Loading...
HomeMy WebLinkAboutC4 Erosion Control Plani 1 i i EN= 1 or is eimmizemor 7381.84 NM WI- le III r w V a W W W W ,1 W W W W W W W W w w W W W W W W w W w wti 740.64. /40.14: INSTALL 5'x 10' x 1.5' REVETMENT RIP -RAP ON FILTER FABRIC W W W w w W 1.6 741 13, W W W 743 -24 742.74 'v 2. 1 4fr21 742.681 v7 X742.52 I s 742.02 43122 1 742.90► jr f 743.14 743.14 'f 4 743.48 743.38 al or 744 501 743.30 1 ,43.14 f ;43 .04111 742 II 743 30 (742.481 741 08 740.58 W y .7- i •1742.54 1 a U) W W ASPHALT SIDEWALK dy .l 743.44 742.94 '1 743.3Q 743.48 742.98 N 742.88 142.88.j W kftweiamehb. FUELING AREA FUEL TANK L742 801 3.50 300 w w W W W W W W W w W y. W w W W W w PROPOSED STEAK 'N SHAKE D -3NT F.F.E. 743.50 4,3 S.F. 743.40 743.30 742.80 74 4 W 1742.80) 43 93 j40.73 1742.58I 743.50 743.00 r743.50 743.50 743.40 W .!Y.. ..W. w W W W FnB2 FxC3 OcA St We SOILS TYPE LEGEND FOX LOAM, 2 TO 6 PERCENT SLOPES, ERODED THE MAIN SOIL FEATURES THAT ADVERSELY AFFECT ENGINEERING USES ARE MODERATE FROST 1 ACTION POTENTIAL, MODERATE SHRINK -SWELL POTENTIAL, MODERATE PERMEABILITY IN THE SUBSOIL, AND RAPID PERMEABILITY IN THE UNDERLYING MATERIAL THIS SOIL HAS SLIGHT LIMITATIONS FOR BUILDING SITES AND SEPTIC TANK ABSORPTION FIELDS. IT HAS MODERATE LIMITATIONS FOR LOCAL ROADS AND STREETS BECAUSE OF MODERATE SHRINK -SWELL POTENTIAL THE BASE MATERIAL FOR ROADS NEEDS TO BE STRENGTHENED WITH SUITABLE MATERIAL. FOX CLAY LOAM, 8 TO 18 PERCENT, SEV. ERODED THE MAIN SOIL FEATURES THAT ADVERSELY AFFECT ENGINEERING USES ARE MODERATE FROST ACTION POTENTIAL, MODERATE SHRINK -SWELL POTENTIAL, MODERATE PERMEABILITY IN THE SUBSOIL, AND RAPID PERMEABILITY IN THE UNDERLYING MATERIAL THIS SOIL HAS MODERATE` LIMITATIONS FOR BUILDING SITES. SLOPE IS A MODERATE LIMITATION FOR DWEWNGS AND IS A SEVERE LIMITATION FOR SMALL COMMERCIAL BUILDINGS. SMALL COMMERCIAL BUILDINGS SHOULD BE CONSTRUCTED ON LESS SLOPING SOILS. REMOVAL OF VEGETATION SHOULD BE KEPT TO A MINIMUM. TOPSOILS SHOULD BE STOCKPILED FOR USE IN EXPOSED AREAS, AND A PLANT COVER SHOULD BE ESTABLISHED AS SOON AS POSSIBLE AFTER CONSTRUCTION. LOCAL ROADS AND STREETS SHOULD BE BUILT ON THE CONTOUR. THE BASE MATERIAL FOR ROADS AND STREETS NEEDS TO BE STRENGTHENED WITH SUITABLE MATERIAL. OCKLEY SILT LOAM, 0 TO 2 PERCENT SLOPES THIS SOIL IS SUITABLE FOR URBAN. THE MAIN SOIL FEATURES THAT ADVERSELY AFFECT ENGINEERING USES ARE MODERATE FROST ACTION POTENTIAL„ MODERATE SHRINK-SWELL POTENTIAL, MODERATE PERMEABILITY IN THE SUBSOIL AND RAPID PERMEABILITY IN THE UNDERLYING MATERIAL. THIS SOIL HAS MODERATE LIMITATIONS FOR BUILDING SITES BECAUSE OF SHRINK SWELL POTENTIAL AND LOW STRENGTH OF THE SOIL USING PROPERLY DESIGNED FOUNDATIONS, FOOTINGS, AND BASEMENT WALLS AND USING DRAINAGE TILE CAN HELP TO PREVENT STRUCTURAL DAMAGE FROM THE LOW STRENGTH AND SHRINKING SWEWNG OF THE SOIL LOW STRENGTH IS A SEVERE LIMITATION TO THE USE OF THIS SOILS FOR LOCAL ROADS AND STREETS. THE BASE MATERIAL FOR ROADS NEEDS TO BE STRENGTHENED WITH