HomeMy WebLinkAboutC102 Landscape/Erosion Control Plan10
NOTE: STAKE GUY
TREES AS SHOWN IF
SITE CONDITI ❑NS
DICTATE.
3, 10 GUAGE STEEL
GUY WIRES EVENLY
SPACED
ROLL BACK TOP 1/3
BURLAP, AND
REMOVE ALL BINDERS
PLACE ROOT BALL
BALL 1 -2' HIGHER THAN
FINISHED GRADE
EARTH SAUCER
PLANTING BED
PREPARED PLANTING
BED SOIL SHALL BE
2 PARTS PEAT MOSS, 2
PARTS COMPOSTED MANURE
1 PART COURSE CUT SAND
AND 2 PARTS ORIGINAL
TOP S ❑IL
APPROVED
GUY ANCHORS
ROOT BALL
DIAMETER
3 X ROOT BALL DIAMETER
SHADE TREE PLANTING DETAIL
LANDSCAPE PLAN NOTES
O SOD- ALL SOD SHALL BE CERTIFIED GRADE CULTIVATED GRASS SOD: OF
"ADVENTURE BLEND" TURF TYPE TALL FESCUE (BY GENERAL CONTRACTOR)
PLANT LIST
1 0
1-
EDGE OF
ASPHALTT\
5 +__060.0QD "A
10XIO' CONCRETE
PAD
10'X12 DUMPSTER
STORAGE
9
9
TREE PROTECTOR
TREE WRAP
6' LAYER OF SHREDDED
HARDWOOD MULCH
PRE EMERGANCE HERBICIDE
FINISH GRADE
SCARIFY PIT SIDES
AND BOTTOM NO
LESS THAN 2" DEEP
EXISTING SUBS ❑IL
OR COMPACTED
BACKFILL
(NO SCALE)
EXISTING
METAL BUILDING
FFE 844.09
PROPOSED BUILDING
ADDITION
FFE 844.09
t r 5 080.000
8
PLACE ROOT BALL
1' -2' HIGHER THAN
FINISHED GRADE.
EARTH SAUCER
PLANTING
EVERGREEN PLANTING STAKING
X
LANDSCAPE PLAN
8
SCARIFY SIDES
BEFORE PLANTING
CAP PLANTING PIT
WITH 2 -3" ON SITE
OR CLAY TOPSOIL
PRIOR TO MULCHING.
th
�I
DO NOT CUT CENTRAL LEADER.
3° LAYER OF SHREDDED HARDWOOD
MULCH.
PRE-EMERGANCE HERBICIDE
JWIIf<II11 FINISH GRADE
g
TOPSOIL MIXTURE TAMPED FIRM
TO PREVENT SETTLEMENT.
REMOVE BINDING
EARTH SAUCER
PLACE SOIL BALL SLIGHTLY
HIGHER THAN FINISH GRADE.
MOUND SOIL OVER BALL. (FOR
ERICACEOUS PLANTS, PLACE
SOIL BALL 1/3 OUT OF GROUND
AND MOUND PEAT MOSS OVER
BALL AND MULCH HEAVY).
10' REAR YARD
SE TBACK
PP
P� p p er'
5 100.000
TREES OF THE SAME SPECIES TO BE
MATCHED IN GROWTH CHARACTER AND
UNIFORMITY.
TWO GALVANIZED NO. 12 WIRE GUYS:
FASTEN TO WOOD STAKES. PLACE
2 -PLY RUBBER HOSE ON WIRE AT ALL
POINTS OF TREE CONTACT.
MINIMUM 2 x 2 x 6' TREATED WOOD
STAKES 2 PER TREE. DRIVE STAKES AT
AN ANGLE AND DRAW VERTICAL. TOP OF
STAKES TO BE PAINTED WITH
FLUORESCENT PAINT OR EQUIVALENT.
3" LAYER OR SHREDDED
HARDWOOD BARK MULCH
INSTALL FERTILIZER
TABLETS
SOIL BACKFILL TO BE 75%
TOPSOIL 25% PEATMOSS,
TAMPED TO PREVENT
SETTLEMENT
EXISTING SUBSOIL
OR COMPACTED
BACKFILL
NOT TO SCALE
SHRUB SMALL TREE PLANTING DETAIL
GENERAL MULCH NOTE:
MULCH AROUND ALL PROPOSED LANDSCAPE
MATERIAL UNLESS SPECIFIED OTHERWISE
C L;R B (FFY
EXISTING 106TH
STREET R.O.W.
(NO SCALE)
1
6
SCALE: 1" 20'
0 10 20 40
6
PROJECT LOCATION
SOILS MAP
Br Brookstone silty clay loam
CrA Crosby silt loam, 0 -3% eroded
MmB2 Miami silt loam, 2 -6% eroded
Or Orthents
GENERAL LANDSCAPE NOTES
1. IN CASE OF DISCREPANCIES BETWEEN THE PLAN AND
THE PLANT LIST, THE PLAN SHALL DICTATE. IF IN
QUESTION, CONTACT THE LANDSCAPE DESIGNER.
ALL SHRUBS PLANTING AREAS TO BE COVERED WITH
4" THICK LAYER OF SHREDDED HARDWOOD BARK
MULCH, ALL GROUND COVER BEDS SHALL BE COVERED
WITH 1" SHREDDED HARDWOOD BARK MULCH. BARK
MULCH SHALL BE APPROVED BY LANDSCAPE DESIGNER
AND SHALL BE UNIFORM IN TEXTURE AND COLOR AND
SHALL BE OBTAINED FROM SAWMILL OR LUMBERING
OPERATIONS. NO UTILITY MULCH OR PROCESSED
TREE TRIMMINGS WILL BE ALLOWED,
3. AN APPROVED PRE EMERGENT HERBICIDE SHALL BE
APPLIED IN ALL PLANTING AND GROUND COVER BEDS
AT RATES SPECIFIED BY MANUFACTURER FOR EACH
VARIETY OF PLANT.
