Loading...
HomeMy WebLinkAboutC102 Landscape/Erosion Control Plan10 NOTE: STAKE GUY TREES AS SHOWN IF SITE CONDITI ❑NS DICTATE. 3, 10 GUAGE STEEL GUY WIRES EVENLY SPACED ROLL BACK TOP 1/3 BURLAP, AND REMOVE ALL BINDERS PLACE ROOT BALL BALL 1 -2' HIGHER THAN FINISHED GRADE EARTH SAUCER PLANTING BED PREPARED PLANTING BED SOIL SHALL BE 2 PARTS PEAT MOSS, 2 PARTS COMPOSTED MANURE 1 PART COURSE CUT SAND AND 2 PARTS ORIGINAL TOP S ❑IL APPROVED GUY ANCHORS ROOT BALL DIAMETER 3 X ROOT BALL DIAMETER SHADE TREE PLANTING DETAIL LANDSCAPE PLAN NOTES O SOD- ALL SOD SHALL BE CERTIFIED GRADE CULTIVATED GRASS SOD: OF "ADVENTURE BLEND" TURF TYPE TALL FESCUE (BY GENERAL CONTRACTOR) PLANT LIST 1 0 1- EDGE OF ASPHALTT\ 5 +__060.0QD "A 10XIO' CONCRETE PAD 10'X12 DUMPSTER STORAGE 9 9 TREE PROTECTOR TREE WRAP 6' LAYER OF SHREDDED HARDWOOD MULCH PRE EMERGANCE HERBICIDE FINISH GRADE SCARIFY PIT SIDES AND BOTTOM NO LESS THAN 2" DEEP EXISTING SUBS ❑IL OR COMPACTED BACKFILL (NO SCALE) EXISTING METAL BUILDING FFE 844.09 PROPOSED BUILDING ADDITION FFE 844.09 t r 5 080.000 8 PLACE ROOT BALL 1' -2' HIGHER THAN FINISHED GRADE. EARTH SAUCER PLANTING EVERGREEN PLANTING STAKING X LANDSCAPE PLAN 8 SCARIFY SIDES BEFORE PLANTING CAP PLANTING PIT WITH 2 -3" ON SITE OR CLAY TOPSOIL PRIOR TO MULCHING. th �I DO NOT CUT CENTRAL LEADER. 3° LAYER OF SHREDDED HARDWOOD MULCH. PRE-EMERGANCE HERBICIDE JWIIf<II11 FINISH GRADE g TOPSOIL MIXTURE TAMPED FIRM TO PREVENT SETTLEMENT. REMOVE BINDING EARTH SAUCER PLACE SOIL BALL SLIGHTLY HIGHER THAN FINISH GRADE. MOUND SOIL OVER BALL. (FOR ERICACEOUS PLANTS, PLACE SOIL BALL 1/3 OUT OF GROUND AND MOUND PEAT MOSS OVER BALL AND MULCH HEAVY). 10' REAR YARD SE TBACK PP P� p p er' 5 100.000 TREES OF THE SAME SPECIES TO BE MATCHED IN GROWTH CHARACTER AND UNIFORMITY. TWO GALVANIZED NO. 12 WIRE GUYS: FASTEN TO WOOD STAKES. PLACE 2 -PLY RUBBER HOSE ON WIRE AT ALL POINTS OF TREE CONTACT. MINIMUM 2 x 2 x 6' TREATED WOOD STAKES 2 PER TREE. DRIVE STAKES AT AN ANGLE AND DRAW VERTICAL. TOP OF STAKES TO BE PAINTED WITH FLUORESCENT PAINT OR EQUIVALENT. 3" LAYER OR SHREDDED HARDWOOD BARK MULCH INSTALL FERTILIZER TABLETS SOIL BACKFILL TO BE 75% TOPSOIL 25% PEATMOSS, TAMPED TO PREVENT SETTLEMENT EXISTING SUBSOIL OR COMPACTED BACKFILL NOT TO SCALE SHRUB SMALL TREE PLANTING DETAIL GENERAL MULCH NOTE: MULCH AROUND ALL PROPOSED LANDSCAPE MATERIAL UNLESS SPECIFIED OTHERWISE C L;R B (FFY EXISTING 106TH STREET R.O.W. (NO SCALE) 1 6 SCALE: 1" 20' 0 10 20 40 6 PROJECT LOCATION SOILS MAP Br Brookstone silty clay loam CrA Crosby silt loam, 0 -3% eroded MmB2 Miami silt loam, 2 -6% eroded Or Orthents GENERAL LANDSCAPE NOTES 1. IN CASE OF DISCREPANCIES BETWEEN THE PLAN AND THE PLANT LIST, THE PLAN SHALL DICTATE. IF IN QUESTION, CONTACT THE LANDSCAPE DESIGNER. ALL SHRUBS PLANTING AREAS TO BE COVERED WITH 4" THICK LAYER OF SHREDDED HARDWOOD BARK MULCH, ALL GROUND COVER BEDS SHALL BE COVERED WITH 1" SHREDDED HARDWOOD BARK MULCH. BARK MULCH SHALL BE APPROVED BY LANDSCAPE DESIGNER AND SHALL BE UNIFORM IN TEXTURE AND COLOR AND SHALL BE OBTAINED FROM SAWMILL OR LUMBERING OPERATIONS. NO UTILITY MULCH OR PROCESSED TREE TRIMMINGS WILL BE ALLOWED, 3. AN APPROVED PRE EMERGENT HERBICIDE SHALL BE APPLIED IN ALL PLANTING AND GROUND COVER BEDS AT RATES SPECIFIED BY MANUFACTURER FOR EACH VARIETY OF PLANT. 