SUITABLE MATERIAL. SLEETH LOAM THIS SOIL IS POORLY SUITED TO URBAN DEVELOPMENT. THE MAIN SOIL FEATURES THAT ADVERSELY AFFECT ENGINEERING USES OF THIS SOIL ARE A SEASONAL HIGH WATER TABLE, HIGH POTENTIAL FROST ACTION, MODERATE PERMEABILITY IN THE SUBSOIL AND RAPID PERMEABIUIY IN THE SUBSTRATUM. THIS SOIL HAS. SEVERE UMITATIONS FOR BUILDING SITES. THE SITES NEED TO BE ARTIFICIALLY DRAINED TO PREVENT WETNESS FROM BECOMING A PROBLEM. DWEWNG AND SMALL BUILDINGS WITH BASEMENTS SHOULD NOT BE CONSTRUCTED ON THIS SOIL USING PROPERLY DESIGNED FOUNDATIONS AND FOOTINGS HELPS TO PREVENT STRUCTURAL DAMAGE FIROM THE LOW STRENGTH AND SHRINKING SWELUNG OF THE SOIL THE SOIL HAS SEVERE LIMITATIONS FOR LOCAL ROADS AND STREETS. INSTALLING DITCHES ALONG ROADS HELPS TO LOWER THE WATER TABLE AND TO PREVENT DAMAGE FROM FROST ACTION. THE BASE MATERIAL FOR ROADS NEEDS TO BE STRENGTHENED OR REPLACED WITH SUITABLE MATERIAL. WESTLAND SILTY CLAY LOAM THE MAIN SOIL' FEATURES THAT ADVERSELY AFFECT ENGINEERING USES OF THIS SOIL ARE A SEASONAL HIGH WATER TABLE, HIGH POTENTIAL FROST ACTION, MODERATE SHRINK -SWELL POTENTIAL, AND SLOW PERMEABIUTY. THIS SOIL HAS SEVERE UMITATIONS FOR BUILDING SITE BECAUSE OF A SEASONAL HIGH WATER TABLE, THE SITES NEED TO BE ARTIFICIALLY DRAINED AND PROTECTED FROM FLOODING. DWELLINGS AND SMALL BUILDINGS WITH BASEMENTS SHOULD NOT BE CONSTRUCTED ON THIS SOIL. USING PROPERLY DESIGNED FOUNDATIONS AND FOOTINGS HELPS TO PREVENT STRUCTURAL DAMAGE FROM THE LOW STRENGTH AND SHRINKING SWEWNG OF THE SOIL THIS SOILS HAS SEVERE UMITATIONS FOR LOCAL ROADS AND STREETS BECAUSE OF A SEASONAL HIGH WATER TABLE AND HIGH POTENTIAL FROST ACTION. INSTALLATION OF I DRAINAGE DITCHES ALONG ROADS HELPS TO LOWER THE WATER TABLE AND TO PREVENT DAMAGE FROM FROST ACTION. THE BASE MATERIAL FOR ROADS NEED TO BE REPLACED OR STRENGTHENED WITH SUITABLE MATERIAL 743.30 742.80 W W W L W CONSTRUCTION DUMPSTER 743.48 742.98 743.50 743.50 [7-43,50 743.50 743.50 1742.60 w W 741.40 "1743. w w W W 7 3.30 42.80 1 742 -6D 1 w '4 4 NI 4. W 4. W W "742990 7 0' 741.8 Io 1 742. i 743165 743:15] 1742 95 742.9] 743.613 743.113 742;601 F r 74115 740.65 W W 3W 740.88 740.3$ SO' z J W -.6 CD Nit W W W I W W W W W W W W I KPILE r ktik W W W W W W W w; w W 4. w W W= W i, W iW W W L W w W 4, w W �,,t W •V W W w W •k w w W W W W W 1. W w W i w W W w w w W W W W; w W I w w w w W w w W W W W W W w 4, I 12' MIN. SIDE 24 SQUARE RIP -RAP ���1'• toss'• \46 SEE PLANS RIP -RAP NEENAH R- 3286 -8V FRAME AND GRATE #2 STONE NOTE: INSTALL NEENAH R- 3701 -15 CATCH BASIN TRAP CATCH BASIN TRAP DETAIL I 18" MIN. 1 OUTLET EROSION CONTROL BOTTOM OF TRAP 6" MIN. BELOW FLOW LINE (NO SCALE) D IdO t 01I1I11 ll111 11 S S 11/A/4/ t- etSTER �s NO" 10200392 STATE OF I, 8 NA t� JAMES I.C. SHINNEMAN P.E 10200392 J 0 (i7 W W Q 73.9 27 739.42 r7p.04 1,738.54.: .M.E.G W W W W I, y 10 W w W w W W w 4 W ,y W W W W W W 4 W W W W W 1 W W W w W w W W 1 W W w w w W .1, w W w W w W W W W w W W W W w W W W\ W W W w W 4. W