4, FINAL PLACEMENT OF PLANT MATERIALS, ETC. SHALL
BE APPROVED BY LANDSCAPE DESIGNER BEFORE
PLANTING OPERATIONS ARE TO PROCEED. ALL TREE
LOCATIONS SHALL BE MARKED WITH A WOODED STAKE
INDICATING VARIETY AND SIZE OF TREE. ALL
GROUND COVER AND MULCH BED LINES SHALL BE
MARKED BY A HIGHLY VISIBLE PAINT LINE WITH
OCCASIONAL WOOD STAKES FOR REFERENCE, ALL
STAKES SHALL BE REMOVED F ❑LL ❑WING PLANTINGS
OPERATIONS, LANDSCAPE DESIGNER RESERVES THE
RIGHT TO ADJUST PLANT LOCATI ❑NS ON SITE,
5. NO SUBSTITUTIONS OF PLANT MATERIAL WILL BE
ALLOWED. IF PLANTS ARE SHOWN TO BE
UNAVAILABLE, THE CONTRACTOR SHALL NOTIFY
LANDSCAPE DESIGNER PRI ❑R TO BID DATE IN
WRITING. ALL PLANTS SHALL BE INSPECTED AND
TAGGED WITH PROJECT IDENTIFICATION AT NURSERY
OR CONTRACTORS OPERATION PRIOR TO MOVING TO
JOB SITE. PLANTS MAY ALSO BE INSPECTED AND
APPROVED I7R REJECTED ON THE JOB SITE,
6. ALL PLANTS ARE TO MEET OR EXCEED AMERICAN
STANDARDS FOR NURSERY STOCK, 1986 EDITION, AS
SET FORTH BY AMERICAN ASSOCIATION OF
NURSERYMEN.
PLANTS AND ALL OTHER MATERIALS TO BE STORED ON
SITE WILL BE PLACED WHERE THEY WILL NOT
CONFLICT WITH CONSTRUCTION OPERATIONS AND AS
DIRECTED BY OWNER.
8. ALL NEW LANDSCAPE PLANTINGS SHALL BE
GUARANTEED FOR A PERIOD OF ONE YEAR F ❑LL ❑WING
FINAL INSPECTION BY LANDSCAPE DESIGNER. AT
THE END OF THIS PERIOD, PLANT MATERIAL TERMED
DEAD OR UNSATISFACTORY BY LANDSCAPE DESIGNER
SHALL BE REPLACED AT NO ADDITIONAL CHARGE BY
THE LANDSCAPE CONTRACTOR.
9, THE LANDSCAPE CONTRACTOR SHALL OBTAIN AND PAY
FOR ALL PERMITS AND FEES THAT MAY BE REQUIRED
FOR HIS PCFTION OF WORK.
10. PEAT MOSS 70 BE USED ON PROJECT SHALL BE A
DOMESTIC CR IMPORTED MATERIAL, CHOCOLATE BROWN
IN COLOR 4i'.ID COMPOSED OF PARTIALLY DECOMPOSED
VEGETABLE MATERIAL. PEAT MOSS TO ALSO BE
MILDLY ACIDIC IN CHARACTER AND SHALL MEET
APPROVAL. OF LANDSCAPE DESIGNER.
11. LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE
DESIGNER IN WRITING PRI ❑R TO BID DATE OF ANY
PLANTS TH T HE FEELS MAY NOT SURVIVE IN
L ❑CATIONS NOTED.
12. ALL LANDSCAPING PLANTINGS TO BE MAINTAINED FOR
1 YEAR FOLLOWING TURNOVER. MAINTENANCE TO INCLUDE
WATERING, WEEDING, CULTIVATI ❑N, MULCHING,
MOWING AND ALL OTHER NECESSARY OPERATIONS
REQUIRED FOR PROPER ESTABLISHMENT OF PLANTINGS.
NOTE: AT END OF MAINTENANCE PERIOD, CONTRACTOR
TO REMOVE GUYING AND STAKING FROM TREES.
13. CONTRACTOR TO SUBMIT UNIT PRICES ON EVERY TYPE
OF WORK AS REQUESTED BY LANDSCAPE DESIGNER,
14. BACKFILL FUR TREE AND SHRUB PLANTING SHALL BE
75% APPROVED TOPSOIL AND 25% APPROVED PEAT
MOSS, TOP LAYER OF BACKFILL SHALL BE 100%
EXISTING TOPSOIL. A 5 -10 -5 ANALYSIS SLOW
RELEASE FERTILIZER SHALL BE INCORPORATED INTO
BACKFILL AT APPROVED RATES.
15. PR ❑VIDE MINIMUM 4" PLANTING SOIL IN ALL GROUND
COVER AND FLOWER AREAS WITH MIXTURE COMPRISING
OF ONE PART COMMERCIAL GRADE 'POTTING S ❑IL,' 5 PARTS
TOPSOIL AND 4 PARTS PEAT MOSS. A FULL 4" LAYER OF
APPROVED SHREDDED FIBROUS PEAT MOSS MAY BE
USED IN LIEU OF PLANTING MIX.
16, PLANTS SHALL BEAR A TAG SHOWING GENUS, SPECIES
AND VARIETY.
17. PLANTS SHALL BE CERTIFIED BY THE STATE OF INDIANA
DEPARTMENT OF NATURAL RESOURCES AND FREE FROM
DISEASE OR HAZARDOUS INSECTS.
)714ER)
CATCH BASIN/
DRAINAGE
STRUCTURE
MAINTENANCE:
4
STM STR ,59 BY OTHER)
MANHOLE
1,844,33
WV N =840.45
INN E= 835 -95
!NV W= 835.74
4
-NOTE
THIS PLAN INDICATES EROSION CONTROL MEASURES
REQUIRED AI- I ER SOIL STRIPPING AND PAD BUILDING
HAS TAKEN PLACE. COORDINATE WITH DEVELOPER FOR
MEASURES REQUIRED UNTIL PROPERTY TURNED OVER
FOR DEVELOPMENT. COORDINATE WITH SOIL
CONSERVATION DISTRICT REPRESENTATIVE FOR ANY
OTHER MEASURES REQUIRED DUE TO SITE CONDITIONS.
5 060.000 "A"
10'710 L�x arET
Rrfl
REFER TO SILT FENCE
SECTION FOR EMBEDMENT
DETAIL
1. INSPECT WEEKLY AND AFTER EACH STORM EVENT.
2. IF FABRIC IS TORN OR DETERIORATED, REPLACE SECTION
IMMEDIATELY.
3. REMOVE SEDIMENT WHEN HEIGHT REACHES 1/3 OF THE
HEIGHT OF THE FENCE OR IS CAUSING FABRIC TO
BULGE.
4. TAKE CARE NOT TO UNDERMINE THE ENTRENCHED
FABRIC.
5. AFTER DRAINAGE AREA IS STABILIZED, REMOVE FENCE
AND SEDIMENT, BRINGING DISTURBED AREA TO GRADE
AND STABILIZE IT.
SILT FENCE INLET
PROTECTION DETAIL
1 "X2" HARDWOOD
CROSSBRACING
(NOT TO SCALE)
EXISTING
METAL BUILDING
FFE 844.09
PROPOSED BUILDING
ADDITION
FFE 844.09
E 15' RCP (BY OR
GRAVELBAG CURB PROTECTION
(FOR INLETS THAT ARE IN LOW POINTS)
NOTE:
GRAVEL BAGS ARE HALF FULL WITH LARGE ROCK AND
PACKED CLOSE TOGETHER TO ELIMINATE GAPS.