4, FINAL PLACEMENT OF PLANT MATERIALS, ETC. SHALL BE APPROVED BY LANDSCAPE DESIGNER BEFORE PLANTING OPERATIONS ARE TO PROCEED. ALL TREE LOCATIONS SHALL BE MARKED WITH A WOODED STAKE INDICATING VARIETY AND SIZE OF TREE. ALL GROUND COVER AND MULCH BED LINES SHALL BE MARKED BY A HIGHLY VISIBLE PAINT LINE WITH OCCASIONAL WOOD STAKES FOR REFERENCE, ALL STAKES SHALL BE REMOVED F ❑LL ❑WING PLANTINGS OPERATIONS, LANDSCAPE DESIGNER RESERVES THE RIGHT TO ADJUST PLANT LOCATI ❑NS ON SITE, 5. NO SUBSTITUTIONS OF PLANT MATERIAL WILL BE ALLOWED. IF PLANTS ARE SHOWN TO BE UNAVAILABLE, THE CONTRACTOR SHALL NOTIFY LANDSCAPE DESIGNER PRI ❑R TO BID DATE IN WRITING. ALL PLANTS SHALL BE INSPECTED AND TAGGED WITH PROJECT IDENTIFICATION AT NURSERY OR CONTRACTORS OPERATION PRIOR TO MOVING TO JOB SITE. PLANTS MAY ALSO BE INSPECTED AND APPROVED I7R REJECTED ON THE JOB SITE, 6. ALL PLANTS ARE TO MEET OR EXCEED AMERICAN STANDARDS FOR NURSERY STOCK, 1986 EDITION, AS SET FORTH BY AMERICAN ASSOCIATION OF NURSERYMEN. PLANTS AND ALL OTHER MATERIALS TO BE STORED ON SITE WILL BE PLACED WHERE THEY WILL NOT CONFLICT WITH CONSTRUCTION OPERATIONS AND AS DIRECTED BY OWNER. 8. ALL NEW LANDSCAPE PLANTINGS SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR F ❑LL ❑WING FINAL INSPECTION BY LANDSCAPE DESIGNER. AT THE END OF THIS PERIOD, PLANT MATERIAL TERMED DEAD OR UNSATISFACTORY BY LANDSCAPE DESIGNER SHALL BE REPLACED AT NO ADDITIONAL CHARGE BY THE LANDSCAPE CONTRACTOR. 9, THE LANDSCAPE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND FEES THAT MAY BE REQUIRED FOR HIS PCFTION OF WORK. 10. PEAT MOSS 70 BE USED ON PROJECT SHALL BE A DOMESTIC CR IMPORTED MATERIAL, CHOCOLATE BROWN IN COLOR 4i'.ID COMPOSED OF PARTIALLY DECOMPOSED VEGETABLE MATERIAL. PEAT MOSS TO ALSO BE MILDLY ACIDIC IN CHARACTER AND SHALL MEET APPROVAL. OF LANDSCAPE DESIGNER. 11. LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE DESIGNER IN WRITING PRI ❑R TO BID DATE OF ANY PLANTS TH T HE FEELS MAY NOT SURVIVE IN L ❑CATIONS NOTED. 12. ALL LANDSCAPING PLANTINGS TO BE MAINTAINED FOR 1 YEAR FOLLOWING TURNOVER. MAINTENANCE TO INCLUDE WATERING, WEEDING, CULTIVATI ❑N, MULCHING, MOWING AND ALL OTHER NECESSARY OPERATIONS REQUIRED FOR PROPER ESTABLISHMENT OF PLANTINGS. NOTE: AT END OF MAINTENANCE PERIOD, CONTRACTOR TO REMOVE GUYING AND STAKING FROM TREES. 13. CONTRACTOR TO SUBMIT UNIT PRICES ON EVERY TYPE OF WORK AS REQUESTED BY LANDSCAPE DESIGNER, 14. BACKFILL FUR TREE AND SHRUB PLANTING SHALL BE 75% APPROVED TOPSOIL AND 25% APPROVED PEAT MOSS, TOP LAYER OF BACKFILL SHALL BE 100% EXISTING TOPSOIL. A 5 -10 -5 ANALYSIS SLOW RELEASE FERTILIZER SHALL BE INCORPORATED INTO BACKFILL AT APPROVED RATES. 15. PR ❑VIDE MINIMUM 4" PLANTING SOIL IN ALL GROUND COVER AND FLOWER AREAS WITH MIXTURE COMPRISING OF ONE PART COMMERCIAL GRADE 'POTTING S ❑IL,' 5 PARTS TOPSOIL AND 4 PARTS PEAT MOSS. A FULL 4" LAYER OF APPROVED SHREDDED FIBROUS PEAT MOSS MAY BE USED IN LIEU OF PLANTING MIX. 16, PLANTS SHALL BEAR A TAG SHOWING GENUS, SPECIES AND VARIETY. 17. PLANTS SHALL BE CERTIFIED BY THE STATE OF INDIANA DEPARTMENT OF NATURAL RESOURCES AND FREE FROM DISEASE OR HAZARDOUS INSECTS. )714ER) CATCH BASIN/ DRAINAGE STRUCTURE MAINTENANCE: 4 STM STR ,59 BY OTHER) MANHOLE 1,844,33 WV N =840.45 INN E= 835 -95 !NV W= 835.74 4 -NOTE THIS PLAN INDICATES EROSION CONTROL MEASURES REQUIRED AI- I ER SOIL STRIPPING AND PAD BUILDING HAS TAKEN PLACE. COORDINATE WITH DEVELOPER FOR MEASURES REQUIRED UNTIL PROPERTY TURNED OVER FOR DEVELOPMENT. COORDINATE WITH SOIL CONSERVATION DISTRICT REPRESENTATIVE FOR ANY OTHER MEASURES REQUIRED DUE TO SITE CONDITIONS. 5 060.000 "A" 10'710 L�x arET Rrfl REFER TO SILT FENCE SECTION FOR EMBEDMENT DETAIL 1. INSPECT WEEKLY AND AFTER EACH STORM EVENT. 2. IF FABRIC IS TORN OR DETERIORATED, REPLACE SECTION IMMEDIATELY. 3. REMOVE SEDIMENT WHEN HEIGHT REACHES 1/3 OF THE HEIGHT OF THE FENCE OR IS CAUSING FABRIC TO BULGE. 4. TAKE CARE NOT TO UNDERMINE THE ENTRENCHED FABRIC. 