i W w W W V 4 IW W W W W W W W W W W W W w 4, W W w W W W W W W W W W w W W W W w w W W W W 4' W W W W w W w w W w w ,740. +9 W w 7.39 W W W k- 738.661 10 R AC W w 9 CONCRETE WASHOUT AREA W w W w W W W W w W W W W W W W W W w W w W W W W 74-Q 88* 442.k8 W 0 -NOTE THIS PLAN INDICATES EROSION CONTROL MEASURES REQUIRED AFTER SOIL STRIPPING AND PAD BUILDING HAS TAKEN PLACE. COORDINATE WITH DEVELOPER FOR MEASURES REQUIRED UNTIL PROPERTY TURNED OVER FOR DEVELOPMENT. COORDINATE WITH SOIL CONSERVATION DISTRICT REPRESENTATIVE FOR ANY OTHER MEASURES REQUIRED DUE TO SITE CONDITIONS. R4W!NG: H: \2004\ WO4 0266 \ENG \C,Q�� nset 040266 C 04 .dwg 1.AYrIUt F_rosian- ;)1 r,(14. AREA MAP 733 4 -735- 736 -737 GRAVELBAG CURB PROTECTION (NO SCALE) (FOR INLETS THAT ARE IN LOW POINTS) NOTE: GRAVEL BAGS ARE HALF FULL WITH LARGE ROCK AND PACKED CLOSE TOGETHER TO EUMINATE GAPS. IF BAG DETERIORATES OR IS DAMAGED, REBAG OLD BAG WITH CONTENTS INTO A NEW BAG. 9 W w W W W Y v v W W W W W W w W w W W *PROJECT LOCATION W W ■W 8 RUNOFF W W w W W W W 4 W W w 1 w SOILS MAP 8 Wr N. WARNING- THIS PLAN TO BE USED FOR EROSION CONTROL PURPOSES ONLY. 1t 7 CONTACT PERSON FOR EROSION CONTROL SEDIMENT PRAdTIC STABIUZATION PRACTICE: JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC. PERMANENT SEEDING SEEDING SODDING STEAK 'n SHAKE 500 CENTURY BUILDING 36 S. PENNSYLVANIA STREET INDIANAPOLIS, IN 46204 TELEPHONE: (317) 655-3603 FAX: (317) 655-7317 CONTACT PERSON: JAY KAMMEYER MULCHING G A KENTUCKY BLUEGRASS 40 LBS/ACRE, CREEPING RFD FESCUE 40 LBS/ACRE; PLUS 2 TONS STRAW MULCH/ACRE, OR ADD ANNUAL RYEGRASS 20 LBS/ACRE B KENTUCKY BLUEGRASS 60 LEIS/ACRE; CREEPING RED FESCUE 60 LBS/ACRE; PLUS 2 TONS STRAW MULCH/ACRE, OR ADD ANNUAL RYEGRASS 30 LBS/ACRE. E ANNUAL RYEGRASS 40 LBS/ACRE. (1 U3/1000 SO. FT.) F SOD G STRAW MULCH 2 TONS/ACRE. VIP IRRIGATION NEEDED DURING JUNE, JULY, AND/OR SEPTEMBER. 0 IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD. EROSION CONTROL LEGEN EROSION CONTROL NOTES 1. ALL DISTURBED AREAS SHALL BE SODDED OR SEEDED, EXCEPT BUILDING PAD AND LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR LOCATION OF LANDSCAPE BEDS. 2. INSTALL SILT FENCE ALONG ALL PROPERTY BOUNDARIES. CONSTRUCTION ENTRANCE CONCRETE WASHOUT IBM SEASONAL SOIL PROTECTION CHART SOD OR LANDSCAPED AREA SEE PLANTING CHART FOR LAWN OR C6 FO LANDSCAPING INLET PROTECTION SILT FENCE SMOOTH FOUNDATION UNDER FILTER Ilyv yisiUtt‘itiViq 11 11 6 ALTER FABRIC 3/8" TREATED PLYWOOD 48"x24" PAINTED WHITE BLACK LEI 1ER 6" HEIGHT 0.5" LAG SCREWS WOOD POST 3"x3"x8' CONCRETE WASHOUT SION 6 (NO SCALE) NOT It SCALE POST 4" DIA. WOOD OR 1.33 LBS/FOOT STEL 10' MAX. SPACING WIRE FENCE 14 GAGE (MIN)-6" MESH SPACING (MAX) FASTENED BY 1" WIRE STAPLES, TIE WIRES, OR HOG RINGS FILTER FABRIC ALONG LENGTH (NO JOINTS) STAPLE OR WIRE TO 'FENCE 4"X4" TRENCH TO BE LATH ac RAGGING ON ALL SIDES MAINTENANCE: DOWN- UPSLOPE SLOPE -1 11E1111 1111= El 1 1E1 SILT FENCE SECTION 10 MIL. PLASTIC UNING PLAN BERM (NO SCALE) STAKE (TYP.) 12" FILTREXX FILTER SOCK SECTION CONCRETE WASHOUT TYPE "BELOW GRADE" NOT TO SCALE 12" FILTREXX FILTER SOCK 10 MIL PLASTIC LINING TO EXTEND TO FILTREXX FILTER SOCK NOTES: I. WASHOUT LOCATION SHOWN ON EROSION CONTROL PLAN. 2. DRY CONCRETE TO BE REMOVED FROM SITE PERIODICALLY AND DISPOSED OF BY APPROVED METHODS. 