IF BAG DETERIORATES OR IS DAMAGED, REBAG OLD BAG
WITH CONTENTS INTO A NEW BAG.
2 "X2 "X36" HARDWOOD
STAKES WITH POINTED
END AT 5' O.C.
1/2" X 2" X 24"
WOOD LATH AT EACH
STAKE OVER FABRIC
36" WIDE NONWOVEN
7 POLYPROPYLENE FABRIC
STM 5TR
URB IN
(NO SCALE)
5 080.000 "A"
5T4 5TR II62 IBY OTHER)
3 BY OTHER)
IN{.f =836.
WV N =836.4
INV W =836.0
EROSION CONTROL PLAN
POST 4" DIA. WOOD OR
1.33 LBS /FOOT STEEL
10' MAX. SPACING
WIRE FENCE 14 GAGE
(MIN) -6" MESH SPACING
(MAX) FASTENED BY 1"
WIRE STAPLES, TIE WIRES,
OR HOG RINGS
FILTER FABRIC ALONG
LENGTH (NO JOINTS)
STAPLE OR WIRE TO FENCE
4 "X4" TRENCH TO BE
BACKFILLED AND COMPACTED
MAINTENANCE:
1. INSPECT WEEKLY AND AFTER EACH STORM EVENT.
2. IF FABRIC IS TORN OR DETERIORATED, REPLACE SECTION IMMEDIATELY.
3. REMOVE SEDIMENT WHEN HEIGHT REACHES 1/3 OF THE HEIGHT OF THE
FENCE OR IS CAUSING FABRIC -O BULGE.
4. TAKE CARE NOT TO UNDERMINE THE ENTRENCHED FABRIC.
5. AFTER DRAINAGE AREA IS STABILIZED, REMOVE FENCE AND SEDIMENT,
BRING DISTURBED AREA TO GRADE AND STABILIZE IT.
PERMANENT SEEDING SPECIFICATIONS:
1) ALL DISTURBED LAWN AREAS SHALL RECEIVE PERMANENT SEEDING IMMEDIATELY.
2) ALL DISTURBED LAWN AREA TO HAVE A MINIMUM OF 6 INCHES OF TOPSOIL (COMPACTED THICKNESS).
3) TOPSOIL TO BE FERTILE, FRIABLE, SANDY LOAM
REASONABLY FREE OF SUBSOIL, CLAY LUMPS, STONES LARGER THAN 1 /2 EXCESSIVE QUANTITIES OF SMALL
STONE /GRAVEL, BRUSH AND OTHER LITER.
4) SOLVE ANY SURFACE OR SUBSURFACE DRAINAGE PROBLEMS AND CONSTRUCT PERMANENT EROSION
CONTROL STRUCTURES.
5) PERFORM THE MAJOR FILLING, SHAPING AND SMOOTHING OF GULLIES OR ERODED AREAS.
6) HAVE TOPSOIL TESTED TO CHECK PH AND NUTRIENT LEVELS. PROVIDE FERTILISER AND SOIL AMENDMENTS
AS REQUIRED TO MEET /EXCEED MINIMUM REQUIREMENTS AS SUGGESTED ON SOILS TEST RESULTS FOR LAWNS.
7) WORK FERTILIZER AND SOIL NUTRIENTS INTO TOP 2 -3 INCHES OF THE TOPSOIL WITH A SMALL DISK,
HARROW OR RAKE OPERATED ACROSS THE SLOPE AS MUCH AS POSSIBLE.
8) ROLL THE TOPSOIL WITH A WATER BALLAST ROLLER WEIGHING 100 TO 300 POUNDS DEPENDING ON SOIL
TYPE. ROLL WITH TOPSOIL IN A SEMI -DRY CONDITION IN TWO OPPOSITE DIRECTIONS (RIGHT ANGLES).
9) RAKE OR SCARIFY AND CUT OR FILL IRREGULARITIES THAT DEVELOP AS REQUIRED AND AGAIN ROLL UNTIL
AREA IS TRUE AND UNIFORM, FREE FROM LUMPS, DEPRESSIONS AND IRREGULARITIES.
10) SOW SEED WITH ADEQUATE EQUIPMENT AT A TIME WHEN LITTLE OR NO WIND IS BLOWING. BROADCAST
HALF OF SEED IN ONE DIRECTION AND THE OTHER HALF IN THE OPPOSITE DIRECTION (RIGHT ANGLES).
1 1) COVER SEED TO A DEPTH OF 1 /2" BY RAKING OR HARROWING. PROVIDE A LIGHT LAYER OF STRAW OR HAY
MULCH AT A RATE OF 1 TO 1 1 TONS PER ACRE. APPLY TACKIFIER TO STABILIZE MULCH.
12) HYDROSEEDING IS ACCEPTABLE METHOD OF SEEDING.
13) KEEP TOPSOIL RELATIVELY MOIST UNTIL LAWN IS ESTABLISHED.
14) RESEED AREAS THAT DO NOT SHOW PROMPT GERMINATION AT 14 DAY INTERVALS UNTIL AN ACCEPTABLE
STAND OF GRASS IS ASSURED.
15) ALL LAWNS SHALL BE GUARANTEED TO HAVE A FULL UNIFORM STAND OF ACCEPTABLE GRASS AT END OF
ONE YEAR GUARANTEE PERIOD WITH NO BARE SPOTS COMPRISING MORE THAN 2% OF ANY LAWN AREA. ANY
AREA SO NOTED WILL BE REWORKED UNTIL AN ACCEPTABLE STAND OF GRASS IS ESTABLISHED.
16) ALL LAWNS TO BE MAINTAINED UNTIL FINAL INSPECTION BY LANDSCAPE DESIGNER BUT NOT LESS THAN 60
DAYS FROM TIME OF INSTALLATION. MAINTENANCE TO INCLUDE WATERING, WEEDING, CULTIVATION, MULCHING,
MOWING AND ALL OTHER NECESSARY OPERATIONS REQUIRED FOR PROPER ESTABLISHMENT OF LAWN.
3
DOWN
UPSLOPE SLOPE
r 5 100.000 "A"
�II�II�I I 4I
I�I I1�I C
E 1 g r B
1 11 11k
1111111=
C
SILT FENCE SECTION
(NO SCALE)
V
STM STR {'65 (BY OTHER
5068 MILE I 1
12' RCP (80 OTHER)
EXISTING 101
STREET P.O.
WARNING-
THIS PLAN TO BE USED FOR
EROSION CONTROL PURPOSES ONLY.
NOTE
THERE SHALL BE NO DIRT OR
DEBRIS IN THE STREET
NOTE
ADDITIONAL EROSI ❑N CONTROL
MEASURES MAY BE
REQUIRED IN THE FIELD
BY THE INSPECTOR.