5. AFTER DRAINAGE AREA IS STABILIZED, REMOVE FENCE AND SEDIMENT, BRINGING DISTURBED AREA TO GRADE AND STABILIZE IT. SILT FENCE INLET PROTECTION DETAIL 1 "X2" HARDWOOD CROSSBRACING (NOT TO SCALE) EXISTING METAL BUILDING FFE 844.09 PROPOSED BUILDING ADDITION FFE 844.09 E 15' RCP (BY OR GRAVELBAG CURB PROTECTION (FOR INLETS THAT ARE IN LOW POINTS) NOTE: GRAVEL BAGS ARE HALF FULL WITH LARGE ROCK AND PACKED CLOSE TOGETHER TO ELIMINATE GAPS. IF BAG DETERIORATES OR IS DAMAGED, REBAG OLD BAG WITH CONTENTS INTO A NEW BAG. 2 "X2 "X36" HARDWOOD STAKES WITH POINTED END AT 5' O.C. 1/2" X 2" X 24" WOOD LATH AT EACH STAKE OVER FABRIC 36" WIDE NONWOVEN 7 POLYPROPYLENE FABRIC STM 5TR URB IN (NO SCALE) 5 080.000 "A" 5T4 5TR II62 IBY OTHER) 3 BY OTHER) IN{.f =836. WV N =836.4 INV W =836.0 EROSION CONTROL PLAN POST 4" DIA. WOOD OR 1.33 LBS /FOOT STEEL 10' MAX. SPACING WIRE FENCE 14 GAGE (MIN) -6" MESH SPACING (MAX) FASTENED BY 1" WIRE STAPLES, TIE WIRES, OR HOG RINGS FILTER FABRIC ALONG LENGTH (NO JOINTS) STAPLE OR WIRE TO FENCE 4 "X4" TRENCH TO BE BACKFILLED AND COMPACTED MAINTENANCE: 1. INSPECT WEEKLY AND AFTER EACH STORM EVENT. 2. IF FABRIC IS TORN OR DETERIORATED, REPLACE SECTION IMMEDIATELY. 3. REMOVE SEDIMENT WHEN HEIGHT REACHES 1/3 OF THE HEIGHT OF THE FENCE OR IS CAUSING FABRIC -O BULGE. 4. TAKE CARE NOT TO UNDERMINE THE ENTRENCHED FABRIC. 5. AFTER DRAINAGE AREA IS STABILIZED, REMOVE FENCE AND SEDIMENT, BRING DISTURBED AREA TO GRADE AND STABILIZE IT. PERMANENT SEEDING SPECIFICATIONS: 1) ALL DISTURBED LAWN AREAS SHALL RECEIVE PERMANENT SEEDING IMMEDIATELY. 2) ALL DISTURBED LAWN AREA TO HAVE A MINIMUM OF 6 INCHES OF TOPSOIL (COMPACTED THICKNESS). 3) TOPSOIL TO BE FERTILE, FRIABLE, SANDY LOAM REASONABLY FREE OF SUBSOIL, CLAY LUMPS, STONES LARGER THAN 1 /2 EXCESSIVE QUANTITIES OF SMALL STONE /GRAVEL, BRUSH AND OTHER LITER. 4) SOLVE ANY SURFACE OR SUBSURFACE DRAINAGE PROBLEMS AND CONSTRUCT PERMANENT EROSION CONTROL STRUCTURES. 5) PERFORM THE MAJOR FILLING, SHAPING AND SMOOTHING OF GULLIES OR ERODED AREAS. 6) HAVE TOPSOIL TESTED TO CHECK PH AND NUTRIENT LEVELS. PROVIDE FERTILISER AND SOIL AMENDMENTS AS REQUIRED TO MEET /EXCEED MINIMUM REQUIREMENTS AS SUGGESTED ON SOILS TEST RESULTS FOR LAWNS. 7) WORK FERTILIZER AND SOIL NUTRIENTS INTO TOP 2 -3 INCHES OF THE TOPSOIL WITH A SMALL DISK, HARROW OR RAKE OPERATED ACROSS THE SLOPE AS MUCH AS POSSIBLE. 8) ROLL THE TOPSOIL WITH A WATER BALLAST ROLLER WEIGHING 100 TO 300 POUNDS DEPENDING ON SOIL TYPE. ROLL WITH TOPSOIL IN A SEMI -DRY CONDITION IN TWO OPPOSITE DIRECTIONS (RIGHT ANGLES). 9) RAKE OR SCARIFY AND CUT OR FILL IRREGULARITIES THAT DEVELOP AS REQUIRED AND AGAIN ROLL UNTIL AREA IS TRUE AND UNIFORM, FREE FROM LUMPS, DEPRESSIONS AND IRREGULARITIES. 10) SOW SEED WITH ADEQUATE EQUIPMENT AT A TIME WHEN LITTLE OR NO WIND IS BLOWING. BROADCAST HALF OF SEED IN ONE DIRECTION AND THE OTHER HALF IN THE OPPOSITE DIRECTION (RIGHT ANGLES). 1 1) COVER SEED TO A DEPTH OF 1 /2" BY RAKING OR HARROWING. PROVIDE A LIGHT LAYER OF STRAW OR HAY MULCH AT A RATE OF 1 TO 1 1 TONS PER ACRE. APPLY TACKIFIER TO STABILIZE MULCH. 12) HYDROSEEDING IS ACCEPTABLE METHOD OF SEEDING. 13) KEEP TOPSOIL RELATIVELY MOIST UNTIL LAWN IS ESTABLISHED. 14) RESEED AREAS THAT DO NOT SHOW PROMPT GERMINATION AT 14 DAY INTERVALS UNTIL AN ACCEPTABLE STAND OF GRASS IS ASSURED. 15) ALL LAWNS SHALL BE GUARANTEED TO HAVE A FULL UNIFORM STAND OF ACCEPTABLE GRASS AT END OF ONE YEAR GUARANTEE PERIOD WITH NO BARE SPOTS COMPRISING MORE THAN 2% OF ANY LAWN AREA. ANY AREA SO NOTED WILL BE REWORKED UNTIL AN ACCEPTABLE STAND OF GRASS IS ESTABLISHED. 16) ALL LAWNS TO BE MAINTAINED UNTIL FINAL INSPECTION BY LANDSCAPE DESIGNER BUT NOT LESS THAN 60 DAYS FROM TIME OF INSTALLATION. MAINTENANCE TO INCLUDE WATERING, WEEDING, CULTIVATION, MULCHING, MOWING AND ALL OTHER NECESSARY OPERATIONS REQUIRED FOR PROPER ESTABLISHMENT OF LAWN. 3 DOWN UPSLOPE SLOPE r 5 100.000 "A" �II�II�I I 4I I�I I1�I C E 1 g r B 1 11 11k 1111111= C SILT FENCE SECTION (NO SCALE) V STM STR {'65 (BY OTHER 5068 MILE I 1 12' RCP (80 OTHER) EXISTING 101 STREET P.O. WARNING- THIS PLAN TO BE USED FOR EROSION CONTROL PURPOSES ONLY. NOTE THERE SHALL BE NO DIRT OR DEBRIS IN THE STREET NOTE ADDITIONAL EROSI ❑N CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR. SCALE: 1" 30' 0 15 30 60 EROSION