3. THE CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 30FT. OF THE TEMP. CONCRETE WASHOUT FACILITY. MAINTENANCE: 1. INSPECT WEEKLY AND AFTER EACH STORM EVENT. 2. IF FABRIC IS TORN OR DETERIORATED, REPLACE SECTION IMMEDIATELY. 3. REMOVE SEDIMENT WHEN HEIGHT REACHES 1/3 OF THE HEIGHT OF THE FENCE OR IS CAUSING FABRIC TO BULGE. 4. TAKE CARE NOT TO UNDERMINE THE ENTRENCHED FABRIC. 5. AFTER DRAINAGE AREA IS STABIUZED, REMOVE FENCE AND SEDIMENT, BRING DISTURBED AREA TO GRADE AND STABILIZE IT. l' HARDWOOD CROSSBRACING 2"X2"X36" HARDWOOD CATCH BASIN/ STAKES WITH POINTED END LATH AT EACH STAKE OVER FABRIC 36" WIDE NONWOVEN POLYPROPYLENE FABRIC REFER TO SILT FENCE SECTION FOR EMBEDMENT DETAIL 1. INSPECT WEEKLY AND AFTER EACH STORM EVENT. 2. IF FABRIC IS TORN OR DETERIORATED, REPLACE SECTION IMMEDIATELY. 3. REMOVE SEDIMENT WHEN HEIGHT REACHES 1/3 OF THE HEIGHT OF THE FENCE OR IS CAUSING FABRIC TO BULGE. 4. TAKE CARE NOT TO UNDERMINE THE ENTRENCHED FABRIC. 5. AFTER DRAINAGE AREA IS STABILIZED, REMOVE FENCE AND SEDIMENT, BRINGING DISTURBED AREA TO GRADE AND STABILIZE IT. SILT FENCE INLET PROTECTION DETAIL 5 (NOT TO SCALE) 4 3 SECTION A CONSTRUCTION PLAN ELEMENTS Al PLAN INDEX SEE BELOW A2 11N17 PLAT (REDUCTION OF EROSION CONTROL PLAN TO BE SUBMITTED WITH FULL SIZE PLAN) A3 PROJECT NARRATIVE THIS IS A PROPOSED COMMERCIAL DEVELOPMENT ON APPROXIMATELY 2.88 ACRES. THE CONSTRUCTION SHALL CONSIST OF ONE BUILDING, ASPHALT PARKING WITH 1 ENTRY DRIVE, AND ENCLOSED STORM SEWERS. A4 VICINITY MAP SEE BOTTOM CENTER OF EROSION CONTROL PLAN A5 LEGAL DESCRIPTION SEE LOWER RIGHT CORNER OF EROSION CONTROL PLAN A6 LOCATION OF ALL LOTS AND PROPOSED SITE IMPROVEMENTS SEE EROSION CONTROL PLAN A7 HYDROLOGIC UNIT CODE (14 DICIT) 05120201090040 AEI NOTATION OF ANY STATE OR FEDERAL WATER QUALITY PERMITS NOT APPLICABLE A9 SPECIFIC POINTS WHERE STORMWATER DISCHARGE LEAVES SITE SEE EROSION CONTROL PLAN A10 LOCATION AND NAME OF WETLANDS, LAKES AND WATER COURSES ON AND ADJACENT TO SITE NOT APPLICABLE CREEK Al2 IDDITIFICATION OF POTENTIAL DISCHARGE TO GROUND WATER NOT APPLICABLE Al4 PRE-CONSTRUCTION AND POST-CONSTRUCTION ESTIMATE OF PEAK DISCHARGE (10 YEAR) Al5 ADJACENT LAND USE INCLUDING UPSTREAM WATERSHED SEE EROSION CONTROL PLAN Al6 CONSTRUCTION UNITS SEE EROSION CONTROL PLAN Al7 IDENTIFICATION OF DUSTING VEGETATNE COVER GRASS A11:I SOILS MAP W/ SOIL DESCRIPTIONS AND LIMffATIONS SEE EROSION CONTROL PLAN A19 LOCATIONS, SIZE DIMENSIONS OF PROPOSED STORMWATER SYSTEMS SEE EROSION CONTROL PLAN A21 LOCATIONS OF PROPOSED SOIL STOCKPILES AND/OR BORROW/DISPOSAL AREAS SEE EROSION CONTROL PLAN A22 DOSTING SITE TOPOGRAPHY SEE EROSION