SCALE: 1" 30'
0 15 30 60
EROSION CONTROL LEGEND
TEMPORARY /PERMANENT SEEDING
USE PLANTING CHART
SF SILT FENCE
SILT FENCE BOX /GRAVELBAG PROTECTION
/GRATE FILTER FABRIC
EROSION CONTROL NOTES:
THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND
ALL SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY
OF EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS
TAKING PLACE, THE CONTRACTOR AND /OR OWNER SHALL TAKE
PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE
CONSULTED IN THE EVENT THIS HAPPENS.
TEMPORARY SEEDING IS TO BE APPLIED TO ANY GRADED AREA
THAT WILL REMAIN UNALTERED IN EXCESS OF 20 DAYS.
PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS
THAT HAVE ACHIEVED FINAL AND FINISHED GRADE.
PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND
WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION.
ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED
PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA
THEY ARE INTENDED TO SERVICE.
ALL EROSION CONTROL MEASURES PROPOSED ARE TO BE
PROPERLY MAINTAINED TO CONTINUE THEIR EFFECTIVENESS.
IF GRADING OCCURS DURING THE MONTHS OF DECEMBER,
JANUARY OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL
BE USED.
DURING DRY WEATHER, KEEP LAWNS WATERED WITH
SPRINKLERS OR OTHER APPROVED METHODS. RESEED ANY
AREAS NOT GERMINATING OR DAMAGED AT INTERVALS AS MAY
BE REQUIRED ACCORDING TO SEASONAL CONDITION AND /OR
CONSTRUCTION ACTIVITY. WATER GRASS AND EXECUTE
NECESSARY WEEDING UNTIL FULL STAND OF GRASS HAS BEEN
OBTAINED.
THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION
CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR
AND /OR OWNER.
IT SHALL BE THE CONTRACTOR'S AND /OR OWNER'S
RESPONSIBILITY TO MINIMIZE SEDIMENTATION (FROM ON -SITE
CONSTRUCTION ACTIVITIES) FROM BEING DEPOSITED ONTO
ADJACENT PROPERTIES AND RECEIVING STREAMS /DITCHES IN
STRICT COMPLIANCE WITH "RULE 5" (327 IAC 15 -5,
CONSTRUCTION ACTIVITY STORM WATER RUNOFF CONTROL). IT
SHALL ALSO BE THE CONTRACTOR'S AND /OR OWNER'S
RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED FROM
THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF
INTENT LE I I ER TO THE OFFICE OF WATER MANAGEMENT, INDIANA
DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY
CONSTRUCTION ACTIVITY..
FOR SEASONAL VARIATIONS SEE SEASONAL SOIL PROTECTION
CHART IN THESE PLANS.
SOIL
STABILIZATION
METHOD
PERMANENT A 8 1 8
SEEDING
DORMANT
SEEDING
TEMPORARY
SEEDING
MULCHING
JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC.
B
G
SODDING F /I
"Holey Moley" says,
"DON'T DIG BLIND"
Mil mmr ■ny, Mar, w lY
1-500 1 500
352 -5544 426 -5200
1•Mt ham MOM
PER INDIANA STATE LAW IS -69 -1991. R IS
AGWNST THE LAW TO EXCAVATE WITHOUT
NOTIFYING THE UNDERGROUND LOCATION SERVICE
TWO (2) WORKING DAYS BEFORE COMMENCING WORK.
PLEASE CALL "HOLEY MOLEY"
1 -800- 382 -5544
TOLL FREE
B
A KENTUCKY BLUEGRASS* 40 LBS /ACRE; CREEPING RED FESCUE 40 LBS /ACRE:
PLUS 2 TONS STRAW MULCH /ACRE. OR ADD ANNUAL RYEGRASS 20 LBS /ACRE.
B KENTUCKY BLUEGRASS* 60 LBS/ACRE; CREEPING RED FESCUE 60 LBS /ACRE;
PLUS 2 TONS STRAW MULCH/ACRE, OR ADD ANNUAL RYEGRASS 30 LBS /ACRE.
C SPRING OATS 3 BUSHEL /ACRE
D WHEAT OR RYE 2 BUSHEL /ACRE.
E ANNUAL RYEGRASS 40 LBS /ACRE.
F SOD (BLEND 3 IMPROVED VARIETIES).
G STRAW MULCH 2 TONS /ACRE.
/I IRRIGATION NEEDED DURING JUNE, JULY, AND /OR SEPTEMBER.
8 IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD.
*KENTUCKY BLUEGRASS BLEND OF 3 IMPROVED VARIETIES.
SEASONAL SOIL PROTECTION CHART
CAUTION!!
THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES
SHOWN ON THIS PLAN ARE BASED UPON ABOVE GROUND
EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, INLETS,
VALVES, AND MARKS MADE UPON THE GROUND BY OTHER) AND
ARE SPECULATIVE IN NATURE. THERE MAY ALSO BE OTHER
EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO
ABOVE GROUND EVIDENCE OR FOR WHICH NO ABOVE GROUND
EVIDENCE WAS OBSERVED. THE EXACT LOCATIONS OF SAID
EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY
THE CONTRACTOR PRIOR TO ANY AND ALL CONSTRUCTION
v
Z
W
EU
w
z r
o
w
z
d
X
Ir�
C
EU
w
X
w
N-�
0\ 01111 11 111/// o,
0111111111//
<cs S Fu vv/ O
G Is kifd>
L v
�3 :47
4 TE O
11°* 7,,
V¼DIA
NP 9
o
K. SHINNEMAN P E 10200392 P
gZit'
Qi) QL)
0
't
c\1
PROJECT NO.
CO
C\,Z
0
1-�
0
r24
z
0
U
z
0
II
U)
N 0
SHEET NO.
C102
W04 -0012
QUANT.
ABBR.
