Loading...
HomeMy WebLinkAboutFloor Plan and ElevationsO ATt 4-13-04 DRA b MC PRO,f C T NO 04025 GPIE GM: Li b r KAS DRAMNG SCAUT 1/8 1 0 Pt 0 T SOLE 1 1 FILL Nutt 04023A1.1 PROPOSED FLOOR PLAN AND ELEVATIONS NEW 3'x7' DOOR NEW CONSTRUCTION NEW ROOF STRUCTURE NEW ALUMINUM GUTTER NEW FIBERGLASS SHINGLES NEW FIBERGLASS SHINGLES O.H. DOOR METAL VERTICAL BUILDING SIDINp NEW FIBERGLASS SHINGLES THRU WALL AIR CONDITIONER O.H. DOOR EAST ELEVATION 1/8" 1'-0" 12 11111111111111 1111111111111111 11111 11 11111111k ir 111111111 v NEW CASEMENT COMBINATION WINDOWS WITH COMBINATION TRANSOM ABOVE n NORTH ELEVATION 1/8" V-0" GAS METER EXIST. 3'x7' DOOR 1/8" 1' EXISTING CONSTRUCTION EXISTING ROOF STRUCTURE ...41.11MOMMI.A.11111.111,......111•11= O.H. DOOR EXISTING DROP BOX EXISTING ENTRY DOOR EXISTING CONSTRUCTION EXISTING ROOF STRUCTURE 12 O.H. DOOR WEST ELEVATION O.H. DOOR NEW CONSTRUCTION NEW ROOF STRUCTURE NEW FIBERGLASS SHINGLES NEW FIBERGLASS SHINGLES O.H. DOOR 10 METAL VERTICAL BUILDING SIDING O.H. DOOR 10- cr NEW ALUMINUM GUTTER NEW FIBERGLASS SHINGLES NEW ALUMINUM GUTTERS AND DOWNSPOUTS (DOWNSPOUTS NOT INDICATED FOR CLARITY) NEW 4. CONC. FILLED STEEL BOLLARD POSTS NEW e CONC. FILLED STEEL BOLLARD POSTS NEW ALUMINUM GUTTERS AND DOWNSPOUTS (DOWNSPOUTS NOT INDICATED FOR CLARITY) METAL VERTICAL BUILDING SIDING a NEW ALUMINUM GUTTER b b 0 0 A1.1 DOSING OFFICEMAITING AREA z 0 LJ EXIST. OIL/GREASE INTERCEPTOR EXIST. COLUMN AND FOOTING TO REMAIN EXIST. CONCRETE FLOOR NEW CONCRETE FLOOR ON. I I •••11. 1/8" 1/8" CONC. SAW CUT LINE 51 SOUTH ELEVATION ■•••••011.....• vow L OM. EXIST. COLUMN AND FOOTING TO REMAIN 0 ■In•••1•PSM•••••■• .11•110 EXIST. COLUMN AND FOOTING TO REMAIN I 1 LJL I I I I z U U z z Lii L., Li .10 ••••••••••••■=11 OM Ix 0 6 3 Li 3: PROPOSED FLOOR PLAN ORTH 0 0 METAL VERTICAL BUILDING SIDING NEW ALUMINUM GUTTER CERTFIEDBY z 0 L.J cm 0 C5 Nt 4.) (i) co v) 0 0 1 co r-- CN4 N. N. %m.o. 0 ID 4) �J N. cD IX) r-- CNA N. SHEET SHEET NO. All