CONTROL PLAN A23 PROPOSED FINAL TOPOGRAPHY SEE EROSION CONTROL PLAN SECTION B STORMWATER POLLUTION PREVENTION PLAN CONSTRUCTION PHASE 01 DESCRIPTION OF POTENTIAL POWITANT SOURCES POTENTIAL POLLUTANTS FROM CONSTRUCTION ACTIVITY SUCH AS ASPHALT FROM PAVING; CONCRETE FROM CURBING, SIDEWALKS, AND DUMPTSTER PAD; OIL, GREASE, ANTIFREEZE, GASOLINE AND DIESEL FUEL FROM CONSTRUCTION EQUIPMENT; SOIL EROSION; FERTILIZER AND PESTICIDES FROM LANDSCAPING AND TRASH SHOULD BE PROPERLY ATTENDED TO TO REDUCE THE CONTAMINANTS FROM ENTERING THE STORM SYSTEM. TRASH SHOULD BE CLEANED UP TO REDUCE CLOGGING OF STORM SYSTEMS AND REDUCE POTENTIAL BACTERIA AND/01 OTHER BIOLOGICAL AGENTS FROM ENTERING IN THE STORM SYSTEM. B2 SEQUENCE DESCRIBING STOR1AWATER QUAUTY MEASURE IMPLEMENTATION RELATIVE TO LAND 1. BEFORE CONSTRUCTION, EVALUATE, MARK, AND PROTECT IMPORTANT TREES AND ASSOCIATED ROOT ZONES. 2. CONSTRUCTION ENTRANCE STRIP TOPSOIL AND PLACE STONE AT ACCESS POINT ALONG PRIVATE ROAD. 3. INSTALL PERIMETER BMP'S SUCH AS SILT FENCING. 4. EARTHWORK STRIP TOPSOIL, BEGIN ROUGH GRADING AND PREPARE BUILDING PAD AND ROUGH GRADE. ESTABUSH STONE ENTRANCE AND STAGING AREA. START BUILDING CONSTRUCTION. FINISH GRADE AND SEED BASINS, SLOPES, SWALES AND MOUNDS. TEMPORARY SEED ALL DISTURBED AREAS. 5. SANITARY SEWER INSTAU_ SANITARY SEWER LATERALS AND APPURTNANCES. 6. STORM SEWER INSTALL STORM SEWERS SYSTEM AND INLET PROTECTION AS STORM INLETS ARE COMPLETED. 7. UTIUTIES COORDINATE INSTAUATION OF WATER, GAS, TELEPHONE, ELECTRIC AND OTHER REQUIRED UTILITY LINES. 8. CLEANUP CONTRACTOR SHALL SPOIL ALL EXCESS MATERIALS, REGRADE AND STABILIZE ALL AREAS DISTURBED BY UTILITY INSTALLATIONS AND RESEED. 9. FINISH GRADING AND PERMANENT EROSION CONTROL FINISH GRADE AND PEMANENTLY SEED ALL PROPERTY PERIMETER AREAS. 10. PAVEMENT INSTALL STONE, BASE COURSES AND FINISHED GRADES FOR PARKING FIELD, ROADWAYS, CURBS AND ENTRY DRIVES. 11. TEMPORARY SEED ALL DISTURBED AREAS. 12. FINAL LANDSCAPING FINAL GRADE AND INSTALL LANDSCAPING. 13. FINAL SEEDING COMPLETE FINAL SEEDING. 14. MAINTENANCE MAINTAIN ALL EROSION AND SEDIMENT CONTROL PRACTICES UNTIL ALL DISTURBED AREAS ARE PERMANENTLY STABLIZED. B3 CONSTRUCTION ENTRANCE SEE EROSION CONTROL PLAN AND SEE DETAIL IN LOWER RIGHT CORNER OF PLAN B4 SEDIMENT CONTROL PLAN FOR SHEET FLOW AREAS SEE EROS A C P O P N L T IC R A O B L LE PLAN B5 SEDIMENT CONTROL PLAN FOR CONCENTRATED FLOW AREAS B6 STORM SEWER INLET PROTECTION MEASURE LOCATIONS AND SPECS SEE EROSION CONTROL PLAN 137 RUNOFF CONTROL MEASURES NOT APPLICABLE 1313 STORM WATER OUTLET PROTECTION SPECS SEE EROSION CONTROL PLAN 09 GRADE STABILIZATION STRUCTURE LOCATIONS AND SPECS SEE EROSION CONTROL PLAN 1310 STORMIER QUALITY CONSTRUCTION DETAILS SEE EROSION CONTROL PLAN B11 IDAPORARY SURFACE STABIUZATTON METHOD FOR EACH SEKSON SEE SEASONAL SOIL PROTECTION CHART 812 PERMANENT SURFACE STABILIZATIONS SEE SEASONAL SOIL PROTECTION CHART B13 MATERIAL HANDUNG AND SPILL PREVENTION PLAN SEE FOLLOWING