BOTANICAL NAME
COMMON NAME
SIZE /REMARKS
TREES
2
AC -R
ACER RUBRUM
RED MAPLE
1 1/2" B B
SHRUBS
1
BE -N
BETULA NIGRA
RIVERBIRCH (MULTI -STEM)
1 1/2" B B
5
CO -F
CORNUS FLORDIA 'CHEROKEE PRINCESS'
WHITE FLOWERING DOGWOOD
1 1/2" B (Sc B
2
PI -G
PICEA GLAUCA CONICA
DWARF ALBERTA SPRUCE
1 1/2" B B
2
AM -G
AMERLANCHIER X GRANDIFLORA 'AUTUMN BRILLIANCE'
AUTUMN BRILLIANCE SERVICEBERRY
6" CLUMP
PERENNIALS
12
BU -K
BUXUS X KOREANA 'GREEN GEM'
GREEN GEM BOXWOOD
1 GAL
3
FO -G
FOTHERGILLA GARDENII
DWARF FOTHERGILLA
1 GAL
16
IL -G
ILEX GLABRA COMPACTA
COMPACT INKBERRY
1 GAL
7
IT -V
ITEA VIRGINICA 'SPRICH'
SPRICH VIRGINIA SWEETSPIRE
1 GAL
3
JU -S
JUNIPERUS SABINA 'BROADMOOR'
BROADMOOR JUNIPER
1 GAL
21
DI -F
DICENTRA FORMOSA 'LUXURIANT'
LUXURIANT BLEEDING HEARTS
1 GAL
GROUNDCOVER
15
HE -B
HEMEROCALLIS 'BAJA'
BAJA RED DAYLILY
1 GAL
2
VI -M
VINCA MINOR 'BOWLES'
PERIWINKLE
50 PER FLAT
10
NOTE: STAKE GUY
TREES AS SHOWN IF
SITE CONDITI ❑NS
DICTATE.
3, 10 GUAGE STEEL
GUY WIRES EVENLY
SPACED
ROLL BACK TOP 1/3
BURLAP, AND
REMOVE ALL BINDERS
PLACE ROOT BALL
BALL 1 -2' HIGHER THAN
FINISHED GRADE
EARTH SAUCER
PLANTING BED
PREPARED PLANTING
BED SOIL SHALL BE
2 PARTS PEAT MOSS, 2
PARTS COMPOSTED MANURE
1 PART COURSE CUT SAND
AND 2 PARTS ORIGINAL
TOP S ❑IL
APPROVED
GUY ANCHORS
ROOT BALL
DIAMETER
3 X ROOT BALL DIAMETER
SHADE TREE PLANTING DETAIL
LANDSCAPE PLAN NOTES
O SOD- ALL SOD SHALL BE CERTIFIED GRADE CULTIVATED GRASS SOD: OF
"ADVENTURE BLEND" TURF TYPE TALL FESCUE (BY GENERAL CONTRACTOR)
PLANT LIST
1 0
1-
EDGE OF
ASPHALTT\
5 +__060.0QD "A
10XIO' CONCRETE
PAD
10'X12 DUMPSTER
STORAGE
9
9
TREE PROTECTOR
TREE WRAP
6' LAYER OF SHREDDED
HARDWOOD MULCH
PRE EMERGANCE HERBICIDE
FINISH GRADE
SCARIFY PIT SIDES
AND BOTTOM NO
LESS THAN 2" DEEP
EXISTING SUBS ❑IL
OR COMPACTED
BACKFILL
(NO SCALE)
EXISTING
METAL BUILDING
FFE 844.09
PROPOSED BUILDING
ADDITION
FFE 844.09
t r 5 080.000
8
PLACE ROOT BALL
1' -2' HIGHER THAN
FINISHED GRADE.
EARTH SAUCER
PLANTING
EVERGREEN PLANTING STAKING
X
LANDSCAPE PLAN
8
SCARIFY SIDES
BEFORE PLANTING
CAP PLANTING PIT
WITH 2 -3" ON SITE
OR CLAY TOPSOIL
PRIOR TO MULCHING.
th
�I
DO NOT CUT CENTRAL LEADER.
3° LAYER OF SHREDDED HARDWOOD
MULCH.
PRE-EMERGANCE HERBICIDE
JWIIf<II11 FINISH GRADE
g
TOPSOIL MIXTURE TAMPED FIRM
TO PREVENT SETTLEMENT.
REMOVE BINDING
EARTH SAUCER
PLACE SOIL BALL SLIGHTLY
HIGHER THAN FINISH GRADE.
MOUND SOIL OVER BALL. (FOR
ERICACEOUS PLANTS, PLACE
SOIL BALL 1/3 OUT OF GROUND
AND MOUND PEAT MOSS OVER
BALL AND MULCH HEAVY).
10' REAR YARD
SE TBACK
PP
P� p p er'
5 100.000
TREES OF THE SAME SPECIES TO BE
MATCHED IN GROWTH CHARACTER AND
UNIFORMITY.
TWO GALVANIZED NO. 12 WIRE GUYS:
FASTEN TO WOOD STAKES. PLACE
2 -PLY RUBBER HOSE ON WIRE AT ALL
POINTS OF TREE CONTACT.
MINIMUM 2 x 2 x 6' TREATED WOOD
STAKES 2 PER TREE. DRIVE STAKES AT
AN ANGLE AND DRAW VERTICAL. TOP OF
STAKES TO BE PAINTED WITH
FLUORESCENT PAINT OR EQUIVALENT.
3" LAYER OR SHREDDED
HARDWOOD BARK MULCH
INSTALL FERTILIZER
TABLETS
SOIL BACKFILL TO BE 75%
TOPSOIL 25% PEATMOSS,
TAMPED TO PREVENT
SETTLEMENT
EXISTING SUBSOIL
OR COMPACTED
BACKFILL
NOT TO SCALE
SHRUB SMALL TREE PLANTING DETAIL
GENERAL MULCH NOTE:
MULCH AROUND ALL PROPOSED LANDSCAPE
MATERIAL UNLESS SPECIFIED OTHERWISE
C L;R B (FFY
EXISTING 106TH
STREET R.O.W.
(NO SCALE)
1
6
SCALE: 1" 20'
0 10 20 40
6
PROJECT LOCATION
SOILS MAP
Br Brookstone silty clay loam
CrA Crosby silt loam, 0 -3% eroded
MmB2 Miami silt loam, 2 -6% eroded
Or Orthents
GENERAL LANDSCAPE NOTES
1. IN CASE OF DISCREPANCIES BETWEEN THE PLAN AND
THE PLANT LIST, THE PLAN SHALL DICTATE. IF IN
QUESTION, CONTACT THE LANDSCAPE DESIGNER.
ALL SHRUBS PLANTING AREAS TO BE COVERED WITH
4" THICK LAYER OF SHREDDED HARDWOOD BARK
MULCH, ALL GROUND COVER BEDS SHALL BE COVERED
WITH 1" SHREDDED HARDWOOD BARK MULCH. BARK
MULCH SHALL BE APPROVED BY LANDSCAPE DESIGNER
AND SHALL BE UNIFORM IN TEXTURE AND COLOR AND
SHALL BE OBTAINED FROM SAWMILL OR LUMBERING
OPERATIONS. NO UTILITY MULCH OR PROCESSED
TREE TRIMMINGS WILL BE ALLOWED,
3. AN APPROVED PRE EMERGENT HERBICIDE SHALL BE
APPLIED IN ALL PLANTING AND GROUND COVER BEDS
AT RATES SPECIFIED BY MANUFACTURER FOR EACH
VARIETY OF PLANT.
