETE-
0-
111/ LR
N.-- SANITARY MANHOLE
ASPHALT
MARE oFwE
GERALD W. CURRY TRUSTEE OF REVOCABLE GRANTOR TRUST
LAND USE: B-6
AREAS TO BE SEEDED W/ PERMANENT SEED EROSI ❑N CONTROL BLANKETS
GRAVEL ENTRANCE
SILT FENCE
INLET SEDIMENT PROTECTION (SEE DETAIL)
30
44 iss 0 1 Jr *Ix r ar
4 74 1 r 01 Pi 0.1
Ate*, 46 04 111 A* At#A0446
tag
11111111111111
North
0
Silt Fence
15
GRAPHIC SCALE
0
60
IN FEET
1 inch 30 ft.
NOTE:
Survey and boundary 1nformation provided
by AMERICAN CONSULTING, INC.. Survey
dated 11/15/02.
FLOOD MAP INFORMATION
FLOOD INSURANCE RATE MAP
THE SITE DOES NOT LIE WITHIN A FLOODWAY OR FLOODWAY
FRINGE PER HAMILTON COUNTY, INDIANA. AND INCORPORATED
AREAS. PANEL 0236, MAP 4 18057CO236F. EFFECTIVE DATE
FEBRUARY 19, 2003. THE SITE IS ZONED 'X'.
EDMUND W. MA TIN TN/ R. KINNICK
LAND USE: B -6
1
-752 4
120
0 Q
ST0
EROSION CONTROL RIGHT-OF-WAY
M INLET
N)
01
11
THE AREA BEHIND THE CURB WILL BE SEEDED
FOR A DISTANCE OF 25 FEET ONCE THE CURB
HAS BEEN BACKFILLED,
Cn
Silt Fence
t. S k ov;
N, axisTEiPf�.,
NO.
880573
i
,o'• STATE OF
/O N
1 11 IIiuifl
1. The contractor shall schedule a Pre- construction meeting with the Hamilton County Soil
and Water Conservation District prior to any construction on the site being started.
2. The construction entrance installed.
3. Sediment basin for pond constructed.
4, Outlet pipe and control structure for pond constructed for pond.
5. Temporary stone swale across main entrance drive constructed.
6. Silt fence entire project site.
7, Maintenance and refueling area constructed.
8. Concrete washout area constructed.
9. Posting information area shall be constructed. All items, as outlined in the 0 M
manual for Post Construction water quality measures shalt be placed in this area.
10. Forebays for pond constructed.
11. Grade the site (side swales, and ponds to be seeded and mulched immediately upon
completion). Temporary seeding shall be recommended for all swates and disturbed
areas that cannot be final seeded within a time period that will prevent slope
erosion, For temporary seeding, the contractor shalt utilize a fast growing seed
of either oats, annual rye grass, wheat or rye depending on time of year.
Disturbed areas should be kept to a minimum at all times.
12. Storm inlets are to be protected immediately after installation.
13. Contractor shalt control mud accumulation on all streets surrounding project by
installing stone surface at all locations where construction traffic Leaves the site.
Dust shall be kept to a minimum by utilizing sprinkling, Calcium Chloride,
Vegetative cover, spray on adhesives or other approved methods.
14. Maintain att fitters and traps during construction to prevent any blockages from
accumulated sediment. Additional seeding and straw bates may be required during
construction as specified by Engineer or Soil Conservation Service. Payment for
additional straw bales shalt be at the contractor's expense. Payment for additional
rip -rap (not shown on plans) and seeding shall be paid for on a unit cost basis.
15. Contractor shall install all storm sewers, and subsurface drains. Straw bale filters
shall be installed at all storm inlets (including street inlets).
Z.
EROSION CONTROL LEASURES A SCHEDULE
2' -3' WASHED STONE
(IND ❑T CA, 4t2)
MINIMUM LENGTH 50'
STONE DRVE EW RANCE DETAL
1. FILL GEOTEXTILE BAGS APPROXIMATELY HALF FULL
WITH 2 TO 3 INCH STONE OR GRAVEL.