SHEET. SHALL MEET THE REQUIREMENTS OF IAC 2-6.1. FOLLOW MATERIAL SAFETY DATA SHEET (MSDS) GUIDELINES FOR CONTAMINANTS PRESENT ON ME. B14 MONITORING AND ktAINIENANCE GUIDEUNES FOR EACH STORMWATER QUALITY MEASURE SEE STORMWATER QUAUTY CONSTRUCTION DETAILS B15 EROSION SEDIMENT- CONTROL SPECS SEE TOP RIGHT CORNER OF EROSION CONTROL PLAN SECTION C STORMWATER POLLUTION PREVENTION PLAN pOST-CONSTRUCTION PHASE Cl DESCRIPTION OF POLLUTANTS AND THEIR SOURCES ASSOCIATED WITH THE PROPOSED LAND USE POTENTIAL POLLUTANTS FROM POST-CONSTRUCTION ACTIVITY SUCH AS SANDS AND SALTS FROM SNOW REMOVAL; OIL, 'GREASE, ANTIFREEZE, ETC. FROM VEHICLES INCLUDING HEAVY METAL FROM BRAKE PAO WEAR SHOULD BE PROPERLY Al IENDED TO TO REDUCE THE CONTAMINANTS FROM ENTERING THE STORM SYSTEM. TRASH SHOULD BE CLEANED UP TO REDUCE CLOGGING OF STORM SYSTEMS AND REDUCE POTENTIAL BACTERIA AND/OR OTHER BIOLOGICAL AGENTS FROM ENTERING IN THE STORM SYSTEM. C2 SEQUENCE DESCRIBING STORMWATER QUALITY MEASURE IMPLEMENTATION A CATCH BASIN TRAP IS TO BE INSTALLED IN STORM INETS #2, #3, AND #6 AT THE TIME THE STORM INLETS ARE INSTALLED. C3 DESCRIPTION OF PROPOSED POST STORMWAIER QUALITY MEASURES A CATCH BASIN TRAP IS TO BE INSTALLED ON THE DOWNSTREAM OUTLET OF STORM INLETS #2, #3, AND #6. CAST-IRON CATCH BASIN TRAPS ARE USED TO PREVENT CLOGGING OF STORM SYSTEMS AND PROVIDE EFFECTIVE MEANS OF KEEPING PIPE LINES ENTIRELY CLEAN. THE DROP PORTION OF THE INLET RETAINS Aft SOLID MATERIAL AND THE TRAP PREVENTS ALL FLOATING DEBRIS FROM ENTERING OUTLET PIPE. C4 LOCATION, DIMENSIONS, SPECIFICATIONS, AND CONSTRUCTION DETAILS OF EACH STORM WATER QUAUTY MEASURE THE CATCH BASIN TRAP TO BE INSTALLED IS A NEENAH R-3701-15. IT IS TO BE INSTALLED OVER THE 21" OUTLET FROM STORM INLET #2. IT IS TO BE INSTALLED OVER THE 15" OUTLET FROM STORM INLET #3. IT IS ALSO TO BE INSTALLED OVER THE 12" OUTLET FROM STORM INET #6. SEE CATCH BASIN TRAP DETAIL ON THIS SHEET. C5 DESCRIPTION OF IAAINTENANCE GUIDEUNES FOR POST CONSTRUCTION STORMWATER QUAUTY MEASURES THE CATCH BASIN TRAPS AND STORM INLETS #2, #3, AND #6 TO BE MAINTAINED BY OWNER. ROUTINE INSPECTION AND MAINTENANCE AS REQUIRED. LOCAL VACTOR COMPANY TO REMOVE SEDIMEWS, OIL AND OTHER FLOATABLE POLLUTANTS WITH A VACTOR. DISPOSE OF ALL WASTE IN ACCORDANCE WITH HAMILTON COUNTY SWCD AND CITY OF CARMEL REQUIREMENTS. 4 3 EROSION CONTROL NOTES: THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE CONSULTED IN THE EVENT THIS HAPPENS. TEMPORARY SEEDING IS TO BE APPLIED TO ANY GRADED AREA THAT WILL REMAIN UNALTERED IN EXCESS OF 20 DAYS. PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS THAT HAVE ACHIEVED FINAL AND FINISHED GRADE. PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION. ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY ARE INTENDED TO SERVICE. ALL EROSION CONTROL MEASURES PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR EFFECTIVENESS. IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED. DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL FULL STAND OF GRASS HAS BEEN OBTAINED. THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION CONTROL IS THE SOLE RESPONSIBIUTY OF THE CONTRACTOR AND/OR OWNER. IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO MINIMIZE SEDIMENTATION (FROM ON-SITE CONSTRUCTION ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES AND RECEIVING STREAMS/DITCHES IN STRICT COMPLIANCE WITH "RULE 5" (327 IAC 15-5, CONSTRUCTION ACTIVITY STORM WATER RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT, INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY CONSTRUCTION FOR SEASONAL VARIATIONS SEE SEASONAL SOIL PROTECTION CHART IN THESE PLANS. PERMANENT SEEDING SPECIFICATIONS: 1) ALL DISTURBED LAWN AREAS SHALL RECEIVE PERMANENT SEEDING IMMEDIATELY. 2) ALL DISTURBED LAWN AREA TO HAVE A MINIMUM OF 6 INCHES OF TOPSOIL (COMPACTED THICKNESS). 3) TOPSOIL TO BE FERTILE, FRIABLE, SANDY LOAM REASONABLY FREE OF SUBSOIL, CLAY LUMPS, STONES LARGER THAN 1/2", EXCESSIVE QUANTITIES OF SMALL STONE/GRAVEL, BRUSH AND OTHER LITER. 4) SOLVE ANY SURFACE OR SUBSURFACE DRAINAGE PROBLEMS AND CONSTRUCT PERMANENT EROSION CONTROL STRUCTURES. 5) PERFORM THE MAJOR FILLING, SHAPING AND SMOOTHING OF GULLIES OR ERODED AREAS. 6) HAVE TOPSOIL TESTED TO CHECK FH AND NUTRIENT LEVELS. PROVIDE FERTILIZER AND SOIL AMENDMENTS AS REQUIRED TO MEET/EXCEED MINIMUM REQUIREMENTS AS SUGGESTED ON SOILS TEST RESULTS FOR LAWNS. 7) WORK FERTILIZER AND SOIL NUTRIENTS INTO TOP 2-3 INCHES OF THE TOPSOIL WITH A SMALL DISK, HARROW OR RAKE OPERATED ACROSS THE SLOPE AS MUCH AS POSSIBLE. 8) ROLL THE TOPSOIL WITH A WATER BALLAST ROLLER WEIGHING 100 TO 300 POUNDS DEPENDING ON SOIL TYPE. ROLL WITH TOPSOIL IN A SEM1-DRY CONDITION IN 1 OPPOSITE DIRECTIONS (RIGHT ANGLES). 9) RAKE OR SCARIFY AND CUT OR FILL IRREGULARITIES THAT DEVELOP AS REQUIRED AND AGAIN ROLL UNTIL AREA IS TRUE AND UNIFORM, FREE FROM LUMPS, DEPRESSIONS AND IRREGULARITIES. 10) SOW SEED WITH ADEQUATE EQUIPMENT AT A TIME WHEN LITTLE OR NO WIND IS BLOWING. BROADCAST HALF OF SEED IN ONE DIRECTION AND THE OTHER HALF IN THE OPPOSITE DIRECTION (RIGHT ANGLES). 11) COVER SEED TO A DEPTH OF 1/2" BY RAKING OR HARROWING. PROVIDE A LIGHT LAYER OF STRAW OR HAY MULCH AT A RATE OF 1 TO 1 1/2 TONS PER ACRE. APPLY TACKIFIER TO STABILIZE MULCH. 12) HYDROS EED ING IS ACCEPTABLE METHOD OF SEEDING. 13) KEEP TOPSOIL RELATIVELY MOIST UNTIL LAWN IS ESTABLISHED. 14) RESEED AREAS THAT DO NOT SHOW PROMPT GERMINATION AT 14 DAY INTERVALS UNTIL AN ACCEPTABLE STAND OF GRASS IS ASSURED. 15) ALL LAWNS SHALL BE GUARANTEED TO HAVE A FULL UNIFORM STAND OF ACCEPTABLE GRASS AT END OF ONE YEAR GUARANTEE PERIOD WITH NO BARE SPOTS COMPRISING MORE THAN 2% OF ANY LAWN AREA. ANY AREA SO NOTED WILL BE REWORKED UNTIL AN ACCEPTABLE STAND OF GRASS IS ESTABLISHED. 