4, FINAL PLACEMENT OF PLANT MATERIALS, ETC. SHALL
BE APPROVED BY LANDSCAPE DESIGNER BEFORE
PLANTING OPERATIONS ARE TO PROCEED. ALL TREE
LOCATIONS SHALL BE MARKED WITH A WOODED STAKE
INDICATING VARIETY AND SIZE OF TREE. ALL
GROUND COVER AND MULCH BED LINES SHALL BE
MARKED BY A HIGHLY VISIBLE PAINT LINE WITH
OCCASIONAL WOOD STAKES FOR REFERENCE, ALL
STAKES SHALL BE REMOVED F ❑LL ❑WING PLANTINGS
OPERATIONS, LANDSCAPE DESIGNER RESERVES THE
RIGHT TO ADJUST PLANT LOCATI ❑NS ON SITE,
5. NO SUBSTITUTIONS OF PLANT MATERIAL WILL BE
ALLOWED. IF PLANTS ARE SHOWN TO BE
UNAVAILABLE, THE CONTRACTOR SHALL NOTIFY
LANDSCAPE DESIGNER PRI ❑R TO BID DATE IN
WRITING. ALL PLANTS SHALL BE INSPECTED AND
TAGGED WITH PROJECT IDENTIFICATION AT NURSERY
OR CONTRACTORS OPERATION PRIOR TO MOVING TO
JOB SITE. PLANTS MAY ALSO BE INSPECTED AND
APPROVED I7R REJECTED ON THE JOB SITE,
6. ALL PLANTS ARE TO MEET OR EXCEED AMERICAN
STANDARDS FOR NURSERY STOCK, 1986 EDITION, AS
SET FORTH BY AMERICAN ASSOCIATION OF
NURSERYMEN.
PLANTS AND ALL OTHER MATERIALS TO BE STORED ON
SITE WILL BE PLACED WHERE THEY WILL NOT
CONFLICT WITH CONSTRUCTION OPERATIONS AND AS
DIRECTED BY OWNER.
8. ALL NEW LANDSCAPE PLANTINGS SHALL BE
GUARANTEED FOR A PERIOD OF ONE YEAR F ❑LL ❑WING
FINAL INSPECTION BY LANDSCAPE DESIGNER. AT
THE END OF THIS PERIOD, PLANT MATERIAL TERMED
DEAD OR UNSATISFACTORY BY LANDSCAPE DESIGNER
SHALL BE REPLACED AT NO ADDITIONAL CHARGE BY
THE LANDSCAPE CONTRACTOR.
9, THE LANDSCAPE CONTRACTOR SHALL OBTAIN AND PAY
FOR ALL PERMITS AND FEES THAT MAY BE REQUIRED
FOR HIS PCFTION OF WORK.
10. PEAT MOSS 70 BE USED ON PROJECT SHALL BE A
DOMESTIC CR IMPORTED MATERIAL, CHOCOLATE BROWN
IN COLOR 4i'.ID COMPOSED OF PARTIALLY DECOMPOSED
VEGETABLE MATERIAL. PEAT MOSS TO ALSO BE
MILDLY ACIDIC IN CHARACTER AND SHALL MEET
APPROVAL. OF LANDSCAPE DESIGNER.
11. LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE
DESIGNER IN WRITING PRI ❑R TO BID DATE OF ANY
PLANTS TH T HE FEELS MAY NOT SURVIVE IN
L ❑CATIONS NOTED.
12. ALL LANDSCAPING PLANTINGS TO BE MAINTAINED FOR
1 YEAR FOLLOWING TURNOVER. MAINTENANCE TO INCLUDE
WATERING, WEEDING, CULTIVATI ❑N, MULCHING,
MOWING AND ALL OTHER NECESSARY OPERATIONS
REQUIRED FOR PROPER ESTABLISHMENT OF PLANTINGS.
NOTE: AT END OF MAINTENANCE PERIOD, CONTRACTOR
TO REMOVE GUYING AND STAKING FROM TREES.
13. CONTRACTOR TO SUBMIT UNIT PRICES ON EVERY TYPE
OF WORK AS REQUESTED BY LANDSCAPE DESIGNER,
14. BACKFILL FUR TREE AND SHRUB PLANTING SHALL BE
75% APPROVED TOPSOIL AND 25% APPROVED PEAT
MOSS, TOP LAYER OF BACKFILL SHALL BE 100%
EXISTING TOPSOIL. A 5 -10 -5 ANALYSIS SLOW
RELEASE FERTILIZER SHALL BE INCORPORATED INTO
BACKFILL AT APPROVED RATES.
15. PR ❑VIDE MINIMUM 4" PLANTING SOIL IN ALL GROUND
COVER AND FLOWER AREAS WITH MIXTURE COMPRISING
OF ONE PART COMMERCIAL GRADE 'POTTING S ❑IL,' 5 PARTS
TOPSOIL AND 4 PARTS PEAT MOSS. A FULL 4" LAYER OF
APPROVED SHREDDED FIBROUS PEAT MOSS MAY BE
USED IN LIEU OF PLANTING MIX.
16, PLANTS SHALL BEAR A TAG SHOWING GENUS, SPECIES
AND VARIETY.
17. PLANTS SHALL BE CERTIFIED BY THE STATE OF INDIANA
DEPARTMENT OF NATURAL RESOURCES AND FREE FROM
DISEASE OR HAZARDOUS INSECTS.
)714ER)
CATCH BASIN/
DRAINAGE
STRUCTURE
MAINTENANCE:
4
STM STR ,59 BY OTHER)
MANHOLE
1,844,33
WV N =840.45
INN E= 835 -95
!NV W= 835.74
4
-NOTE
THIS PLAN INDICATES EROSION CONTROL MEASURES
REQUIRED AI- I ER SOIL STRIPPING AND PAD BUILDING
HAS TAKEN PLACE. COORDINATE WITH DEVELOPER FOR
MEASURES REQUIRED UNTIL PROPERTY TURNED OVER
FOR DEVELOPMENT. COORDINATE WITH SOIL
CONSERVATION DISTRICT REPRESENTATIVE FOR ANY
OTHER MEASURES REQUIRED DUE TO SITE CONDITIONS.
5 060.000 "A"
10'710 L�x arET
Rrfl
REFER TO SILT FENCE
SECTION FOR EMBEDMENT
DETAIL
1. INSPECT WEEKLY AND AFTER EACH STORM EVENT.
2. IF FABRIC IS TORN OR DETERIORATED, REPLACE SECTION
IMMEDIATELY.
3. REMOVE SEDIMENT WHEN HEIGHT REACHES 1/3 OF THE
HEIGHT OF THE FENCE OR IS CAUSING FABRIC TO
BULGE.