CONTROL LEGEND TEMPORARY /PERMANENT SEEDING USE PLANTING CHART SF SILT FENCE SILT FENCE BOX /GRAVELBAG PROTECTION /GRATE FILTER FABRIC EROSION CONTROL NOTES: THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING PLACE, THE CONTRACTOR AND /OR OWNER SHALL TAKE PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE CONSULTED IN THE EVENT THIS HAPPENS. TEMPORARY SEEDING IS TO BE APPLIED TO ANY GRADED AREA THAT WILL REMAIN UNALTERED IN EXCESS OF 20 DAYS. PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS THAT HAVE ACHIEVED FINAL AND FINISHED GRADE. PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION. ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY ARE INTENDED TO SERVICE. ALL EROSION CONTROL MEASURES PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR EFFECTIVENESS. IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED. DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED ACCORDING TO SEASONAL CONDITION AND /OR CONSTRUCTION ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL FULL STAND OF GRASS HAS BEEN OBTAINED. THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND /OR OWNER. IT SHALL BE THE CONTRACTOR'S AND /OR OWNER'S RESPONSIBILITY TO MINIMIZE SEDIMENTATION (FROM ON -SITE CONSTRUCTION ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES AND RECEIVING STREAMS /DITCHES IN STRICT COMPLIANCE WITH "RULE 5" (327 IAC 15 -5, CONSTRUCTION ACTIVITY STORM WATER RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND /OR OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF INTENT LE I I ER TO THE OFFICE OF WATER MANAGEMENT, INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY CONSTRUCTION ACTIVITY.. FOR SEASONAL VARIATIONS SEE SEASONAL SOIL PROTECTION CHART IN THESE PLANS. SOIL STABILIZATION METHOD PERMANENT A 8 1 8 SEEDING DORMANT SEEDING TEMPORARY SEEDING MULCHING JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC. B G SODDING F /I "Holey Moley" says, "DON'T DIG BLIND" Mil mmr ■ny, Mar, w lY 1-500 1 500 352 -5544 426 -5200 1•Mt ham MOM PER INDIANA STATE LAW IS -69 -1991. R IS AGWNST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. PLEASE CALL "HOLEY MOLEY" 1 -800- 382 -5544 TOLL FREE B A KENTUCKY BLUEGRASS* 40 LBS /ACRE; CREEPING RED FESCUE 40 LBS /ACRE: PLUS 2 TONS STRAW MULCH /ACRE. OR ADD ANNUAL RYEGRASS 20 LBS /ACRE. B KENTUCKY BLUEGRASS* 60 LBS/ACRE; CREEPING RED FESCUE 60 LBS /ACRE; PLUS 2 TONS STRAW MULCH/ACRE, OR ADD ANNUAL RYEGRASS 30 LBS /ACRE. C SPRING OATS 3 BUSHEL /ACRE D WHEAT OR RYE 2 BUSHEL /ACRE. E ANNUAL RYEGRASS 40 LBS /ACRE. F SOD (BLEND 3 IMPROVED VARIETIES). G STRAW MULCH 2 TONS /ACRE. /I IRRIGATION NEEDED DURING JUNE, JULY, AND /OR SEPTEMBER. 8 IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD. *KENTUCKY BLUEGRASS BLEND OF 3 IMPROVED VARIETIES. SEASONAL SOIL PROTECTION CHART CAUTION!! THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN ARE BASED UPON ABOVE GROUND EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY OTHER) AND ARE SPECULATIVE IN NATURE. THERE MAY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE EXACT LOCATIONS OF SAID EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO ANY AND ALL CONSTRUCTION v Z W EU w z r o w z d X Ir� C EU w X w N-� 0\ 01111 11 111/// o, 0111111111// <cs S Fu vv/ O G Is kifd> L v �3 :47 4 TE O 11°* 7,, V¼DIA NP 9 o K. SHINNEMAN P E 10200392 P gZit' Qi) QL) 0 't c\1 PROJECT NO. CO C\,Z 0 1-� 0 r24 z 0 U z 0 II U) N 0 SHEET NO. C102 W04 -0012 QUANT. ABBR. BOTANICAL NAME COMMON NAME SIZE /REMARKS TREES 2 AC -R ACER RUBRUM RED MAPLE 1 1/2" B B SHRUBS 1 BE -N BETULA NIGRA RIVERBIRCH (MULTI -STEM) 1 1/2" B B 5 CO -F CORNUS FLORDIA 'CHEROKEE PRINCESS' WHITE FLOWERING DOGWOOD 1 1/2" B (Sc B 2 PI -G PICEA GLAUCA CONICA DWARF ALBERTA SPRUCE 1 1/2" B B 2 AM -G AMERLANCHIER X GRANDIFLORA 'AUTUMN BRILLIANCE' AUTUMN BRILLIANCE SERVICEBERRY 6" CLUMP PERENNIALS 12 BU -K BUXUS X KOREANA 'GREEN GEM' GREEN GEM BOXWOOD 1 GAL 3 FO -G FOTHERGILLA GARDENII DWARF FOTHERGILLA 1 GAL 16 IL -G ILEX GLABRA COMPACTA COMPACT INKBERRY 1 GAL 7 IT -V ITEA VIRGINICA 'SPRICH' SPRICH VIRGINIA SWEETSPIRE 1 GAL 3 JU -S JUNIPERUS SABINA 'BROADMOOR' BROADMOOR JUNIPER 1 GAL 21 DI -F DICENTRA FORMOSA 'LUXURIANT' LUXURIANT BLEEDING HEARTS 1 GAL GROUNDCOVER 15 HE -B HEMEROCALLIS 'BAJA' BAJA RED DAYLILY 1 GAL 2 VI -M VINCA MINOR 'BOWLES' PERIWINKLE 50 PER FLAT 10 NOTE: STAKE GUY TREES AS SHOWN IF SITE CONDITI ❑NS DICTATE. 