16) ALL LAWNS TO BE MAINTAINED UNTIL FINAL INSPECTION BY LANDSCAPE DESIGNER BUT NOT LESS THAN 60 DAYS FROM TIME OF INSTALLATION. MAINTENANCE TO INCLUDE WATERING, WEEDING, CULTIVATION, MULCHING, MOWING AND ALL OTHER NECESSARY OPERATIONS REQUIRED FOR PROPER ESTABLISHMENT OF LAWN. LAND DESCRIPTION LOT 2 (PER PLAT) Lot 2 in Carmax, a subdivision in Hamilton County, the plat of which is recorded as Instrument No. 2003-61408 in Plat Cabinet 3, page 199 in the Office of the Recorder of Hamilton County, Indiana, also described as follows: Part of the South half of the Southeast Quarter of Section 8, Township 17 North, Range 04 East of the Second Principal Meridian in Clay Township, Hamilton County, Indiana, being more particularly described as follows: Beginning at the Southeast corner of Section 8, Township 17 North, Range 04 East; thence North 90 degrees 00 minutes 00 seconds West (North 89 degrees 4-7 minutes 47 seconds West measured) along the South line of said half quarter section, a distance of 357.27 feet; thence North 00 degrees 21 minutes 05 seconds East 60.00 feet to a point in the North line of right-of-way appropriated by the Board of Commissioners of Hamilton County pursuant to proceedings under Cause No. 29D01-9604-M1-169, as set out in a transcript recorded August 26, 1996 as Instrument No. 9609635823 in the Office of the Recorder, Hamilton County, Indiona; thence on said right-of-way line, south 89 degrees 49 minutes 30 seconds East (South 89 degrees 47 minutes 47 seconds West measured) a distance of 17.12 feet; thence North 00 degrees 00 minutes 00 seconds West 369.41 feet; thence North 90 degrees 00 minutes 00 seconds East 342.44 feet to a point in the East line of said half quarter section; thence on the East line thereof, South 00 degrees Og minutes 40 seconds West (South 00 degrees 21 minutes 14 seconds West measured) 430.75 feet to the Point of Beginning. Containing 3.392 acres, more or less, subject to rights-of-way, easements and restrictions. EXCEPT that part of the above-described real estate appropriated by the Board of Commissioners of Hamilton County pursuant to proceedings under Cause No. 29001-9604-MI-169, as set out in a transcript recorded August 26, 1996 os Instrument No. 9609635823 in the Office of the Recorder, Hamilton County, Indiana. Containing 0.507 acres, more or less, subject to rights-of-way, easements and restrictions. Leaving a net acreage after said exception of 2.885 acres, more or less. 0 15 30 60 2 Call 1-800-382-5544 2 WORKING DAYS BEFORE YOU DIG. "IT'S THE LAW" INDIANA UNDERGROUND PRCRECTION SERVICE, INC. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILMES SHOWN ON THIS PLAN ARE BASED UPON ABOVE GROUND EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY OTHER) AND ARE SPECULATIVE IN NATURE. THERE MAY ALSO BE OTHER EXISTING UNDERGROUND UTIUTIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE EXACT LOCATIONS 0 SAID EXISTING UNDERGROUND UTILMES SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO ANY AND ALL CONSTRUCTION PLEASE CALL "HOLEY MOLEY" cc 0 czr cp cf] ca SHEET NO. 124 ix I 6 6 Tzl 4 i:4 1 24 CCY LLI Ica in C 4 1 61 0 0 CNI 0 irs gic NC