4. TAKE CARE NOT TO UNDERMINE THE ENTRENCHED
FABRIC.
5. AFTER DRAINAGE AREA IS STABILIZED, REMOVE FENCE
AND SEDIMENT, BRINGING DISTURBED AREA TO GRADE
AND STABILIZE IT.
SILT FENCE INLET
PROTECTION DETAIL
1 "X2" HARDWOOD
CROSSBRACING
(NOT TO SCALE)
EXISTING
METAL BUILDING
FFE 844.09
PROPOSED BUILDING
ADDITION
FFE 844.09
E 15' RCP (BY OR
GRAVELBAG CURB PROTECTION
(FOR INLETS THAT ARE IN LOW POINTS)
NOTE:
GRAVEL BAGS ARE HALF FULL WITH LARGE ROCK AND
PACKED CLOSE TOGETHER TO ELIMINATE GAPS.
IF BAG DETERIORATES OR IS DAMAGED, REBAG OLD BAG
WITH CONTENTS INTO A NEW BAG.
2 "X2 "X36" HARDWOOD
STAKES WITH POINTED
END AT 5' O.C.
1/2" X 2" X 24"
WOOD LATH AT EACH
STAKE OVER FABRIC
36" WIDE NONWOVEN
7 POLYPROPYLENE FABRIC
STM 5TR
URB IN
(NO SCALE)
5 080.000 "A"
5T4 5TR II62 IBY OTHER)
3 BY OTHER)
IN{.f =836.
WV N =836.4
INV W =836.0
EROSION CONTROL PLAN
POST 4" DIA. WOOD OR
1.33 LBS /FOOT STEEL
10' MAX. SPACING
WIRE FENCE 14 GAGE
(MIN) -6" MESH SPACING
(MAX) FASTENED BY 1"
WIRE STAPLES, TIE WIRES,
OR HOG RINGS
FILTER FABRIC ALONG
LENGTH (NO JOINTS)
STAPLE OR WIRE TO FENCE
4 "X4" TRENCH TO BE
BACKFILLED AND COMPACTED
MAINTENANCE:
1. INSPECT WEEKLY AND AFTER EACH STORM EVENT.
2. IF FABRIC IS TORN OR DETERIORATED, REPLACE SECTION IMMEDIATELY.
3. REMOVE SEDIMENT WHEN HEIGHT REACHES 1/3 OF THE HEIGHT OF THE
FENCE OR IS CAUSING FABRIC -O BULGE.
4. TAKE CARE NOT TO UNDERMINE THE ENTRENCHED FABRIC.
5. AFTER DRAINAGE AREA IS STABILIZED, REMOVE FENCE AND SEDIMENT,
BRING DISTURBED AREA TO GRADE AND STABILIZE IT.
PERMANENT SEEDING SPECIFICATIONS:
1) ALL DISTURBED LAWN AREAS SHALL RECEIVE PERMANENT SEEDING IMMEDIATELY.
2) ALL DISTURBED LAWN AREA TO HAVE A MINIMUM OF 6 INCHES OF TOPSOIL (COMPACTED THICKNESS).
3) TOPSOIL TO BE FERTILE, FRIABLE, SANDY LOAM
REASONABLY FREE OF SUBSOIL, CLAY LUMPS, STONES LARGER THAN 1 /2 EXCESSIVE QUANTITIES OF SMALL
STONE /GRAVEL, BRUSH AND OTHER LITER.
4) SOLVE ANY SURFACE OR SUBSURFACE DRAINAGE PROBLEMS AND CONSTRUCT PERMANENT EROSION
CONTROL STRUCTURES.
5) PERFORM THE MAJOR FILLING, SHAPING AND SMOOTHING OF GULLIES OR ERODED AREAS.
6) HAVE TOPSOIL TESTED TO CHECK PH AND NUTRIENT LEVELS. PROVIDE FERTILISER AND SOIL AMENDMENTS
AS REQUIRED TO MEET /EXCEED MINIMUM REQUIREMENTS AS SUGGESTED ON SOILS TEST RESULTS FOR LAWNS.
7) WORK FERTILIZER AND SOIL NUTRIENTS INTO TOP 2 -3 INCHES OF THE TOPSOIL WITH A SMALL DISK,
HARROW OR RAKE OPERATED ACROSS THE SLOPE AS MUCH AS POSSIBLE.
8) ROLL THE TOPSOIL WITH A WATER BALLAST ROLLER WEIGHING 100 TO 300 POUNDS DEPENDING ON SOIL
TYPE. ROLL WITH TOPSOIL IN A SEMI -DRY CONDITION IN TWO OPPOSITE DIRECTIONS (RIGHT ANGLES).
9) RAKE OR SCARIFY AND CUT OR FILL IRREGULARITIES THAT DEVELOP AS REQUIRED AND AGAIN ROLL UNTIL
AREA IS TRUE AND UNIFORM, FREE FROM LUMPS, DEPRESSIONS AND IRREGULARITIES.
10) SOW SEED WITH ADEQUATE EQUIPMENT AT A TIME WHEN LITTLE OR NO WIND IS BLOWING. BROADCAST
HALF OF SEED IN ONE DIRECTION AND THE OTHER HALF IN THE OPPOSITE DIRECTION (RIGHT ANGLES).
1 1) COVER SEED TO A DEPTH OF 1 /2" BY RAKING OR HARROWING. PROVIDE A LIGHT LAYER OF STRAW OR HAY
MULCH AT A RATE OF 1 TO 1 1 TONS PER ACRE. APPLY TACKIFIER TO STABILIZE MULCH.
12) HYDROSEEDING IS ACCEPTABLE METHOD OF SEEDING.
13) KEEP TOPSOIL RELATIVELY MOIST UNTIL LAWN IS ESTABLISHED.
14) RESEED AREAS THAT DO NOT SHOW PROMPT GERMINATION AT 14 DAY INTERVALS UNTIL AN ACCEPTABLE
STAND OF GRASS IS ASSURED.
15) ALL LAWNS SHALL BE GUARANTEED TO HAVE A FULL UNIFORM STAND OF ACCEPTABLE GRASS AT END OF
ONE YEAR GUARANTEE PERIOD WITH NO BARE SPOTS COMPRISING MORE THAN 2% OF ANY LAWN AREA. ANY
AREA SO NOTED WILL BE REWORKED UNTIL AN ACCEPTABLE STAND OF GRASS IS ESTABLISHED.
16) ALL LAWNS TO BE MAINTAINED UNTIL FINAL INSPECTION BY LANDSCAPE DESIGNER BUT NOT LESS THAN 60
DAYS FROM TIME OF INSTALLATION. MAINTENANCE TO INCLUDE WATERING, WEEDING, CULTIVATION, MULCHING,
MOWING AND ALL OTHER NECESSARY OPERATIONS REQUIRED FOR PROPER ESTABLISHMENT OF LAWN.
