HomeMy WebLinkAbout09060016 Construction Plans for Carmel Public Library Parking & Signage Improvemnts pg. 07ADD INLET PROTECTION NEXT INLET STEP 1: STEP 3: FLOW EXCAVATE A 4" X 8" DEEP TRENCH SE C1ION 8" COMPACTED FILL NON -WOVEN HEAVY DUTY GEOTEXTILE FABRIC ON DOWN SLOPE AND BOTTOM OF TRENCH STEP 2: 2" X 2" HARDWOOD POST 18" 2" HARDWOOD POST NON -WOVEN HEAVY DUTY GEOTEXTILE FABRIC Inetalatlon: 1. Loy out the location of the fence so that it is parallel to the contour of the slope and of least 10 feet beyond the toe of the slope to provide a sediment storage area. Turn the ends of the fence up slope such that the point of contact between the ground and the bottom of the fence end terminates at a higher elevation than the top of the fence of its lowest point. 2. Excavate an eight -inch deep by four -inch wide trench along the entire length of the fence line. Installation by plowing is also acceptable. 3. Install the silt fence with the filter fabric located on the up -slope side of the excavated trench and the support posts on the down -slope side of the trench. 4. Drive the support posts at least 18 inches into the ground, tightly stretching the fabric between the posts as each is driven into the soil. A minimum of 12 inches of the filter fabric should extend into the trench. 5. Loy the lower four inches of filter fabric on the bottom of the trench and extend it toward the up -slope side of the trench. 6. Backfill the trench with soil material and compact it in place. Note: If the silt fence is being constructed on -site, attach the filter fabric posts and attach wooden lathe to secure the fabric to the posts. Allow inches of fabric below ground level. Complete the silt fence installation, 1 through 6 above. Maintenance: Inspect within 24 hours of o rain event and of least once every seven calendar days. If fence fabric tears, starts to decompose, or in any way becomes ineffective, replace the affected portion immediately. Not Al repairs should meet specifications as outlined within this measure. Remove deposited sediment when it is causing the filter fabric to bulge or when it reaches one -half the height of the fence at its lowest point. When contributing drainage area has been stabilized, remove the fence and sediment deposits, grade the site to blend with the surrounding area, and stabilize. SILT FENCE BARRIER INSTALLATION to the support for at least 12 following steps STORM SEWER GRATE REINFORCED CORNERS MANAGEABLE 2 FOOT CONTAINMENT AREA EC -14 DANDY SACK OR ENGINEERED EQUAL NO SCALE LIFT STRAPS OPTIONAL OVERFLOW PORTS DUMPING STRAPS STORM INLET SYMBOL/ HATCH /LIN ETYPE SF 0 EROSION CONTROL NOTES INSTALLATION AND MAINTENANCE GUIDELINES INSERT (BAG) INLET PROTECTION LEGEND PROPOSED EROSION CONTROL DETAIL DESCRIPTION NO. EC -14 INSERT (BAG) INLET PROTECTION PERMANENT SEEDING WITH MULCH OR HYDROSEED EC 10 SILT FENCE BARRIER INSTALLATION CONSTRUCTION LIMITS CARPEL EARTHWORK NOTE NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 1. SEE THIS SHEET FOR EROSION CONTROL DETAILS. 2. SILT FENCE BARRIER TO BE INSTALLED PRIOR TO CONSTRUCTION. 3. EROSION CONTROL MEASURES TO BE MAINTAINED THROUGHOUT THE ENTIRE CONSTRUCTION PROCESS. 4. STORM WATER DISCHARGE WILL NOT ENTER THE GROUNDWATER FOR THIS PROJECT. 5. EROSION CONTROL MAINTENANCE SITE TO BE INSPECTED AT LEAST ONCE A WEEK AND MAKE REPAIRS IMMEDIATELY AFTER PERIODS OF RAINFALL. 6. THE 100 YEAR FLOODPLAIN, FLOODWAY FRINGE AND FLOODWAYS ARE AS (SHOWN /NOT PRESENT). 7. BROOKSTON SOIL IS PRESENT AND IS A HYDRIC SOIL. 8. ANY DISCREPANCIES OR CONFLICTS WHICH BECOME APPARENT BEFORE OR DURING CONSTRUCTION SHALL BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER PRIOR TO CONSTRUCTION SO THAT CLARIFICATION OR REDESIGN MAY OCCUR. NOTE: THE DANDY CURB SACK WILL BE MANUFACTURED IN THE U.S.A. FROM A WOVEN MONOFILAMENT FABRIC. Installation 1. Remove the grate from the catch basin. 2. If using option oil absorbents, place absorbent pillow in unit. 3. Stand the grate on end, move the top lifting strops out of the way and place the grate into the dandy sack so that the grate is below the top strops and above the lower straps. 4. Holding the lidting devices, inster the grate into the inlet. Maintenance Inspect doily. Remove all accumulated sediment after each storm event. Dispose of sediment in an area where it will not reenter the paved area or storm drains. To empty unit, lift the unit out of the inlet by using the lifting straps and remove the grate. If using optional oil absorbents, replace absorbent when near saturation. Contact: 708 867 -8446 When contributing drainage area had been stabilized, remove inlet protection. U C Q) Q 0. A 0 z z Q z w 1 0 W 0 z_ w 0 z LU Q 3 J w 8 N 0 LiJ N O LIJ LiJ z J W d' tJ7 U CERTIFIED BY t k ehi., ,,.,``,fie 1'a Inl/llp, y,,G�sTF Q� <<\6 B CD I PE 10809217 STATE OF o` ,S ZONAL 00 II 0/25/09 Date COVERING EROSION CONTROL PLAN DESIGN "HOLEY MOLEY SAYS CALL AT LEAST TWO FULL WORKING DAYS BEFORE YOU DIG ITS THE LAN( 1- 800 382 -5544 CALL TOLL FREE 1- 800 428 -5200 FOR CALLS OUTSIDE OF INDIANA Drawn By: GCW Checked By: STA Quality Assurance: PJG Scale: 0 Scale: t' 40 Sheet C401