3, 10 GUAGE STEEL GUY WIRES EVENLY SPACED ROLL BACK TOP 1/3 BURLAP, AND REMOVE ALL BINDERS PLACE ROOT BALL BALL 1 -2' HIGHER THAN FINISHED GRADE EARTH SAUCER PLANTING BED PREPARED PLANTING BED SOIL SHALL BE 2 PARTS PEAT MOSS, 2 PARTS COMPOSTED MANURE 1 PART COURSE CUT SAND AND 2 PARTS ORIGINAL TOP S ❑IL APPROVED GUY ANCHORS ROOT BALL DIAMETER 3 X ROOT BALL DIAMETER SHADE TREE PLANTING DETAIL LANDSCAPE PLAN NOTES O SOD- ALL SOD SHALL BE CERTIFIED GRADE CULTIVATED GRASS SOD: OF "ADVENTURE BLEND" TURF TYPE TALL FESCUE (BY GENERAL CONTRACTOR) PLANT LIST 1 0 1- EDGE OF ASPHALTT\ 5 +__060.0QD "A 10XIO' CONCRETE PAD 10'X12 DUMPSTER STORAGE 9 9 TREE PROTECTOR TREE WRAP 6' LAYER OF SHREDDED HARDWOOD MULCH PRE EMERGANCE HERBICIDE FINISH GRADE SCARIFY PIT SIDES AND BOTTOM NO LESS THAN 2" DEEP EXISTING SUBS ❑IL OR COMPACTED BACKFILL (NO SCALE) EXISTING METAL BUILDING FFE 844.09 PROPOSED BUILDING ADDITION FFE 844.09 t r 5 080.000 8 PLACE ROOT BALL 1' -2' HIGHER THAN FINISHED GRADE. EARTH SAUCER PLANTING EVERGREEN PLANTING STAKING X LANDSCAPE PLAN 8 SCARIFY SIDES BEFORE PLANTING CAP PLANTING PIT WITH 2 -3" ON SITE OR CLAY TOPSOIL PRIOR TO MULCHING. th �I DO NOT CUT CENTRAL LEADER. 3° LAYER OF SHREDDED HARDWOOD MULCH. PRE-EMERGANCE HERBICIDE JWIIf<II11 FINISH GRADE g TOPSOIL MIXTURE TAMPED FIRM TO PREVENT SETTLEMENT. REMOVE BINDING EARTH SAUCER PLACE SOIL BALL SLIGHTLY HIGHER THAN FINISH GRADE. MOUND SOIL OVER BALL. (FOR ERICACEOUS PLANTS, PLACE SOIL BALL 1/3 OUT OF GROUND AND MOUND PEAT MOSS OVER BALL AND MULCH HEAVY). 10' REAR YARD SE TBACK PP P� p p er' 5 100.000 TREES OF THE SAME SPECIES TO BE MATCHED IN GROWTH CHARACTER AND UNIFORMITY. TWO GALVANIZED NO. 12 WIRE GUYS: FASTEN TO WOOD STAKES. PLACE 2 -PLY RUBBER HOSE ON WIRE AT ALL POINTS OF TREE CONTACT. MINIMUM 2 x 2 x 6' TREATED WOOD STAKES 2 PER TREE. DRIVE STAKES AT AN ANGLE AND DRAW VERTICAL. TOP OF STAKES TO BE PAINTED WITH FLUORESCENT PAINT OR EQUIVALENT. 3" LAYER OR SHREDDED HARDWOOD BARK MULCH INSTALL FERTILIZER TABLETS SOIL BACKFILL TO BE 75% TOPSOIL 25% PEATMOSS, TAMPED TO PREVENT SETTLEMENT EXISTING SUBSOIL OR COMPACTED BACKFILL NOT TO SCALE SHRUB SMALL TREE PLANTING DETAIL GENERAL MULCH NOTE: MULCH AROUND ALL PROPOSED LANDSCAPE MATERIAL UNLESS SPECIFIED OTHERWISE C L;R B (FFY EXISTING 106TH STREET R.O.W. (NO SCALE) 1 6 SCALE: 1" 20' 0 10 20 40 6 PROJECT LOCATION SOILS MAP Br Brookstone silty clay loam CrA Crosby silt loam, 0 -3% eroded MmB2 Miami silt loam, 2 -6% eroded Or Orthents GENERAL LANDSCAPE NOTES 1. IN CASE OF DISCREPANCIES BETWEEN THE PLAN AND THE PLANT LIST, THE PLAN SHALL DICTATE. IF IN QUESTION, CONTACT THE LANDSCAPE DESIGNER. ALL SHRUBS PLANTING AREAS TO BE COVERED WITH 4" THICK LAYER OF SHREDDED HARDWOOD BARK MULCH, ALL GROUND COVER BEDS SHALL BE COVERED WITH 1" SHREDDED HARDWOOD BARK MULCH. BARK MULCH SHALL BE APPROVED BY LANDSCAPE DESIGNER AND SHALL BE UNIFORM IN TEXTURE AND COLOR AND SHALL BE OBTAINED FROM SAWMILL OR LUMBERING OPERATIONS. NO UTILITY MULCH OR PROCESSED TREE TRIMMINGS WILL BE ALLOWED, 3. AN APPROVED PRE EMERGENT HERBICIDE SHALL BE APPLIED IN ALL PLANTING AND GROUND COVER BEDS AT RATES SPECIFIED BY MANUFACTURER FOR EACH VARIETY OF PLANT. 