3
DOWN
UPSLOPE SLOPE
r 5 100.000 "A"
�II�II�I I 4I
I�I I1�I C
E 1 g r B
1 11 11k
1111111=
C
SILT FENCE SECTION
(NO SCALE)
V
STM STR {'65 (BY OTHER
5068 MILE I 1
12' RCP (80 OTHER)
EXISTING 101
STREET P.O.
WARNING-
THIS PLAN TO BE USED FOR
EROSION CONTROL PURPOSES ONLY.
NOTE
THERE SHALL BE NO DIRT OR
DEBRIS IN THE STREET
NOTE
ADDITIONAL EROSI ❑N CONTROL
MEASURES MAY BE
REQUIRED IN THE FIELD
BY THE INSPECTOR.
SCALE: 1" 30'
0 15 30 60
EROSION CONTROL LEGEND
TEMPORARY /PERMANENT SEEDING
USE PLANTING CHART
SF SILT FENCE
SILT FENCE BOX /GRAVELBAG PROTECTION
/GRATE FILTER FABRIC
EROSION CONTROL NOTES:
THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND
ALL SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY
OF EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS
TAKING PLACE, THE CONTRACTOR AND /OR OWNER SHALL TAKE
PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE
CONSULTED IN THE EVENT THIS HAPPENS.
TEMPORARY SEEDING IS TO BE APPLIED TO ANY GRADED AREA
THAT WILL REMAIN UNALTERED IN EXCESS OF 20 DAYS.
PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS
THAT HAVE ACHIEVED FINAL AND FINISHED GRADE.
PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND
WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION.
ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED
PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA
THEY ARE INTENDED TO SERVICE.
ALL EROSION CONTROL MEASURES PROPOSED ARE TO BE
PROPERLY MAINTAINED TO CONTINUE THEIR EFFECTIVENESS.
IF GRADING OCCURS DURING THE MONTHS OF DECEMBER,
JANUARY OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL
BE USED.
DURING DRY WEATHER, KEEP LAWNS WATERED WITH
SPRINKLERS OR OTHER APPROVED METHODS. RESEED ANY
AREAS NOT GERMINATING OR DAMAGED AT INTERVALS AS MAY
BE REQUIRED ACCORDING TO SEASONAL CONDITION AND /OR
CONSTRUCTION ACTIVITY. WATER GRASS AND EXECUTE
NECESSARY WEEDING UNTIL FULL STAND OF GRASS HAS BEEN
OBTAINED.
THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION
CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR
AND /OR OWNER.
IT SHALL BE THE CONTRACTOR'S AND /OR OWNER'S
RESPONSIBILITY TO MINIMIZE SEDIMENTATION (FROM ON -SITE
CONSTRUCTION ACTIVITIES) FROM BEING DEPOSITED ONTO
ADJACENT PROPERTIES AND RECEIVING STREAMS /DITCHES IN
STRICT COMPLIANCE WITH "RULE 5" (327 IAC 15 -5,
CONSTRUCTION ACTIVITY STORM WATER RUNOFF CONTROL). IT
SHALL ALSO BE THE CONTRACTOR'S AND /OR OWNER'S
RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED FROM
THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF
INTENT LE I I ER TO THE OFFICE OF WATER MANAGEMENT, INDIANA
DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY
CONSTRUCTION ACTIVITY..
FOR SEASONAL VARIATIONS SEE SEASONAL SOIL PROTECTION
CHART IN THESE PLANS.
SOIL
STABILIZATION
METHOD
PERMANENT A 8 1 8
SEEDING
DORMANT
SEEDING
TEMPORARY
SEEDING
MULCHING
JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC.
B
G
SODDING F /I
"Holey Moley" says,
"DON'T DIG BLIND"
Mil mmr ■ny, Mar, w lY
1-500 1 500
352 -5544 426 -5200
1•Mt ham MOM
PER INDIANA STATE LAW IS -69 -1991. R IS
AGWNST THE LAW TO EXCAVATE WITHOUT
NOTIFYING THE UNDERGROUND LOCATION SERVICE
TWO (2) WORKING DAYS BEFORE COMMENCING WORK.
PLEASE CALL "HOLEY MOLEY"
1 -800- 382 -5544
TOLL FREE
B
A KENTUCKY BLUEGRASS* 40 LBS /ACRE; CREEPING RED FESCUE 40 LBS /ACRE:
PLUS 2 TONS STRAW MULCH /ACRE. OR ADD ANNUAL RYEGRASS 20 LBS /ACRE.
B KENTUCKY BLUEGRASS* 60 LBS/ACRE; CREEPING RED FESCUE 60 LBS /ACRE;
PLUS 2 TONS STRAW MULCH/ACRE, OR ADD ANNUAL RYEGRASS 30 LBS /ACRE.
C SPRING OATS 3 BUSHEL /ACRE
D WHEAT OR RYE 2 BUSHEL /ACRE.
E ANNUAL RYEGRASS 40 LBS /ACRE.
F SOD (BLEND 3 IMPROVED VARIETIES).
G STRAW MULCH 2 TONS /ACRE.
/I IRRIGATION NEEDED DURING JUNE, JULY, AND /OR SEPTEMBER.
8 IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD.
*KENTUCKY BLUEGRASS BLEND OF 3 IMPROVED VARIETIES.
SEASONAL SOIL PROTECTION CHART
CAUTION!!
THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES
SHOWN ON THIS PLAN ARE BASED UPON ABOVE GROUND
EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, INLETS,
VALVES, AND MARKS MADE UPON THE GROUND BY OTHER) AND
ARE SPECULATIVE IN NATURE. THERE MAY ALSO BE OTHER
EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO
ABOVE GROUND EVIDENCE OR FOR WHICH NO ABOVE GROUND
EVIDENCE WAS OBSERVED. THE EXACT LOCATIONS OF SAID
EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY
THE CONTRACTOR PRIOR TO ANY AND ALL CONSTRUCTION
v
Z
W
EU
w
z r
o
w
z
d
X
Ir�
C
EU
w
X
w
N-�
0\ 01111 11 111/// o,
0111111111//
<cs S Fu vv/ O
G Is kifd>
L v
�3 :47
4 TE O
11°* 7,,
V¼DIA
NP 9
o
K. SHINNEMAN P E 10200392 P
gZit'
Qi) QL)
0
't
c\1
PROJECT NO.
CO
C\,Z
0
1-�
0
r24
z
0
U
z
0
II
U)
N 0
SHEET NO.
C102
W04 -0012