2. AT A POSITION DOMM SLOPE OF THE 1.01 AND UPSLOPE
OF THE INLE1, LAY BAGS TIGHTLY IN A ROW CURING
UPSLOPE FROM CURB AND AWAY FROM INLET.
3. OVERLAP BAGS ONTO THE CURB AND EXTEND A MIN
IMUM OF 3 FEET INTO THE STREET.
4. FOR ADDITIONAL LAYERS. OVERLAP BAGS WITH THE
ROW BENEATH, AND LEAVE A ONE -BAG GAP IN THE
MIDDLE OF THE TOP ROW TO SERVE AS A SPILLWAY,
5. PLACE BAGS IN AN ARC AROUND CURB INLETS THAT
ARE IN A SUMP POSITION.
B. SET UP SAFETY /TRAFFIC BARRIERS TO KEEP VEHICLES
FROM HITTING BAGS, CAUSING POSSIBLE INJURY.
7. INSPECT AND REPAIR AS NEEDED, AND REMOVE ANY
ACCUMULATED SEDIMENTS AFTER EVERY STORM.
TRENC
PACKE
STRAW
PLAN
ELEVATION
POINTS "A" SHOULD BE
HIGHER THAN POINT "B"
GRAVEL BAGS OVERLAP ONTO THE CURB
0
J
GAP BETYEEN BAGS
ACTS AS A SPILLWAY
CURB INLET PROTECTION DETAIL
OR
1 ESCAVATE A TRENCH ST OOD STAK
4' DEEP AND THE
WIDTH WIDTH OF A STRAW
BALE.
STRAW BAL
3 WEDGE LOOSE STRAW
BETWEEN BALES TO
CREATE A CONTINUOUS
BARRIER.
COMPACTED
BACKFILL
DRAINAGE WAY
I .I =iI
STRAW BALE BARRIER
3 FT. (MIN.)
`RUNOFF
R UNOF \WO
PLACE AND
STAKE STRAW
BALES, TWO
STAKES PER
BALE.
m I I tIL BINDING WIRE
OR TWINE
J4 BACKFILL AND
COMPACT THE
EXCAVATED SOIL
AS SHOWN ON THE
UPHILL SIDE OF
THE BARRIER TO
PREVENT PIPING.
EROSION CONTROL MEASURES MANTENANCE MOMS
STRAW BALE DAM MAINTENANCE REQUIREMENTS
1. INSPECT STRAW BALE DAMS AFTER EACH STORM EVENT AND PROMPTLY REMOVE ANY
SEDIMENT DEPOSITS.
2. INSPECT PERIODICALLY FOR DETERIORATION OR DAMAGE FROM CONSTRUCTION
AND REPAIR IMMEDIATELY,
3, AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL
STRAW BALES AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
SILT FENCE MAINTENANCE REQUIREMENTS
1. INSPECT SILT FENCE AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS OR BECOMES INEFFECTIVE, REPLACE THE AFFECTED AREA
IMMEDIATELY.
3. REMOVE SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST
POINT OR IS CAUSING THE FABRIC TO BULGE.
4. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL
FENCE AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS
1. INSPECT TEMPORARY SEDIMENT TRAP AFTER EACH STORM EVENT.
2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH.
3. REPLACE SPILLWAY GRAVEL FACING IF CLOGGED.
4, INSPECT VEGETATION, AND RE -SEED IF NECESSARY.
5. PROMPTLY REPLACE ANY DISPLACED RIPRAP.
6. AFTER ALL DISTURBED AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE
AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
CURB INLET SEDIMENT BARRIER MAINTENANCE REQUIREMENTS
1. INSPECT CURB INLET SEDIMENT BARRIER PERIODICALLY AND AFTER EACH STORM
EVENT AND REPAIR IF NEEDED.
2. REMOVE SEDIMENT WITHOUT FLUSHING, WHEN IT REACHES HALF THE HEIGHT OF
THE BARRIER.
3. DEPOSIT SEDIMENT WHERE IT WILL NOT ENTER STORM DRAINS.
EROSION CONTROL BLANKET MAINTENANCE REQUIREMENTS
1. INSPECT EROSION CONTROL BLANKET PERIODICALLY AND AFTER EACH STORM EVENT,
2. IF ANY AREA SHOWS EROSION, ADD SOIL AND RE -SEED THE AREA, RE -LAY AND STAPLE
THE BLANKET.