4, FINAL PLACEMENT OF PLANT MATERIALS, ETC. SHALL BE APPROVED BY LANDSCAPE DESIGNER BEFORE PLANTING OPERATIONS ARE TO PROCEED. ALL TREE LOCATIONS SHALL BE MARKED WITH A WOODED STAKE INDICATING VARIETY AND SIZE OF TREE. ALL GROUND COVER AND MULCH BED LINES SHALL BE MARKED BY A HIGHLY VISIBLE PAINT LINE WITH OCCASIONAL WOOD STAKES FOR REFERENCE, ALL STAKES SHALL BE REMOVED F ❑LL ❑WING PLANTINGS OPERATIONS, LANDSCAPE DESIGNER RESERVES THE RIGHT TO ADJUST PLANT LOCATI ❑NS ON SITE, 5. NO SUBSTITUTIONS OF PLANT MATERIAL WILL BE ALLOWED. IF PLANTS ARE SHOWN TO BE UNAVAILABLE, THE CONTRACTOR SHALL NOTIFY LANDSCAPE DESIGNER PRI ❑R TO BID DATE IN WRITING. ALL PLANTS SHALL BE INSPECTED AND TAGGED WITH PROJECT IDENTIFICATION AT NURSERY OR CONTRACTORS OPERATION PRIOR TO MOVING TO JOB SITE. PLANTS MAY ALSO BE INSPECTED AND APPROVED I7R REJECTED ON THE JOB SITE, 6. ALL PLANTS ARE TO MEET OR EXCEED AMERICAN STANDARDS FOR NURSERY STOCK, 1986 EDITION, AS SET FORTH BY AMERICAN ASSOCIATION OF NURSERYMEN. PLANTS AND ALL OTHER MATERIALS TO BE STORED ON SITE WILL BE PLACED WHERE THEY WILL NOT CONFLICT WITH CONSTRUCTION OPERATIONS AND AS DIRECTED BY OWNER. 8. ALL NEW LANDSCAPE PLANTINGS SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR F ❑LL ❑WING FINAL INSPECTION BY LANDSCAPE DESIGNER. AT THE END OF THIS PERIOD, PLANT MATERIAL TERMED DEAD OR UNSATISFACTORY BY LANDSCAPE DESIGNER SHALL BE REPLACED AT NO ADDITIONAL CHARGE BY THE LANDSCAPE CONTRACTOR. 9, THE LANDSCAPE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND FEES THAT MAY BE REQUIRED FOR HIS PCFTION OF WORK. 10. PEAT MOSS 70 BE USED ON PROJECT SHALL BE A DOMESTIC CR IMPORTED MATERIAL, CHOCOLATE BROWN IN COLOR 4i'.ID COMPOSED OF PARTIALLY DECOMPOSED VEGETABLE MATERIAL. PEAT MOSS TO ALSO BE MILDLY ACIDIC IN CHARACTER AND SHALL MEET APPROVAL. OF LANDSCAPE DESIGNER. 11. LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE DESIGNER IN WRITING PRI ❑R TO BID DATE OF ANY PLANTS TH T HE FEELS MAY NOT SURVIVE IN L ❑CATIONS NOTED. 12. ALL LANDSCAPING PLANTINGS TO BE MAINTAINED FOR 1 YEAR FOLLOWING TURNOVER. MAINTENANCE TO INCLUDE WATERING, WEEDING, CULTIVATI ❑N, MULCHING, MOWING AND ALL OTHER NECESSARY OPERATIONS REQUIRED FOR PROPER ESTABLISHMENT OF PLANTINGS. NOTE: AT END OF MAINTENANCE PERIOD, CONTRACTOR TO REMOVE GUYING AND STAKING FROM TREES. 13. CONTRACTOR TO SUBMIT UNIT PRICES ON EVERY TYPE OF WORK AS REQUESTED BY LANDSCAPE DESIGNER, 14. BACKFILL FUR TREE AND SHRUB PLANTING SHALL BE 75% APPROVED TOPSOIL AND 25% APPROVED PEAT MOSS, TOP LAYER OF BACKFILL SHALL BE 100% EXISTING TOPSOIL. A 5 -10 -5 ANALYSIS SLOW RELEASE FERTILIZER SHALL BE INCORPORATED INTO BACKFILL AT APPROVED RATES. 15. PR ❑VIDE MINIMUM 4" PLANTING SOIL IN ALL GROUND COVER AND FLOWER AREAS WITH MIXTURE COMPRISING OF ONE PART COMMERCIAL GRADE 'POTTING S ❑IL,' 5 PARTS TOPSOIL AND 4 PARTS PEAT MOSS. A FULL 4" LAYER OF APPROVED SHREDDED FIBROUS PEAT MOSS MAY BE USED IN LIEU OF PLANTING MIX. 16, PLANTS SHALL BEAR A TAG SHOWING GENUS, SPECIES AND VARIETY. 17. PLANTS SHALL BE CERTIFIED BY THE STATE OF INDIANA DEPARTMENT OF NATURAL RESOURCES AND FREE FROM DISEASE OR HAZARDOUS INSECTS. )714ER) CATCH BASIN/ DRAINAGE STRUCTURE MAINTENANCE: 4 STM STR ,59 BY OTHER) MANHOLE 1,844,33 WV N =840.45 INN E= 835 -95 !NV W= 835.74 4 -NOTE THIS PLAN INDICATES EROSION CONTROL MEASURES REQUIRED AI- I ER SOIL STRIPPING AND PAD BUILDING HAS TAKEN PLACE. COORDINATE WITH DEVELOPER FOR MEASURES REQUIRED UNTIL PROPERTY TURNED OVER FOR DEVELOPMENT. COORDINATE WITH SOIL CONSERVATION DISTRICT REPRESENTATIVE FOR ANY OTHER MEASURES REQUIRED DUE TO SITE CONDITIONS. 5 060.000 "A" 10'710 L�x arET Rrfl REFER TO SILT FENCE SECTION FOR EMBEDMENT DETAIL 1. INSPECT WEEKLY AND AFTER EACH STORM EVENT. 2. IF FABRIC IS TORN OR DETERIORATED, REPLACE SECTION IMMEDIATELY. 3. REMOVE SEDIMENT WHEN HEIGHT REACHES 1/3 OF THE HEIGHT OF THE FENCE OR IS CAUSING FABRIC TO BULGE. 4. TAKE CARE NOT TO UNDERMINE THE ENTRENCHED FABRIC. 5. AFTER DRAINAGE AREA IS STABILIZED, REMOVE FENCE AND SEDIMENT, BRINGING DISTURBED AREA TO GRADE AND STABILIZE IT. SILT FENCE INLET PROTECTION DETAIL 1 "X2" HARDWOOD CROSSBRACING (NOT TO SCALE) EXISTING METAL BUILDING FFE 844.09 PROPOSED BUILDING ADDITION FFE 844.09 E 15' RCP (BY OR GRAVELBAG CURB PROTECTION (FOR INLETS THAT ARE IN LOW POINTS) NOTE: GRAVEL BAGS ARE HALF FULL WITH LARGE ROCK AND PACKED CLOSE TOGETHER TO ELIMINATE GAPS. IF BAG DETERIORATES OR IS DAMAGED, REBAG OLD BAG WITH CONTENTS INTO A NEW BAG. 2 "X2 "X36" HARDWOOD STAKES WITH POINTED END AT 5' O.C. 1/2" X 2" X 24" WOOD LATH AT EACH STAKE OVER FABRIC 36" WIDE NONWOVEN 7 POLYPROPYLENE FABRIC STM 5TR URB IN (NO SCALE) 5 080.000 "A" 5T4 5TR II62 IBY OTHER) 3 BY OTHER) IN{.f =836. WV N =836.4 INV W =836.0 EROSION CONTROL PLAN POST 4" DIA. WOOD OR 1.33 LBS /FOOT STEEL 10' MAX. SPACING WIRE FENCE 14 GAGE (MIN) -6" MESH SPACING (MAX) FASTENED BY 1" WIRE STAPLES, TIE WIRES, OR HOG RINGS FILTER FABRIC ALONG LENGTH (NO JOINTS) STAPLE OR WIRE TO FENCE 4 "X4" TRENCH TO BE BACKFILLED AND COMPACTED MAINTENANCE: 1. INSPECT WEEKLY AND AFTER EACH STORM EVENT. 2. IF FABRIC IS TORN OR DETERIORATED, REPLACE SECTION IMMEDIATELY. 3. REMOVE SEDIMENT WHEN HEIGHT REACHES 1/3 OF THE HEIGHT OF THE FENCE OR IS CAUSING FABRIC -O BULGE. 4. TAKE CARE NOT TO UNDERMINE THE ENTRENCHED FABRIC. 5. AFTER DRAINAGE AREA IS STABILIZED, REMOVE FENCE AND SEDIMENT, BRING DISTURBED AREA TO GRADE AND STABILIZE IT. PERMANENT SEEDING SPECIFICATIONS: 1) ALL DISTURBED LAWN AREAS SHALL RECEIVE PERMANENT SEEDING IMMEDIATELY. 2) ALL DISTURBED LAWN AREA TO HAVE A MINIMUM OF 6 INCHES OF TOPSOIL (COMPACTED THICKNESS). 3) TOPSOIL TO BE FERTILE, FRIABLE, SANDY LOAM REASONABLY FREE OF SUBSOIL, CLAY LUMPS, STONES LARGER THAN 1 /2 EXCESSIVE QUANTITIES OF SMALL STONE /GRAVEL, BRUSH AND OTHER LITER. 4) SOLVE ANY SURFACE OR SUBSURFACE DRAINAGE PROBLEMS AND CONSTRUCT PERMANENT EROSION CONTROL STRUCTURES. 5) PERFORM THE MAJOR FILLING, SHAPING AND SMOOTHING OF GULLIES OR ERODED AREAS. 6) HAVE TOPSOIL TESTED TO CHECK PH AND NUTRIENT LEVELS. PROVIDE FERTILISER AND SOIL AMENDMENTS AS REQUIRED TO MEET /EXCEED MINIMUM REQUIREMENTS AS SUGGESTED ON SOILS TEST RESULTS FOR LAWNS. 7) WORK FERTILIZER AND SOIL NUTRIENTS INTO TOP 2 -3 INCHES OF THE TOPSOIL WITH A SMALL DISK, HARROW OR RAKE OPERATED ACROSS THE SLOPE AS MUCH AS POSSIBLE. 8) ROLL THE TOPSOIL WITH A WATER BALLAST ROLLER WEIGHING 100 TO 300 POUNDS DEPENDING ON SOIL TYPE. ROLL WITH TOPSOIL IN A SEMI -DRY CONDITION IN TWO OPPOSITE DIRECTIONS (RIGHT ANGLES). 9) RAKE OR SCARIFY AND CUT OR FILL IRREGULARITIES THAT DEVELOP AS REQUIRED AND AGAIN ROLL UNTIL AREA IS TRUE AND UNIFORM, FREE FROM LUMPS, DEPRESSIONS AND IRREGULARITIES. 10) SOW SEED WITH ADEQUATE EQUIPMENT AT A TIME WHEN LITTLE OR NO WIND IS BLOWING. BROADCAST HALF OF SEED IN ONE DIRECTION AND THE OTHER HALF IN THE OPPOSITE DIRECTION (RIGHT ANGLES). 1 1) COVER SEED TO A DEPTH OF 1 /2" BY RAKING OR HARROWING. PROVIDE A LIGHT LAYER OF STRAW OR HAY MULCH AT A RATE OF 1 TO 1 1 TONS PER ACRE. APPLY TACKIFIER TO STABILIZE MULCH. 12) HYDROSEEDING IS ACCEPTABLE METHOD OF SEEDING. 13) KEEP TOPSOIL RELATIVELY MOIST UNTIL LAWN IS ESTABLISHED. 14) RESEED AREAS THAT DO NOT SHOW PROMPT GERMINATION AT 14 DAY INTERVALS UNTIL AN ACCEPTABLE STAND OF GRASS IS ASSURED. 15) ALL LAWNS SHALL BE GUARANTEED TO HAVE A FULL UNIFORM STAND OF ACCEPTABLE GRASS AT END OF ONE YEAR GUARANTEE PERIOD WITH NO BARE SPOTS COMPRISING MORE THAN 2% OF ANY LAWN AREA. ANY AREA SO NOTED WILL BE REWORKED UNTIL AN ACCEPTABLE STAND OF GRASS IS ESTABLISHED. 