3. AFTER VEGETATIVE COVER IS ESTABLISHED, CHECK THE AREA PERIODICALLY.
TEMPORARY CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS
1. INSPECT ENTRANCE WEEKLY AND AFTER EACH STORM EVENT OR HEAVY USE.
2. RESHAPE ENTRANCE AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
3. ADD CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY
BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED
INTO A SEDIMENT TRAP OR BASIN.
5, REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY,
EROSION GAMBOL HMV
NMI AMERICAN GREEN 5150
OR EQUAL F R SECURING 7HE
BLANKET. USE USE EROS i
CON1ROL BLANKET.
NTAL Eft204
1. FILL GEOTEXTILE BAGS APPROXIMATELY HALF FULL
WITH 2 TO 3 INCH STONE OR GRAVEL.
2. OVERLAP BAGS AROUND INLET AND EXTEND A MIN-
IMUM OF 3 FEET AWAY FROM CASTING.
3. FOR ADDITIONAL LAYERS, OVERLAP BAGS WITH THE
ROW BENEATH, AND LEAVE A ONE -BAG GAP IN THE
MIDDLE OF THE TOP ROW TO SERVE AS A SPILLWAY.
4. PLACE BAGS IN AN ARC AROUND INLETS THAT
ARE IN A SUMP POSITION.
5. SET UP SAFETY /TRAFFIC BARRIERS TO KEEP VEHICLES
FROM HITTING BAGS, CAUSING POSSIBLE INJURY.
6. INSPECT AND REPAIR AS NEEDED, AND REMOVE ANY
ACCUMULATED SEDIMENTS AFTER EVERY STORM.
INLET PROTECTION DETAIL
1. PREPARE SOL BRIE INSWING BLANKET% INCLUDING
APPLICATION OF LM FER1LIZER MD SEED"
2. BEGIN AT 7HE ltP W 11E CHANNEL BY ARMGHO NliG 7HE
BLANKET N A d' DEEP x 8' NNE TRENCH. BAt1CFILt AND
Cl 'ACT THE WENCH AFTER STAPLING.
ROt.L CENTER OUWKET Ili DIRECTION G OMER FLOW ON
BOTTOM OF CHANNEL
4 PLACE ELAN= END OVER EN! (S IPA2E SftE IMTH
A 3' OVERLAP. US A DOUBLE ROIV OF STAGGERED STAPLES
4' APART 10 SECURE BLA NCEI5
Yid SEE CRAM PLAN
NOTES RJR INSTALLATION
(swALE)
TYPICAL SECTION
FABRIC OVER THE CASTING INLET
falcon
ENGINEERING, INC.
13110 Promise Road, Noblesville, IN 46060
Phone: (317) 841 -3141 Fax: (317) 841 -9951
PROPOSED GRADE
TOP VIEW
Job No.
SAW BAGS
CONTRACTOR SHALL SURROUND ALL EXrIST1NG
DRAINAGE STRUCTURES W/ SAND BAGS
THESE SILT CONTROL DEWCES HILL BE
MAINTAINED BY THE CONTRACTOR UNTIL
ENQP EER AUTHORIZES REMOVAL,
WERE STRUCTURES ARE PLACED IN PAVED
SURFACE AREAS, EROSIOY CONTROL MEASURES
CAN BE REMOVED W1EN PAWNG IS STARTED IN
THE AFFECTED AREA.
B FLLL WENGJH a: t AIMS AT TOP OF SIDE SLOPES
MST OE ANCHORS) N 6' DEEP x 8' NfE 1REINCt>I`
MOM. AND COMPACT DIE 7RDICH AFTER STAPLNMG.
RAN= 0 S PE SLOPES MUST OE OVERLAPPED 4'
OVER THE CENTER LINNET MD STAPLED.
7. NNE MOM EN) OF 711E BLANGEIS MST OE WHORED
DI A 6"' DEEP x 6' NVE TRENCH BACKFIL AND COMPACT IHE
WENCH AFTER STAPI.NMG.
Date March 29, 2004
100.0
1'' 30'
Sheet No. 5 OF t t