16) ALL LAWNS TO BE MAINTAINED UNTIL FINAL INSPECTION BY LANDSCAPE DESIGNER BUT NOT LESS THAN 60 DAYS FROM TIME OF INSTALLATION. MAINTENANCE TO INCLUDE WATERING, WEEDING, CULTIVATION, MULCHING, MOWING AND ALL OTHER NECESSARY OPERATIONS REQUIRED FOR PROPER ESTABLISHMENT OF LAWN. 3 DOWN UPSLOPE SLOPE r 5 100.000 "A" �II�II�I I 4I I�I I1�I C E 1 g r B 1 11 11k 1111111= C SILT FENCE SECTION (NO SCALE) V STM STR {'65 (BY OTHER 5068 MILE I 1 12' RCP (80 OTHER) EXISTING 101 STREET P.O. WARNING- THIS PLAN TO BE USED FOR EROSION CONTROL PURPOSES ONLY. NOTE THERE SHALL BE NO DIRT OR DEBRIS IN THE STREET NOTE ADDITIONAL EROSI ❑N CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR. SCALE: 1" 30' 0 15 30 60 EROSION CONTROL LEGEND TEMPORARY /PERMANENT SEEDING USE PLANTING CHART SF SILT FENCE SILT FENCE BOX /GRAVELBAG PROTECTION /GRATE FILTER FABRIC EROSION CONTROL NOTES: THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING PLACE, THE CONTRACTOR AND /OR OWNER SHALL TAKE PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE CONSULTED IN THE EVENT THIS HAPPENS. TEMPORARY SEEDING IS TO BE APPLIED TO ANY GRADED AREA THAT WILL REMAIN UNALTERED IN EXCESS OF 20 DAYS. PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS THAT HAVE ACHIEVED FINAL AND FINISHED GRADE. PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION. ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY ARE INTENDED TO SERVICE. ALL EROSION CONTROL MEASURES PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR EFFECTIVENESS. IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED. DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED ACCORDING TO SEASONAL CONDITION AND /OR CONSTRUCTION ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL FULL STAND OF GRASS HAS BEEN OBTAINED. THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND /OR OWNER. IT SHALL BE THE CONTRACTOR'S AND /OR OWNER'S RESPONSIBILITY TO MINIMIZE SEDIMENTATION (FROM ON -SITE CONSTRUCTION ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES AND RECEIVING STREAMS /DITCHES IN STRICT COMPLIANCE WITH "RULE 5" (327 IAC 15 -5, CONSTRUCTION ACTIVITY STORM WATER RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND /OR OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF INTENT LE I I ER TO THE OFFICE OF WATER MANAGEMENT, INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY CONSTRUCTION ACTIVITY.. FOR SEASONAL VARIATIONS SEE SEASONAL SOIL PROTECTION CHART IN THESE PLANS. SOIL STABILIZATION METHOD PERMANENT A 8 1 8 SEEDING DORMANT SEEDING TEMPORARY SEEDING MULCHING JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC. B G SODDING F /I "Holey Moley" says, "DON'T DIG BLIND" Mil mmr ■ny, Mar, w lY 1-500 1 500 352 -5544 426 -5200 1•Mt ham MOM PER INDIANA STATE LAW IS -69 -1991. R IS AGWNST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. PLEASE CALL "HOLEY MOLEY" 1 -800- 382 -5544 TOLL FREE B A KENTUCKY BLUEGRASS* 40 LBS /ACRE; CREEPING RED FESCUE 40 LBS /ACRE: PLUS 2 TONS STRAW MULCH /ACRE. OR ADD ANNUAL RYEGRASS 20 LBS /ACRE. B KENTUCKY BLUEGRASS* 60 LBS/ACRE; CREEPING RED FESCUE 60 LBS /ACRE; PLUS 2 TONS STRAW MULCH/ACRE, OR ADD ANNUAL RYEGRASS 30 LBS /ACRE. C SPRING OATS 3 BUSHEL /ACRE D WHEAT OR RYE 2 BUSHEL /ACRE. E ANNUAL RYEGRASS 40 LBS /ACRE. F SOD (BLEND 3 IMPROVED VARIETIES). G STRAW MULCH 2 TONS /ACRE. /I IRRIGATION NEEDED DURING JUNE, JULY, AND /OR SEPTEMBER. 8 IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD. *KENTUCKY BLUEGRASS BLEND OF 3 IMPROVED VARIETIES. SEASONAL SOIL PROTECTION CHART CAUTION!! THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN ARE BASED UPON ABOVE GROUND EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY OTHER) AND ARE SPECULATIVE IN NATURE. THERE MAY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE EXACT LOCATIONS OF SAID EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO ANY AND ALL CONSTRUCTION v Z W EU w z r o w z d X Ir� C EU w X w N-� 0\ 01111 11 111/// o, 0111111111// <cs S Fu vv/ O G Is kifd> L v �3 :47 4 TE O 11°* 7,, V¼DIA NP 9 o K. SHINNEMAN P E 10200392 P gZit' Qi) QL) 0 't c\1 PROJECT NO. CO C\,Z 0 1-� 0 r24 z 0 U z 0 II U) N 0 SHEET NO. C102 W04 -0012